Sr. No. Document Descriptions R e v. N o. Rel eas ed Dat e Revie w Code Rev. No. Released Date Revie w Code Remarks 1. Process Data sheet of Day Oil Tank - - Not submitted till date 2. Process Data sheet of Expansion Bellow - - Not submitted till date 3. Process Data sheet of Silencer - - Not submitted till date 4. Performance Guarantee Test Procedure - - Not submitted till date 5. Writ up covering salient technical details of boiler - - Not submitted till date 6. Start-up and loading curves for utility boilers including start-up curves under hot, warm and cold conditions - - Not submitted till date 7. Basic design calculation for system design sizing & equipment selection - - Not submitted till date 8. Weight Schedule of equipment / package - - Not submitted till date 9. IBR approved Pressure Parts Drawings - - Not submitted till date 10. Sub-vendor list for all Bought Out items - - Not submitted till date 11. Performance Curves / selection Charts/Nomo-graphs/Equipment sizing calculation - - Not submitted till date 12. Equipment data sheet by sub- vendor - - Not submitted till date 13. Flow sheets / P&ID for the bought out equipment/ system/ package - - Not submitted till date 14. Mandatory spare parts list along with erection & commissioning spares list - - Not submitted till date 15. Special tools & tackles list - - Not submitted till date 16. Installation, Operation & Maintenance Manual - - Not submitted till date 17. Pre-commissioning(including Alkali Boiling Out & Commissioning Procedure) - - Not submitted till date 18. Estimated weight of equipments - - Not submitted till date 19.

Upload: surefooted1

Post on 25-Dec-2015

3 views

Category:

Documents


0 download

DESCRIPTION

documents not submitted.pdf

TRANSCRIPT

Page 1: documents not submitted.pdf

Sr. No.

Document Descriptions Rev. No.

Released Date

Review Code

Rev. No.

Released Date

Review Code

Remarks

1. Process Data sheet of Day Oil Tank

- - Not submitted till date

2. Process Data sheet of Expansion Bellow

- - Not submitted till date

3. Process Data sheet of Silencer - - Not submitted till date

4. Performance Guarantee Test Procedure

- - Not submitted till date

5. Writ up covering salient technical details of boiler

- - Not submitted till date

6. Start-up and loading curves for utility boilers including start-up curves under hot, warm and cold conditions

- - Not submitted till date

7. Basic design calculation for system design sizing & equipment selection

- - Not submitted till date

8. Weight Schedule of equipment / package

- - Not submitted till date

9. IBR approved Pressure Parts Drawings

- - Not submitted till date

10. Sub-vendor list for all Bought Out items

- - Not submitted till date

11. Performance Curves / selection Charts/Nomo-graphs/Equipment sizing calculation

- - Not submitted till date

12. Equipment data sheet by sub-vendor

- - Not submitted till date

13. Flow sheets / P&ID for the bought out equipment/ system/ package

- - Not submitted till date

14. Mandatory spare parts list along with erection & commissioning spares list

- - Not submitted till date

15. Special tools & tackles list - - Not submitted till date

16. Installation, Operation & Maintenance Manual

- - Not submitted till date

17. Pre-commissioning(including Alkali Boiling Out & Commissioning Procedure)

- - Not submitted till date

18. Estimated weight of equipments - - Not submitted till date

19.