APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUMBER
Ute Tribal 4-28-4-2
2. TYPE OF WORK
DRILL NEW WELL REENTER P&A WELL DEEPEN WELL 3. FIELD OR WILDCAT
UNDESIGNATED
4. TYPE OF WELLOil Well Coalbed Methane Well: NO
5. UNIT or COMMUNITIZATION AGREEMENT NAME
6. NAME OF OPERATORNEWFIELD PRODUCTION COMPANY
7. OPERATOR PHONE435 646-4825
8. ADDRESS OF OPERATORRt 3 Box 3630 , Myton, UT, 84052
9. OPERATOR [email protected]
10. MINERAL LEASE NUMBER(FEDERAL, INDIAN, OR STATE)
2OG0005609
11. MINERAL OWNERSHIP
FEDERAL INDIAN STATE FEE 12. SURFACE OWNERSHIP
FEDERAL INDIAN STATE FEE
13. NAME OF SURFACE OWNER (if box 12 = 'fee')Clinton and Donette Moon
14. SURFACE OWNER PHONE (if box 12 = 'fee')
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee')HC 64 Box 113, ,
16. SURFACE OWNER E-MAIL (if box 12 = 'fee')
17. INDIAN ALLOTTEE OR TRIBE NAME(if box 12 = 'INDIAN')
18. INTEND TO COMMINGLE PRODUCTION FROMMULTIPLE FORMATIONS
YES (Submit Commingling Application) NO
19. SLANT
VERTICAL DIRECTIONAL HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 542 FNL 868 FWL NWNW 28 4.0 S 2.0 W U
Top of Uppermost Producing Zone 542 FNL 868 FWL NWNW 28 4.0 S 2.0 W U
At Total Depth 542 FNL 868 FWL NWNW 28 4.0 S 2.0 W U
21. COUNTYDUCHESNE
22. DISTANCE TO NEAREST LEASE LINE (Feet)542
23. NUMBER OF ACRES IN DRILLING UNIT40
25. DISTANCE TO NEAREST WELL IN SAME POOL(Applied For Drilling or Completed)
1087
26. PROPOSED DEPTHMD: 6785 TVD: 6785
27. ELEVATION - GROUND LEVEL
5422
28. BOND NUMBER
29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
43-7478
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORCANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY
DRILLED)
TOPOGRAPHICAL MAP
NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825
SIGNATURE DATE 12/23/2009 EMAIL [email protected]
API NUMBER ASSIGNED
43013500790000
Permit Manager
APPROVAL
FORM 3
AMENDED REPORT
API Well No: 43013500790000API Well No: 43013500790000
EORM 3STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME andUNeUMBaER4-28-4-2
2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL UNDESIGNATED
4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO
6. NAME OF OPERATOR 7. OPERATOR PHONENEWFIELD PRODUCTION COMPANY 435 646-4825
8. ADDRESS OF OPERATOR 9. OPERATOR E-MAILRt 3 Box 3630 , Myton, UT, 84052 [email protected]
10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, O2RSTOAO
609 FEDERAL INDIAN STATE FEE FEDERAL INDIAN STATE I FEE I
13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')Clinton and Donette Moon
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')HC 64 Box 113, ,
17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT
(if box 12 = 'INDIAN')MULTIPLE FORMATIONS
YES I (Submit Commingling Application) NO l' VERTICALI DIRECTIONAL I HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 542 FNL 868 FWL NWNW 28 4.0 S 2.0 W U
Top of Uppermost Producing Zone 542 FNL 868 FWL NWNW 28 4.0 S 2.0 W U
At Total Depth 542 FNL 868 FWL NWNW 28 4.0 S 2.0 W U
21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITDUCHESNE 542 40
25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 6785 TVD: 67851087
27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
5422 43-7478
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORCANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
[2 AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP
DRILLED)
NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825
SIGNATURE DATE 12/23/2009 EMAIL [email protected]
API NUMBER ASSIGNED APPROVAL
43013500790000
Permit
![Page 2: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/2.jpg)
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6785
Pipe Grade Length Weight
Grade J-55 LT&C 6785 15.5
API Well No: 43013500790000API Well No: 43013500790000
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6785
Pipe Grade Length Weight
Grade J-55 LT&C 6785
![Page 3: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/3.jpg)
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 8.625 0 290
Pipe Grade Length Weight
Grade J-55 ST&C 290 24.0
API Well No: 43013500790000API Well No: 43013500790000
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 8.625 0 290
Pipe Grade Length Weight
Grade J-55 ST&C 290
![Page 4: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/4.jpg)
’APIW
ellNo:43013500790000’
T4S. R2W, U.S. B.&M. NEWFIßlAPRODUCTIONCOXPANY
WELL LOCATION, WELL 4-28-4-2W,LOCATED AS SHOWN IN THE NW 1/4 NW
EL LOCAT/0N: 1/4 (LOT 4) OF SECTION 28, T4S, R2W,EL 4-28-4-2W S.L.B.&M. DUCHESNE COUNTY, UTAH.ELEV UNGRADED GROUND = 5422.0'
o
589°56'W- 80.24 (G L.O.)
SB956W G.LO. (Bos/s of Beorings) - 5260.63' (Meosured) sep NDucherne I Set Stone V)
n!y Cnd Rebarvoisir coc LOT '.
868LET 2
LÜ1 3 )- O -see , (Mec' c O o
VDOW LCT 4 974•466--. . -
BAR SCAL.E
o SS. 635.59v)38
, 2 THIS IS TO CERTIFY THA .
* WAS-574'46 PREPARED FROM FIELD . RVEYS
g87 6° S "* / MADE BY ME OR UNE . THATeas]" THE SAME ARE TRU . RRECT TL. TH ST OF
643.3 MY KNOWLEDGE AN gi No.189377574'45
STACY W.
STA I ! OF t AF.gE OFL-7..... .J
De tscole TRI STATELANDSURVEYING& CONSULTING180 NORTH VERNAL AVE. - VERNAL, UTAH 84078
(435) 781-2501
IM¯lL 4-28-4-2W DATE SURVEYED
= SECTION CORNERS LOCATED (Surface Location) NAD 8J 06-30-08 SURVEYED BY: T.H.
LA 17L3E = 40' Cô' 42 7 DATE DRAWN:DRAWN BY: F.T.MBASIS OF ELEV; CO¾GITUDE =
!!C¯ 07' 14,7]· 07-09-08
U.S.G.S. 7-l/2 min QUAD (MYTON SW) SCALE: 1" =
![Page 5: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/5.jpg)
’APIW
ellNo:43013500790000’
MEMORANDUM /
EASEMENT, GHT-OF-Wk 548 9 O
and Filed By: CB11SURFACE USE AGREEME ROLYNE MADSEN, Reco ede r o
CHESNE COUNTYCORPORATIONFor: NEWFIELDPRODUCTION
This Easement and Surface UseAgreement("Agreement") is entered into this276 day of May, 2008byand between,Clintonand Donette Moon whose address is HC 64 Box 113,DuchesneUtah 84021("SurfaceOwner,"whether one or more), and NEWFIELDPRODUCTIONCOMPANY,a Texas corporation("NEWFIELD"),with offices at 1401 SeventeenthStoet, Suite 1000,Denver, Colorado 80202,coveringcertain lands, (the "Lands") situated in Duchesne County,Utah described as follows:
Township4 South, Range 2 WestSection20: NWNE, NENE, SWNE,SENESection21: NWNW, SWNW, SENW, SWNE,SENE,NWSE, NESE, SWSW, SESW,SWSE,SESESection28: Lot 1,Lot 2, Lot 3, Lot 4,
DuchesneCounty, Utah
being 726 acres, more or less
For and in consideration of the sum of ten dollars ($10.00),and other valuable consideration, thereceipt and sufficiencyof which are herebyacknowledged, the undersignedhereby agree to the terms andprovisions set forth as follows:
1. Comvensation for Well; Release of All Claims
NEWFIELÐshall pay to Surface Owner thesum as set forth in and according to the terms of thatcertain Letter Agreement for Easement, Right-ofWay and Surface Use by and between SurfaceOwnerandNEWFIELD,dated May 27, 2008, as full payment and satisfactionfor any and all detriment,depreciation,injury or damageof any nature to the Lands or growingcrops thereonthat may occur as a result ofNEWFIELD'sdrilling or completion operationsor its continuing activities for theproductionortransportationof oil, gas, or other hydrocarbonsor products associated with the foregoing including,but notlimitedto,surface use, access, pipelines, gathering lines, pipeline interconnections, and any and all otherreasonableor customaryusesof land related to saidoperationsor activities.
2. Grant of Right of Way and Easement
SurfaceOwner hereby grants, bargains, leases, assigns, and conveys to NEWFIELD an easementandright-of-wayfor the purpose of construction, using and maintaining access roads, locations for surfaceequipment and subsurface gathering lines for each well drilled upon theLands, pipelines, and pipelineinterconnectionsfor two years from date of this agreement and so long thereafter as NEWFIELD's oil andgas leases remain in effect.
This Agreementshall be binding upon therespective heirs, executors, administrators, successors, andassignsof theundersigned.
These Parties hereto have executed thisdocumenteffective as of the day first above written.
CLINTONAND DONETTE MOON NEWFIELD PRODUC ON COMPANY
By: y:Cli n Moon S wner ary D. Packer, Presidek
By: , MV\Dor tte Moon, Surface wner
Page l of202 08
![Page 6: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/6.jpg)
’APIW
ellNo:43013500790000’
Ent 488859 EkAB548 Pg 8271STATE OF UTAH )
)ssCOUNTYOF þÑe54C )
oThis instrumentwas acknowledgedbeforeme this Z-3 day of L C.. , 2008 by Clintonand
DonetteMoon, Surface Owners.
Witness my hand and official seal.
My commissionexpires Up ( 204/Notary Public
DAVIDALLREDNotawPublic. State ofUtahMy Commission ExpiresJuly¾ 20t1
90BNSkieRood121,Rylgggy
STATE OF COLORADO ))ss
COUNTY OF DENVER )
This instrumentwas acknowledgedbefore me this, 2008 by
Gary D. Packer, as President of Newfield Production Com , a Texas corporation, on behalf of the
y hand and official seal..
Notary Public
expires
Page 2 of 2
02-0& OS
![Page 7: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/7.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD PRODUCTION COMPANYUTE TRIBAL 4-28-4-2
NWINW (LOT #4) SECTION 28, T4S, R2WDUCHESNE COUNTY, UTAH
ONSHORE ORDER NO. 1
DRILLING PROGRAM
1. GEOLOGIC SURFACE FORMATION:
Uinta formation of Upper Eocene Age
2. ESTIMATED TOPS OF IMPORTANT GEOLOGIC MARKERS:
Uinta 0' - 1935'Green River 1935'Wasatch 6785'Base of Moderately Saline Ground Water @375'
3. ESTIMATED DEPTIIS OF ANTICIPATED WATER, OIL, GAS OR MINERALS:
Green River Formation 1935' -- 6785' - Oil
4. PROPOSED CASING PROGRAM
Please refer to the Ute Tribe Green River Development Program Standard Operating Practices(SOP).
5. MINIMUM SPECIFICATIONS FOR PRESSURE CONTROL:
Please refer to the Ute Tribe Green River Development Program Standard Operating Practices(SOP). See Exhibit "C".
6. TYPE AND CHARACTERISTICS OF THE PROPOSED CIRCULATION MUDS:
Please refer to the Ute Tribe Green River Development Program Standard Operating Practices(SOP).
7. AUXILIARY SAFETY EQUIPMENT TO BE USED:
Please refer to the Ute Tribe Green River Development Program Standard Operating Practices(SOP).
8. TESTING, LOGGING AND CORING PROGRAMS:
Please refer to the Ute Tribe Green River Development Program Standard Operating Practices(SOP).
9. ANTICIPATED ABNORMAL PRESSURE OR TEMPERATURE:
No abnormal temperatures or pressures are anticipated. No hydrogen sulfide has been encounteredor is known to exist from previous drilling in the area at this depth. Maximum
![Page 8: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/8.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
bottomhole pressure will approximately equal total depth in feet multiplied by a 0.433 psilfootgradient
10. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONS:
Please refer to the Ute Tribe Green River DevelopmentProgram Standard Operating Practices(SOP).
![Page 9: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/9.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000' 2-M SYSTEMBlowout Prevention Equipment Systems
I
EXHIBIT
![Page 10: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/10.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
ton
Soren
I I
.. . I
LLEY
i iProposed Location
Wed 4-28
en- i
. I
I
81 2 1
n oa
18 Nor1hVemal Ave. Vernal, Utah84078
Ute Tribal 4-28-4-2W. a · - · = -
SEC. 28, T4S, R2W, U.S.B.&M. - = - "A"s i I
![Page 11: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/11.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
L
L'
PLEAS/
A 6pL
£1,23 11,140' O
2710' 1.440' 21,020, 280'940 21180'
IProposed LocationWell 4·28
.2,070' ¯ -M. Eh
Legend =
¢¿-5/4/¢ Existing Road
.
a«¿S«myy fx Proposed Access435) 781-2501
1BCNorth Vemal A . vernal.UMih 64078
Well 4-28-4-2WSEC. 28, T4S, R2W, U.S.B.&M. -
![Page 12: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/12.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
PLEAS/
p L A E
230±1,14 IIne
Proposed LocationWell 4·28
2)|
I
I tillII.mii, 4
.L.egend =
494x'Semmyáy'Av. ------ Proposed Gas L.ine
435) 781.2501180 Nonh Vemal Ave Vomal. Ulah 84078
Well 4-28-4-2WSEC. 28, T4S, R2W, U.S.B.&M.
![Page 13: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/13.jpg)
’APIW
ellNo:43013500790000’
Io
iI -
Surface Spud
- le li u 7 a a le it ta r e u to 11 la e e a to 11on Compinion
• Producing onWeiProducingGas Wel
I / waterIn¡seson Wai elo is is u is a te a l a n to 17 m a 14 is u 15 15 I'
.-
Temporarir AbandonedPhigged& Abandoned
21 21 25 m .o2 21 24 to A J 29 .5 m mit 4 21
• .• J.. r A. 4, e z. eWBAirDisposal Wel
as 27 2eas
injection Staions
AT A&f. A AA' A
84446 A/A a AAAAA • s
»,, .to A/ & .L ."./ ,,, A gL st,
2. 2. J.
. 4. / / -4 / .L to y .1,,t
/ 19 / it, - J. • T•./ J.. =A • a. . i a
t. .t.r..e . s.>. .,
7.s. ...,.. x,7 a./.:," J a m -.-
...m- .f. +
C a. g.a. Al CIa. a, .n.s.-L..e.<9 v.a.M.= ./ z.J. + t =· á a a s as t. a. .s. m as s.
.tC • s .s ,s. .Un .= a..* a..(p. g in.:, -s,,,
a. .«2." L s. e is. y= ±.» A a. ,,
jf ¿..t,s..r...r...s.;,.t yarsyy J..e,4,g.•,,.x,/.". C e, e.'AA. A..e,;•,s.na. ,s."
,ga
.r/ . / æ .-r.lak Jae.-.g., i : M.''; ..Jaa..x,,.•.,.=1.,,a,.a . - /-.-
../•1•/a.s. e ... ,r,
d. A ·5* A Aa.A in & A4, 44 A st. A 4. (,A g ,p & ,+, a e- A & 3. A 4. J. And..A & A
.5. A .4 A d'. ß= .5. A & A 4 ,g, Ñ A .$. A ,S, 4 A.1 4, 5. Ja 4 ,$,.1' as b y A 4. .5. A A A..t
a ihaa.S. ? A. Em .t. . ,ag 4, .Ja.5 As.& A e .L 4 A..?.. ¿,41
A.
-
NEWFIELD s
- +ROCKY MOUNTMNS
ExWA
1477 9 101telET t i
imivmo a
![Page 14: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/14.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
P
Lf
PLEASANT
VALLEY
I.
V
g O g
Proposed LocationWell 4-28
.. 2l
i. |
I ILI F I.F••
Legend =
.
L• Áreffaw usy 'Ar O One-MueRadlus
L.. _ -. __
(435) 781-2501180 Nordo Verild Ave Vorsal. Utah 84078
Well 4-28-4-2W B-L NBETHSEC. 28, T4S, R2W, U.S.B.&M. Exhibit
![Page 15: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/15.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD PRODUCTION COMPANYWELL 4-28-4-2W
Section 28, T4S, R2W, U.S.B.&M.
PROPOSED ACCESS
C/1. 6C/1. 5
E/0.2 STA. 2+90
pi r rossort.STOCKP/LE
STA. 2+20 _ C/4.2Top of
- Cut Slope
2' Berrn Around Fi//Portion of Location
F/2.6 ,¿c. C/1.4 C/2.2
STA 1+60·¯¯¯
P/T
WELL HEAD: 'UNGRADED = 5422 O' N
F/N. GRADE = 54205° Elore pit is to
be locoted aminimum of 80'
EXCESSMATER/AL from wel/ head.
