New Audenried High School
Originally Opened in 1931 New School Opened in 2008
Project Specifics
• School District Capital Improvements Project• Multi-Prime Contract• 211,515 s.f. Building Budgeted at $62.5 Million
Dollars• Project included the demolition of the existing
structure, land enhancement, construction of two gyms, cafeteria, auditorium, three story classroom wing, library, diesel academy, six science labs, music academy, and a culinary school.
Earth Works/ Reconditioning the Land
Architectural Plans
Steel and Foundation Work
Concrete Progress and Steel Erection Process
Concrete Arch Work Main Gym
Exterior Façade Work
Interior Finish Work
Project Responsibilities
• QA/QC throughout the design, shop drawing, and construction process
• RFI, COR, and RFP recommendations and review.• Overall Coordination of the Project• Maintaining all project correspondences• Ensured Site Safety with owner supplied policy• Ensured schedule compliance• Reviewed and processed payment applications• Ensured Contact compliance throughout the projects
duration.• Provided monthly reports on progress.