Distribution List – 1

1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045

2. Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045

3. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafir Marg, New Delhi – 110 001 Fax No. 011-2371 6674.

4. Chief Executive Officer POSOCO B-9, Qutab Institutional Area Katwaria Sarai, New Delhi – 110 0016

5. The Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore – 560 009. Fax No. 080-22259343

6. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri (E), Mumbai – 400 093.

7. Member Secretary Eastern Regional Power Committee 14, Golf Club Road, Tollygunge Kolkata-700033

8. Director (Transmission) Transmission Corp. of Andhra Pradesh Ltd. Vidyut Soudha Hyderabad – 500 082. FAX : 040-6666 5137

9. Director (TANTRANSCO) Tamil Nadu Electricity Board (TNEB) 6th Floor, Eastern Wing, 800 Anna Salai, Chennai – 600 002. Fax No. 044-2851 6362

10. Director (Grid Transmission and Management) Transmission Corp. of Telangana Ltd. Vidyut Soudha, Khairatabad Hyderabad – 500 082. FAX : 040-2332 1751

11. Member (Transmission) Kerala State Electricity Board Vidyuthi Bhawanam, Pattom, P.B. No. 1028 Thiruvananthapuram – 695 004. Fax No. 0471-2444 738

12. Member (Transmission) Karnataka State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore 560 009. Fax No. 080-2222 8367

13. Director (Operation), MSETCL 4th Floor, "Prakashganga'' Plot No. C- 19, E-Block Bandra - Kurla Complex, Bandra (East), Mumbai – 400 051

14. The Executive Engineer (Projects) Chief Engineer (Transmission) Nuclear Power Corpn. of India Ltd, 12th Floor, North Wing, VS Bhawan Anushaktinagar, Mumbai-400 094

15. Managing Director Chhattisgarh State Transmission Co. Ltd. Dangania, Raipur – 492 013

16. Chairman & Managing Director MPPTCL, Block No.3 Shakti Bhawan, Rampur, Jabalpur – 482 008

17. Managing Director Gujarat Energy Transmission Corp. Ltd. Sardar Patel Vidyut Bhawan, Race Course, Vadodra -390 007

18. The Executive Engineer UT of Daman & Diu Administration. OIDC Corporate Office, Plot No. 35 Somnath, Daman, Pin 396 210

19. The Executive Engineer (Projects) Electricity Department UT of Dadra & Nagar Havelli, Post Naroli-396 235, Silvassa

20. The Chief Engineer Electricity Department The Government of Goa, Panaji

21. Director (Engineering) OPTCL Jan path, Bhubaneshwar-751022

22. Superintending Engineer –I First Floor, Electricity Department Gingy Salai Puducherry – 605 001. Fax No. 0413-2334 277/2331 556

23. Director (System Operation) WBSETCL Vidyut Bhavan, 5th Floor Block-D, Bidhannagar Sector-II, Kolkata-700091

24. Director (System) Damodar Valley Corporation DVC Towers, VIP Road, Kolkata-700054

25. Managing Director Jharkhand Urja Sancharan Nigam Limited (JUSNL) Engineering Building, HEC, Dhurwa, Ranchi -834004

Distribution List – 2

1. Shri S. B. Agrawal CEO - Power Adhunik Power & Natural Resources Ltd. Crescent Towers (3rd Floor) 229 A J C Bose Road, Kolkata-700 020 Phone : 033-30915300 Mobile : 09007098190 Email : [email protected]

2. Shri P. Krishnamurthy General Manager(Ele..)Power Purchase Bangalore Electricity Supply Company Limited(BESCOM), Corporate Office, K.R.Circle, Bengaluru-560001 Phone : 080-22352796 Mobile : 09449055636 Email : [email protected], [email protected]

3. Sh. Devendra Kumar Patel GM (Power) Bharat Aluminium Company Ltd. Balco Nagar, Korba - 495 684 Chhattisgarh Email: [email protected]; [email protected]; [email protected]

Tel: +91 7759242097

4. Vikas Saksena President-Engineering

Jindal Power Limited 4th Floor, Jindal Centre Plot No.2 , Tower – B, Sector-32, Gurgaon, Haryana- 122001 Tel : +91 124 6612337 Mob : + 91 9971200857 Email : [email protected]

5. Shri Amit Jain, Director, Jindal India Thermal Power Ltd. Plot-12, Sector B-1, Local Shopping Complex Vasant Kunj, New Delhi – 110 070 Mobile : 09810062441 Email : [email protected]

6. Shri Anand Mohan Misra Associate Vice President Head – Business Development Jhabua Power Limited Avantha Power & Infrastructure Ltd., 6th & 7th Floor, Vatika City Point M.G.Road, Gurgaon – 122002 M : 09810553164 Ph : 0124-4392011 Email : [email protected]

6. Sh. Vijay Gulati General Manager NTPC Vidyut Vyapar Nigam Limited 7th Floor, Core-3, Scope Complex, Lodhi Road, New Delhi-110003 Email : [email protected] Tel : 09650990156