Toe of /Ei// Slope
STA 0+00
TOPSOIL (5) 9 C/1.7E/2.8 x STOfXTRE
REFERENCE POINTS210' NORTHWEST = 5421.5'260'NORTHWEST = 54226'170' NORTHEAST = 5414.7220' NORTHEAST = 5412.9'
SURVEYED BY: TH DATE SURVEYED: 06-30-08 i State "32 '"'¯2
DRAWN BY: F T.M DATE DRAWN: 07-09-08 La,nd Surveying, Inc.SCALE: 1" = 50' REVISED: 3 180 NORTH VERNAL AVE. VERNAL, UTAH
![Page 16: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/16.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD PRODUCTION COMPANYCROSS SECTIONS
WELL 4-28--4-2W
-l-
o' S M. 2+90
| | |
S M. 2+20
EX/SI/NGF/N/SHED G/MOE GRADE
SM. 1+60
= so SM. 0+00 ESTIMATED EARTHWORK QUANTITIES(No Shrink or swell adjustments have been used)
(E×pressed in Cubic Yards)
ITEM CUT FILL 6" TOPSOIL EXCESS
NOTE: PAD 1.700 1.700 TOPsoil is 0UNLESS OTHERWISE
nol includedPlT 640 0 in Pad Cut 640
NOTED ALL CUT/FILLSLOPES ARE AT 1.5:1 TOTALS 2,340 1.700 960 640
SURVEYED BY: T.H. DATE SURVEYED: 06-30-08 i State """"'¯26°'
DRAWN BY: F.T.M. DATE DRAWN: 07-09-08 La.nd Surveying, Inc.SCALE: 1" = 50' REVISED: 4 180 NORTH VERNAL AVE. VERNAL, UTAH
![Page 17: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/17.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD PRODUCTION COMPANYTYPICAL RIG LAYOUTWELL 4--28-4-2W
PROPOSED ACCESSROAO (Max 6X Grode)
ergency tol
STORAGE
CLA-SÛ
T ILET
I -I RI St R VEi pil
- 120' - 29 i - (a acep) -
SURVEYED BY: TH DATE SURVEYED: 06-30-08. i State t'3" '''-2
DRAWN BY: F.T M DATE DRAWN: 07-09-08 Land Surveyin Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNAL AVE. VERNAL, UTAH
![Page 18: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/18.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
Newfield Production CompanyProposed Site Facility Diagram
Ute Tribal 4-28-4-2
NWINW (LOT #4) Sec. 28, T4S, R2W
Duchesne County, Utah
2OGOOO5609
Well Head 55 Gallons
O Methonol
Pumping lJnit 150 Gallons LegendChemical Drums
Emulsion Line ------
LoadRack - ---------
55 GallonsWater Line -· -·-· ---·
Motor Oil I leater Gas Sales -- · · -- · -- ·
Treater Oil Line
Gas Sales Meter
II
Water Tank 6 --
400 bbl Production Phase:
1) Valves 1, 3, and 4 sealed closed
2) Valves 2, 5, and 6 sealed open
I2
Sales Phase:4 Production Tank 3 - - -1- - - - - - - - - - -
Load Rack
1) Valves 1, 2, 4, 5, and 6 sealed closed400 bbl 1 .
.
I 2) Valve 3 open
5 IDraining Phase:
2 1) Valves 1 and 6 open
Production Tank4
400 bbl3 - - - -
Diked
![Page 19: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/19.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
EXHIBIT D
Wells located on Clinton and Donette Moon(Private Land Owners)
ARCHAEOLOGICAL & PALEOTOLOGICAL REPORT WAIVER
For the above referenced location; Clinton and Donette Moon, the Private SurfaceOwner. (Having a Surface Owner Agreement with Newfield Production Company)
Clinton Moon, representing this entity does agree to waive the request from the State ofUtah and Bureau of Land Management for an Archaeological/Cultural and PaleotologicalResource Survey for any wells covered by the Surface Use Agreement dated 05/27/08between the above said private land owner and Newfield Production. This waiver herebyreleases Newfield Production Company from this request.
CÏintonMoon / Date tiradMecham DatePrivate Surface Owner Newfield Production
![Page 20: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/20.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD PRODUCTION COMPANYUTE TRIBAL 4-28-4-2
NWINW (LOT #4) SECTION 28, T4S, R2WDUCHESNE COUNTY, UTAH
ONSHORE ORDER NO. 1
MULTI-POINT SURFACE USE & OPERATIONS PLAN
L EXISTING ROADS
See attached Topographic Map "A"
To reach Newfield Production Company well location site Ute Tribal 4-28-4-2 located in the NW1/4NW 1/4 Section 28, T4S, R2W, Duchesne County,Utah:
Proceed southwesterly out of Myton, Utah along Highway 40 - 1.4 miles ± to the junctionof thishighway and UT State Hwy 53; proceed southeasterly - 5.4 miles ± to it's junctionwith an existingroad to the southwest; proceed southwesterly -0.5 miles ± to it's junctionwith the beginning ofthe proposed access road to the west; proceed along the proposed access road -- 2.2 miles ± to theproposed well location.
The aforementioned dirt oil field service roads and other roads in the vicinity are constructed outof existing native materials that are prevalent to the existing area they are located in and rangefrom clays to a sandy-clay shale material.
The roads for access during the drilling, completion and production phase will be maintained at thestandards required by the State of Utah, or other controlling agencies. This maintenance willconsist of some minor grader work for smoothing road surfaces and for snow removal. Anynecessary fill material for repair will be purchase and hauled from private sources.
2. PLANNED ACCESS ROAD
Approximately 11,810'of access road is proposed for the proposed well. See attachedTopographic Map "B".
The proposed access road will be an 18' crown road (9' either side of the centerline) with drainageditches along either side of the proposed road whether it is deemed necessary in order to handleany run-off from normal meteorological conditions that are prevalent to this area. The maximumgrade will be less than 8%.
There will be no culverts required along this access road. There will be barrow ditches andturnouts as needed along this road.
There are no fences encountered along this proposed road. There will be no new gates or cattleguards required.
All construction material for this access road will be borrowed material accumulated duringconstruction of the access road.
3. LOCATION OF EXISTING WELLS
Refer to Exhibit "B".
4. LOCATION OF EXISTING AND/0R PROPOSED
![Page 21: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/21.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
There are no existing facilities that will be used by this well.
It is anticipated that this well will be a producing oil well.
Upon construction of a tank battery, the well pad will be surrounded by a dike of sufficientcapacity to contain at minimum 110% of the largest tank volume within the facility battery.
Tank batteries will be built to State specifications.
All permanent surface equipment will be painted Carlsbad. All facilities will be painted within sixmonths of installation.
5. LOCATION AND TFPE OF WATERSUPPLY
Newfield Production will transport water by truck for drilling purposes from the following watersources:
Johnson Water DistrictWater Right : 43-7478
Neil Moon PondWater Right: 43-11787
Maurice Harvey PondWater Right: 47-1358
Newfield Collector WellWater Right: 41-3530 (A30414DV, contracted with the Duchesne County Conservancy District).
There will be no water well drilled at this site.
6. SOURCE OF CONSTRUCTION MATERIALS
All construction material for this location shall be borrowed material accumulated duringconstruction of the location site and access road.
A mineral material application is not required for this location.
7. METHODS FOR HANDLING WASTE DISPOSAL
A small reserve pit (90' x 40' x 8' deep, or less) will be constructed from native soil and claymaterials. The reserve pit will receive the processed drill cutting (wet sand, shale & rock)removed from the wellbore. Any drilling fluids, which do accumulate in the pit as a result ofshale-shaker carryover, cleaning of the sand trap, etc., will be promptly reclaimed. All drillingfluids will be fresh water based, typically containing Total Dissolved Solids of less than 3000PPM. No potassium chloride, chromates, trash, debris, nor any other substance deemed hazardouswill be placed in this pit. Therefore, it is proposed that no synthetic liner be required in the reservepit. However, if upon constructing the pit there is insufficient fine clay and silt present, a liner willbe used for the purpose of reducing water loss through percolation.
Newfield requests approval that a flare pit not be constructed or utilized on this location.
A portable toilet will be provided for human waste.
A trash basket will be provided for garbage (trash) and hauled away to an approved disposal site atthe completion of the drilling
![Page 22: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/22.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
Immediately upon first production, all produced water will be confined to a steel storage tank. Ifthe production water meets quality guidelines, it is transported to the Ashley, Monument Butte,Jonah, and Beluga water injection facilities by company or contract trucks. Subsequently, theproduced water is injected into approved Class H wells to enhance Newfield's secondary recoveryproject.
Water not meeting quality criteria, is disposed at Newfield's Pariette #4 disposal well (Sec. 7, T9SRl9E), State of Utah approved surface disposal facilities, or Federally approved surface disposalfacilities.
8. ANCILLARY FACILITIES
There are no ancillary facilities planned for at the present time and none foreseen in the nearfuture.
9. WELL SITE LAYOUT
See attached Location Layout Sheet.
Fencing Requirements
All pits will be fenced according to the followingminimum standards:
a) A 39-inch net wire shall be used with at least one strand of barbed wire on top of the net.
b) The net wire shall be no more than two (2) inches above the ground. The barbed wireshall be three (3) inches above the net wire. Total height of the fence shall be at leastforty-two (42) inches.
c) Corner posts shall be centered and/or braced in such a manner to keep tight at all times
d) Standard steel, wood or pipe posts shall be used between the corner braces. Maximumdistance between any two posts shall be no greater than sixteen (16) feet.
e) All wire shall be stretched, by using a stretching device, before it is attached to the cornerposts.
The reserve pit fencing will be on three (3) sides during drilling operations and on the fourth sidewhen the rig moves off location. Pits will be fenced and maintained until cleanup.
Existing fences to be crossed by the access road will be braced and tied off before cutting so as toprevent slacking in the wire. The opening shall be closed temporarily as necessary duringconstruction to prevent the escape of livestock, and upon completion of construction the fenceshall be repaired to BLM specifications.
10. PLANS FOR RESTORATION OF SURFACE:
a) Producing Location
Immediately upon well completion, the location and surrounding area will be cleared of all unusedtubing, equipment, debris, material, trash and junknot required for production.
The reserve pit and that portion of the location not needed for production facilities/operations willbe recontoured to the approximated natural contours. Weather permitting, the reserve pit will bereclaimed within one hundred twenty (120) days from the date of well completion. Before any dirtwork takes place, the reserve pit must have all fluids and hydrocarbons removed.
b) Dry Hole Abandoned
![Page 23: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/23.jpg)
’APIWellNo:43013500790000’'APIWellNo:430 13500790000'
At such time as the well is plugged and abandoned, the operator shall submit a subsequent reportof abandonment and the State of Utah will attach the appropriate surface rehabilitation conditionsof approval.
11. SURFACE OWNERSHIP - Clinton and Donette Moon. See attached Surface Use Agreement.
12. OTHER ADDITIONAL INFORMATION
Newfield Production Company requests l1,810' of disturbed area be granted to allow forconstruction of the planned access road. Refer to Topographic Map "B". A permanent widthof 30' and a running surface of 18' is proposed for the planned access road. The constructionphase of the planned access road will last approximately (5) days. The planned access road will bean 18' crown road (9' either side of the centerline) with drainage ditches along either side of theproposed road whether it is deemed necessary in order to handle any run-off from normalmeteorological conditions that are prevalent to this area. The maximum grade will be less than8%. There will be no culverts required along this access road. There will be barrow ditches andturnouts as needed along this road. There are no fences encountered along this proposed road.There will be no new gates or cattle guards required. All construction material for this access roadwill be borrowed material accumulated during construction of the access road.
Newfield Production Company requests 14,510' of disturbed area be granted for construction ofthe proposed gas lines. It is proposed that the disturbed area will temporarily be 50' wide to allowfor construction of a 6" gas gathering line, and a 3" poly fuel gas line, with a permanent width of30' upon completion of the proposed gas lines. The construction phase of the proposed gas lineswill last approximately (5) days. Both proposed lines will tie in to the existing pipelineinfrastructure. Refer to Topographic Map "C."
a) Newfield Production Company is responsible for informing all persons in the area whoare associated with this project that they will be subject to prosecution for knowinglydisturbing historic or archaeological sites, or for collecting artifacts. If historic orarchaeological materials are uncovered during construction, Newfield is to immediatelystop work that might further disturb such materials and contact the Authorized Officer.
b) Newfield Production will control noxious weeds along rights-of-way for roads, pipelines,well sites or other applicable facilities. On State administered land it is required that aPesticide Use Proposal shall be submitted and given approval prior to the application ofherbicides or other possible hazardous chemicals.
c) Drilling rigs and/or equipment used during drilling operations on this well site will not bestacked or stored on State Lands after the conclusion of drilling operations or at any othertime without State authorization. However, if State authorization is obtained, it is only atemporary measure to allow time to make arrangements for permanent storage oncommercial facilities.
The Archaeological and Paleontological Report Waiver is attached.
Additional Surface Stipulations
All lease and/or unit operations will be conducted in such a manner that full compliance is madewith all applicable laws and regulations, Onshore Oil and Gas Orders, the approved plan of operations andany applicable Notice to Lessees. A copy of these conditions will be furnished to the field representative toensure compliance.
Hazardous Material
![Page 24: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/24.jpg)
’APIWellNo:43013500790000’'APIWellNo:430 13500790000'
Newfield Production Company guarantees that during the drilling and completion of the Ute Tribal 4-28-4-2, Newfield will not use, produce, store, transport or dispose 10,000# annually of any of the hazardouschemicals contained in the Environmental Protection Agency's consolidated list of chemicals subject toreporting under Title III Superfund Amendments and Reauthorization Act (SARA) of 1986. Newfield alsoguarantees that during the drilling and completion of the Ute Tribal 4-28-4-2, Newfield will use, produce,store, transport or dispose less than the threshold planning quantity (T.P.Q.)of any extremely hazardoussubstances as defined in 40 CFR 355.
A complete copy of the approved APD, if applicable, shall be on location during the construction of thelocation and drilling activities.
Newfield Production Company or a contractor employed by Newfield Production shall contact the Stateoffice at (801) 722-3417, 48 hours prior to construction activities.
The State office as well as the Ute Tribe Energy and Mineral Department shall be notified upon sitecompletion prior to moving on the drilling rig.
13. LESSEE'S OR OPERATOR'S REPRENSENTATIVE AND CERTIFICATION:
Representative
Name: Dave AllredAddress: Newfield Production Company
Route 3, Box 3630Myton, UT 84052
Telephone: (435) 646-372I
CertificationPlease be advised that Newfield Production Company is considered to be the operator of well #4-28-4-2,NW/NW Section 28, T4S, R2W, Duchesne County, Utah and is responsible under the terms and conditionsof the lease for the operations conducted upon the leased lands. Bond coverage is provided by, FederalBond #WYB000493.
I hereby certify that the proposed drill site and access route have been inspected, and I am familiar with theconditions which currently exist; that the statements made in this plan are true and correct to the best of myknowledge; and that the work associated with the operations proposed here will be performed by NewfieldProduction Company and its contractors and subcontractors in conformity with this plan and the terms andconditions under which it is approved. This statement is subject to the provisions of the 18 U.S.C. 1001 forthe filing of f4a/lse9statement.
Date 4 CrozierRegulatory Specialist
Newfield Production
![Page 25: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/25.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD
Route #3 Box 3630Myton, Utah 84052
(435) 646-4825, FAX: (435) 646-3031
July 14, 2009
State of UtahDivision of Oil, Gas & MiningAttn: Diana Mason1594 West North Temple - Suite 1210P.O. Box 145801Salt Lake City, Utah 84114-5801
RE: Application for Permit to DrillUte Tribal 2-28-4-2Ute Tribal 4-28-4-2
Dear Diana:
The above mentioned locations are Exception Location. Our Land Department willsend you the required exception location letters. If you have any questions, feel free togive either Dave Allred or myself a call.
