BLIP operations 3-2-10
• Status – running at ~139MeV
– BLIP average beam up to 98.3µA, with a high of 103.3µA on 2/26.
Operation with beam 161hrs.
• Operations issues– Ion source pulse timing problem has reduced effective pulse rate
below the expected 6.67Hz. This will be corrected next
maintenance day.
– No target problems this week
– Research irradiation at 139 MeV began 3/1.
![Page 2: BLIP operations 3-2-10](https://reader036.vdocuments.us/reader036/viewer/2022072013/56812abf550346895d8e8814/html5/thumbnails/2.jpg)
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566
0.00
20000.00
40000.00
60000.00
80000.00
100000.00
120000.00
140000.00
To Date Accum. uA-hrs
FY2006
FY2007
FY2008
FY2009
FY2010
Days of Operation
uA
-hrs