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 1 of 20

Minutes of Meeting held on 06.08.2015 for processing of Long Term Access & Medium Term Open Access applications received during the period of Jan’14-Dec’14 & and in Jun’15 (MTOA) as per the CERC directions vide Orders dated 16.02.2015 & 03.07.2015

1.0 The list of participants present in the meeting is enclosed at Annexure-I

2.0 COO (CTU-Plg & CE) welcomed the participants and informed that in

compliance with the directions issued by Hon’ble CERC vide its Orders dated

16.02.2015 & 03.07.2015, CTU is processing all the LTA & MTOA applications

received during the period Nov’13 to Dec’14 which are seeking power transfer

from NEW Grid to SR Grid sequentially on a monthly basis. The grant of LTA/

MTOA applications received in Nov’13 to Dec’13 were discussed in the LTA/

MTOA Meeting of SR & WR Constituents held on 15.07.2015 and the same has

been processed in-line with CERC Regulations.

3.0 Further, it was informed that Minutes of Meeting of SR & WR constituents held

on 15.07.2015 were issued vide CTU letter dated 20.07.2015. Subsequently,

one of the participants M/s Dhariwal Infrastructures Ltd informed through email

that the commissioning schedule of its generation plant has been inadvertently

mentioned as Aug’15 instead of Aug’14. The same is taken into cognizance.

As no further comments/observations have been received, accordingly the

minutes, as circulated were confirmed with the above modifications.

4.0 It was further informed that one of LTA applicants of Dec’13, M/s Ideal Energy

Projects Ltd was agreed for grant of LTA in the meeting held on 15.07.2015. In

this regard, CTU stated that IEPL in December, 2013 had applied for both LTA

& Connectivity. At the time of application, IEPL indicated that it was granted

Connectivity to STU network through LILO of Koradi - Wardha line of MSETCL

and also sought connectivity to ISTS grid. However, the connectivity application

to ISTS Grid made in December, 2013 could not be processed in absence of

consent (NoC) from MSETCL for disconnection from state network till date.

Further, IEPL vide its letter dated 11.05.2015 has sought permission to retain

connectivity with STU network whereby it becomes an embedded intra-state

entity making it necessary to obtain NoC from MSETCL for injection of power.

The issue was discussed in the 21st LTA meeting of WR held on 17.07.2015,

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 2 of 20

wherein, in the absence of NoC from MSETCL, the Connectivity & LTA

applications of IEPL received in Dec’13 were decided to be closed on account

of non-conformity with the Regulations. Accordingly, closure letter has been

issued to M/s Ideal Energy Projects Ltd.

5.0 Regarding available balance ATC for transfer of power under LTA/MTOA for

application’s Jan’14 onwards, following may be noted:

a) With effect from 1st June, 2014, 211 MW MTOA was expiring. Out of

which, while processing June, 2013 to Oct, 2013 MTOA applications as

per CERC directions in the above referred order, 100 MW has been

allocated to PTC for transfer of power from BALCO in Chattisgarh to

Kerala for the period from 1st March’ 2015 to 28th February, 2017.

b) GMR Emco has been granted LTA for (150 MW) for application in Dec’ 13

and MTOA (150 MW) for application in Nov’ 13, against the same PPA.

GMR EMCO has informed in the meeting held on 15-07-2015 that as and

when the LTA granted for the application made in Dec’13 operationalizes,

the MTOA shall be relinquished in line with CERC Regulations.

Accordingly, assumption has been made that MTOA would be surrendered

and hence access of only 150 MW shall be given to EMCO at any point of

time.

c) Based on the letter from IDEAL energy dated 11-05-2015 communicating

its intention of connecting to STU Grid (Maharashtra grid) and non-

availability of NOC from MSETCL even by date of LTA meeting of WR

constituents held on 17-07-2015, Dec’13 LTA application of Ideal Energy

(240MW) has been found to be not in conformity with the Regulations and

has been closed.

It was informed that after the allocation of LTA of 2198.5 MW (1208+990.5) and

MTOA of 475.2 MW (465.2+10.0) for Nov’13-Dec’13 applications, the

cumulative LTA & MTOA including those granted for power transfer from NEW

grid to SR would be 4089.5MW including 20 MW LTA for Solar allocation from

NR to SR from 01.06.2016 onwards and 1325.2 MW respectively, details given

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 3 of 20

at Annexure-II and the total ATC envisaged between NEW grid and SR grid is

5900 MW w.e.f 1st April, 2015.

Therefore, the balance notional ATC available for allocation w.e.f 1st April, 2015

is 505.3MW. The same is considered for processing of the applications from

Jan’14 to Dec’14. System Studies have been carried out for the same and

circulated as a part of the agenda for this meeting.

6.0 Representative of CTU explained the methodology being followed for grant of

LTA/MTOA applications received in the months of Jan’14 to Dec’ 14 in-line with

the guidelines prescribed in CERC Orders dated 16.02.2015 and the treatment

of MOP allocation & determination of ATC as per the Order dated 03.07.2015.

Further, the LTA/ MTOA applications as per the agenda were taken up for

discussion. The details of MTOA applications received from Jan’ 14 to Dec’ 14

are given at Annexure-III.