Sincerely,
Mandie Crozier ORegulatory
![Page 26: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/26.jpg)
ª
ª
·
'
'
'
'
H
'
'
HG
G
G
G
G
G
G
G
G
GG
M O N U M E N T B U T T E F I E L DM O N U M E N T B U T T E F I E L D
P L E A S A N T V A L L E Y F I E L DP L E A S A N T V A L L E Y F I E L D
2120
21
22
29
22
28
20
15
27
4301316208JENSEN 1
4301350008Moon 1-20-4-2
4301350007Moon 3-20-4-2
4301350006Moon 1-29-4-2
4301350005Moon 3-29-4-2
4301350004Moon 4-29-4-2
4301350003Moon 2-29-4-2
4301350002Moon 4-20-4-2
4301350001Moon 2-20-4-2
4301310007(2) JENSEN A-1
4301350032Federal 8-21-8-16
4301350031Federal 6-21-8-16
4301350030Federal 2-21-8-16
4301350025Federal 1-21-8-16
4301334000FEDERAL 5-21-8-16
4301333997FEDERAL 7-20-8-16
4301333995FEDERAL 8-20-8-16
4301350034Federal 11-21-8-16
4301350033Federal 10-21-8-164301333999
FEDERAL 12-21-8-16
4301333998FEDERAL 13-21-8-16
4301333996FEDERAL 10-20-8-16
4301350079Ute Tribal 4-28-4-2
4301350078Ute Tribal 3-28-4-2
4301350077Ute Tribal 2-28-4-2
4301334036UTE TRIBAL 14-21-4-2
4301334035UTE TRIBAL 15-21-4-2
4301334034UTE TRIBAL 16-21-4-2
4301333636UTE TRIBAL 13-22-4-2
Map Produced by Diana MasonMap Prepared:
Well Name: Ute Tribal 4-28-4-2API Number: 4301350079
Township 04.0 S Section 28Range 02.0 WMeridian: UBM
F1,200 0 1,200600 Feet
1:12,000
UnitsSTATUS
ACTIVE
EXPLORATORY
GAS STORAGE
NF PP OIL
NF SECONDARY
PI OIL
PP GAS
PP GEOTHERML
PP OIL
SECONDARY
TERMINATED
FieldsSTATUS
ACTIVE
COMBINED
Sections
Wells Query Events
D <all other values>
GIS_STAT_TYPE
" <Null>
APD
H DRL
4 GI
!* GS
N LA
G NEW
7 OPS
ª PA
* PGW
' POW
O RET
¸ SGW
· SOW
6 TA
" TW
¸ WD
¸ WI
=* WS
Tooele
Millard
Iron
San Juan
Kane
Juab
Uintah
Box Elder
Emery
Garfield
Grand
Utah
Beaver Wayne
Duchesne
Sevier
Summit
Rich
Washington
Carbon
Sanpete
Cache
Piute
Davis
Wasatch
Weber
DaggettSalt Lake
Morgan
Location Map
Operator: NEWFIELD PRODUCTION COMPANY
’APIW
ellNo:43013500790000’
API Number: 4301350079Well Name: Ute Tribal 4-28-4-2
Township 04.0 S Range 02.0 W Section 28Meridian: UBM
Operator: NEWFIELD PRODUCTION COMPANY
Map Prepared:Map Produced by Diana Mason
M430n1 2000-2
M430n1 2000-2 20 21 22
4301350008 secoNDARY + NEW
Moon 1-20-4-2 43013340364301334035 4301333636 TERMiNATeo . oP
M430n1 2000-2 UTE TRIBAL 14-21-4-2 gUTE TRIBAL 15-21-4-2 UTE TRIBAL 13-22-4-2
Fields RA
4301334034 s1Alus
UTE TRIBAL 16-21-4-
4301350077 3°*
Ute Tribal 2-28-4-2 IA
4301350079 4301350078 T*
4301350004 Ute Tribal 4-28-4-2 Ute Tribal 3-28-4-2 wo
Moon 4-29-4-2 $8 15M430n1 2090-
2
29
301350025
CacheRichLocation Map
4301350006 Federal1-21-8-1 /Weber
Moon 1-29-4-2 4301350003 4301350030 avisAor
Moon2-29-4-2 Federal2-21-8-16 MONUMENTBUTTEF I ELD akLakSummit
4301350032
Tooele
Utah
sate DuchesnUintah
430 1E6N208
Federal8-21-8-16 PLE A S A NT VA LLEY F I ELD JuabCarbon
4301333995 4301334000FEDERAL8-20-8-1E FEDERALS-21-8-16 Millard
Emery Grand
43013500314301333997 Federal 6-21-8-16 Beaver Wayne
FEDERAL7-20-8-16 21Garfeld
4301350034 4301350033san Juan
4301333999Federal11-21-8-16 Federal10-21-8-16 4301310007 Washington Kane
20 FEDERAL 12-21-8-16 (2) JENSENA-
4301333996FEDERAL 10-20-8-16
43013339981200 soo a 12ooFeet
FEDERAL 13-21-8-16
![Page 27: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/27.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD
ROCKY MOUNTAINS
December 9, 2009
State of Utah, Division of Oil, Gas & MiningATTN: Diana MasonPO Box 145801Salt Lake City, UT 84114-5801
RE: Exception LocationUte Tribal 4-28-4-2T4S R2W, Section 28: NWNW542'FNL 868' FWLDuchesne County, Utah
Dear Ms. Mason;
Pursuant to Rule 649-3-3 of the Oil & Gas Rules and Regulations of the State of Utah, Newfield ProductionCompany ("NPC") hereby requests an exception location for the drilling of the captioned well. Theproposed drillsite for this well is located 12' east of the drilling window required by Rule R649-3-2, whichrequires a well to be located in the center of a forty (40) acre quarter-quarter section, or a substantiallyequivalent lot or tract, with a tolerance of two hundred (200) feet in any direction from the center.
The attached plat depicts the proposed location and illustrates the deviation from the drilling window. Therequested location has been chosen at the request of the surface owner.
Please note the drillsite and all surrounding acreage within a four hundred sixty (460') foot radius is ownedby NPC and The Ute Indian Tribe. You will find a copy of The Ute Indian Tribe's consent to thisexception location attached to this letter.
If you have any questions or require further information, please do not hesitate to contact the undersignedat 303-382-4137 or by email at [email protected] . Your consideration of this matter is greatlyappreciated.
Sincepely,
Alan D. WildLand Associate
Attachment
DEC15 2869
1001 17th Street, Suite 2000 Denver, CO 80202 [303) 893-0102 Fax (303)
![Page 28: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/28.jpg)
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
NEWFIELD
ROCKY MOUNTAINS
July 29, 2009
Larry LoveUte IndianTribeEnergyMinerals Dept.P.O. Box 70Fort Duchesne,ITI' 84026
Re: ExceptionLocationUte Tribal4-28-4-2Duchesne County,Utah
Dear Mr. Love:
In accordance with Section3.1.D of the Exploration& DevelopmentAgreementdated December22, 2006among theUte Indian Tribe, Newfield Production Companyand theUte DistributionCorporation,pleasebe advised thatNewfieldis requestingapproval from theUtah Division of Oil, Gas & Mining for thefollowingwell:
Ute Tribal 4-28-4-2 -
T4S R2W, Section28: Lot4542' FNL 868' FWLDuchesne County,Utah
This well is located outsideof the drillingwindowas required by State of Utah R649-3-2. The locationwas chosen in order to accommodate the surface owner. It isnecessary to obtain your written concurrencewith this exception locationas a leaseholdowner.
Enclosed you will find a plat showingthe locationof the above referenced well. If you are in agreementtothis location,please verify your consentby signing and datingwhere indicatedon page 2 of this letter andreturning to my attention as soon as possible by email at reveland(Anewfield.comor fax to 303-893-0103.
If youhave any questionsor need further information,please do not hesitateto contactme at 303-382-4444or by email at reveland©newfield.c_ogi.l appreciate yourprompt attentionto this matter.
Sincerely,
Roxann EvelandLand Associate
DEC15 20091001 17th Sheet. Suite 2000 Denvec CO 80202 (303) 893-0102 Fax (303)
![Page 29: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/29.jpg)
’APIWellNo:43013500790000’'APIWellNo:430 13500790000'
Tot NewfieldPtodundan CoqpanyAthe Roxann Evelmd
tesland(innewfield.comsamfi303-893-0103fax
te seedatoegenowYrlimí*a4e148229 Seedan28:Let4542'R4L 860' PWLDudmacandy, Utah
Please be advisedThe Ute Indian Tribe does not havean objection to the proposed locationof theaforementioned welL
By:...
Ïià Naäie and Tidc
DEC15
![Page 30: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/30.jpg)
ON-SITE PREDRILL EVALUATIONUtah Division of Oil, Gas and Mining
Operator NEWFIELD PRODUCTION COMPANY
Well Name Ute Tribal 4-28-4-2
API Number 43013500790000 APD No 1763 Field/Unit UNDESIGNATED
Location: 1/4,1/4 NWNW Sec 28 Tw 4.0S Rng 2.0W 542 FNL 868 FWL
GPS Coord (UTM) Surface Owner Clinton and Donette Moon
Participants
Floyd Bartlett (DOGM), Tim Eaton, (Newfield Production Co.).
Regional/Local Setting & Topography
The proposed location is approximately 9 road miles southwest of Myton, UT in a sub-drainage of Pleasant Valley
Wash which drains into the Pariette Draw drainage of Duchesne County. Both of these draws contain perennial
streams somewhat consisting of irrigation runoff and seepage. Pariette Draw runs into the Green River
approximately 6 miles downstream from Ouray, Utah and about 13 miles downstream from the location. Broad
flats with those in lower Pleasant Valley frequently used for agriculture characterize the area. Flats are intersected
by drainages with gentle to moderate side slopes. Access is by State, County and existing or planned oil field
development roads. Two thousand and seventy feet of new road will be constructed to reach the location.
The proposed Ute Tribal 4-28-4-2 oil well location is in the non-irrigated area of upper Pleasant Valley. It is on a
gentle rolling terrain primarily sloping to the northeast. A swale exists to the south that runs westerly and joins a
larger swale that continues to the north. No drainages intersect the location and no diversions will be needed.
Irrigated field are approximately 1-1/2 miles to the northeast. No springs, streams, seeps or ponds are known to
exist in the immediate area.
The surface is private, owned by Mr. Clinton Moon. A surface use agreement exists. The minerals are owned by
the United States Government and held in trust for the Ute Indian Tribe. Mr. James Hereford of the BLM, who
represent the Tribe, was invited by telephone to the pre-site. He did not attend
Surface Use Plan
Current Surface Use
Grazing
Recreational
Wildlfe Habitat
New Road
MilesWell Pad Src Const Material Surface Formation
0.04 Width 199 Length 290 Onsite UNTA
Ancillary Facilities N
Waste Management Plan Adequate?
Environmental Parameters
Affected Floodplains and/or Wetlands N
Flora / Fauna
12/21/2009 Page 1
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
ON-SITE PREDRILL EVALUATIONUtah Division of Oil, Gas and Mining
Operator NEWFIELD PRODUCTION COMPANYWell Name Ute Tribal 4-28-4-2
API Number 43013500790000 APD No 1763 Field/Unit UNDESIGNATEDLocation: 1/4,1/4 NWNW Sec 28 Tw 4.0S Rng 2.0W 542 FNL 868 FWLGPS Coord (UTM) Surface Owner Clinton and Donette Moon
ParticipantsFloyd Bartlett (DOGM), Tim Eaton, (Newfield Production Co.).
Regional/Local Setting & TopographyThe proposed location is approximately 9 road miles southwest of Myton, UT in a sub-drainage of Pleasant ValleyWash which drains into the Pariette Draw drainage of Duchesne County. Both of these draws contain perennialstreams somewhat consisting of irrigation runoff and seepage. Pariette Draw runs into the Green Riverapproximately 6 miles downstream from Ouray, Utah and about 13 miles downstream from the location. Broadflats with those in lower Pleasant Valley frequently used for agriculture characterize the area. Flats are intersectedby drainages with gentle to moderate side slopes. Access is by State, County and existing or planned oil fielddevelopment roads. Two thousand and seventy feet of new road will be constructed to reach the location.
The proposed Ute Tribal 4-28-4-2 oil well location is in the non-irrigated area of upper Pleasant Valley. It is on agentle rolling terrain primarily sloping to the northeast. A swale exists to the south that runs westerly and joins alarger swale that continues to the north. No drainages intersect the location and no diversions will be needed.Irrigated field are approximately 1-1/2 miles to the northeast. No springs, streams, seeps or ponds are known toexist in the immediate area.
The surface is private, owned by Mr. Clinton Moon. A surface use agreement exists. The minerals are owned bythe United States Government and held in trust for the Ute Indian Tribe. Mr. James Hereford of the BLM, whorepresent the Tribe, was invited by telephone to the pre-site. He did not attend
Surface Use PlanCurrent Surface UseGrazingRecreationalWildlfe Habitat
New Road Well Pad Src Const Material Surface FormationMiles0.04 Width 199 Length 290 Onsite UNTA
Ancillary Facilities N
Waste Management Plan Adequate?
Environmental ParametersAffected Floodplains and/or Wetlands N
Flora / Fauna
I
12/21/2009 Page
![Page 31: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/31.jpg)
Fair desert shrub type vegetation consisting of sitanion hystrix, broom snakeweed, black sage, cheatgrass,
halogeton, , winter fat, prickly pear, globe mallow, shadscale, curly mesquite, horsebrush, Indian ricegrass
and spring annuals.
Cattle, deer, prairie dogs, small mammals and birds.
.
Soil Type and Characteristics
Moderately deep sandy, shaley, clay loam with small surface rock
Erosion Issues N
Sedimentation Issues N
Site Stability Issues N
Drainage Diverson Required? N
Berm Required? N
Erosion Sedimentation Control Required? N
Paleo Survey Run? N Paleo Potental Observed? N Cultural Survey Run? N Cultural Resources?
Reserve Pit
Site-Specific Factors Site Ranking
Distance to Groundwater (feet) 100 to 200 5
Distance to Surface Water (feet) >1000 0
Dist. Nearest Municipal Well (ft) >5280 0
Distance to Other Wells (feet) 300 to 1320 10
Native Soil Type Mod permeability 10
Fluid Type Air/mist 0
Drill Cuttings
Annual Precipitation (inches)
Affected Populations
Presence Nearby Utility Conduits
Final Score 25 1 Sensitivity Level
Characteristics / Requirements
A reserve pit 40' x 80' x 8' deep will be located in an area of cut on the southwest side of the location. A pit
liner is required. Newfield commonly uses a 16 mil liner.
Closed Loop Mud Required? N Liner Required? Y Liner Thickness 16 Pit Underlayment Required? Y
Other Observations / Comments
Floyd Bartlett 8/24/2009
Evaluator Date / Time
12/21/2009 Page 2
’APIWellNo:43013500790000’'APIWellNo:43013500790000'
Fair desert shrub type vegetation consisting of sitanion hystrix, broom snakeweed, black sage, cheatgrass,halogeton, , winter fat, prickly pear, globe mallow, shadscale, curly mesquite, horsebrush, Indian ricegrassand spring annuals.
Cattle, deer, prairie dogs, small mammals and birds.
Soil Type and CharacteristicsModerately deep sandy, shaley, clay loam with small surface rock
Erosion Issues N
Sedimentation Issues N
Site Stability Issues N
Drainage Diverson Required? N
Berm Required? N
Erosion Sedimentation Control Required? N
Paleo Survey Run? N Paleo Potental Observed? N Cultural Survey Run? N Cultural Resources?
Reserve Pit
Site-Specific Factors Site Ranking
Distance to Groundwater (feet) 100 to 200 5Distance to Surface Water (feet) >1000 0Dist. Nearest Municipal Well (ft) >5280 0
Distance to Other Wells (feet) 300 to 1320 10Native Soil Type Mod permeability 10
Fluid Type Air/mist 0Drill Cuttings
Annual Precipitation (inches)Affected Populations
Presence Nearby Utility ConduitsFinal Score 25 1 Sensitivity Level
Characteristics / RequirementsA reserve pit 40' x 80' x 8' deep will be located in an area of cut on the southwest side of the location. A pitliner is required. Newfield commonly uses a 16 mil liner.
Closed Loop Mud Required? N Liner Required? Y Liner Thickness 16 Pit Underlayment Required? Y
Other Observations / Comments
Floyd Bartlett 8/24/2009Evaluator Date / Time
I
12/21/2009 Page
![Page 32: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/32.jpg)
APD No API WellNo Status Well Type Surf Owner CBM
1763 43013500790000 LOCKED OW P No
Operator NEWFIELD PRODUCTION COMPANY Surface Owner-APD Clinton and Donette Moon
Well Name Ute Tribal 4-28-4-2 Unit
Field UNDESIGNATED Type of Work DRILL
Location NWNW 28 4S 2W U 542 FNL 868 FWL GPS Coord (UTM) 575006E 4440318N
Geologic Statement of Basis
The mineral rights for the proposed well are owned by the Ute Tribe. The BLM will be the agency responsible
for evaluating and approving the drilling, casing and cementing programs.
Brad Hill
APD Evaluator
9/1/2009
Date / Time
Surface Statement of Basis
The proposed location is approximately 9 road miles southwest of Myton, UT in a sub-drainage of Pleasant
Valley Wash which drains into the Pariette Draw drainage of Duchesne County. Both of these draws contain
perennial streams somewhat consisting of irrigation runoff and seepage. Pariette Draw runs into the Green
River approximately 6 miles downstream from Ouray, Utah and about 13 miles downstream from the location.
Broad flats with those in lower Pleasant Valley frequently used for agriculture characterize the area. Flats are
intersected by drainages with gentle to moderate side slopes. Access is by State, County and existing or planned
oil field development roads. Two thousand and seventy feet of new road will be constructed to reach the
location.
The proposed Ute Tribal 4-28-4-2 oil well location is in the non-irrigated area of upper Pleasant Valley. It is on
a gentle rolling terrain primarily sloping to the northeast. A swale exists to the south that runs westerly and
joins a larger swale that continues to the north. No drainages intersect the location and no diversions will be
needed. Irrigated field are approximately 1-1/2 miles to the northeast. No springs, streams, seeps or ponds are
known to exist in the immediate area.
