BLIP operations 3-2-10 Status – running at ~139MeV BLIP average beam up to 98.3µA, with a high of 103.3µA on 2/26. Operation with beam 161hrs. Operations issues Ion source pulse timing problem has reduced effective pulse rate below the expected 6.67Hz. This will be corrected next maintenance day. No target problems this week Research irradiation at 139 MeV began 3/1.

Upload: francesca-murphy

Post on 30-Dec-2015

29 views

Category:

Documents


0 download

DESCRIPTION

BLIP operations 3-2-10. Status – running at ~ 139MeV BLIP average beam up to 98.3µA, with a high of 103.3 µA on 2/26 . Operation with beam 161hrs. Operations issues - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BLIP operations  3-2-10

BLIP operations 3-2-10

• Status – running at ~139MeV

– BLIP average beam up to 98.3µA, with a high of 103.3µA on 2/26.

Operation with beam 161hrs.

• Operations issues– Ion source pulse timing problem has reduced effective pulse rate

below the expected 6.67Hz. This will be corrected next

maintenance day.

– No target problems this week

– Research irradiation at 139 MeV began 3/1.

Page 2: BLIP operations  3-2-10

123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566

0.00

20000.00

40000.00

60000.00

80000.00

100000.00

120000.00

140000.00

To Date Accum. uA-hrs

FY2006

FY2007

FY2008

FY2009

FY2010

Days of Operation

uA

-hrs