7.0 The representative of POSOCO stated that the TRM of 750 MW for NEW grid

to SR grid flow gate is as per the STOA regulations and it should be higher in

case of planning for processing of LTA/MTOA where uncertainties are much

more. He further stated that in the recent past the LTAs have been curtailed

due tolot of construction works of transmission lines and scheduled shutdown of

the critical transmission lines and therefore CTU should consider such

uncertainties which are happening in the real time operation.

The representative of TANGEDCO stated that CTU should consider the

contingencies as per the Transmission Planning Criteria and should determine

& allocate ATC accordingly. He further stated that keeping margins more than

that envisaged in planning criteria would lead to sub-optimal utilisation of

transmission capacity.

CTU clarified that for determination of TTC/ATC, the contingencies of N-1 have

been considered as per the Transmission Planning Criteria and wherever the

transmission system is planned as per N-1-1 criteria, same has been

considered. However under the conditions as stated by POSOCO, they may

take actions in-line with the CERC Regulations.

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 4 of 20

8.0 Applications received in Jan’14: As the LTA application (M/s Adhunik Power

& Natural Resources Ltd) submitted in January’14 is seeking power transfer of

100 MW from NEW Grid to SR grid against ATC of 505.3 MW, it was informed

that the LTA can be accommodated and hence notional LTA for the applied

quantum was agreed for grant from 01.04.2015.

9.0 Applications received in Feb’14: It was informed that no LTA application has

been received in the month of Feb’14. MTOA applications were submitted

however, the same cannot be processed as time period for which MTOA has

been sought had already elapsed as well as the ATC is available only after 1

year from the month in which application has been made. Accordingly, it was

agreed to close the MTOA applications.

10.0 Applications received in Mar’14: An application for LTA was submitted by

BESCOM for transfer of 450 MW from ER to SR. However the balance capacity

after granting LTA of 100 MW to Jan’14 application is 405.3 MW which is

inadequate to accommodate the LTA quantum of 450 MW. Further, ATC of 200

MW would be available w.e.f 01st Dec’15 as a result of expiry of MTOA granted

to Jindal Power for transfer of power from Chhattisgarh to Tamil Nadu thereby

resulting in ATC of 605.3 MW w.e.f 01.12.2015. Hence, it was agreed that LTA

for 450 MW may be granted to BESCOM from 01.12.2015, leaving a balance

ATC of 155.3 MW. For the MTOA applications received in this month, the

period for which MTOA has been sought has already elapsed, therefore, it was

agreed to close these applications.

11.0 Applications received in Apr’14: In the month of Apr’14, only one LTA

application (KSEB-233.75 MW) has been received. As per the agenda, it was

mentioned that the balance ATC of 155.3 MW between NEW grid and SR Grid

is not adequate for accommodating the LTA requirement of 233.75 MW.

Therefore, as per the directions of CERC, ATC of 155.3 MW between NEW

Grid and SR Grid shall be earmarked for grant of LTA, however, LTA shall be

granted when adequate ATC for accommodating full quantum of LTA shall be

available. Further, ATC of 200 MW would be available w.e.f 1st January, 2016

when MTOA of 200MW granted to Adani Power for transfer of power from their

generation project in Gujarat to TANGEDCO shall expire on 31st December,

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 5 of 20

2015. With this, the ATC available would be 355.3MW (155.3+200MW) from 1st

January’16 and accordingly LTA of 233.75 MW sought by KSEB for transfer of

power from DVC projects in ER can be accommodated.

Towards this, Representative of KSEB informed that it has requested CTU for

reduction of LTA quantum of the present application from 233.75 to 141.5 MW

vide its letter dated 05.08.2015 and the same has to be considered in the

treatment of its LTA application submitted in Apr’14. He further stated that as

the request for change in quantum is less than 100 MW, there is no need of

submission of a fresh application as per Clause 12 of the CERC Regulations.

As a result of reduction in required LTA quantum, the following were

deliberated:

a.) As per CERC Orders, the processing of LTA/ MTOA applications received

during the period Nov’13 to Dec’14 is being carried out as if were processed

in the past. Thus, whether to consider the request made by the applicant in

the present timeframe i.e., in Aug’15?

b.) In case the request is considered, can the quantum of 92.25 MW (233.75-

141.50 MW) be considered for allocation of ATC against the applications

received in the subsequent months i.e., from May’14 to Dec’14?

Accordingly, opinion of the participants was sought on the above issues.

The Representative of KSEB & Jindal Power Ltd opined that accommodating a

request for increase in quantum for less than 100 MW would have an impact on

the processing of subsequent applications and similarly, a request for decrease

in quantum for less than 100 MW also will have an impact on its following

applications. Hence, if the present request for decrease in quantum is

entertained, the released capacity may be considered for allocation of

LTA/MTOA for the months of May’14 to Dec’14.

Representative of TANGEDCO mentioned that as the applications are being

processed as if were processed in the past and request is made in the present,

there is no clear provision with respect to its treatment in the CERC Regulations

and Orders. Further, a change in request for decrease in quantum may be

accommodated as the released capacity can be utilized by other applicants.

