New Audenried High School
Originally Opened in 1931 New School Opened in 2008
![Page 2: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/2.jpg)
Project Specifics
• School District Capital Improvements Project• Multi-Prime Contract• 211,515 s.f. Building Budgeted at $62.5 Million
Dollars• Project included the demolition of the existing
structure, land enhancement, construction of two gyms, cafeteria, auditorium, three story classroom wing, library, diesel academy, six science labs, music academy, and a culinary school.
![Page 3: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/3.jpg)
Earth Works/ Reconditioning the Land
![Page 4: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/4.jpg)
Architectural Plans
![Page 5: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/5.jpg)
Steel and Foundation Work
![Page 6: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/6.jpg)
Concrete Progress and Steel Erection Process
![Page 7: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/7.jpg)
Concrete Arch Work Main Gym
![Page 8: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/8.jpg)
Exterior Façade Work
![Page 9: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/9.jpg)
Interior Finish Work
![Page 10: Audenried High School](https://reader038.vdocuments.us/reader038/viewer/2022103017/557c056dd8b42a0a6a8b51c0/html5/thumbnails/10.jpg)
Project Responsibilities
• QA/QC throughout the design, shop drawing, and construction process
• RFI, COR, and RFP recommendations and review.• Overall Coordination of the Project• Maintaining all project correspondences• Ensured Site Safety with owner supplied policy• Ensured schedule compliance• Reviewed and processed payment applications• Ensured Contact compliance throughout the projects
duration.• Provided monthly reports on progress.