The surface is private, owned by Mr. Clinton Moon. A surface use agreement exists. The minerals are owned
by the United States Government and held in trust for the Ute Indian Tribe. Mr. James Hereford of the BLM,
who represent the Tribe, was invited by telephone to the pre-site. He did not attend
Floyd Bartlett
Onsite Evaluator
8/24/2009
Date / Time
Conditions of Approval / Application for Permit to Drill
Category Condition
Pits A synthetic liner with a minimum thickness of 16 mils with a felt subliner shall be properly installed and maintained in thereserve pit.
Surface The well site shall be bermed to prevent fluids from leaving the pad.
Surface The reserve pit shall be fenced upon completion of drilling operations.
Application for Permit to Drill
Statement of Basis12/21/2009 Utah Division of Oil, Gas and Mining Page 1
’APIWellNo:43013500790000’'APIWellNo:43013500790000'I
Application for Permit to DrillStatement of Basis
12/21/2009 Utah Division of Oil, Gas and Mining Py 1
I
APD No API WellNo Status Well Type Surf Owner CBM1763 43013500790000 LOCKED OW P NoOperator NEWFIELD PRODUCTION COMPANY Surface Owner-APD Clinton and Donette MoonWell Name Ute Tribal 4-28-4-2 UnitField UNDESIGNATED Type of Work DRILLLocation NWNW 28 4S 2W U 542 FNL 868 FWL GPS Coord (UTM) 575006E 4440318NGeologic Statement of Basis
The mineral rights for the proposed well are owned by the Ute Tribe. The BLM will be the agency responsiblefor evaluating and approving the drilling, casing and cementing programs.
Brad Hill 9/1/2009APD Evaluator Date / Time
Surface Statement of BasisThe proposed location is approximately 9 road miles southwest of Myton, UT in a sub-drainage of PleasantValley Wash which drains into the Pariette Draw drainage of Duchesne County. Both of these draws containperennial streams somewhat consisting of irrigation runoff and seepage. Pariette Draw runs into the GreenRiver approximately 6 miles downstream from Ouray, Utah and about 13 miles downstream from the location.Broad flats with those in lower Pleasant Valley frequently used for agriculture characterize the area. Flats areintersected by drainages with gentle to moderate side slopes. Access is by State, County and existing or plannedoil field development roads. Two thousand and seventy feet of new road will be constructed to reach thelocation.
The proposed Ute Tribal 4-28-4-2 oil well location is in the non-irrigated area of upper Pleasant Valley. It is ona gentle rolling terrain primarily sloping to the northeast. A swale exists to the south that runs westerly andjoins a larger swale that continues to the north. No drainages intersect the location and no diversions will beneeded. Irrigated field are approximately 1-1/2 miles to the northeast. No springs, streams, seeps or ponds areknown to exist in the immediate area.
The surface is private, owned by Mr. Clinton Moon. A surface use agreement exists. The minerals are ownedby the United States Government and held in trust for the Ute Indian Tribe. Mr. James Hereford of the BLM,who represent the Tribe, was invited by telephone to the pre-site. He did not attend
Floyd Bartlett 8/24/2009Onsite Evaluator Date / Time
Conditions of Approval / Application for Permit to DrillCategory ConditionPits A synthetic liner with a minimum thickness of 16 mils with a felt subliner shall be properly installed and maintained in the
reserve pit.Surface The well site shall be bermed to prevent fluids from leaving the pad.Surface The reserve pit shall be fenced upon completion of drilling
![Page 33: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/33.jpg)
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 7/14/2009 API NO. ASSIGNED: 43013500790000
WELL NAME: Ute Tribal 4-28-4-2
OPERATOR: NEWFIELD PRODUCTION COMPANY (N2695) PHONE NUMBER: 435 646-4825
CONTACT: Mandie Crozier
PROPOSED LOCATION: NWNW 28 040S 020W Permit Tech Review:
SURFACE: 0542 FNL 0868 FWL Engineering Review:
BOTTOM: 0542 FNL 0868 FWL Geology Review:
COUNTY: DUCHESNE
LATITUDE: 40.11172 LONGITUDE: -110.11989
UTM SURF EASTINGS: 575006.00 NORTHINGS: 4440318.00
FIELD NAME: UNDESIGNATED
LEASE TYPE: 2 - Indian
LEASE NUMBER: 2OG0005609 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 4 - Fee COALBED METHANE: NO
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - WYB000493 Unit:
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: 43-7478 Board Cause No: R649-3-3
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
Comments: Presite Completed IRR SEC:
Stipulations: 1 - Exception Location - bhill 4 - Federal Approval - dmason 5 - Statement of Basis - bhill 23 - Spacing - dmason
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
I
I
APD RECEIVED: 7/14/2009 API NO. ASSIGNED: 43013500790000
WELL NAME: Ute Tribal 4-28-4-2
OPERATOR: NEWFIELD PRODUCTION COMPANY (N2695) PHONE NUMBER: 435 646-4825
CONTACT: Mandie Crozier
PROPOSED LOCATION: NWNW 28 040S 020W Permit Tech Review:
SURFACE: 0542 FNL 0868 FWL Engineering Review:
BOTTOM: 0542 FNL 0868 FWL Geology Review:
COUNTY: DUCHESNE
LATITUDE: 40.11172 LONGITUDE: -110.11989
UTM SURF EASTINGS: 575006.00 NORTHINGS: 4440318.00
FIELD NAME: UNDESIGNATED
LEASE TYPE: 2 - Indian
LEASE NUMBER: 2OGOOO5609 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 4 - Fee COALBED METHANE: NO
I
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - WYBOOO493 Unit:
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: 43-7478 Board Cause No: R649-3-3
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
I
Comments: Presite CompletedIRR SEC:
Stipulations: 1 - Exception Location - bhill4 - Federal Approval - dmason5 - Statement of Basis - bhill23 - Spacing -
![Page 34: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/34.jpg)
Permit To Drill
******************Well Name: Ute Tribal 4-28-4-2
API Well Number: 43013500790000
Lease Number: 2OG0005609
Surface Owner: FEE (PRIVATE)
Approval Date: 12/23/2009
Issued to:NEWFIELD PRODUCTION COMPANY , Rt 3 Box 3630 , Myton, UT 84052
Authority:Pursuant to Utah Code Ann. §40-6-1 et seq., and Utah Administrative Code R649-3-1 et seq., the UtahDivision of Oil, Gas and Mining issues conditions of approval, and permit to drill the listed well. This permitis issued in accordance with the requirements of R649-3-3. The expected producing formation or pool is theGREEN RIVER Formation(s), completion into any other zones will require filing a Sundry Notice (Form 9).Completion and commingling of more than one pool will require approval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operation isunderway, or a request for extension is made prior to the expiration date
Exception Location:Appropriate information has been submitted to DOGM and administrative approval of the requestedexception location is hereby granted.
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas Conservation GeneralRules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtained prior todrilling.
This proposed well is located in an area for which drilling units (well spacing patterns) have not beenestablished through an order of the Board of Oil, Gas and Mining (the “Board”). In order to avoid thepossibility of waste or injury to correlative rights, the operator is requested, once the well has been drilled,completed, and has produced, to analyze geological and engineering data generated therefrom, as well as anysimilar data from surrounding areas if available. As soon as is practicable after completion of its analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which the well is located isbeing drained, the operator is requested to seek an appropriate order from the Board establishing drilling andspacing units in conformance with such analysis by filing a Request for Agency Action with the Board.
Compliance with the Conditions of Approval/Application for Permit to Drill outlined in the Statement ofBasis (copy attached).
API Well No: 43013500790000API Well No: 43013500790000
State of UtahDEPARTMENT OF NATURAL RESOURCES
- MICHAEL R. STYLER
GARY R. HERBERT Excutiw Drotor
comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor
Permit To Drillkkkkkkkkkkkkkkkkkk
Well Name: Ute Tribal 4-28-4-2API Well Number: 43013500790000
Lease Number: 2OGOOO5609Surface Owner: FEE (PRIVATE)Approval Date: 12/23/2009
Issued to:NEWFIELD PRODUCTION COMPANY , Rt 3 Box 3630 , Myton, UT 84052
Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., the UtahDivision of Oil, Gas and Mining issues conditions of approval, and permit to drill the listed well. This permitis issued in accordance with the requirements of R649-3-3. The expected producing formation or pool is theGREEN RIVER Formation(s), completion into any other zones will require filing a Sundry Notice (Form 9).Completion and commingling of more than one pool will require approval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operation isunderway, or a request for extension is made prior to the expiration date
Exception Location:Appropriate information has been submitted to DOGM and administrative approval of the requestedexception location is hereby granted.
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas Conservation GeneralRules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtained prior todrilling.
This proposed well is located in an area for which drilling units (well spacing patterns) have not beenestablished through an order of the Board of Oil, Gas and Mining (the "Board"). In order to avoid thepossibility of waste or injury to correlative rights, the operator is requested, once the well has been drilled,completed, and has produced, to analyze geological and engineering data generated therefrom, as well as anysimilar data from surrounding areas if available. As soon as is practicable after completion of its analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which the well is located isbeing drained, the operator is requested to seek an appropriate order from the Board establishing drilling andspacing units in conformance with such analysis by filing a Request for Agency Action with the Board.
Compliance with the Conditions of Approval/Application for Permit to Drill outlined in the Statement ofBasis (copy
![Page 35: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/35.jpg)
Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well: • Within 24 hours following the spudding of the well – contact Carol Daniels at 801-538-5284 (please leave a voicemail message if not available) OR submit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas website at https://oilgas.ogm.utah.gov
Reporting Requirements:All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Rules will bepromptly filed with the Division of Oil, Gas and Mining, including but not limited to: • Entity Action Form (Form 6) – due within 5 days of spudding the well • Monthly Status Report (Form 9) – due by 5th day of the following calendar month • Requests to Change Plans (Form 9) – due prior to implementation • Written Notice of Emergency Changes (Form 9) – due within 5 days • Notice of Operations Suspension or Resumption (Form 9) – due prior to implementation • Report of Water Encountered (Form 7) – due within 30 days after completion • Well Completion Report (Form 8) – due within 30 days after completion or plugging
Approved By:
Gil HuntAssociate Director, Oil & Gas
API Well No: 43013500790000API Well No: 43013500790000
Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:
• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov
Reporting Requirements:All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Rules will bepromptly filed with the Division of Oil, Gas and Mining, including but not limited to:
• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging
Approved By:
Gil HuntAssociate Director, Oil &
![Page 36: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/36.jpg)
STATE OF UTAHO DEPARTMENT OF NATURAL RESOURCES5. LEASE DESIGNATION AND SERIALNUMBER:
DIVISION OF OIL, GAS AND MINING MON BUTTE EDA 20G0005609
SUNDRY NOTICES AND REPORTS ON WELLS6. IFINDIAN,ALLOTTEEORTRIBENAME:
Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-holedepth, reenter plugged 7. UNIT or CA AGREEMENT NAME:
wells, or to drill horizontal laterals. Use APPLICATIONFOR PERMIT TO DRILL form for such proposals.
I. TYPE OF WELL: 8. WELL NAME and NUMBER:
OIL WELL GAS WELL OTHER UTE TRIBAL 4-28-4-2
2. NAME OF OPERATOR: 9. API NUMBER:
NEWFIELD PRODUCTION COMPANY 43013500793. ADDRESSOF OPERATOR: PHONE NUMBER 10. FIELD AND POOL, OR WILDCAT:
Route 3 Box 3630 CITY Myton STATE UT ZIP 84052 435.646.3721 MYTON/TRIBAL EDA4. LOCATION OF WELL:
FOOTAGES AT SURFACE: COUNTY: DUCHESNE
OTRIOTR. SECTION.TOWNSHIP. RANGE. MERIDIAN: NWNW, 28, T4S, R2W STATE: UT
a CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION
O ACIDIZE DEEPEN O REPERFORATE CURRENT FORMATION
O NOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL
Approximate date work will CASINGREPAIR NEW CONSTRUCTION TEMPORARITLY ABANDON
O CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR
O CHANGE TUBING PLUG AND ABANDON VENT OR FLAIR
SUBSEOUENT REPORT Q CHANGE WELL NAME PLUGBACK WATER DISPOSAL
(SubmitOriginalForm Only) O CHANGE WELL STATUS PRODUCTION (START/STOP) WATER SHUT-OFF
Date of Work Completion: O COMMINGLE PRODUCINGFORMATIONS RECLAMATIONOF WELL SITE OTHER: - Weekly Status Report
05/04/20 10 CONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details includingdates, depths, volumes, etc.
The above subject well was completed on 05-04-10, attached is a daily completion status report.
NAME (PLEASE PRINT) Lucy Chavez-Naupoto TITLE Administrative Assistant
SIGNATURE _ DATE 05/13/2010
(ThisspaceforStateuseonly) * RECE1VEDMAY18 2010
DIV.0FOlL,GAS&
![Page 37: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/37.jpg)
Summary Rig Activity Page 1 of 2
Daily Activity Report
Format For Sundry
UTE TRIBAL 4-28-4-23/1/2010 To 7/30/2010
4/22/2010 Day: 1 Completion
Rigless on 4/22/2010 - Run CBL & perforate 1st stage - Install 5m frac head. NU 6" 5KCameron BOP. RU hot oil truck & pressure test casing, blind rams, frac head, & casing valvesto 4500 psi w/ 2 bw. RU The Perforators LLC WLT w/ mast & run CBL under pressure. WLTD @6902 ' w/ cement top @ surface. Perforate stage #1, Wstch sds (6743'-45') w/ 3 1/8" Portplug guns (11 gram .36" EH 16.82" pen) w/3 spf for a total of 6 shots. BsCarb sds (6693'-95')w/ 3 1/8" Port plug guns (11 gram .36" EH 16.82" pen) w/ 3 spf for a total of 6 shots. BsCarbsds (6679'-81') w/ 3 1/8" Port plug guns (11 gram .36" EH 16.82" pen) w/ 3 spf for a total of6 shots. BsCarb sds (6654'-56') w/ 3 1/8" Port plug guns (11 gram .36" EH 16.82" pen) w/ 3spf for a total of 6 shots. BsCarb sds (6640'-44') w/ 3 1/8" Port plug guns (11 gram .36" EH16.82" pen) w/3 spf for a total of 12 shots. BsCarb sds (6620'-22') w/ 3 1/8" Port plug guns(11 gram .36" EH 16.82" pen) w/ 3 spf for a total of 6 shots. RD The Peforators LLC WLT.Daily Cost: $0Cumulative Cost: $10,728
4/30/2010 Day: 2 Completion
Rigless on 4/30/2010 - Frac welL - MIRU PSI WLT & BJ Services. Frac stage #1. Perforate &frac stages 2-4. EWTR 4780. RU Flowback equipment. Open well to pit for flowback. Flowbackwell for 8.5 hrs to recover 1275 bbis. Turned to oil. SIWFN. WSIP 1500 psi. EWTR 3505 BBLS.Daily Cost: $0Cumulative Cost: $40,265
5/2/2010 Day: 3 Completion
WWS #3 on 5/2/2010 - RUSU. Set kill plug. Prep & tal\y tbg. TIH picking up & drifting tbg. -
MIRUSU WWS #3. Check well pressure. 1600 psi. RU PSI WLT. RIH w/ wireline to set kill plug.Set CBP @ 4650'. POOH w/ wireline. RD PSI WLT. ND Cameron BOP. Break out frac head. MUwellhead. NU Schaffer BOP. Prep & tally tbg. MU 4 3/4" Weatherford chornp bit, bit sub, &PSN. TIH picking up & drifting tbg. Tag kill plug PU & RU power swivel. Drill out kill plug.Circulate out oil & gas. Continue TIH w/ tbg. Tag CBP @ 4770'. Drill out plug. Continue pickingup tbg. Tag next CBP. Dril\ out plug. Circulate well clean. SDFNDaily Cost: $0Cumulative Cost: $57,750
5/4/2010 Day: 4 Completion
WWS #3 on 5/4/2010 - Clean out to PBTD. Flow well - Check well pressure. TBG 1100 psi.CSG 1100 psi. Continue picking up tbg to tag next CBP @ 6420'. Drill out plug. Continuepicking up tbg to tag fill @ 6754'. Clean out sand to PBTD @ 6462'. Circulat clean. RD powerswivel. LD 3 jts tbg. Flow well for 5 hrs while waiting on brine water to recover 550 bbls.SDFN EWTR 2955 BBLS - Check pressure. CSG 500 psi. TBG 750 psi. Pump 35 bw down tbg.TIH w/ tbg to tag PBTD @ 6962'. No new fill. LD excess tbg. Circulate well w/ 220 bbls 10#brine. TOOH w/ tbg. Get out of hole w/ 209 jts tbg. LD bit & bit sub. MU btm hole assambly.TIH w/ tbg detail @ follows. NC, 2 jts 2 7/8" j-55 6.5# EUE tbg, PSN, 1 jt, TAC, & 206 jts tbg.Get in hole w/ tbg. RD workfloor. ND BOP. Set TAC. MU B-1 adapter flange. Land tbg on
http://www.inewfield.com/denver/SumActRpt.asp?RC=159619&API=4301350079&Min...
