  • Annexure-I

    Remarks

    l.Technology for testing of AL-551

    engines to be transferred inadvance.

    2.Technology for the subsequentphases to be transferred

    immediately.1.TPP Documents for Ph I-II

    (AssemblyShop) to be forwardedimmediately.

    2.Activities for TPP for Ph III-IV

    (Manufacturing Shops) also to be

    taken up immediately.

    RussianSide to submit DSA againstindents of Indian Side, without

    linking it to any other issues, plan

    to supply Ph-O enginesimmediately.

    Russian Side to consjder the issue

    and submit the list of sparesimmediately.

    Russian Side to re consider theissue and submit a draft contract.

    During MTR of 30th IRSA meeting,Russian Side informed that the

    issue is premature.

    Contractual Schedule/agreement

    in MTR of 30th IRSA

    As per SA 135611230363

    of Dt.04.02.2013, supply of TO iswithin 19 months from completion

    of stage 1.7 of contractP/735634212338.

    During MTR of 30th IRSA meeting,Russian Side indicated that thesubmission of TPP Documents andDefence to be determined after

    assigning 300 Hrs initial life to the

    engine.

    During MTR of 30th IRSA meeting,Russian Side indicated that the

    time frames of delivery of TKswould be determined after

    completion of work under contract

    P/2338.

    of During MTR of 30th IRSA meeting,Russian Side informed that will

    study this request and inform theJ.S. additionally.

    Activity

    Transfer

    Technological

    Documentation(TD)

    TPP activities for PhI-IV

    Supply of Kits forSeries Production

    Programme(18 Ph-

    0,2 Ph-I, 5 Ph-III)

    Finalization

    Manufacturer's

    Recommended List

    of Spares(MRLS) for

    the engineDraft Contract for

    setup of facilitiesfor Repair and

    Overhaul of engines

    at Koraput

    1

    2

    4

    3

    5