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 6 of 20

However, a similar change for increase in quantum should not be accepted as it

results in impacting the subsequent applications. Therefore, the Representative

was of the view that the request of KSEB for reduction may be considered while

granting LTA, however the quantum available due to such reduction should be

considered as if it is known only in Aug’15. This way action will be in line with

the Regulatory point of view.

Representative of Jindal India Thermal Power Ltd mentioned that allowing such

a request for change in quantum at this stage would provide an opportunity for

other applicants to request for change in quantum for the applications made in

the past.

After due deliberations, CTU mentioned that such requests for change in

quantum can be accommodated as long as they are in the line with the CERC

Regulations. Further, it is informed that as per the Regulations, there is no need

of a fresh application for change in quantum for less than 100 MW and hence

the priority of the application remains the same even if the request for change is

made at a later date. Though the request has been made in Aug’15, the said

application is still in process and hence, the present request for reduction of

quantum can be accommodated as per CERC Regulations for grant. However,

this request for reduction of quantum could not have been visualized in the past

at the time of processing the applications of May’14 to Dec’14 and hence the

reduced quantum shall not be considered in the ATC available for allocation to

Jan’14-Dec’14 applications.

Accordingly, it was proposed that LTA of 141.5 MW may be granted to KSEB

with effective from 01st Jan’16.

All the Constituents and the applicants unanimously agreed for the above.

12.0 Applications from May’14 to Sep’14 – No LTA application has been received

during this period. MTOA applications were submitted, however, time period for

which MTOA has been sought has already elapsed. Accordingly, it was agreed

to close the MTOA applications.

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 7 of 20

13.0 Applications received in Oct’14: No LTA applications were submitted in the

month of Oct’14. However, there are 7 eligible MTOA applications as per the list

below:

As per the CERC directions, in cases where ATC is not adequate for grant of

LTA, the available ATC shall be earmarked and blocked for the LTA till the

adequate capacity is available for accommodating full quantum of LTA. This

ATC during the intervening period is to be used for grant of MTOA. In this

regard, as mentioned at para 10, ATC of 405.3 MW available from 01.04.2015

is less than LTA sought for 450 MW, similarly, as mentioned at para 11, ATC of

155.3 MW available from 1.12.2015 is less than the LTA sought for 233.75 MW.

The ATC so available for MTOA in the intervening period is summarized below:

Sl. No. Period from Period To ATC Quantum (MW)

1 01.04.2015 30.11.2015 405.3

2 01.12.2015 31.12.2015 155.3

3 01.01.2016 - 62

Further from 1st June, 2016 ATC of 500 MW would be available upon expiry of

MTOA (KSK-400 MW & NETL-100 MW). However as the end date of all the

Sl. No. Applicant

Quantum

Injection Point

Drawl Start Date End Date

1 Shree Cement Limited

300 IPP, Odisha TSSPDCL, Telangana

29-May-2015 26-May-2016

2 GMR Energy Trading Limited

200 GMR Chhattisgarh

APSPDCL, AP

1-Jun-2015 26-May-2016

3 Shree Cement Limited

50 IPP of Shree Cement Ltd, Rajasthan

APSPDCL, AP

1-Jun-2015 26-May-2016

4 NTPC Vidyut Vyapar Nigam Limited

250 Essar Power M.P. Ltd.,

MP

APSPDCL, AP

1-Jun-2015 26-May-2016

5 PTC India Ltd. 300

SESA Sterlite Ltd, Odisha

APSPDCL, AP

1-Jun-2015 26-May-2016

6 Adani Enterprises Ltd.

100 Adani Power . St-I,

Mundra,

APSPDCL, AP

1-Sep-2015 26-May-2016

7 PTC India Ltd. 200 Jaypee Nigrie

STPP, MP

APSPDCL, AP

1-Sep-2015 26-May-2016

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 8 of 20

MTOA applications of Oct’ 14 is before 31st May, 2016, therefore, this capacity

of 500 MW shall be not be available for Oct’14 MTOA applications.

In this regard, it was explained that ATC of 155.3 MW is not available for the

period beyond 31st December, 2015 for the reasons mentioned herein:

As mentioned in Para 11, the MTOA of 200 MW granted to Adani Enterprises is

expiring on 31st Dec, 2015. However, while processing Feb, 2015 MTOA

applications, MTOA was granted to KSEB for 140.5 MW for the period from 1st

Jan, 2016 to 31st May, 2018 & to Jindal Power for 59.5 MW for the period 1st

Jan, 2016 to 31st Aug, 2017. Subsequently, while processing the Dec, 2013

LTA application, KSEB was granted LTA in which the PPA enclosed was same

as that for the Feb, 2015 MTOA application. As the priority for operationalization

of Dec, 2013 LTA application shall be higher than the Feb, 2015 MTOA,

therefore, 140.5 MW ATC shall be available as considered above. Accordingly,

balance ATC beyond 1st January, 2016 shall be 62 MW (=121.55 – 59.5).

