Page 1: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Agenda for Stave Working Mtg

CH

Page 2: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Organization

• Status reports– Mechanical and material– DC-DC– Electrical test– HSIO

• Working sessions: DAQ, powering, Assy?• Plan tasks for IT-SC: project plan, costings, specs• Longer range planning• Other issues

Page 3: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Goals continued• 1st pass schedule for Oxford AUW– Use Nov CERN as a guideline

• Form group to draft a specifications documents• Costing document: material, labor?, tools• Derive a schedule for DC-DC test• Where are we on noise tests (serial/DC-DC)?• Input to B180 meeting• Should we write a series of status reports? Benchmarks?• How far can we take the petal prototyping?• Implications of Chamonix

Page 4: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Outline

• Tues 9-13: Intro and mechanical• Tue 14-18: electrical• Wed 9-13 parallel working sessions• Wed 14-17: discussions and planning

Page 5: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Tues 9-13

• 9-9:30 Introduction and goals for the meeting (CH)• 9:30-10 B180 discussion Todd Huffman• 10-10:30 Thermo-mechanical stave prototyping (J.Hill)• Coffee/tea• 11:00-11:30 Stave prototyping (Georg)• 11:30-12:00 Stave FEA (G.Beck)• 12:00-12:30 Stave assy system (M.Gibson)• 12:30-13:00 BNL/Yale mechanics status (Lynn/Emmet)

Page 6: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Tues 14-18

• 14-14:30 Materials assessment and further reduction, Ti pipes, (Jones, Affolder)

• 14:30-15 full scale serial systems, filters, multiplicity, SP chip: (Mitch Newcomer and Dave Lynn)

• 15-15:30 Petal mechanics (David Santoya)• Coffee/tea• 16-16:30 DC-DC Liverpool/CERN (Ashley Greenall)• 16:30-17 DC-DC Cables (Roy Wastie/Carl Haber)• 17-17:30 status of serial stave tests• 17:30-18 HSIO software status, distribution

Page 7: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Wed 9-13

• DAQ• Further discussion of powering issues:– DC-DC led by Ashley– Serial led by Mitch Newcomer, Dave Nelson– Giulio on power supply

• Stave/Module Assy aspects ?• Mechanical– Stave Cylinder Interfaces and Cylinder Specs by

Stephanie Yang and Ian Wilmut (30 min)

Page 8: Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,

Wed 14-17

• 14-15 Goals for Oxford AUW• 15-16 toward a full length stave• 16-17 long range planning, organization for

pre-production model, costings, resources