Organization
• Status reports– Mechanical and material– DC-DC– Electrical test– HSIO
• Working sessions: DAQ, powering, Assy?• Plan tasks for IT-SC: project plan, costings, specs• Longer range planning• Other issues
![Page 3: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,](https://reader036.vdocuments.us/reader036/viewer/2022082518/5697bfd41a28abf838cacbe3/html5/thumbnails/3.jpg)
Goals continued• 1st pass schedule for Oxford AUW– Use Nov CERN as a guideline
• Form group to draft a specifications documents• Costing document: material, labor?, tools• Derive a schedule for DC-DC test• Where are we on noise tests (serial/DC-DC)?• Input to B180 meeting• Should we write a series of status reports? Benchmarks?• How far can we take the petal prototyping?• Implications of Chamonix
![Page 4: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,](https://reader036.vdocuments.us/reader036/viewer/2022082518/5697bfd41a28abf838cacbe3/html5/thumbnails/4.jpg)
Outline
• Tues 9-13: Intro and mechanical• Tue 14-18: electrical• Wed 9-13 parallel working sessions• Wed 14-17: discussions and planning
![Page 5: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,](https://reader036.vdocuments.us/reader036/viewer/2022082518/5697bfd41a28abf838cacbe3/html5/thumbnails/5.jpg)
Tues 9-13
• 9-9:30 Introduction and goals for the meeting (CH)• 9:30-10 B180 discussion Todd Huffman• 10-10:30 Thermo-mechanical stave prototyping (J.Hill)• Coffee/tea• 11:00-11:30 Stave prototyping (Georg)• 11:30-12:00 Stave FEA (G.Beck)• 12:00-12:30 Stave assy system (M.Gibson)• 12:30-13:00 BNL/Yale mechanics status (Lynn/Emmet)
![Page 6: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,](https://reader036.vdocuments.us/reader036/viewer/2022082518/5697bfd41a28abf838cacbe3/html5/thumbnails/6.jpg)
Tues 14-18
• 14-14:30 Materials assessment and further reduction, Ti pipes, (Jones, Affolder)
• 14:30-15 full scale serial systems, filters, multiplicity, SP chip: (Mitch Newcomer and Dave Lynn)
• 15-15:30 Petal mechanics (David Santoya)• Coffee/tea• 16-16:30 DC-DC Liverpool/CERN (Ashley Greenall)• 16:30-17 DC-DC Cables (Roy Wastie/Carl Haber)• 17-17:30 status of serial stave tests• 17:30-18 HSIO software status, distribution
![Page 7: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,](https://reader036.vdocuments.us/reader036/viewer/2022082518/5697bfd41a28abf838cacbe3/html5/thumbnails/7.jpg)
Wed 9-13
• DAQ• Further discussion of powering issues:– DC-DC led by Ashley– Serial led by Mitch Newcomer, Dave Nelson– Giulio on power supply
• Stave/Module Assy aspects ?• Mechanical– Stave Cylinder Interfaces and Cylinder Specs by
Stephanie Yang and Ian Wilmut (30 min)
![Page 8: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,](https://reader036.vdocuments.us/reader036/viewer/2022082518/5697bfd41a28abf838cacbe3/html5/thumbnails/8.jpg)
Wed 14-17
• 14-15 Goals for Oxford AUW• 15-16 toward a full length stave• 16-17 long range planning, organization for
pre-production model, costings, resources