Amongst the Oct’14 applicants, the application at Sl. No (1) of M/s. Shree

Cements has the longest period thereby gets the highest priority. Therefore it

was agreed that M/s Shree cements may be granted MTOA as per the

following:

Quantum for which MTOA is granted (MW)

62 93.3 144.7

Date from which MTOA is granted

29th May 2015 29th May 2015 29th May 2015

Date upto which MTOA is granted

26th May 2016 31st Dec 2015 30th Nov 2015

After allocating MTOA as per above, 105.3 MW of ATC shall be available from

1st Apr’ 15 to 30th Nov’ 15. The same is allocated to applicants with next longest

duration in proportion to the quantum they had applied for. Accordingly it is

mentioned that MTOA may be granted to the MTOA applications for the period

from 1st June’15 to 30th Nov’ 15 on pro-rata basis as below:

a.) GMR Energy Trading Limited (26 MW against request of 200 MW),

b.) Shree cements (7 MW against request of 50 MW),

c.) NTPC Vidyut Vyapar Nigam Limited(33 MW against request of 250 MW) and

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 9 of 20

d.) PTC India Ltd (39 MW against request of 300 MW).

The remaining applications of October’14 shall be closed on account of non-

availability of ATC.

The constituents agreed for the above.

14.0 Applications received in Nov’14: No application for LTA has been received in

the month of Nov’14. However, a total of three MTOA applications are found to

be eligible and the same are considered. The ATC from the period of 1st April,

2015 to 31st Dec, 2015 has been utilized for grant of MTOA applications of Oct’

2014. The next ATC would be available from 1st June, 2016, however this

capacity cannot be considered for allocation to the Nov’ 2014 MTOA

applications as per Regulation 19(2), since the ATC is getting available 12

months later from the month in which the MTOA applications has been made.

Hence, it was agreed that the above MTOA applications shall be closed on

account of non-availability of ATC.

15.0 Applications received in Dec’14: LTA applications for a total quantum of 727

MW have been received for transfer of power from NEW Grid to SR Grid

(Kerala). It was explained that the ATC available between NEW grid and SR

grid is 5900 MW against which 4873 MW LTA has been granted on firm basis

and 838 MW has been granted on target region basis, thereby, leaving balance

capacity of 189 MW. This capacity is not adequate to accommodate all the LTA

applications received in Dec, 2014. Therefore, it was informed that LTA to Dec,

2014 applicants can only be granted with the enhancement of ATC through

system augmentation which is already under construction.

Further, for the entire LTA of 727 MW, Kerala is the firm beneficiary. With the

proposed LTA of 727 MW, the cumulative grant/proposed grant of MTOA and

LTA to Kerala shall be about 3000 MW. There are constraints in the import

capability of Kerala & accordingly strengthening of transmission system and

augmentation of transformation capacity may be required.

Representative of KSEB stated that some of their MTOA shall be expiring in the

period 2017-18 and hence, the import requirement mentioned in the agenda

needs to be re-worked. CTU mentioned that the decision for Dec, 2014 LTA

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 10 of 20

shall have impact on June, 2015 applications which are required to be

processed by 10th August, 2015, therefore, the re-assessment of import

capability may be completed on that day (i.e., 06.08.15) itself. After

deliberations, it emerged that instead of taking any decision in haste, as a

special case the processing of MTOA application may be delayed by a week or

so. Accordingly, it was decided that a separate meeting may be convened at an

early date (on 13.08.2015) with constituents and Dec, 2014 applicants wherein

June, 2015 MTOA applications may also be processed.

As regards MTOA applications, it was mentioned that the entire available ATC

uptill May, 2016 has been allocated for MTOA and the next ATC shall be

available from 1st June, 2016 with the expiry of MTOA. This capacity cannot be

considered for allocation to the Dec’ 2014 MTOA applications as per Regulation

19(2), since the ATC is getting available 1 year later from the month in which

the MTOA applications have been made. Accordingly, it was agreed to close all

the MTOA applications of Dec’ 2014.

16.0 MTOA Applications received in Jun’15: As mentioned above, the processing

of LTA applications received in Dec’14 would have an impact on the processing

of MTOA applications received in Jun’15 and hence it was decided that the

Jun’15 applications will be considered at a later date along with the Dec’14

applications in the above scheduled meeting.

17.0 Conclusion: In line with the above, it was decided to grant notional LTA to

Jan’14-Nov’14 LTA applicants subject to availability of the dedicated

transmission system as well as identified common transmission system and

notional MTOA with the existing/under construction transmission system to the

applications received in the January-December, 2014 for transfer of power from

NEW to SR. Further the applicants are liable to pay relinquishment charges as

per the directions of Hon’ble CERC, wherever applicable and are also subject

to the establishment of necessary payment security mechanism.