![Page 38: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/38.jpg)
Summary Rig Activity Page 2 of 2
wellhead w/ 18000# tension. X-over to rod equipment. Flush tbg w/ 60 bw. PU & prime newCentral Hydraulic 2 1/2" x 1 1/2" x 17' x 20' RHAC pump. TIH picking up rod detail @ follows.6- 1 1/2" wt bars, 20 - 3/4" guided rods, 144 - 3/4" slick rods, & 100 7/8" guided rods. Get inhole w/ rods. Space out pump w/ 1 - 2' & 1 - 4' x 7/8" pony subs. MU new 1 1/2" × 26'polished rod. RU pumping unit. TBG satnding full. Stroke test pump to 800 psi w/ unit. Goodpump action. RDMOSU. PWOP @ 5:00 PM W/ 76" SL @ 5 SPM FINAL REPORT! EWTR 2955BBLS - Check well pressure. TBG 1100 psi. CSG 1100 psi. Continue picking up tbg to tag nextCBP @ 6420'. Drill out plug. Continue picking up tbg to tag fill @ 6754'. Clean out sand toPBTD @ 6462'. Circulat clean. RD power swivel. LD 3 jts tbg. Flow well for 5 hrs while waitingon brine water to recover 550 bbis. SDFN EWTR 2955 BBLS - Check pressure. CSG 500 psi.TBG 750 psi. Pump 35 bw down tbg. TIH w/ tbg to tag PBTD © 6962'. No new fill. LD excesstbg. Circulate well w/ 220 bbis 10# brine. TOOH w/ tbg. Get out of hole w/ 209 jts tbg. LD bit& bit sub. MU btm hole assambly. TIH w/ tbg detail @ follows. NC, 2 jts 2 7/8" j-55 6.5# EUEtbg, PSN, 1 jt, TAC, & 206 jts tbg. Get in hole w/ tbg. RD workfloor. ND BOP. Set TAC. MU B-1adapter flange. Land tbg on wellhead w/ 18000# tension. X-over to rod equipment. Flush tbgw/ 60 bw. PU & prime new Central Hydraulic 2 1/2" x 1 1/2" x 1T x 20' RHAC pump. TIHpicking up rod detail @ follows. 6- 1 1/2" wt bars, 20 - 3/4" guided rods, 144 - 3/4" slick rods,& 100 7/8" guided rods. Get in hole w/ rods. Space out pump w/ 1 - 2' & 1 - 4' x 7/8" ponysubs. MU new 1 1/2" x 26' polished rod. RU pumping unit. TBG satnding full. Stroke test pumpto 800 psi w/ unit. Good pump action. RDMOSU. PWOP @ 5:00 PM W/ 76" SL @ 5 SPM FINALREPORT! EWTR 2955 BBLS FinalizedDaily Cost: $0Cumulative Cost: $63,053
Pertinent Files: Go to File List
http://www.inewfield.com/denver/SumActRpt.asp?RC=159619&API=4301350079&Min...
![Page 39: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/39.jpg)
Form 3160-4(August 2007)
UNITED STATESFORM APPROVED
O DEPARTMENT OF THE INTERIOR OMBNO. 1004-0137BUREAU OF LAND MANAGEMENT Expires: July 31, 2010
WELL COMPLETION OR RECOMPLETION REPORT AND LOG 5. Lease Serial No.EDA 2OGOOO5609
a. Type of Well Oil Well Gas Well Dry D Other 6. If Indian, Allottee or Tribe Nameb. Type of Completion; G New Well Work Over Deepen Plug Back Diff. Resvr.,
Other: 7. Unit or CA Agreement Name and No.
2. Name of Operator 8. Lease Name and Well No.NEWFIELD EXPLORATION COMPANY UTE TRIBAL4-28-4-23. Address 3a. Phone No. (include area code) 9. AFI Well No.
1401 17TH ST. SUITE 1000 DENVER, CO 80202 (435)646-3721 43-013-500794 Location of Well (Report location clearly and in accordance with Federal requirements)* I0. Field and Pool or Exploratory
MONUMENT BUTTEAt surface 542' FNL & 868' FWL (NW/NW) SEC. 28, T4S, RTW-tvV 11. Sec., T., R., M., on Block and
Survey or AreaSEC.28,T45,R1W
At top prod. interval reported below 12. County or Parish 13. State
At total depth 7015' DUCHESNE UT14. Date Spudded 15. Date T.D. Reached 16. Date Completed 05/04/2010 17. Elevations (DF, RKB, RT, GL)*04/03/2010 04/13/2010 D & A g Ready to Prod. 5422' GL 5434' KB\ 8. Total Depth: MD 7015' 19. Plug Back T.D.: MD 6902' 20. Depth Bridge Plug Set: MD
TVD TVD TVD21. Type Electric & Other Mechanical Logs Run (Submit copy of each) 22. Was well cored? No Yes (Submit analysis)DUAL IND GRD, SP, COMP. DENSITY,COMP. NEUTRON,GR,CALIPER, CMT BOND WasDSTrun? No Yes (Submitreport)
Directional Survey? O No Yes (Submit copy)23. Casing and Liner Record (Report all strings set in well)
Hole Size Size/Grade Wt. (#/ft.) Top (MD) Bottom (MD) Stage Cemhenter of SCkeut
SluœrryVol. Cement Top* Amount Pulled
12-1/4" 8-5/8" J-55 24# 0 319' 160 CLASS G7-7/8" 5-1/2" J-55 15.5# 0 7007' 300 PRIMLITE 00'
466 50/50 POZ
24. Tubing RecordSize Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) PackerDepth (MD)
2-7/8" EOT@ 6833' TA @6731'25. Producing Intervals 26. Perforation Record
Formation Top Bottom Perforated Interval Size No. Holes Perf. StatusA) Green River 6620-6745' WstchSd BsC .36" 3 42B) Green River 6438-6551' CPL .34" 3 30C) Green River 6257-6390' CP1 CP2 CP3 .34" 3 33
.D) Green River 4715-4719' GB4 .40" 3 1227. Acid, Fracture, Treatment, Cement Squeeze, etc.
Depth Interval Amount and Type of Material6620-6745' Frac w/ 74706#'s 30/50 sand in 1963 bb\s of slick water.6438-6551' Frac w/ 65764#'s 30/50 sand in 1955 bbis of slick water.6257-6390' Frac w/ 75411#'s 20/40 sand in 480 bbis of Lightning 17 fluid.4715-4719' Frac wl 7138#'s 20/40 sand in 78 bbis of Lightning 17 fluid.28. Production - Interval ADate First Test Date Hours Test Oil Gas Water Oil Gravity 3as Production MethodProduced Tested Production BBL MCF BBL Corr. API 3ravity 2-1/2" x 1-1/2" x 17' x 20' RHAC Pump5-4-10 5-15-10 24 50 0 93
Choke Tbg. Press. Csg. 24 Hr Oil Gas Water Gas/Oil Well StatusSize FIwg. Press. Rate BBL MCF BBL Ratio PRODUCING
SI
28a. Production - Interval BDate First fest Date Hours Test Oil Gas Water Oil Gravity 3as Production MethodProduced fested Production BBL MCF BBL Corr. API Gravity
Choke fbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well Status DECEIVEDSize Flwg. Press. Rate BBL MCF BBL Ratio
SI + JUNO1 2010*(See instructions and spaces for additional data on page 2)
DIV.0FOIL,GAS&
![Page 40: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/40.jpg)
28b. Production - Interval CDate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity
Choke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize FIwg. Press. Rate BBL MCF BBL Ratio
SI
28c. Production - Interval DDate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity
Choke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize FIwg. Press. Rate BBL MCF BBL Ratio
SI
29. Disposition of Gas (Solid, usedfor fuel,vented, etc.)
USED FOR FUEL
30. Summary of Porous Zones (Include Aquifers): 31. Formation (Log) Markers
Show all important zones of porosity and contents thereof: Cored intervals and all drill-stem tests' GEOLOGICAL MARKERSmeluding depth interval tested, cushion used, time tool open, flowing and shut-in pressures andrecoveries.
Top
Formation Top Bottom Descriptions, Contents, etc. NameMeas. Depth
GARDEN GULCH MRK 4200'GARDENGULCH 1 4422'
GARDEN GULCH 2 4548'POINT3 483T
X MRKR 5090'Y MRKR 5123'
DOUGALS CREEK MRK 5242°
BI CARBONATE MRK 5504'
B LIMESTON MRK 5649'CASTLE PEAK 6179'
BASAL CARBONATE 6570'WASATCH 6697'
32. Additional remarks (include plugging procedure):
33. Indicate which items have been attached by placing a check in the appropriate boxes:
Electrical/Mechanical Logs (1 full set req'd.) Geologic Report DST Report Directional Survey
Sundry Notice for plugging and cement verification Core Analysis Other: Drilling Daily Activity
34. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records (see attached instructions)*
Name e L C v aup Title Administrative Assistant
Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any
false, fictitious or fraudulent statements or representations as to any matter withín its.jurisdiction.
(Continued on page 3) (Form 3160-4, page
![Page 41: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/41.jpg)
' Summary Rig Activity Page 1 of 2
Daily Activity Report
Format For Sundry
UTE TRIBAL 4-28-4-22/1/2010 To 6/30/2010
UTE TRIBAL 4-28-4-2 Waiting on CementDate: 4/5/2010Ross #21 at 320. Days Since Spud - On 4/3/10 Ross Rig #21 spud Ute Tribal 4-28-4-2, drilled320' of 12 1/4" hole, and ran 7 jts 8 5/8" - casing (guide shoe, shoe jt, baffle plate, 6 jts) set
@ 319.03' KB. On 4/5/10 BJ Services cemented - Returned 5 bbis to pit. - 8 5/8" casing w/160 sks Class "G" + 2% CaCl2 + 0.25#|sk Cello Flake at 15.8 ppg w/ 1.17 yield.Daily Cost: $0Cumulative Cost: $30,517
UTE TRIBAL 4-28-4-2 Waiting on CementDate: 4/10/2010NDSI #1 at 906. 1 Days Since Spud - Test Kelly ,Safety valve, Pipe rams, blind rams andchoke manifold to 2000# for 10 minutes, test - Move rig w/ RW Jones to UT 4-28-4-2 and rigup and set equipment - Pick up bit and mud motor, motor leaking oil, wait for a new one - P/Ubit ,.208 hunting m.m, Monel, directional tools,and 7 drill collar gain circulation tag @ 307 -
Drill 7 7/8" hole F/307 to 906 w/ 18K WOB,TRPM-122,GPM-326,Avg ROP-120 ft/hr - No H2Sor flow in last 24 hours - Surface casing to 1500 # for 30 minunes, ( flange on well head wasleaking and had to fix it)Daily Cost: $0Cumulative Cost: $52,872
UTE TRIBAL 4-28-4-2 Drill 7 7/8" hole with fresh waterDate: 4/11/2010NDSI #1 at 4129. 2 Days Since Spud - Slid 13' 3.6 degree 3285-3298, slid 15' 3.69 degree3316'-3331, slid 12' 4035'-4047' - Drill 7 7/8" hole F/ 1094' to 4129' w/ 20K WOB,TRPM-128,GPM-352,Avg ROP-132 ft/hr - Rig Service , check crownomatic and BOP - Drill 7 7/8" holeF/ 906' to 1094' w/ 20K WOB,TRPM128,GPM-352 Avg ROP-188 ft/hr - No H2S or flow in last24 hoursDaily Cost: $0Cumulative Cost: $80,443
UTE TRIBAL 4-28-4-2 Drill 7 7/8" hole with fresh waterDate: 4/12/2010NDSI #1 at 6041. 3 Days Since Spud - Drill 7 7/8" hole F/ 4224' to 5034' w/ 20K WOB,TRPM-124,GPM-353,Avg ROP-85 ft/hr - No H2S or flow in last 24 hours - Drill 7 7/8" hole F/ 5034' to6041' w/ 20K WOB,TRPM-124,GPM-336, Avg ROP-134 ft/hr - Kelly up and wash down 25 ft,fan bottom - TOOH, Change bit and TIH w/ bit # 2 - Circulate Bottoms up for trip, bit - RigService, check crownomatic and BOP - Drill 7 7/8" hole F/ 4129 to 4224' w/ 20K WOB,TRPM-128,GPM-348, Avg ROP-190 ft/hrDaily Cost: $0Cumulative Cost: $101,538
UTE TRIBAL 4-28-4-2 Cementing 5.5 casingDate: 4/13/2010NDSI #1 at 7015. 4 Days Since Spud - Slide F/ 6699' to 6712' & 6824' to 6837' - 6 jts of
casing to UT Tribe 3-19-4-1 - Cement W/ BJ - Change swap in mud pump - Drill 77/8 hole
http://www.inewfield.com/denver/SumActRpt.asp?RC=159619&API=4301350079&Min...
![Page 42: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/42.jpg)
Summary Rig Activity Page 2 of 2
f/6041' - 641T w/ 20K WOB,TRPM-124,GPM-353,Avg ROP-150' ft/hr - Duel Guard GammaRay Loggers depth 7015' - Hold saftey mtg & RU Phoenix Survey Inc & Log with CompensatedDensity Compensated Neutron Gamma Ray - LDDP & BHA - Fix compound chain - LDDP - Circ- RU QT casing & run 161 jts of 5.5 J55 LT&C Shoe @ 7007.46' Float coller 6962.36'Transferred - Drill 77/8 hole f/641T - 7015' w/ 20K WOB,TRPM-124,GPM-353,Avg ROP-99.6'
ft/hr - Test 5.5 casingDaily Cost: $0Cumulative Cost: $266,061
UTE TRIBAL 4-28-4-2 Cleaning mud pitsDate: 4/14/2010NDSI #1 at 7015. 5 Days Since Spud - Release rig @ 12:30 PM on4/13/10 - Clean Mud pits -
RU & Cement w/ BJ 300 sks Mixed @ 11 ppg & 3.53 yeild PLII+3%KCL+5#CSE+0.5#CF+2#KOL+.5SMS+FP+SF & - 466 sks of tail cmt mixed @ 14.4 ppg &1.17 yeild 50:50:2+3%KCL+).5%EC-1+.25#CF+.05#SF+.3SMS+FP-6L - Nipple down & set5.5 casing slips w/ 110,000#s FinalizedDaily Cost: $0Cumulative Cost: $291,853
Pertinent Files: Go to File List
http://www.inewfield.com/denver/SumActRpt.asp?RC=159619&API=4301350079&Min...
![Page 43: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/43.jpg)
Form 3160-4(August 2007)
UNITED STATES FORM APPROVED
O DEPARTMENT OF THE INTERIOR OMB NO. 1004-0137
BUREAU OF LAND MANAGEMENT Expires: July 31, 2010
WELL COMPLETION OR RECOMPLETION REPORT AND LOG 5. Lease Serial No.EDA 2OGOOO5609
la. Type of Well Oil Well Gas Well Dry D Other 6. If Indian, Allottee or Tribe Name
b. Type of Completion: O New Well Work Over Deepen Plug Back Diff Resvr.,
Other:7. Unit or CA Agreement Name and No.
2 Name of Operator 8. Lease Name and Well No.NE\NFIELD EXPLORATION COMPANY UTE TRIBAL4-28-4-2
3. Address 3a, Phone No. (include area code) 9. AFI Well No.1401 17TH ST. SUITE 1000 DENVER, CO 80202 (435)646-3721 43-013-50079
4 Location of Well (Report location clearly and in accordance with Federal requirements)* I0. Field and Pool or ExploratoryMONUMENT BUTTE
At surface 542' FNL & 868' FWL (NWINW) SEC. 28, T4S, R2W 11. Sec., T., R., M., on Block andSurvey or Area
SEC. 28, T4S, R2W
At top prod. interval reported below 12. County or Parish 13. State
At total deptli 7015' DUCHESNE UT
14. Date Spudded 15. Date T.D. Reached 16. Date Completed 05/04/2010 17. Elevations (DF, RKB, RT, GL)*
04/03/2010 04/13/2010 D & A Ready to Prod. 5422' GL 5434' KB18. Total Depth: MD 7015' 19. Plug Back T.D.: MD 6902' |20.Depth Bridge Plug Set: MD
TVD TVD | TVD
2 l. Type Electric & Other Mechanical Logs Run (Submit copy of each) 22. Was well cored? No Yes (Submit analysis)
DUAL IND GRD, SP, COMP. DENSITY,COMP. NEUTRON,GR,CALIPER, CMT BOND Was DST run? No Yes (Submit report)Directional Survey? No Yes (Submit copy)
23. Casing and Liner Record (Report all strings set in well)
H ÏeSize Size/Grade Wt. (#/ft.) Top (MD) Bottom (MD) Stage C enter of SCkent
Sltirry Vol Cement Top* Amount Pulled
12-1/4" 8-5/8" J-55 24# 0 319' 160 CLASS G7-7/8" 5-1/2" J-55 15.5# 0 7007' 300 PRIMLITE 00'
466 50/50 POZ
24. Tubing RecordSize Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD)
2-7/8" EOT@ 6833' TA @6731'25 Producing Intervals 26. Perforation Record
Formation Top Bottom Perforated Interval Size No. Holes PerE Status
^) Green River 6620-6745' WstchSd BsC .36" 3 42
B) Green River 6438-6551' CPL .34" 3 30c) Green River 6257-6390' CP1 CP2 CP3 .34" 3 33D) Green River 4715-4719' GB4 .40" 3 12
27. Acid, Fracture, Treatment, Cement Squeeze, etc.Depth Interval Amount and Type of Material
6620-6745' Frac w/ 74706#'s 30/50 sand in 1963 bbis of slick water.6438-6551° Frac w/ 65764#'s 30/50 sand in 1955 bbis of slick water.6257-6390' Frac w/ 75411#'s 20/40 sand in 480 bbls of Lightning 17 fluid.
