/ f~~~I;:r~~ ~ JNl1T - q)1<I~l ~: ~ - 763002, ~: ~~, 'U«f HINDUSTAN AERONAUTICS LIMITED ENGiNE DIVISION - KORAPUT po. SUNABEDA - 763 002, DIST. KORAPUT, ODISHA, INDIA FAX: (91) 06853·220217/220004 SUNABEDA (91) 0891·2755464 VISAKHAPATNAM FAX/E-mail Ref: HAL/ED-KPT!PROJ/P1-2/2013/715 To: Mr. I M Goncharenko First Deputy Director General JSCRosoboronexport Moscow 107076 Russia Fax: 007-495-534-61-53/637-97-00 Sub: Resumption of Key ToT activities for AL-551 Engine. Dear Sir, Date: 28.12.2013 ' 1. It is very heartening to know that the works against stage 1.7 of contract P/735634212338, for decision on the establishment of initial assigned life of 300 Hrs to AL-551 Engine, have been informed fulfilled by the Russian Side. This achievement of the major milestone in development of the engine is highly appreciated by the Indian Side. 2. At the same time, attention of both the Indian.& Russian Sides needs to be drawn towards resumption of all the Key ToT activities, which were linked to the assigning of initial life of 300 Hrs to the engine and expedite all possible actions for all the activities pertaining to Series Production of the engines at Koraput. 3. Key activities which needs to be resumed with immediate concern are brought out at Annexure-I. 4. In order to make up the delay met so far to the Project, it is requested to expedite the actions as requested above, in mutual interest, 5. On be~alf of the Indian Side, I would like to extend my Christmas and New Year wishes to the Russian Partners and families, and look forward for continued relationship. With best regards, (Aniruddh Kumar) ~. Executive Director (Engine & Sukhoi Engine Division) Copy To: 1. Mr. A.V. Artyukhov, General Director, JSCUMPO UFA (Fax No. 007 3472 382636/383744) 2. Mr. Yuri Shmotin, General Designer, JSCNPO Saturn, Moscow (Fax No. 0074956830243) 3. Resident Manager,Moscow (FAX No. 0074959177523),

Upload: russialeaks

Post on 26-Nov-2015

12 views

Category:

Documents


2 download

TRANSCRIPT

  • /f~~~I;:r~~

    ~ JNl1T - q)1

  • Annexure-I

    Remarks

    l.Technology for testing of AL-551

    engines to be transferred inadvance.

    2.Technology for the subsequentphases to be transferred

    immediately.1.TPP Documents for Ph I-II

    (AssemblyShop) to be forwardedimmediately.

    2.Activities for TPP for Ph III-IV

    (Manufacturing Shops) also to be

    taken up immediately.

    RussianSide to submit DSA againstindents of Indian Side, without

    linking it to any other issues, plan

    to supply Ph-O enginesimmediately.

    Russian Side to consjder the issue

    and submit the list of sparesimmediately.

    Russian Side to re consider theissue and submit a draft contract.

    During MTR of 30th IRSA meeting,Russian Side informed that the

    issue is premature.

    Contractual Schedule/agreement

    in MTR of 30th IRSA

    As per SA 135611230363

    of Dt.04.02.2013, supply of TO iswithin 19 months from completion

    of stage 1.7 of contractP/735634212338.

    During MTR of 30th IRSA meeting,Russian Side indicated that thesubmission of TPP Documents andDefence to be determined after

    assigning 300 Hrs initial life to the

    engine.

    During MTR of 30th IRSA meeting,Russian Side indicated that the

    time frames of delivery of TKswould be determined after

    completion of work under contract

    P/2338.

    of During MTR of 30th IRSA meeting,Russian Side informed that will

    study this request and inform theJ.S. additionally.

    Activity

    Transfer

    Technological

    Documentation(TD)

    TPP activities for PhI-IV

    Supply of Kits forSeries Production

    Programme(18 Ph-

    0,2 Ph-I, 5 Ph-III)

    Finalization

    Manufacturer's

    Recommended List

    of Spares(MRLS) for

    the engineDraft Contract for

    setup of facilitiesfor Repair and

    Overhaul of engines

    at Koraput

    1

    2

    4

    3

    5

    S.No