documents not submitted.pdf
DESCRIPTION
documents not submitted.pdfTRANSCRIPT
Sr. No.
Document Descriptions Rev. No.
Released Date
Review Code
Rev. No.
Released Date
Review Code
Remarks
1. Process Data sheet of Day Oil Tank
- - Not submitted till date
2. Process Data sheet of Expansion Bellow
- - Not submitted till date
3. Process Data sheet of Silencer - - Not submitted till date
4. Performance Guarantee Test Procedure
- - Not submitted till date
5. Writ up covering salient technical details of boiler
- - Not submitted till date
6. Start-up and loading curves for utility boilers including start-up curves under hot, warm and cold conditions
- - Not submitted till date
7. Basic design calculation for system design sizing & equipment selection
- - Not submitted till date
8. Weight Schedule of equipment / package
- - Not submitted till date
9. IBR approved Pressure Parts Drawings
- - Not submitted till date
10. Sub-vendor list for all Bought Out items
- - Not submitted till date
11. Performance Curves / selection Charts/Nomo-graphs/Equipment sizing calculation
- - Not submitted till date
12. Equipment data sheet by sub-vendor
- - Not submitted till date
13. Flow sheets / P&ID for the bought out equipment/ system/ package
- - Not submitted till date
14. Mandatory spare parts list along with erection & commissioning spares list
- - Not submitted till date
15. Special tools & tackles list - - Not submitted till date
16. Installation, Operation & Maintenance Manual
- - Not submitted till date
17. Pre-commissioning(including Alkali Boiling Out & Commissioning Procedure)
- - Not submitted till date
18. Estimated weight of equipments - - Not submitted till date
19.