47 15-4719' Frac w/ 7138#'s 20/40 sand in 78 bbis of Lightning 17 fluid.28 Production - Interval ADate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced rested Production BBL MCF BBL Corr. API Gravity 2-1/2" x 1-1/2" x 17' x 20' RHAC Pump
5-4-10 5-15-10 24 50 0 93Choke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio PRODUCING
SI
18ä Production - Interval BDate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodPro luced Tested Product on BBL MCF BBL Corr. API Gravity RECEIVEDÜboke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize Flwg. Press. Rate BBL MCF BBL Ratio
SI
*(See instructions and spaces for additional data on page 2) Div.0EOlLCAD&Mlf
![Page 44: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/44.jpg)
28b. Production - Interval CDate First Test Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodRroduced Tested Production BBL MCF BBL Corr. API Gravity
Choke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSite F1wg. Press. Rate BBL MCF BBL Ratio
SI
28c. Production - Interval DDate First Test Date Hours Test Dil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity
Choke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize F1wg. Press. Rate BBL MCF BBL Ratio
SI
29. Disposition of Gas (Solid, usedfor fuel,vented, etc.)
USED FOR FUEL
30. Summary of Porous Zones (Include Aquifers): 31. Formation (Log) Markers
Show all important zones of porosity and contents thereof: Cored intervals and all drill-stem tests' GEOLOGICAL MARKERSmeluding depth interval tested, cushton used, time tool open, flowing and shut-m pressures andrecoveries.
TopFormation Top Bottom Descriptions, Contents, etc. Name
Meas. Depth
GARDEN GULCH MRK 4200'GARDENGULCH1 4422'
GARDENGULCH2 4548'POINT 3 4837'
XMRKR 5090°
YMRKR 5123'
DOUGALS CREEK MRK 5242'BI CARBONATE MRK 5504'
B LIMESTON MRK 5649'CASTLEPEAK 6179'
BASAL CARBONATE 6570'WASATCH 6697'
32. Additional remarks (include plugging procedure):
33. Indicate which items have been attached by placing a check in the appropriate boxes:
O Electrical/Mechanical Logs (1 full set req'd.) Geologic Report DST Report Directional Survey
Sundry Notice for plugging and cement verification Core Analysis Other: Drilling Daily Activity
34. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records (see attached instructions)*
Name (please pring Lucy Chavez-Naup Title Administrative Assistant
Signature Date 05/27/2010
Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States anytidse, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.
(Continued on page 3) (Form 3160-4, page
![Page 45: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/45.jpg)
Summary Rig Activity Page 1 of 2
Daily Activity Report
Format For Sundry
UTE TRIBAL 4-28-4-22/1/2010 To 6/30/2010
UTE TRIBAL 4-28-4-2 Waiting on CementDate: 4/5/2010Ross #21 at 320. Days Since Spud - On 4/3/10 Ross Rig #21 spud Ute Tribal 4-28-4-2, drilled320' of 12 1/4" hole, and ran 7 jts 8 5/8" - casing (guideshoe, shoe jt, baffle plate, 6 jts) set
@ 319.03' KB. On 4/5/10 BJ Services cemented - Returned 5 bbis to pit. - 8 5/8" casing w/160 sks Class "G" + 2% CaCl2 + 0.25#/sk Cello Flake at 15.8 ppg w/ 1.17 yield.Daily Cost: $0Cumulative Cost: $30,517
UTE TRIBAL 4-28-4-2 Waiting on CementDate: 4/10/2010NDSI #1 at 906. 1 Days Since Spud - Test Kelly ,Safety valve, Pipe rams, blind rams andchoke manifold to 2000# for 10 minutes, test - Move rig w/ RW Jones to UT 4-28-4-2 and rigup and set equipment - Pick up bit and mud motor, motor leaking oil, wait for a new one - P/Ubit ,.208 hunting m.m, Monel, directional tools,and 7 drill collar gain circulation tag @ 307 -
Drill 7 7/8" hole F/307 to 906 w/ 18K WOB,TRPM-122,GPM-326,Avg ROP-120 ft/hr - No H2Sor flow in last 24 hours - Surface casing to 1500 # for 30 minunes, ( flange on well head wasleaking and had to fix it)Daily Cost: $0Cumulative Cost: $52,872
UTE TRIBAL 4-28-4-2 Drill 7 7/8" hole with fresh waterDate: 4/11/2010NDSI #1 at 4129. 2 Days Since Spud - Slid 13' 3.6 degree 3285-3298, slid 15' 3.69 degree
3316'-3331, slid 12' 4035'-4047' - Drill 7 7/8" hole F/ 1094' to 4129' w/ 20K WOB,TRPM-128,GPM-352,Avg ROP-132 ft/hr - Rig Service , check crownomatic and BOP - Drill 7 7/8" holeF/ 906' to 1094' w/ 20K WOB,TRPM128,GPM-352 Avg ROP-188 ft/hr - No H2S or flow in last24 hoursDaily Cost: $0Cumulative Cost: $80,443
UTE TRIBAL 4-28-4-2 Drill 7 7/8" hole with fresh waterDate: 4/12/2010NDSI #1 at 6041. 3 Days Since Spud - Drill 7 7/8" hole F/ 4224' to 5034' w/ 20K WOB,TRPM-124,GPM-353,Avg ROP-85 ft/hr - No H2S or flow in last 24 hours - Drill 7 7/8" hole F/ 5034' to6041' w/ 20K WOB,TRPM-124,GPM-336, Avg ROP-134 ft/hr - Kelly up and wash down 25 ft,fan bottom - TOOH, Change bit and TIH w/ bit # 2 - Circulate Bottoms up for trip, bit - Rig
Service, check crownomatic and BOP - Drill 7 7/8" hole F/ 4129 to 4224' w/ 20K WOB,TRPM-128,GPM-348, Avg ROP-190 ft/hrDaily Cost: $0Cumulative Cost: $101,538
UTE TRIBAL 4-28-4-2 Cementing 5.5 casingDate: 4/13/2010NDSI #1 at 7015. 4 Days Since Spud - Slide F/ 6699' to 6712' & 6824' to 6837' - 6 jts of
casing to UT Tribe 3-19-4-1 - Cement W/ BJ - Change swap in mud pump - Drill 77/8 hole
http://www.inewfield.com/denver/SumActRpt.asp?RC=159619&API=4301350079&Min...
![Page 46: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/46.jpg)
' Summary Rig Activity Page 2 of 2
f/6041' - 6417' w/ 20K WOB,TRPM-124,GPM-353,Avg ROP-150' ft/hr - Duel Guard Gamma
Ray Loggers depth 7015' - Hold saftey mtg & RU Phoenix Survey Inc & Log with Compensated
Density Compensated Neutron Gamma Ray - LDDP & BHA - Fix compound chain - LDDP - Circ- RU QT casing & run 161 jts of 5.5 J55 LT&C Shoe @ 7007.46' Float coller 6962.36'Transferred - Drill 77/8 hole f/6417' - 7015' w/ 20K WOB,TRPM-124,GPM-353,Avg ROP-99.6'
ft/hr - Test 5.5 casingDaily Cost: $0Cumulative Cost: $266,061
UTE TRIBAL 4-28-4-2 Cleaning mud pitsDate: 4/14/2010NDSI #1 at 7015. 5 Days Since Spud - Release rig @ 12:30 PM on4/13/10 - Clean Mud pits -
RU & Cement w/ BJ 300 sks Mixed @ 11 ppg & 3.53 yelld PLII+3%KCL+5#CSE+0.5#CF+2#KOL+.5SMS+FP+SF & - 466 sks of tail cmt mixed @ 14.4 ppg &
1.17 yeild 50:50:2+3%KCL+).5%EC-1+.25#CF+.05#SF+.3SMS+FP-6L - Nipple down & set
5.5 casing slips w/ 110,000#s FinalizedDally Cost: $0Cumulative Cost: $291,853
Pertinent Files: Go to File List
http://www.inewfield.com/denver/SumActRpt.asp?RC=159619&API=4301350079&Min...
![Page 47: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/47.jpg)
Form3160-3 A y FORM APPROVED(August2007) OMí3No.1004-0137
) A a ExpiresJuly31,2010UNITED STATES
DEPARTMENT OF THE INTERIOR 5 LeaseSerialNo.2OG0005609
BUREAU OF LAND MANAGEMENT6. If lndian.Alloteeor TribeNaine
APPLICATION FOR PERMIT TO DRILL OR REENTER UTE
la. Typeof work: DRILL REENTER2 If UnitNoCAAgreement,NameandNo.
8. Lease Nameand WellNo.Ib. Typeof Well: OilWell GasWell Other Sin¢e Zone MultipleZone Ute Tribal 4-28-4-2
2. Nameof Operator Newfield Production Company 9. APl WellNo.
Add 3b PhoneNo.tincludearea code) 10. Fieldand Pool,or Exploratory3a. ress Route #3 Box 3630, Myton UT 84052(435) 646-3721 Undesignated
4. Locationof Well(Report locationclearly and in accordancewith any State requirements.*) I1.Sec.,T.R.M. or Blk.andSurveyorArea
At surface NWINW (Lot #4) 542' FNL 868' FWL Sec. 28, T4S R2W
At proposedprod.zone
14. Distancein miles anddirectionfromnearesttown or postoffice* 12. Countyor Parish 13.State
Approximately 9.5 miles southwest of Myton, UT Duchesne UT
15. Distancefromproposed* 16.No.of acres inlease 17. SpacingUnitdedicatedto thiswelllocationto nearestpropertyor leaseline, ft. Approx. 542' f/lse, NA' flunit
'NA
(Also tonearest drig. unit line,if any) 40 Acres
18. Distancefromproposedlocation* 19.ProposedDepth 20. BLM/BIA BondNo.on fileppn tor
otd llinas, mpleted' Approx. 1087' 6,785' WYB000493
21. Elevations(Showwhether DF,KDB,RT,GL etc.) 22. Approximatedatework will start* 23. Estimatedduration
5422' GL (7) days from SPUD to rig release
24. Attachments
The following,completed inaccordancewiththe requirements of OnshoreOiland GasOrderNo.t, must beattached to this form:
1. Wellplatcertified bya registered surveyor. I Bondto cover the operations unless covered by an existingbondon file (see
2. A DrillingPlan. Item20above).
3. A SurfaceUse Plan (if the location is on National ForestSystemLands, the i OperatorcertificationSUPO nust be tlledwith the appropriate ForestServiceOfficet 6. Suchother site specific informationand.lor plansas may be required by the
25 5 Name (ePrinte pet0 Dat
TitleRegulatory S ec a is
Title TING OfficeHNALFIELDOFFICE
\pplicalon approvaldoes not warrant or certify that the applicant holds egalorequitable tide to those riglus inde subject!easewhichwouldentitietheapplicantto
any. are anached. CONDITIONSOFAPPROVALATTACHEDUC 18U C. Section100MndTide-D U.S.C.Sectionill2. make it a crone forany personknowinglyand adàdy to make to any depa t or agency of de Eni:ed
Statesany false ictitiousor Fraudulentstatementsor representationsas to any matterwithin itsjurisdiction.
WISNOTICEOFAPPROVAL
MAR16 2010DIV.0FOlL,GAS&
![Page 48: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/48.jpg)
g eUNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE
170 South 500 East VERNAL, UT 84078 (435) 781-4400
CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMTT TO DRILL
Company: Newfield Production Company Location: Lot 4, Sec. 28, T4S, R2WWell No: Ute Tribal 4-28-4-2 Lease No: 2OG0005609API No: 43-013-50079 Agreement: N/A
OFFICE NUMBER: (435) 781-4400
OFFICE FAX NUMBER: (435) 781-3420
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance is made with theapplicable laws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill includingSurface and Downhole Conditions of Approval. The operator is considered fully responsible for the actions of hissubcontractors. A copy of the approved APD must be on location during construction, drilling, and completionoperations. This permit is approved for a two (2) year period, or until lease expiration, whichever occurs
first. An additional extension, up to two (2) years, may be applied for by sundry notice prior to expiration.
NOTIFICATION REQUIREMENTS
Construction Activity - The Ute Tribe Energy & Minerals Dept. and BLM(Notify Ute Tribe Energy & Minerals Dept. I Environmental Scientist shall be notified at least 48 hours inand BLM Environmental Scientist) advance of any construction activity. The Ute Tribal office is
open Monday through Thursday.
Construction Completion - Upon completion of the pertinent APD/ROW construction,(Notify Ute Tribe Energy & Minerals Dept. notify the Ute Tribe Energy & Minerals Dept. for a Tribaland BLM Environmental Scientist) Technician to verify the Affidavit of Completion. Notify the
BLM Environmental Scientist prior to moving on the drillingrig.
Spud Notice - Twenty-Four (24) hours prior to spudding the well.
(Notify BLM Petroleum Engineer)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify BLM Supv. Petroleum Tech.) all casing strings to: ut vn [email protected].
BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify BLM Supv. Petroleum Tech.)
First Production Notice - Within Five (5) busin days after new well begins or(Notify BLM Petroleum Engineer) production resumes after well has been off production for more
than ninety (90)
![Page 49: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/49.jpg)
Page 2 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
SITE SPECIFIC COAs:
None - Private SurfaceSee attached Surface Use
![Page 50: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/50.jpg)
Page 3 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
DOWNHOLE PROGRAMCONDITIONS OF APPROVAL (COAs)
SITE SPECIFIC DOWNHOLE COAs:
. Newfield Production Co. shall adhere to all referenced requirements in the SOP (version: UteTribal Green River Development Program) along with all Oil and Gas rules and requirementslisted in the Code of Federal Regulations and all Federal Onshore Oil and Gas Orders.
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS
• The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.
• Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least 24 hours inadvance of casing cementing operations and BOPE & casing pressure tests.
• All requirements listed in Onshore Order #2 III. E. Special Drilling Operations are applicable forair drilling of surface hole.
• Blowout prevention equipment (BOPE) shall remain in use until the well is completed orabandoned. Closing unit controls shall remain unobstructed and readily accessible at all times.Choke manifolds shall be located outside of the rig substructure.
• All BOPE components shall be inspected daily and those inspections shall be recorded in thedaily drilling report. Components shall be operated and tested as required by Onshore Oil & GasOrder No. 2 to insure good mechanical working order. All BOPE pressure tests shall beperformed by a test pump with a chart recorder and by the rig pumps. Test shall bereported in the driller's log.
• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out fromunder the surface casing and weekly thereafter as specified in Onshore Oil & Gas Order No. 2.
• Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.
• No aggressive/fresh hard-banded drill pipe shall be used within casing.
• Cement baskets shall not be run on surface casing.
• The operator must report all shows of water or water-bearing sands to the BLM. If flowingwater is encountered it must be sampled, analyzed, and a copy of the analyses submitted to theBLM Vernal Field
![Page 51: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/51.jpg)
O O Page 4 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
• The operator must report encounters of all non oil & gas mineral resources (such as Gilsonite, tarsands, oil shale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of eachencounter. Each report shall include the well name/number, well location, date and depth (fromKB or GL) of encounter, vertical footage of the encounter and, the name of the person makingthe report (along with a telephone number) should the BLM need to obtain additionalinformation.
• A complete set of angular deviation and directional surveys of a directional well will besubmitted to the Vernal BLM office engineer within 30 days of the completion of the well.
• While actively drilling, chronologic drilling progress reports shall be filed directly with theBLM, Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the PetroleumEngineers until the well is completed.
• A cement bond log (CBL) will be run from the production casing shoe to the top of cement andshall be utilized to determine the bond quality for the production casing. Submit a field copy ofthe CBL to this office.
• Please submit an electronic copy of all other logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM.
• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operationmust have prior approval from the BLM Vernal Field
![Page 52: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/52.jpg)
- O O Page 5 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
OPERATING REQUIREMENT REMINDERS:
• All wells, whether drilling, producing, suspended, or abandoned, shall be identified inaccordance with 43 CFR 3162.6. There shall be a sign or marker with the name of the operator,lease serial number, well number, and surveyed description of the well.
• In accordance with 43 CFR 3162.4-3, this well shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in whichoperations commence and continue each month until the well is physically plugged andabandoned. This report shall be filed in duplicate, directly with the Minerals ManagementService, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-
3650 for reporting information.
