Methodologies
• Applicability 1
• Carbon Pools 2
• CO2-Fixation 3
• Baseline 4
• Leakage 5
• Other emissions 6
• Carbon Performance 7
![Page 3: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/3.jpg)
1. Aboveground woody biomass
2. Belowground woody biomass
3. Soil Organic Carbon (SOC)
4. Litter & Dead wood
5. Harvest Wood Products (HWP) • Timber • Energy wood
![Page 4: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/4.jpg)
![Page 5: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/5.jpg)
tCO2
Years Baseline Leakage
CO2-Fixation
- 20% Buffer
Methodologies
![Page 6: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/6.jpg)
![Page 7: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/7.jpg)
tCO2/ha
Years
Methodologies
![Page 8: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/8.jpg)
Methodologies
• Applicability 1
• Carbon Pools 2
• CO2-Fixation 3
• Baseline 4
• Leakage 5
• Other emissions 6
• Carbon Performance 7
![Page 9: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/9.jpg)
Applicability
• No wetland • Not drained or irrigated • No plaughing more than 10 % • Baseline not increasing (A/R)
![Page 10: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/10.jpg)
Other emissions
• Fuel for machines = 0 • Fertilizer used = 0 • CO2 of wood + 10% (N2O)
![Page 11: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/11.jpg)
Permanence
![Page 12: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/12.jpg)
2015 2020 2025 2030 2010 2035
Permanence
![Page 13: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/13.jpg)
Backstops 1. Sustainability requirements
2. Frequent Monitoring, Reporting and Verification (MRV)
3. Compliance pathway
a) Retiring CO2-certificates from the same activity (have not been sold) b) Adding additional activity areas c) Re-implementing activities d) Purchase CO2-certificates from other Gold Standard activities
1. Project owner’s liability
2. Compliance Buffer
Permanence
![Page 14: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/14.jpg)
No financial instrument
2040 2014
Upfront credits based on conservative estimation
Up-front finance
![Page 15: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/15.jpg)
Improved Forest Management (IFM)
![Page 16: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/16.jpg)
Baseline Project (dotted lines indicate long-term average)
16
Stop Logging (SL)
Stop Logging (SL): Unsustainable (upper) or sustainable (lower) logging baseline -active (left) or planned (right) at project start - is prevented for forest stocks to recover, respectively remain unchanged.
![Page 17: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/17.jpg)
17
Reduced Impact Operations (RI)
Baseline Project (dotted lines indicate long-term average)
Reduced Impact Operations (RI): Unsustainable (upper) or sustainable (lower) logging baseline stocks are maintained or increased by applying improved harvesting and management techniques.
![Page 18: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/18.jpg)
IFM Standards Study - Summary Presentation for Discussion 18
Extension of Rotation Age (ER)
Baseline Project (dotted lines indicate long-term average)
Extension of Rotation Age (ER): Sustainable logging baseline stocks are increased by extending rotation age, respectively extending cutting cycles.
![Page 19: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/19.jpg)
IFM Standards Study - Summary Presentation for Discussion 19
Increased Growth Management (IG)
Baseline Project (dotted lines indicate long-term average)
Increased Growth Management (IG): Sustainable logging baseline stocks are increased by actively supporting growth. e.g. through candidate selection and thinning or competing species management.
![Page 20: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/20.jpg)
IFM Standards Study - Summary Presentation for Discussion 20
Rehabilitation (RE)
Baseline Project (dotted lines indicate long-term average)
Rehabilitation (RE): Unsustainable (upper) or sustainable (lower) logging baseline stocks are increased. Forest degradation is halted and forests are restored and sustainably managed by actively supporting regeneration. Understocked managed forests are improved by actively supporting regeneration. Note: If no harvesting is done in project area, the RE approach is identical to a stop logging (SL) project (except that recovery is actively supported)
![Page 21: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE](https://reader031.vdocuments.us/reader031/viewer/2022030418/5aa54bb47f8b9ae7438d2af5/html5/thumbnails/21.jpg)
IFM Standards Study - Summary Presentation for Discussion 21
Prevent Fires and Pests (PF)
Baseline Project (dotted lines indicate long-term average)
Prevention of Fires and Pests (PF): Uncontrolled loss of forest stocks due to fires and/or pests are halted by introducing protection or sustainable management schemes. Note: Asides from the difference in baseline, these activities are identical to SL and RI projects, respectively.