![Page 1: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/1.jpg)
Project ManagementWhat Unique Things Must Be Considered
EPC Heavy Industrial Projects
By Bob StevensProject Engineering Manager (Retired)
Bechtel Corporation - 01/28/20201
![Page 2: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/2.jpg)
In my career:
Project Manager Small to Midsized Projects
Engineering Manager Mega Projects (> $10 Billion)
2
![Page 3: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/3.jpg)
After explaining to two young engineers why I could not approve their calculation; explaining their thermodynamics error, one said to the other, “I told you he is not the Pointy-Haired Boss in DILBERT.”
“Yes, and please close the door behind you. We are behind schedule and running over budget. I have to figure out how we get back on track.”
3
![Page 4: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/4.jpg)
4
![Page 5: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/5.jpg)
Tonight – An Enjoyable Graduate Level Lecture• No Differential Equations• No Exam
Project Management >> Scheduling and Cost Analysis
No Confidential nor Secret Information
Safety is NO Accident!5
![Page 6: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/6.jpg)
Project Manager
Engineering Manager
Procurement Manager
Construction Manager
Business Manager
6
![Page 7: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/7.jpg)
Engineering Manager (The Conductor, Color in the Blank Spaces)
(ChE) - Process Engineering (Simulation, H&M Balance, PFD)
(ChE/ME) - Project Engineering (P&IDs, Equip. Data Sheets, Info. to Others)
(ME) - Mechanical Equipment Engineering – Equipment & Packages
Environment Engineering (Air, Water, Solid, Environmental Controls)
Materials Engineering (Selection, Specifications)
Geo Technical Engineering (Soil Conditions)
Civil Engineering (Concrete)
Architectural / Engineering (Buildings)
Structural Engineering (Steel)
Piping Design (Model/Layout, Stress Analysis, Piping Isometrics, Pipe Hangers)
Electrical Engineering (Power, Cathodic Protection)
Control Systems Engineering (Instruments, Software, DCS)
Etc.7
![Page 8: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/8.jpg)
Engineering Manager (con’t)
Scheduling
• Most Common Tools - Primavera, MS Project
• Critical Path
• Staffing
Cost Analysis
• FORWARD LOOKING (Accounting is HISTORICAL)
• Estimating (Lang and More Detailed)
• Wage Rate Mix
• Contingency / Senior Management (or Owner) Allowance
• Trends (Non-Variance/ Variance)
• Progress/Performance – Cost/Commitment
8
![Page 9: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/9.jpg)
Procurement Manager
Prime Contract AdministrationDirect Hire Administration Subcontract AdministrationPurchasing – Engineered EquipmentPurchasing – Bulk MaterialsExpeditingTraffic – (Ohio River Clearance, Highway and Rail Clearances)Logistics – (Permits for Shipments – Roads, Highways)
9
![Page 10: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/10.jpg)
Construction Manager
SuperintendentsField EngineersRigging EngineersInspection / Quality Control & AssuranceLabor Agreements (NMA, GPA, Open Shop, etc.)Craft Availability / Travelers (Estimating and Construction) Craft Training (Especially in Developing Countries)
ALSO
CommissioningStartup
10
![Page 11: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/11.jpg)
Business Manager
Accounting – (Backward Looking - HISTORICAL)Payroll / Timekeeper – (Allocation of Charges)Payment – Vendors (Engineered Equipment & Bulks)Management of the Money – “Cash Neutral”TaxesAdministrative Assistants / Document Control ClerksHuman Resources (Visas, as well)LegalHousing - (Especially International) – Pioneer and ConstructionFood - (Ditto)Emergency Response - (Evacuation, Fire, Medical, Snakes, etc.)Community Relations - (Government, Police, Community Relations)
11
![Page 12: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/12.jpg)
12
![Page 13: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/13.jpg)
Contract Methodology
• Design Bid Build – Competitive – Less Expensive?
• Design Build – Cooperative – Less Expensive?
13
![Page 14: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/14.jpg)
Contract / Subcontract Types
• Lump Sum / Turn Key – (Hoover Dam)
• Well defined scope
• Grass Roots
• Lower Unknowns
• Cost Plus (Reimbursable) • Not well defined scope
• Unknown
• Existing Facilities
14
![Page 15: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/15.jpg)
Contract / Subcontract Types - Variations
• Unit Rates (Air to Soil Interface)
• Lump Sump with Unit Rates for Extras
• Incentives
• Safety – Good – Risk – Taking Injuries Home in Your Pocket
• Quality – Rework – Customer Satisfaction
• Schedule – Permits, Long Lead Equipment (Pre-FID Work / Cancellations)
• Many Other Variations & Flavors
15
![Page 16: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/16.jpg)
Contract / Subcontract – Risk Assessments
WHO CAN BEST MANAGE AT LEAST COST?Owner or Contractor / Subcontractor?