• Should the well be successfully completed for production, the BLM Vernal Field office must benotified when it is placed in a producing status. Such notification will be by writtencommunication and must be received in this office by not later than the fifth business dayfollowing the date on which the well is placed on production. The notification shall provide, as aminimum, the following informational items:
o Operator name, address, and telephone number.
o Well name and number.
o Well location (¼¼,Sec., Twn, Rng, and P.M.).
o Date well was placed in a producing status (date of first production for which royalty willbe paid).
o The nature of the well's production, (i.e., crude oil, or crude oil and casing head gas, ornatural gas and entrained liquid hydrocarbons).
o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i.e., State or private.
o Unit agreement and/or participating area name and number, if applicable.
o Communitization agreement number, if applicable.
• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLM Vernal Field Office.
• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A willbe reported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall bereported verbally within 24 hours, followed by a written report within 15 days. "Other thanMajor Events" will be reported in writing within 15 days. "Minor Events" will be reported onthe Monthly Report of Operations and
![Page 53: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/53.jpg)
O O Page 6 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
• Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) shall be submitted not later than 30 daysafter completion of the well or after completion of operations being performed, in accordancewith 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and all other surveys ordata obtained and compiled during the drilling, workover, and/or completion operations, shall befiled on BLM Form 3160-4. Submit with the well completion report a geologic report including,at a minimum, formation tops, and a summary and conclusions. Also include deviation surveys,sample descriptions, strip logs, core data, drill stem test data, and results of production tests ifperformed. Samples (cuttings, fluid, and/or gas) shall be submitted only when requested by theBLM, Vernal Field Office.
• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall haveprior written approval from the BLM Vernal Field Office.
• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLM Vernal FieldOffice Petroleum Engineers will be provided with a date and time for the initial meter calibrationand all future meter proving schedules. A copy of the meter calibration reports shall besubmitted to the BLM Vernal Field Office. All measurement facilities will conform to the APIstandards for liquid hydrocarbons and the AGA standards for natural gas measurement. Allmeasurement points shall be identified as the point of sale or allocation for royalty purposes.
• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submittedto the BLM Vernal Field Office within 30 days of installation or first production, whicheveroccurs first. All site security regulations as specified in Onshore Oil & Gas Order No. 3 shall beadhered to. All product lines entering and leaving hydrocarbon storage tanks will be effectivelysealed in accordance with Onshore Oil & Gas Order No. 3.
• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which will result in the disturbance of new ground, shall require the filing ofa suitable plan and need prior approval of the BLM Vernal Field Office. Emergency approvalmay be obtained orally, but such approval does not waive the written report requirement.
• No location shall be constructed or moved, no well shall be plugged, and no drilling or workoverequipment shall be removed from a well to be placed in a suspended status without priorapproval of the BLM Vernal Field Office. If operations are to be suspended for more than 30days, prior approval of the BLM Vernal Field Office shall be obtained and notification givenbefore resumption of operations.
• Pursuant to Onshore. Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. A permanentdisposal method must be approved by this office and in operation prior to the end of this 90-dayperiod. In order to meet this deadline, an application for the proposed permanent disposalmethod shall be submitted along with any necessary water analyses, as soon as possible, but nolater than 45 days after the date of first production. Any method of disposal which has not beenapproved prior to the end of the authorized 90-day period will be considered as an Incident ofNoncompliance and will be grounds for issuing a shut-in order until an acceptable manner fordisposing of said water is provided and approved by this
![Page 54: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/54.jpg)
g e Page 7 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notified at least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended orabandoned, all pits must be fenced immediately until they are backfilled. The "SubsequentReport of Abandonment" (Form BLM 3160-5) must be submitted within 30 days after the actualplugging of the well bore, showing location of plugs, amount of cement in each, and amount ofcasing left in hole, and the current status of the surface
![Page 55: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/55.jpg)
STATEOF UTAH OPERATOR FIELD PRODUCTION COMPANY OPERA O CT. No. N2695DIVISIONOF OIL,GASAND MINING ADDRESS: RT. 3 BOX 3630ENTITYACTION FORM-FORM 6 MYTON, UT 84052
ACTlON CURRENT NEW APINUMBER WELLNAME WELLLOCATiON SPUD EFFECTIVECODE ENTITYNO. ENTITYNO.QQ tiC JP KG COUNiY DATE DATE
A 99999 4301350079 UTE TRIBAL 4-28-4-2 NWNW 28 4S 2W DUCHESNE 4/3/2010 /OWELL1 COMMENTS:
ACTION CURRENT NEW API NUMBER WELLNAME WELL LOCATION SPUD EFFECTIVECODE ENTITYNO E1
00 4301334194 WEST POINT8 1-8-18
SEœNE
1 8 16 DU I SNE
4ISDI2
10 70
ACTION CURRENT NEW API NUMBER WELL NAME WELLLOCATioN SPUD EFFECTIVECODE ENTITY NO. ENTITY ND LKI SU _I V HU COUN IY ¯
DATE
B 99999 17400 4301350148 FEDERAL10-29-8-16 NWSE 29 88 16E DUCHESNE 4/2/2010 10
ACTION CURRENT NEW APINUMBER WELL NAME WELLLOCATION SPUD EFFECTIVEBR E E1 ON
4301350120 SO MON BUTTE V-2-9-16 S SE 9S 16E DU
HNESNE
4/1
2nO10
/O
ACTION CURRENT NEW APINUMBER WELLNAME WELLLOCATION SPUD EFFECTIVECODE ENTITYNO ENTITYNO.
4304740020 SUNDANC -11-9-17 NWSW 9S
17GE
UIN AH
4/5D/2010
/OWELL 5 COMMENTS;
ACTION CURRENT NEW APINUMBER WELLNAME WELLLOCATION SPUD EFFECTIVECODE ENTITY NO. ENTITYNO. 'QQ SC TP RG COUNTY DATE DATEv' 43e‡/Vo#i unirm
B 99999 17400 SUNDANCE FED L-12-9-17 NWSE 12 9S 17E DUCHESNE 4/12/2010 ÒWELL 5 COMMENTS:
ACTION CODES (See instructionson back of fann)A - anew entityfor newwell(single wel only) lyB - •well toexisting entity Eqroupor unitwen) Jen triPa rkC- from one existng entityto anoiherexistingentily SD - wettfromone existingentityto a new entity I - •
E- ther(explaininconimentssection) Prod ction lerk 04/12/10
NOR UseCOMMENTse:SontaexplaittwhyeachActionCodewasselected DN.0FOIL,GAS&MINING
![Page 56: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/56.jpg)
FORM -5 UNITE TA TES FORMAPPROVED
(August 2007) DEPARTMENT OF THE INTERIOR ° °j
BUREAU OF LAND MANAGEMENT 5. Lease Serial No.SUNDRY NOTICES AND REPORTS ON WELLS MON BUTTEEDA 20G0005609
Do not use this form for proposals to drill or to re-enter anabandoned well. Use Form 3'160-3 (APD) for such proposals. 6. If Indian, Allottee or Tribe Name.
SUBMIT IN TRIPLICATE - Other Instructions on page 2 7. If Unit or CA/Agreement, Name and/or
1. Type of WellOil Well Gas Well Other 8. Well Name and No.
2. Name of Operator UTE TRIBAL 4-28-4-2
NEWFIELD PRODUCTION COMPANY 9. API'Noll .
3a. Address Route 3 Box 3630 3b. Phone (include are code) 4301350079Myton, UT 84052 435646 372] 10 Field and Pool, or Fxnlaratorv Area
4 Location of Well (Footage, Sec., T., R., M, or SurveyDescription) MONUMENT BUTTEl1. County or Parish, State
NWNW Section 28 T4S R2W DUCHESNE, UT
12. CHECK APPROPRIATE BOX(ES) TO INIDICATE NATURE OF NOTICE, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
.
Acid ize O Deepen Q Production (Start/Resume) Q Water Shut-OffNottce of Intent
Alter Casing O Fracture Treat Q Reclamation Well Integrity
SubsequentReport Casing Repair New Construction Q Recomplete G OtherChange Plans Plug & Abandon Q Temporarily Abandon Spud Notice
Final Abandonment Convert to Injector Plug Back O Water Disposal
13. Describe Proposed or CompletedOperation:(Clearly state all pertinent details, including estimatedstarting date of any proposed work and approximate duration thereof Ifthe
proposal is to deependirectionallyor recomplete horizontally, give subsurface locations and measured and true vertical depths ofall pertinent markers and zones. Attach the
Bond under which the work will be performed or provide the liond No. on file with BLM/BIA. Requiredsubsequent reports shall be filed within 30 days followingcompletion
of the involvedoperations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 shall be filed once testing has been completed.
Final Abandonment Noticesshall be filed only after all requirements, includingreclamation, have been completed, and the operator has determined that the site is ready for finalinspection.)
On 4/3/10 MIRURoss #21. Spud well @8:00 AM. Drill320' of 12 1/4" hole with air mist. TlH Wl7 Jt's 8 5/8" J-55 24# casing.Set @319.03' KB. On 4/4/10 cement with 160 sks of class "G" w/ 2% CaCL2 + 1/4# per sk Cello Flake mixed @ 15.8 ppg with1.17 cf/sk yield. Returned 5 bbis cement to pit. WOC.
I hereby certify that the foregoing is true and Titlecorrect (Printed/ Typed)
Mitch Bens Drilling Foreman
Signature Date04/05/2010
THIS SPACE FOR FEDERAL OR STATE OFFICE USE
Approved by . . . . . . . . . . . . . . . . . Title pateConditions of approval, if any, are attached. Approval of this notice does not warrant or
certify that the applicant holds legal or equitable title to those rights in the subject lease Officewhich would entitle the applicant to conduct operations thereon.
Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United
States any false, fictitious and fraudulent statements orrevresentations as to any matter within its insisdiction
(Instructions on page 2)
DXOEOlL,GAS&
![Page 57: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/57.jpg)
NEWFIELD PR CTION COMPANY - CASING & MENT REPORT
8 5/8" CASING SET AT 319.03
LAST CASING 14 SET AT 5 OPERATOR Newfield Exploration CompanyDATUM 12 WELL UTE TRIBAL 4-28-4-2
DATUMTO CUT OFF CASING 12 FIELDIPROSPECT Monument ButteDATUMTO BRADENHEAD FLANGE 12 CONTRACTOR & RIG# Ross Rig #21TD DRILLER 320 LOGGERHOLE SIZE 12 1/4"
LOG OF CASING STRING:PIECES OD ITEM - MAKE - DESCRIPTION WT / FT GRD THREAD CONDT LENGTH
1 Well Head A 0.95
7 8 5/8" ST&CCasing 24 J-55 STC A 307.18
1 Well Head A 0.9
CASING INVENlORYBAL. FEET JTS TOTAL LENGTHOF STRING 309.03
TOTAL LENGTH OF STRING 309.03 7 LESS CUT OFF PIECE 2
LESS NONCSG. ITEMS 1.85 PLUS DATUMTO T/CUT OFF CSG 12
PLUS FULL JTS. LEFT OUT 0 CASING SET DEPTH 319.03
TOTAL CSG. DEL O THRDS)33
7. 8 7 COMPARETIMING
BEGIN RUN CSG. Spud 8:00 AM 4/3/2010 GOOD CIRCTHRU JOB Yes
CSG. IN HOLE 4:00 PM 4/3/2010 Bbls CMT CIRC TO SURFACE 5
BEGIN CIRC 11:19 AM 4/5/2010 RECIPROCATED PIPI No
BEGIN PUMP CMT 11:31 AM 4/5/2010BEGIN DSPL. CMT 11:40 AM 4/5/2010 BUMPED PLUG TO 130
PLUG DOWN 11:47 AM
![Page 58: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/58.jpg)
ICEMENT USED CEMENT COMPANY- BJ ServicesSTAGE # SX CEMENT TYPE & ADDITIVES
1 160 Class"G"+ 2%CaCl2+0.25#lsk CelloFlakeat 15.8ppgw/1.17yield.
CENTRALIZER& SCRATCHER PLACEMENT SHOW MAKE & SPACING
Middle of first, topof second, and thirdfor a totalof three.
COMPANY REPRESENTATIVE Mitch Benson DATE
![Page 59: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/59.jpg)
e 0 spudBLM- Vernal Field Office - Notification Form
Operator Newfield Exploration Rig Name/# Ross #21Submitted By Mitch Benson Phone Number (435) 823-5885Name/Numer Ute Tribal 4-28-4-2Qtr/QrtNW/NW Section _28 Township 4S_ Range 2WLease Serial Number 2OGOOO5609API Number 43-013-50079
Spud Notice -- Spud is the initial spudding of the well, not drillingout below a casing string.
Date/Time 4/3/2010 9:00:00 AM
Casinq -- Please report time casing run starts, not cementingtimes.
X Surface CasingIntermediateProduction CasingLinerOther
Date/Time 4/3/2010 4:00:00 PM
![Page 60: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/60.jpg)
Form3160-3 A y FORM APPROVED(August2007) OMí3No.1004-0137
) A a ExpiresJuly31,2010UNITED STATES
DEPARTMENT OF THE INTERIOR 5 LeaseSerialNo.2OG0005609
BUREAU OF LAND MANAGEMENT6. If lndian.Alloteeor TribeNaine
APPLICATION FOR PERMIT TO DRILL OR REENTER UTE
la. Typeof work: DRILL REENTER2 If UnitNoCAAgreement,NameandNo.
8. Lease Nameand WellNo.Ib. Typeof Well: OilWell GasWell Other Sin¢e Zone MultipleZone Ute Tribal 4-28-4-2
2. Nameof Operator Newfield Production Company 9. APl WellNo.
Add 3b PhoneNo.tincludearea code) 10. Fieldand Pool,or Exploratory3a. ress Route #3 Box 3630, Myton UT 84052(435) 646-3721 Undesignated
4. Locationof Well(Report locationclearly and in accordancewith any State requirements.*) I1.Sec.,T.R.M. or Blk.andSurveyorArea
At surface NWINW (Lot #4) 542' FNL 868' FWL Sec. 28, T4S R2W
At proposedprod.zone
14. Distancein miles anddirectionfromnearesttown or postoffice* 12. Countyor Parish 13.State
Approximately 9.5 miles southwest of Myton, UT Duchesne UT
15. Distancefromproposed* 16.No.of acres inlease 17. SpacingUnitdedicatedto thiswelllocationto nearestpropertyor leaseline, ft. Approx. 542' f/lse, NA' flunit
'NA
(Also tonearest drig. unit line,if any) 40 Acres
18. Distancefromproposedlocation* 19.ProposedDepth 20. BLM/BIA BondNo.on fileppn tor
otd llinas, mpleted' Approx. 1087' 6,785' WYB000493
21. Elevations(Showwhether DF,KDB,RT,GL etc.) 22. Approximatedatework will start* 23. Estimatedduration
5422' GL (7) days from SPUD to rig release
24. Attachments
The following,completed inaccordancewiththe requirements of OnshoreOiland GasOrderNo.t, must beattached to this form:
1. Wellplatcertified bya registered surveyor. I Bondto cover the operations unless covered by an existingbondon file (see
2. A DrillingPlan. Item20above).
3. A SurfaceUse Plan (if the location is on National ForestSystemLands, the i OperatorcertificationSUPO nust be tlledwith the appropriate ForestServiceOfficet 6. Suchother site specific informationand.lor plansas may be required by the
25 5 Name (ePrinte pet0 Dat
TitleRegulatory S ec a is
Title TING OfficeHNALFIELDOFFICE
\pplicalon approvaldoes not warrant or certify that the applicant holds egalorequitable tide to those riglus inde subject!easewhichwouldentitietheapplicantto
any. are anached. CONDITIONSOFAPPROVALATTACHEDUC 18U C. Section100MndTide-D U.S.C.Sectionill2. make it a crone forany personknowinglyand adàdy to make to any depa t or agency of de Eni:ed
Statesany false ictitiousor Fraudulentstatementsor representationsas to any matterwithin itsjurisdiction.
WISNOTICEOFAPPROVAL
MAR16 2010DIV.0FOlL,GAS&
![Page 61: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/61.jpg)
g eUNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE
170 South 500 East VERNAL, UT 84078 (435) 781-4400
CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMTT TO DRILL
Company: Newfield Production Company Location: Lot 4, Sec. 28, T4S, R2WWell No: Ute Tribal 4-28-4-2 Lease No: 2OG0005609API No: 43-013-50079 Agreement: N/A
OFFICE NUMBER: (435) 781-4400
OFFICE FAX NUMBER: (435) 781-3420
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance is made with theapplicable laws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill includingSurface and Downhole Conditions of Approval. The operator is considered fully responsible for the actions of hissubcontractors. A copy of the approved APD must be on location during construction, drilling, and completionoperations. This permit is approved for a two (2) year period, or until lease expiration, whichever occurs
first. An additional extension, up to two (2) years, may be applied for by sundry notice prior to expiration.
NOTIFICATION REQUIREMENTS
Construction Activity - The Ute Tribe Energy & Minerals Dept. and BLM(Notify Ute Tribe Energy & Minerals Dept. I Environmental Scientist shall be notified at least 48 hours inand BLM Environmental Scientist) advance of any construction activity. The Ute Tribal office is
open Monday through Thursday.
