a/r methodology - mvc colombia vohrer technical director land use & forests iván hernández...

22
Moriz Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE forestry & land use June 2015, Bogotá A/R Methodology

Upload: doxuyen

Post on 11-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Moriz Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE forestry & land use

June 2015, Bogotá

A/R Methodology

Page 2: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Methodologies

• Applicability 1

• Carbon Pools 2

• CO2-Fixation 3

• Baseline 4

• Leakage 5

• Other emissions 6

• Carbon Performance 7

Page 3: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

1. Aboveground woody biomass

2. Belowground woody biomass

3. Soil Organic Carbon (SOC)

4. Litter & Dead wood

5. Harvest Wood Products (HWP) • Timber • Energy wood

Page 4: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE
Page 5: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

tCO2

Years Baseline Leakage

CO2-Fixation

- 20% Buffer

Methodologies

Page 6: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE
Page 7: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

tCO2/ha

Years

Methodologies

Page 8: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Methodologies

• Applicability 1

• Carbon Pools 2

• CO2-Fixation 3

• Baseline 4

• Leakage 5

• Other emissions 6

• Carbon Performance 7

Page 9: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Applicability

• No wetland • Not drained or irrigated • No plaughing more than 10 % • Baseline not increasing (A/R)

Page 10: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Other emissions

• Fuel for machines = 0 • Fertilizer used = 0 • CO2 of wood + 10% (N2O)

Page 11: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Permanence

Page 12: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

2015 2020 2025 2030 2010 2035

Permanence

Page 13: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Backstops 1. Sustainability requirements

2. Frequent Monitoring, Reporting and Verification (MRV)

3. Compliance pathway

a) Retiring CO2-certificates from the same activity (have not been sold) b) Adding additional activity areas c) Re-implementing activities d) Purchase CO2-certificates from other Gold Standard activities

1. Project owner’s liability

2. Compliance Buffer

Permanence

Page 14: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

No financial instrument

2040 2014

Upfront credits based on conservative estimation

Up-front finance

Page 15: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Improved Forest Management (IFM)

Page 16: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Baseline Project (dotted lines indicate long-term average)

16

Stop Logging (SL)

Stop Logging (SL): Unsustainable (upper) or sustainable (lower) logging baseline -active (left) or planned (right) at project start - is prevented for forest stocks to recover, respectively remain unchanged.

Page 17: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

17

Reduced Impact Operations (RI)

Baseline Project (dotted lines indicate long-term average)

Reduced Impact Operations (RI): Unsustainable (upper) or sustainable (lower) logging baseline stocks are maintained or increased by applying improved harvesting and management techniques.

Page 18: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

IFM Standards Study - Summary Presentation for Discussion 18

Extension of Rotation Age (ER)

Baseline Project (dotted lines indicate long-term average)

Extension of Rotation Age (ER): Sustainable logging baseline stocks are increased by extending rotation age, respectively extending cutting cycles.

Page 19: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

IFM Standards Study - Summary Presentation for Discussion 19

Increased Growth Management (IG)

Baseline Project (dotted lines indicate long-term average)

Increased Growth Management (IG): Sustainable logging baseline stocks are increased by actively supporting growth. e.g. through candidate selection and thinning or competing species management.

Page 20: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

IFM Standards Study - Summary Presentation for Discussion 20

Rehabilitation (RE)

Baseline Project (dotted lines indicate long-term average)

Rehabilitation (RE): Unsustainable (upper) or sustainable (lower) logging baseline stocks are increased. Forest degradation is halted and forests are restored and sustainably managed by actively supporting regeneration. Understocked managed forests are improved by actively supporting regeneration. Note: If no harvesting is done in project area, the RE approach is identical to a stop logging (SL) project (except that recovery is actively supported)

Page 21: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

IFM Standards Study - Summary Presentation for Discussion 21

Prevent Fires and Pests (PF)

Baseline Project (dotted lines indicate long-term average)

Prevention of Fires and Pests (PF): Uncontrolled loss of forest stocks due to fires and/or pests are halted by introducing protection or sustainable management schemes. Note: Asides from the difference in baseline, these activities are identical to SL and RI projects, respectively.

Page 22: A/R Methodology - MVC Colombia Vohrer Technical Director Land Use & Forests Iván Hernández Regional Manager - Latin America Kai Windhorst Consultant for Gold Standard - UNIQUE

Moriz Vohrer [email protected]

Skype: morizv

Thank you