Construction Productivity
Asbestos / Lead Paint Abatement
Underground Surprises – Benzene Mitigation, U/G Obstuctions
Unknowns / Unknowables
Force Majeure
16
![Page 17: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/17.jpg)
Choose Any 2 of the 3
17
![Page 18: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/18.jpg)
FAST / CHEAP / GOOD
• Good / Cheap – Well Defined Lump Sum (Grass Roots Plant)
• Good / Fast – A Lot of Unknowns and Little TimeRestore Rail Car Loading Facility – High Margin Specialty Chemical
Piping Isometrics – Design Review, SOE Review, Fabrication, Install
• Fast / Cheap – Temporary Facility (Run a Hose, Temp Piping)
18
![Page 19: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/19.jpg)
19
![Page 20: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/20.jpg)
Regulatory / Permits• Expansion of Interstate 70 – Denver – 12 milesPermit work – 13 years
8,951 of Pages with 7,307 Pages of Appendices
Senior Government Officials Asked By the Cabinet Secretary
“Did you read all the pages of these documents?”
“No” was the emphatic answer
• Keystone XL PipelinePermit work – 12 years
Partial Approvals
Still not fully Approved
20
![Page 21: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/21.jpg)
Environmental
• Existing Brownfield Site – Prospective Chemical PlantOpen Pit Quarries – Trees – Backfill
Fly Ash Pond – Old Coal Fired Power Plant
21
![Page 22: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/22.jpg)
External InfrastructurePermits – Work with Governmental Agencies
Corp of Engineers – River Locks and Dams
Coast Guard – River Traffic
Railroad
State Highway Expansion
Natural Gas
Electrical Power – Substation, Additional Power Plant Unit
Etc.
22
![Page 23: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/23.jpg)
Ethics• Chemical Plant – 1 of 3 Proposed Locations - $5 Billion PlantHalf River Bottom, Half Up on Two Hills
Laydown
Parking
• Owner of the Site “How Much Will It Take to Recommend My Site?”
“May the Best Site Win”
“You are Such a Boy Scout. I Admire You. Not How I do Business, Though.”
23
![Page 24: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/24.jpg)
Heuristics 1. Schedule – 2x As Long as First Appears2. Cost – 3x as Much as First Appears3. Cost & Schedule Contingency4. If you are just running on track, you will end up behind.
• There is always unforeseen items around the corner.5. The bitterness of poor quality remains long after the
sweetness of low price is long forgotten.
24
![Page 25: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/25.jpg)
QualityCorrective Action Report
Egypt – Pipe Welding Inspection Inspector – 6 months – Full Penetration Welds Error
Action: Reinspect all Shots, Grind out and Redo all Errors
Waste Treatment Plant – Misspelled Word – P&ID Notes Threatened – Whistleblower
40 Hours of Investigation and Resolution
Procedure Says – Red Pencil on Master Stick File25
![Page 26: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/26.jpg)
26
![Page 27: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/27.jpg)
27
![Page 28: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/28.jpg)
Engineered Lifts
• Heavy Vessel Lift – (Vit Plant)
• Tight Clearances – (Low Sulfur Diesel Hydrotreater)
28
![Page 29: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/29.jpg)
29
![Page 30: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/30.jpg)
Whatever it Takes…
30
![Page 31: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/31.jpg)
Whatever it Takes…High Task, High People Relationships
31
![Page 32: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/32.jpg)
32
![Page 33: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/33.jpg)
General Jim Mattis
USMC (Ret.)
Sec of Defense (Former)
33
![Page 34: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/34.jpg)
34
![Page 35: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/35.jpg)
Whatever it Takes…
High Task, High People Relationships
Servant Leadership
Or
What the Project Manager does when his team is at his Christmas Dinner party
35
![Page 36: (2020-01-28) Project Management presentation...2020/01/28 · Project Management What Unique Things Must Be Considered EPC Heavy Industrial Projects By Bob Stevens Project Engineering](https://reader035.vdocuments.us/reader035/viewer/2022081405/5f0c8f2e7e708231d4360224/html5/thumbnails/36.jpg)
What happened to my CAR?
36