Construction Completion - Upon completion of the pertinent APD/ROW construction,(Notify Ute Tribe Energy & Minerals Dept. notify the Ute Tribe Energy & Minerals Dept. for a Tribaland BLM Environmental Scientist) Technician to verify the Affidavit of Completion. Notify the
BLM Environmental Scientist prior to moving on the drillingrig.
Spud Notice - Twenty-Four (24) hours prior to spudding the well.
(Notify BLM Petroleum Engineer)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify BLM Supv. Petroleum Tech.) all casing strings to: ut vn [email protected].
BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify BLM Supv. Petroleum Tech.)
First Production Notice - Within Five (5) busin days after new well begins or(Notify BLM Petroleum Engineer) production resumes after well has been off production for more
than ninety (90)
![Page 62: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/62.jpg)
Page 2 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
SITE SPECIFIC COAs:
None - Private SurfaceSee attached Surface Use
![Page 63: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/63.jpg)
Page 3 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
DOWNHOLE PROGRAMCONDITIONS OF APPROVAL (COAs)
SITE SPECIFIC DOWNHOLE COAs:
. Newfield Production Co. shall adhere to all referenced requirements in the SOP (version: UteTribal Green River Development Program) along with all Oil and Gas rules and requirementslisted in the Code of Federal Regulations and all Federal Onshore Oil and Gas Orders.
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS
• The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.
• Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least 24 hours inadvance of casing cementing operations and BOPE & casing pressure tests.
• All requirements listed in Onshore Order #2 III. E. Special Drilling Operations are applicable forair drilling of surface hole.
• Blowout prevention equipment (BOPE) shall remain in use until the well is completed orabandoned. Closing unit controls shall remain unobstructed and readily accessible at all times.Choke manifolds shall be located outside of the rig substructure.
• All BOPE components shall be inspected daily and those inspections shall be recorded in thedaily drilling report. Components shall be operated and tested as required by Onshore Oil & GasOrder No. 2 to insure good mechanical working order. All BOPE pressure tests shall beperformed by a test pump with a chart recorder and by the rig pumps. Test shall bereported in the driller's log.
• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out fromunder the surface casing and weekly thereafter as specified in Onshore Oil & Gas Order No. 2.
• Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.
• No aggressive/fresh hard-banded drill pipe shall be used within casing.
• Cement baskets shall not be run on surface casing.
• The operator must report all shows of water or water-bearing sands to the BLM. If flowingwater is encountered it must be sampled, analyzed, and a copy of the analyses submitted to theBLM Vernal Field
![Page 64: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/64.jpg)
O O Page 4 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
• The operator must report encounters of all non oil & gas mineral resources (such as Gilsonite, tarsands, oil shale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of eachencounter. Each report shall include the well name/number, well location, date and depth (fromKB or GL) of encounter, vertical footage of the encounter and, the name of the person makingthe report (along with a telephone number) should the BLM need to obtain additionalinformation.
• A complete set of angular deviation and directional surveys of a directional well will besubmitted to the Vernal BLM office engineer within 30 days of the completion of the well.
• While actively drilling, chronologic drilling progress reports shall be filed directly with theBLM, Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the PetroleumEngineers until the well is completed.
• A cement bond log (CBL) will be run from the production casing shoe to the top of cement andshall be utilized to determine the bond quality for the production casing. Submit a field copy ofthe CBL to this office.
• Please submit an electronic copy of all other logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM.
• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operationmust have prior approval from the BLM Vernal Field
![Page 65: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/65.jpg)
- O O Page 5 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
OPERATING REQUIREMENT REMINDERS:
• All wells, whether drilling, producing, suspended, or abandoned, shall be identified inaccordance with 43 CFR 3162.6. There shall be a sign or marker with the name of the operator,lease serial number, well number, and surveyed description of the well.
• In accordance with 43 CFR 3162.4-3, this well shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in whichoperations commence and continue each month until the well is physically plugged andabandoned. This report shall be filed in duplicate, directly with the Minerals ManagementService, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-
3650 for reporting information.
• Should the well be successfully completed for production, the BLM Vernal Field office must benotified when it is placed in a producing status. Such notification will be by writtencommunication and must be received in this office by not later than the fifth business dayfollowing the date on which the well is placed on production. The notification shall provide, as aminimum, the following informational items:
o Operator name, address, and telephone number.
o Well name and number.
o Well location (¼¼,Sec., Twn, Rng, and P.M.).
o Date well was placed in a producing status (date of first production for which royalty willbe paid).
o The nature of the well's production, (i.e., crude oil, or crude oil and casing head gas, ornatural gas and entrained liquid hydrocarbons).
o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i.e., State or private.
o Unit agreement and/or participating area name and number, if applicable.
o Communitization agreement number, if applicable.
• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLM Vernal Field Office.
• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A willbe reported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall bereported verbally within 24 hours, followed by a written report within 15 days. "Other thanMajor Events" will be reported in writing within 15 days. "Minor Events" will be reported onthe Monthly Report of Operations and
![Page 66: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/66.jpg)
O O Page 6 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
• Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) shall be submitted not later than 30 daysafter completion of the well or after completion of operations being performed, in accordancewith 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and all other surveys ordata obtained and compiled during the drilling, workover, and/or completion operations, shall befiled on BLM Form 3160-4. Submit with the well completion report a geologic report including,at a minimum, formation tops, and a summary and conclusions. Also include deviation surveys,sample descriptions, strip logs, core data, drill stem test data, and results of production tests ifperformed. Samples (cuttings, fluid, and/or gas) shall be submitted only when requested by theBLM, Vernal Field Office.
• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall haveprior written approval from the BLM Vernal Field Office.
• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLM Vernal FieldOffice Petroleum Engineers will be provided with a date and time for the initial meter calibrationand all future meter proving schedules. A copy of the meter calibration reports shall besubmitted to the BLM Vernal Field Office. All measurement facilities will conform to the APIstandards for liquid hydrocarbons and the AGA standards for natural gas measurement. Allmeasurement points shall be identified as the point of sale or allocation for royalty purposes.
• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submittedto the BLM Vernal Field Office within 30 days of installation or first production, whicheveroccurs first. All site security regulations as specified in Onshore Oil & Gas Order No. 3 shall beadhered to. All product lines entering and leaving hydrocarbon storage tanks will be effectivelysealed in accordance with Onshore Oil & Gas Order No. 3.
• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which will result in the disturbance of new ground, shall require the filing ofa suitable plan and need prior approval of the BLM Vernal Field Office. Emergency approvalmay be obtained orally, but such approval does not waive the written report requirement.
• No location shall be constructed or moved, no well shall be plugged, and no drilling or workoverequipment shall be removed from a well to be placed in a suspended status without priorapproval of the BLM Vernal Field Office. If operations are to be suspended for more than 30days, prior approval of the BLM Vernal Field Office shall be obtained and notification givenbefore resumption of operations.
• Pursuant to Onshore. Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. A permanentdisposal method must be approved by this office and in operation prior to the end of this 90-dayperiod. In order to meet this deadline, an application for the proposed permanent disposalmethod shall be submitted along with any necessary water analyses, as soon as possible, but nolater than 45 days after the date of first production. Any method of disposal which has not beenapproved prior to the end of the authorized 90-day period will be considered as an Incident ofNoncompliance and will be grounds for issuing a shut-in order until an acceptable manner fordisposing of said water is provided and approved by this
![Page 67: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/67.jpg)
g e Page 7 of 7Well: Ute Tribal 4-28-4-2
3/5/2010
• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notified at least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended orabandoned, all pits must be fenced immediately until they are backfilled. The "SubsequentReport of Abandonment" (Form BLM 3160-5) must be submitted within 30 days after the actualplugging of the well bore, showing location of plugs, amount of cement in each, and amount ofcasing left in hole, and the current status of the surface
![Page 68: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/68.jpg)
STATEOF UTAH OPERATOR FIELD PRODUCTION COMPANY OPERA O CT. No. N2695DIVISIONOF OIL,GASAND MINING ADDRESS: RT. 3 BOX 3630ENTITYACTION FORM-FORM 6 MYTON, UT 84052
ACTlON CURRENT NEW APINUMBER WELLNAME WELLLOCATiON SPUD EFFECTIVECODE ENTITYNO. ENTITYNO.QQ tiC JP KG COUNiY DATE DATE
A 99999 4301350079 UTE TRIBAL 4-28-4-2 NWNW 28 4S 2W DUCHESNE 4/3/2010 /OWELL1 COMMENTS:
ACTION CURRENT NEW API NUMBER WELLNAME WELL LOCATION SPUD EFFECTIVECODE ENTITYNO E1
00 4301334194 WEST POINT8 1-8-18
SEœNE
1 8 16 DU I SNE
4ISDI2
10 70
ACTION CURRENT NEW API NUMBER WELL NAME WELLLOCATioN SPUD EFFECTIVECODE ENTITY NO. ENTITY ND LKI SU _I V HU COUN IY ¯
DATE
B 99999 17400 4301350148 FEDERAL10-29-8-16 NWSE 29 88 16E DUCHESNE 4/2/2010 10
ACTION CURRENT NEW APINUMBER WELL NAME WELLLOCATION SPUD EFFECTIVEBR E E1 ON
4301350120 SO MON BUTTE V-2-9-16 S SE 9S 16E DU
HNESNE
4/1
2nO10
/O
ACTION CURRENT NEW APINUMBER WELLNAME WELLLOCATION SPUD EFFECTIVECODE ENTITYNO ENTITYNO.
4304740020 SUNDANC -11-9-17 NWSW 9S
17GE
UIN AH
4/5D/2010
/OWELL 5 COMMENTS;
ACTION CURRENT NEW APINUMBER WELLNAME WELLLOCATION SPUD EFFECTIVECODE ENTITY NO. ENTITYNO. 'QQ SC TP RG COUNTY DATE DATEv' 43e‡/Vo#i unirm
B 99999 17400 SUNDANCE FED L-12-9-17 NWSE 12 9S 17E DUCHESNE 4/12/2010 ÒWELL 5 COMMENTS:
ACTION CODES (See instructionson back of fann)A - anew entityfor newwell(single wel only) lyB - •well toexisting entity Eqroupor unitwen) Jen triPa rkC- from one existng entityto anoiherexistingentily SD - wettfromone existingentityto a new entity I - •
E- ther(explaininconimentssection) Prod ction lerk 04/12/10
NOR UseCOMMENTse:SontaexplaittwhyeachActionCodewasselected DN.0FOIL,GAS&MINING
![Page 69: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/69.jpg)
FORM -5 UNITE TA TES FORMAPPROVED
(August 2007) DEPARTMENT OF THE INTERIOR ° °j
BUREAU OF LAND MANAGEMENT 5. Lease Serial No.SUNDRY NOTICES AND REPORTS ON WELLS MON BUTTEEDA 20G0005609
Do not use this form for proposals to drill or to re-enter anabandoned well. Use Form 3'160-3 (APD) for such proposals. 6. If Indian, Allottee or Tribe Name.
SUBMIT IN TRIPLICATE - Other Instructions on page 2 7. If Unit or CA/Agreement, Name and/or
1. Type of WellOil Well Gas Well Other 8. Well Name and No.
2. Name of Operator UTE TRIBAL 4-28-4-2
NEWFIELD PRODUCTION COMPANY 9. API'Noll .
3a. Address Route 3 Box 3630 3b. Phone (include are code) 4301350079Myton, UT 84052 435646 372] 10 Field and Pool, or Fxnlaratorv Area
4 Location of Well (Footage, Sec., T., R., M, or SurveyDescription) MONUMENT BUTTEl1. County or Parish, State
NWNW Section 28 T4S R2W DUCHESNE, UT
12. CHECK APPROPRIATE BOX(ES) TO INIDICATE NATURE OF NOTICE, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
.
Acid ize O Deepen Q Production (Start/Resume) Q Water Shut-OffNottce of Intent
Alter Casing O Fracture Treat Q Reclamation Well Integrity
SubsequentReport Casing Repair New Construction Q Recomplete G OtherChange Plans Plug & Abandon Q Temporarily Abandon Spud Notice
Final Abandonment Convert to Injector Plug Back O Water Disposal
13. Describe Proposed or CompletedOperation:(Clearly state all pertinent details, including estimatedstarting date of any proposed work and approximate duration thereof Ifthe
proposal is to deependirectionallyor recomplete horizontally, give subsurface locations and measured and true vertical depths ofall pertinent markers and zones. Attach the
Bond under which the work will be performed or provide the liond No. on file with BLM/BIA. Requiredsubsequent reports shall be filed within 30 days followingcompletion
of the involvedoperations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 shall be filed once testing has been completed.
Final Abandonment Noticesshall be filed only after all requirements, includingreclamation, have been completed, and the operator has determined that the site is ready for finalinspection.)
On 4/3/10 MIRURoss #21. Spud well @8:00 AM. Drill320' of 12 1/4" hole with air mist. TlH Wl7 Jt's 8 5/8" J-55 24# casing.Set @319.03' KB. On 4/4/10 cement with 160 sks of class "G" w/ 2% CaCL2 + 1/4# per sk Cello Flake mixed @ 15.8 ppg with1.17 cf/sk yield. Returned 5 bbis cement to pit. WOC.
I hereby certify that the foregoing is true and Titlecorrect (Printed/ Typed)
Mitch Bens Drilling Foreman
Signature Date04/05/2010
THIS SPACE FOR FEDERAL OR STATE OFFICE USE
Approved by . . . . . . . . . . . . . . . . . Title pateConditions of approval, if any, are attached. Approval of this notice does not warrant or
certify that the applicant holds legal or equitable title to those rights in the subject lease Officewhich would entitle the applicant to conduct operations thereon.
Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United
States any false, fictitious and fraudulent statements orrevresentations as to any matter within its insisdiction
(Instructions on page 2)
DXOEOlL,GAS&
![Page 70: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/70.jpg)
NEWFIELD PR CTION COMPANY - CASING & MENT REPORT
8 5/8" CASING SET AT 319.03
LAST CASING 14 SET AT 5 OPERATOR Newfield Exploration CompanyDATUM 12 WELL UTE TRIBAL 4-28-4-2
DATUMTO CUT OFF CASING 12 FIELDIPROSPECT Monument ButteDATUMTO BRADENHEAD FLANGE 12 CONTRACTOR & RIG# Ross Rig #21TD DRILLER 320 LOGGERHOLE SIZE 12 1/4"
LOG OF CASING STRING:PIECES OD ITEM - MAKE - DESCRIPTION WT / FT GRD THREAD CONDT LENGTH
1 Well Head A 0.95
7 8 5/8" ST&CCasing 24 J-55 STC A 307.18
1 Well Head A 0.9
CASING INVENlORYBAL. FEET JTS TOTAL LENGTHOF STRING 309.03
TOTAL LENGTH OF STRING 309.03 7 LESS CUT OFF PIECE 2
LESS NONCSG. ITEMS 1.85 PLUS DATUMTO T/CUT OFF CSG 12
PLUS FULL JTS. LEFT OUT 0 CASING SET DEPTH 319.03
TOTAL CSG. DEL O THRDS)33
7. 8 7 COMPARETIMING
BEGIN RUN CSG. Spud 8:00 AM 4/3/2010 GOOD CIRCTHRU JOB Yes
CSG. IN HOLE 4:00 PM 4/3/2010 Bbls CMT CIRC TO SURFACE 5
BEGIN CIRC 11:19 AM 4/5/2010 RECIPROCATED PIPI No
BEGIN PUMP CMT 11:31 AM 4/5/2010BEGIN DSPL. CMT 11:40 AM 4/5/2010 BUMPED PLUG TO 130
PLUG DOWN 11:47 AM
![Page 71: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/71.jpg)
ICEMENT USED CEMENT COMPANY- BJ ServicesSTAGE # SX CEMENT TYPE & ADDITIVES
1 160 Class"G"+ 2%CaCl2+0.25#lsk CelloFlakeat 15.8ppgw/1.17yield.
CENTRALIZER& SCRATCHER PLACEMENT SHOW MAKE & SPACING
Middle of first, topof second, and thirdfor a totalof three.
COMPANY REPRESENTATIVE Mitch Benson DATE
![Page 72: DIVISION - UtahAPIWellNo:43013500790000’ Ent 488859 Ek AB548 Pg 8271 STATE OF UTAH))ss COUNTYOF þÑe54C) o This instrument was acknowledged before me this Z-3 day of L C.., 2008](https://reader034.vdocuments.us/reader034/viewer/2022050108/5f4611345f87e22b1a5d4c2b/html5/thumbnails/72.jpg)
e 0 spudBLM- Vernal Field Office - Notification Form
Operator Newfield Exploration Rig Name/# Ross #21Submitted By Mitch Benson Phone Number (435) 823-5885Name/Numer Ute Tribal 4-28-4-2Qtr/QrtNW/NW Section _28 Township 4S_ Range 2WLease Serial Number 2OGOOO5609API Number 43-013-50079
Spud Notice -- Spud is the initial spudding of the well, not drillingout below a casing string.
Date/Time 4/3/2010 9:00:00 AM
Casinq -- Please report time casing run starts, not cementingtimes.
X Surface CasingIntermediateProduction CasingLinerOther
Date/Time 4/3/2010 4:00:00 PM