Download - BBA Project Guidelines & Certificates
-
7/24/2019 BBA Project Guidelines & Certificates
1/8
Tilak Maharashtra Vidyapeeth, Pune
BBA VI Semester Project Guidelines
Purpose:
Project work is the best way to practice what you have learnt.The purpose of including project report in the bachelor program is to provide you anopportunity to study a problem applying management concepts in a scientific manner. Itenables you to apply your conceptual knowledge in a practical situation and to learn theart of conducting a study in a systematic way and presenting its findings in a coherentreport.
Submission ates:
Students will normally be expected to complete the Project Report within a period of onemonth.
The submission date !or "#$%&$' Students is ""nd(ebruary "#$')
The riginal copy of Project Report must reach !idyapeeth on or before the datementioned above.
If the students fail to submit the report by the last date" the project report *ill beaccepted be!ore "+th(ebruary "#$' *ith late !ee o! s) %##-.)
Vi/a 01amination:
If students are unable to complete the project in the maximum time permitted" they willnot be allowed to appear for the !iva #xamination.
Please note that the Vi/a & Voce *ill be conducted a!ter the end o! semestere1amination)
The 2hoice o! Project:
The students must do a Project only in the area of speciali$ation he%she has
chosen.
#ach student will choose a research topic in consultation with the Internal &uideof the respective speciali$ation.
The method of data collection would be of survey method.
The students are expected to collect data from the organi$ation within ' to ()
days.
The Source of data can be primary as well as secondary.
0ach students *ill do the project indi/idually on separate topic 34o t*o
projects must be same5)
-
7/24/2019 BBA Project Guidelines & Certificates
2/8
The role of the faculty member as a project guide is initially to give guidance on
the choice of the project title and the methodology to be employed" develop*uestionnaires with students and later to give advice in all aspects of theresearch.
The students must submit the +ompany !isit certificate signed by the authorities
from the organi$ation.
Presentation o! Project eport:
,- The main report should follow the following chapter scheme se*uentially.
a Title Pageb !idyapeeth +ertificatec Internal &uide +ertificated +ompany +ertificatee -cknowledgementf Index of +ontents with page numbers.
+hapter (/ &eneral Introduction ,Industrial 0ackground
+hapter 1/ Introduction to the problem
Title of the project
Statement of the problem
Purpose of the study
bjectives of the study
Scope of the study
+hapter 2/ Profile of the company
+hapter 3/ Theoretical Perspective
+hapter 4/ 5ethodology
6ata collection methods % sources
Sampling Plan
+hapter 7/ 6ata -nalysis and Interpretation
+hapter '/ 8indings
+hapter 9/ :imitations
+hapter ;/ +onclusions and Recommendations
-ppendix
+opies of 8orms %
-
7/24/2019 BBA Project Guidelines & Certificates
3/8
,0 The following are the notes of guidance for the presentations of Project Report.
Paper and Te1t: The Project Report must be printed or typed on -3 si$e white bond paper.
The pages should be numbered consecutively. The preferred position forthe page number is typed at the bottom centre of the page.
The text should be in double or (.4 line spacing in Times =ew Roman or
-rial font with font si$e between () and (3 inclusive. >eadings should bein a font si$e no larger than (7.
The Project report must be of minimum 4) Pages.
Mar6ins:5argins at the binding left hand side should be not less than 2) mm.Top" bottom and side margins should be not less than (4 mm.
Title Pa6e:
The format of Title Page is enclosed. -ll students must follow the same pattern.
Submission:
Student must make two spiral ? bond copies of the project report with blue colour cover.7ne copy must be submitted to the Vidyapeeth on or be!ore ""nd(ebruary "#$'and remaining one copy of project must be submitted at the time of !iva. These mustconfirm to the style described above.
-fter submission of the Project Report" the students must make themselves available"
for a viva voce examination. 8ailure to do so will normally be deemed to constitute afailure in that assessment.
&uides should ensure that the guidelines are thoroughly followed by all the students.
-
7/24/2019 BBA Project Guidelines & Certificates
4/8
Tilak Maharashtra Vidyapeeth,
Pune(Deemed Under Section 3 of UGC Act 1956 Vide Notification
No. F.9-19/85 U3 dated !"t#A$ri% 198& ' t#e Go)ernment of *ndia.+
Vidyapeeth Bhavan, Gultekdi, Pune 411 037
CERTIFICATE
This is to Certify that theproject titled
_________________________ is abonade work carried out byMr./Ms. _____________________a student of Bachelor of
Business Administrationemester !th" peciali#ation_____________ $%&.___________ under Tilak
-
7/24/2019 BBA Project Guidelines & Certificates
5/8
Maharashtra 'idyapeeth" inthe year ()*+.
Head of the Department Examiner Examiner Internal
ExternalDate :
Place : VidyapeethSeal
Certificate
TO WHOMSOEVER IT MAY CONCERN
(To be taken on Company !etter Hea"#
This is to certify that Mr /
Ms ......................................................... BBA Student
of Tilak Maharashtra Vidyapeeth, Pune has
successfully completed their project work for award
of achelor De!ree of usiness "dministration.
He / She has done the project on
_______________________________,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
-
7/24/2019 BBA Project Guidelines & Certificates
6/8
Company Name
Company Sea$
%ei&nation
Si&nat're
-
7/24/2019 BBA Project Guidelines & Certificates
7/8
#erti$cate of Internal %uide
&To 'e !i(en on #enter)s *etter Head+
This is to certify that the project
titled
is a !ona"de work
carried out !y
.............................................................................. a
candidate for the
award of Bachelor of Business Administration
of Tilak Maharashtra #idyapeeth$ %une under my
&uidance and direction.
Si&nature of &uide
'ame()ate( )esi&nation(%lace( *nstitute(
-
7/24/2019 BBA Project Guidelines & Certificates
8/8
Project 7n88888888888888888888888888888888888
8888888888888888888888888888888888888888888888888888888888888888888888
Bachelor o! Business Administration 3Speciali9ation5
Submitted in partial !ul!illment o! the reuirements !or a*ard o! Bachelor o!Business Administration o! Tilak Maharashtra Vidyapeeth, Pune)
Submitted by8888888838Student 4ame858888888888
P4:o!
32entre 4ame ; Place5
Tilak Maharashtra VidyapeethGultekdi , Pune