It was informed that the intimations for grant of notional LTA/MTOA shall be

issued by CTU in terms of the CERC directions as per the details mentioned

below:

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 11 of 20

A. Grant of notional LTA to the applications received in Jan’14:

Sl. No. Applicant

App. Date

LTA/MTOA

Injection Point

Drawl Quantum

of LTA Granted

Date from which LTA

Granted

Date upto which LTA

Granted

1 Adhunik Power & Natural Resources Ltd.

Jan-14 LTA Jamshedpur, Jharkhand

TANGEDCO 100 01.04.2015 30.09.2028

B. Grant of notional LTA to the applications received in Mar’14:

Sl. No. Applicant

App. Date

LTA/MTOA

Injection Point

Drawl Quantum

of LTA Granted

Date from which LTA

Granted

Date upto which LTA

Granted

1 BESCOM Mar-14

LTA West Bengal and

Jharkhand

BESCOM 450 01.12.2015 31.03.2039

C. Grant of notional LTA to the applications received in Apr’14

Sl. No. Applicant

App. Date

LTA/MTOA

Injection Point

Drawl Quantum

of LTA Granted

Date from which LTA

Granted

Date upto which LTA

Granted

1 KSEB Apr-14 LTA West Bengal KSEB 141.50 01.01.2016 31.04.2039

D. Grant of notional MTOA to the applications received in Oct’14:

Sl. No.

Applicant

App. date

LTA/ MTOA

Injection Point

Drawl Quantum of MTOA Granted

Date from which MTOA

Granted

Date upto which MTOA

Granted

1 Shree Cement Limited

Oct'2014 MTOA IPP, Odisha TSSPDCL, Telangana

62 29.5.2015 26.05.2016

93.3 29.5.2015 31.12.2015

144.7 29.5.2015 30.11.2015

2 GMR Energy Trading Limited

Oct'2014 MTOA GMR Chhattisgarh

APSPDCL, AP

26 01.6.2015 30.11.2015

3 Shree Cement Limited

Oct'2014 MTOA IPP of Shree Cement Limited,

Rajasthan

APSPDCL, AP

7 01.6.2015 30.11.2015

4 NTPC Vidyut Vyapar Nigam Limited

Oct'2014 MTOA Essar Power M.P. Ltd., MP

APSPDCL, AP

33 01.6.2015 30.11.2015

5 PTC India Ltd. Oct'2014 MTOA SESA Sterlite Ltd, Odisha

APSPDCL, AP

39 01.6.2015 30.11.2015

The meeting ended with vote of thanks.

- - - - - x x x x - - - - - x x x x - - - - -

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 12 of 20

Annexure-I

List of Participants in the Meeting held on 06.08.2015 for processing of LTA & MTOA

applications received from Jan’14 to Dec’14 and in Jun’15 (MTOA).

Sl.

No.

Name Designation Organization E-mail

1. C.S. Bobade Vice President Jindal India Thermal Power Ltd

[email protected]

2. Anil Kumar Sr. Manager Jindal India Thermal Power Ltd

[email protected]

3. Biju S.S AEE/ PSE KSEB Ltd. [email protected]

4. B. Pradeep GE, TRHC KSEB Ltd. [email protected]

5. Venugopal N Ch Engr (Commercial)

KSEB Ltd. [email protected]

6. Vikas Saksena Pressident (Engg) Jindal Power Ltd [email protected]

7. K K Agarwal CEO Jindal Power Ltd [email protected]

8. Vineet Sarawagi Manager (Commercial)

Adhunik Power [email protected]

9. Subrata Ghosal Deputy Chief Engr DVC [email protected]

10. Tanmay Sinha AGM-Power Sale & Regulatory

Vedanta Ltd, BALCO [email protected]

11. Anurag Gupta AGM-SO NTPC Vyapar Vidyut Nigam Ltd

[email protected]

12. Suresh Babu Addl. Director PCKL [email protected]

13. Janmejaya Mahapatra

AVP Jhabua Power Ltd [email protected]

14. Jitu Mahapatra AVP Jhabua Power Ltd [email protected]

15. K Seshadri OSD/ PPP TNEB [email protected]

16. S. Thirunavukkarasu SE/ PPP TNEB [email protected]

17. N.N. Shaji CE SO KSEB Ltd. [email protected]

18. S.R.Anand EE LD KSEB Ltd. [email protected]

19. Swapnil Mishra AM Shree Cement Ltd [email protected]

20. Chandan Bhartiya AM Vedanta Ltd (Sterlite) [email protected]

21. Amit Kumar AGM Shree Cement Ltd [email protected]

22. S.R. Narasimhan AGM- SO NLDC, POSOCO [email protected]

23. Seema Gupta COO (CTU-Plg & CE) POWERGRID [email protected]

24. Mukesh Khanna AGM ( CTU-Plg) POWERGRID [email protected]

25. Avinsah M. Pavgi AGM (Commercial) POWERGRID [email protected]

26. D N Rozekar DGM (CTU-Plg) POWERGRID [email protected]

27. V.Thiagarajan Asst. GM (CTU-Plg) POWERGRID [email protected]

28. Jyoti Prasad Asst. GM (CTU-Plg) POWERGRID [email protected]

29. Rajesh Verma CDE (CTU-Plg) POWERGRID [email protected]

30. Anil Kumar Meena DCDE (CTU-Plg) POWERGRID [email protected]

31. Rajeev Ranjan Sr. Engr (CTU-Plg) POWERGRID [email protected]

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 13 of 20

32. G Venkatesh Engineer (CTU-Plg) POWERGRID [email protected]

33. Swapnil Verma Officer-Law (CTU-Plg)

POWERGRID [email protected]

