Charles Taylor Adjusting Limited 88 Leadenhall Street London EC3A 3BA
Construction of Mobile Offshore Drilling Units… …and some claims arising.
Mike McMahon CEng
LMA
24 July 2014
![Page 2: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/2.jpg)
Content
• What’s a modern MODU? • MODU construction locations • Significance of South Korea • How a yard big works / stages of construction • Transfer of risk • Recent claims • Issues arising • Other considerations
1
![Page 3: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/3.jpg)
Semi-Sub Drilling Unit - Overview
• 44 MW DP3 • 150 crew • 3,000m water depth • 9,000m drilling • Harsh environments • Development Drilling
2
![Page 4: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/4.jpg)
Drill Ship Overview
• 42MW DP3 • 200 crew • 3,000m water depth • 12,000m drilling • Storage space • Exploration
3
![Page 5: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/5.jpg)
MODUs currently under construction by country
4
Location Semisub Drillship Total South Korea 9 36 45 Brazil 6 23 29 China 10 4 14 Singapore 1 3 4 Azerbaijan 1 0 1 Total 27 66 93
Source www.rigzone.com
![Page 6: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/6.jpg)
DSME in 2013
5
![Page 7: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/7.jpg)
DSME – Sales Trends
6
![Page 8: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/8.jpg)
DSME – Sales Trends
7
![Page 9: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/9.jpg)
DSME – Sales Trends Units Numbers Built Average Unit Price (US$/m)
Commercial Ships 995 Gas Carrier 105 93 LNG Carrier 83 109 LPG Carrier 22 33 Oil Tanker 333 105
ULCC/VLCC 147 161 Suezmax TK 70 82 Aframax TK 37 58
Others 79 44 Full Containership 234 76
Above 10,000 TEU 54 137 5,000 TEU ~ 10,000 TEU 67 86
Below 5,000 TEU 113 41 Other Commercial Vessels Ro/Ro, Car Carrier 64 58 Bulk Carrier 193 62 Naval & Special Ship 56 1 Ferry 10 19
Wind Turbine Installation Vessel 2
OSV 2
Offshore Projects & Plant 72
Fixed Platform 25 FPSO 4
TLP 3 FPU 3
Semi-Submersible Rig 20 Drillship 13
Jack Up Rig 2 Drilling Barge 1 Modular Plant 1 8
![Page 11: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/11.jpg)
Construction
10
![Page 12: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/12.jpg)
Recent S. Korea Shipyard Experiences
Claim Year Description Construction Stage
Shipyard specific?
Insured Value (US$)
Deductible (US$)
Approx. Cost (US$)
Semi-Sub
2013 Flooding Pre-commissioning Yes 700m 250,000 100m
Drillship
2013 Engine over-speed Sea-trials Yes 566m 500,000 8m
Drillship
2013 Engine Pre-commissioning Yes 566m 250,000 5m
Drillship
2013 Engine Pre-commissioning Yes 566m 250,000 0.3m
Semi-sub 2012 Collapsed mud tank Commissioning Yes 709m 250,000 0.5m
Semi-sub 2011 Dropped Module Assembly Yes 561m 250,000 10m
11
![Page 13: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/13.jpg)
Transfer of risk – WELCAR Schedule 2
Stage Value US$ OFE Preliminary Cost 15,000,000 BFE (1) Derrick 27,480,000 BFE (2) Builder Furnished Equipment (2) 360,000,000 Hull Hull Construction 144,700,000 Topside Topside Construction 120,520,000
Integration Integration of Hull and Topside 667,700,000 Sea Trials Sea Trails 667,700,000 DEM Design, Engineering and Management 106,831,000 Total 774,531,000
12
![Page 14: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/14.jpg)
Builder Furnished Equipment
• Main diesel generator sets (eg, 8 x 5mw) • Propulsion system, (DP3) • Mud handling (Dual system) • Drilling systems • Ballast water management • Power distribution System • Lifting gear • Mooring system • Etc.
13
![Page 15: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/15.jpg)
Recent S. Korea Shipyard Experiences
Claim Year Description Construction Stage
Shipyard specific?
Insured Value (US$)
Deductible (US$)
Approx. Cost (US$)
Semi-Sub
2013 Flooding Pre-commissioning Yes 700m 250,000 100m
Drillship
2013 Engine over-speed Sea-trials Yes 566m 500,000 8m
Drillship
2013 Engine Pre-commissioning Yes 566m 250,000 5m
Drillship
2013 Engine Pre-commissioning Yes 566m 250,000 0.3m
Semi-sub 2012 Collapsed mud tank Commissioning Yes 709m 250,000 0.5m
Semi-sub 2011 Dropped Module Assembly Yes 561m 250,000 10m
14
![Page 16: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/16.jpg)
Dropped Module
15
![Page 17: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/17.jpg)
Dropped Module
16
![Page 18: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/18.jpg)
Engine Damage
17
![Page 19: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/19.jpg)
Engine Damage
18
![Page 20: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/20.jpg)
Mud Tank Collapse
19
![Page 21: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/21.jpg)
Overspeed of Generator Sets
20
![Page 22: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/22.jpg)
Overspeed of Generator Sets (x2)
21
![Page 23: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/23.jpg)
Flooding
22
![Page 24: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/24.jpg)
Flooding
23
![Page 25: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/25.jpg)
Common Themes/ Considerations
• Failure of working systems • Risks are constantly changing • Human error (1,000 personnel) • Production is extremely quick
(20 months) • Sea Trials in congested waters
24
![Page 26: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/26.jpg)
Common Adjusting Issues Arising
• Restoration vs replacement • Cost effective repairs (Use of a repair yard?) • Cost presentation – labour / yard costs • Claims Control / Co-operation • WELCAR sub-limits
• Tests, Leak and/or Damage Search Costs • Expediting Costs
25
![Page 27: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/27.jpg)
Working in Korea
• Shipbuilding Nation • Local survey expertise • Cultural sensitivities • Commercial considerations – the ‘Chaebol’ • Local Insurers’ Relationships • Local retentions
26
![Page 28: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/28.jpg)
Summary
• There is demand for new MODU • S. Korea still main market • Construction is highly automated / controlled • Some claims arise (modest compared to value?) • S. Korea is unique
27
![Page 29: Construction of Mobile Offshore Drilling Units… …and some](https://reader031.vdocuments.us/reader031/viewer/2022013009/61ce2e8b13c0430a686e0e87/html5/thumbnails/29.jpg)
Questions?
Thank you
28