34. K Jyoth Kumar Officer (CTU-Plg) POWERGRID [email protected]

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 14 of 20

Annexure-II

Total ATC envisaged between NEW grid and SR grid

Post Grant of LTA & MTOA to Nov-Dec’13

applications

Total LTA (including GoI allocation to SR beneficiaries) 4089.5

Talcher Firm Share to SR beneficiaries 1773

Share in Jajjhar (surrendered by Delhi) 0

Allocation from U-3 Jajjhar 0

DVC Allocation 33

Solar Allocation 65

Solar Allocation (01.06.2016 onwards from NR to SR) 20

BALCO (1200 MW) 100

Jindal Power Ltd. (2400 MW) 400

KSK Mahanadi Power Co. Ltd (3600 MW) 500

DB Power Ltd. (500 MW) 208

Ind-Bharat (Utkal) Power Ltd. 500

GMR EMCO Energy Ltd. ** 150

BALCO 100

Dhariwal Power 100

KSEB (from Maithon Power) 140.5

Total MTOA Granted 1325.2

SAIL - VISP (01.11.2011 to 31.05.2014) 0

PTC India Ltd (16.06.2013 to 31.05.2014) 0

National Energy Trading and Service Ltd. (16.06.2013 to 31.05.2016) 100

KSK Mahanadi Power Company Ltd (16.06.2013 to 31.05.2016) 400

Jindal Power Ltd (16.06.2013 to 30.11.2015) 200

Adani Enterprises Ltd (16.06.2013 to 31.12.2015) 200

PTC India Ltd (01.03.2015 to 28.02.2017) 100

NTPC Vidyut Vyapar Nigam Ltd (01.06.2014 to 28.02.2017) 0

SAIL - VISP (01.08.2014 to 31.07.2017) 4.55

SAIL - VISP (01.08.2014 to 31.07.2017) 13.65

EMCO Energy Ltd** (01.08.2014 to 31.07.2014) 0

NTPC Vidyut Vyapar Nigam Ltd (01.08.2014 to 28.02.2017) 297

Facor Power Ltd (01.08.2014 to 30.09.2016) 10

Grand Total LTA/MTOA Granted 5414.7

Total ATC between NEW grid and SR 5900

Notional Transmission Margins available (01.04.2015 onwards) 505.3

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 15 of 20

Annexure-III

MTOA Applications received during January 2014 - December 2014

Sl. No.

Name of the Applicant

Injection of Power Seeking MTOA

for (MW)

Month of

Application

Date from which MTOA

required / Granted

Date upto which MTOA

required / Granted

Drawl of Power Status / Remarks

Entity / Location of Generating

Station

Region Entity / Location of

Loads

Region

1 Gujarat Urja Vikas Nikas Limited

GVUNL, Gujarat

WR 700 Jan-14 1-Jul-2014

30-Jun-2015

BESCOM, Karnataka

SR

Not eligible for grant as the period has already expired, so applications closed.

2 Shree Cement Limited

IPP of Shree Cement Ltd, Rajasthan

NR 140 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

3 Essar Power MP Ltd.

Madhya Pradesh

WR 210 Feb-14 1-Aug-2014

30-Jun-2015

BESCOM, Karnataka

SR

4 NTPC Vidyut Vyapar Nigam Limited

JAYPEE NIGRIE, Madhya Pradesh

WR 200 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

5 NTPC Vidyut Vyapar Nigam Limited

JPL, 4x250MW Tamnar,

Chhattisgarh

WR 200 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

6 NTPC Vidyut Vyapar Nigam Ltd.

CSPDCL, Chhattisgarh

WR 500 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

7 SESA Sterlite Ltd.

SESA Sterlite Ltd,

Odisha

ER 500 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

8 Mittal Processors Pvt. Ltd.

Vandana Vidyut Ltd,

Chhattisgarh

WR 50 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

9 NTPC Vidyut Vyapar Nigam Limited

CSPDCL, Chhattisgarh

WR 297 Feb-14 1-Aug-2014

28-Feb-2017

KSEB, Kerala

SR MTOA granted against application in Nov’ 13 for the same PPA, so closed

10 Knowledge Infrastructure Systems Private Ltd

JPL, 4x250MW Tamnar,

Chhattisgarh

WR 199.3 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

Not eligible for grant as the period has already expired, so applications closed.

11 Shree Cement Ltd.

SESA Sterlite Ltd.,

Odisha

ER 200 Feb-14 1-Aug-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

12 Ideal Energy Projects Ltd.

IPP of Ideal Energy

Projects Ltd, Nagpur

WR 140 Mar-14 1-Sep-2014

30-Jun-2015

BESCOM, Karnataka

SR

13 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 130 Mar-14 1-Sep-2014

31-May-2015

KSEB, Kerala

SR

14 Instinct Infra & Power Ltd.

Aarti Steels Ltd, Odisha

ER 40 Apr-14 1-Oct-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR Not eligible for grant as the period has

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 16 of 20

Sl. No.

Name of the Applicant

Injection of Power Seeking MTOA

for (MW)

Month of

Application

Date from which MTOA

required / Granted

Date upto which MTOA

required / Granted

Drawl of Power Status / Remarks

Entity / Location of Generating

Station

Region Entity / Location of

Loads

Region

15 Adani Enterprises Ltd.

Adani Power Ltd Stage I & II, Gujarat

WR 200 Apr-14 1-Oct-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR already expired, so applications closed.

16 PTC India Ltd.

Bharat Aluminium Company

Ltd, Chhatisgarh

WR 100 Apr-14 1-Oct-2014

28-Feb-2017

KSEB, Kerala

SR LTA Granted for Nov 2013 application having same PPA, so closed

17 NTPC Vidyut Vyapar Nigam Limited

CSPDCL, Chhattisgarh

WR 297 Apr-14 1-Oct-2014

28-Feb-2017

KSEB, Kerala

SR MTOA granted against application in Nov’ 13 for the same PPA, so closed

18 Essar Power MP Ltd.

Madhya Pradesh

WR 210 Apr-14 1-Oct-2014

30-Jun-2015

BESCOM, Karnataka

SR

Not eligible for grant as the period has already expired, so closed.

19 KSEB Ltd. UPCL, Karnataka

SR 18.5 Apr-14 1-Oct-2014

31-May-2015

KSEB, Kerala

SR

20 PTC India Ltd.

Action Ispat & Power Pvt Ltd, Odisha

ER 30 Apr-14 1-Oct-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

21 PTC India Ltd.

Jindal Power Ltd,

Chhattisgarh

WR 260 Apr-14 1-Oct-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

22 JSW Power Trading Co. Ltd

JSW Energy Ltd,

Karnataka

SR 200 Apr-14 1-Oct-2014

31-May-2015

KSEB, Kerala

SR

23 Mittal Processors Pvt Ltd

Vandana Vidyut Ltd,

Chhattisgarh

WR 50 May-14 1-Nov-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

24 Thermal Powertech Corporation India Ltd

TPCIL, Andhra Pradesh

SR 175 May-14 1-Feb-2015

31-May-2015

KSEB, Kerala

SR

25 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 130 May-14 1-Nov-2014

31-May-2015

KSEB, Kerala

SR

26 JSW Power Trading Co. Ltd

JSW Energy Ltd,

Karnataka

SR 200 Jun-14 1-Dec-2014

31-May-2015

KSEB, Kerala

SR

27 Adani Enterprises Ltd.

Adani Power Ltd Stage I & II, Gujarat

WR 107.78 Jun-14 1-Dec-2014

28-May-2015

TSSPDCL, Telangana

SR

28 Adani Enterprises Ltd.

Adani Power Ltd Stage I & II, Gujarat

WR 92.22 Jun-14 1-Dec-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

29 Coastal Energen Private Limited

Coastal Energen Pvt

Ltd, Tamil Nadu

SR 558 Jun-14 1-Dec-2014

31-Dec-2015

TANGEDCO, Tamil

Nadu

SR Granted & operational

30 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 200 Jun-14 1-Jun-2015

31-May-2016

KSEB, Kerala

SR Not considered as MTOA sought within SR & has already been

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 17 of 20

Sl. No.

Name of the Applicant

Injection of Power Seeking MTOA

for (MW)

Month of

Application

Date from which MTOA

required / Granted

Date upto which MTOA

required / Granted

Drawl of Power Status / Remarks

Entity / Location of Generating

Station

Region Entity / Location of

Loads

Region

31 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 100 Jun-14 1-Jun-2015

31-May-2016

KSEB, Kerala

SR granted for their application against Nov’ 2014

32 NTPC Vidyut Vyapar Nigam Ltd

JAYPEE NIGRIE, Madhya Pradesh

WR 92.22 Jun-14 1-Dec-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

Not eligible for grant as the period has already expired, so applications closed.

33 NTPC Vidyut Vyapar Nigam Ltd

JAYPEE NIGRIE, Madhya Pradesh

WR 107.78 Jun-14 1-Dec-2014

28-May-2015

TGPCC, Telangana

SR

34 NTPC Vidyut Vyapar Nigam Ltd

CSPDCL, Chhattisgarh

WR 269.45 Jun-14 1-Dec-2014

28-May-2015

TGPCC, Telangana

SR

35 NTPC Vidyut Vyapar Nigam Limited

CSPDCL, Chhattisgarh

WR 297 Jun-14 1-Dec-2014

28-Feb-2017

KSEB, Kerala

SR MTOA granted against application in Nov’ 13 for the same PPA, so closed

36 NTPC Vidyut Vyapar Nigam Limited

CSPDCL, Chhattisgarh

WR 230.55 Jun-14 1-Dec-2014

28-May-2015

APCPDCL, Andhra Pradesh

SR

Not eligible for grant as the period has already expired, so application closed.

37 Thermal Powertech Corporation India Ltd

TPCIL, Andhra Pradesh

SR 175 Jul-14 1-Feb-2015

31-May-2015

KSEB, Kerala

SR

38 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 130 Jul-14 1-Jan-2015

31-May-2015

KSEB, Kerala

SR

39 NSL Sugars Limited

NSL Sugars Limited

(Aland Unit), Karnataka

SR 7.63 Jul-14 1-Jan-2015

28-May-2015

TSSPDCL, Telangana

SR Granted & operational

40 NSL Sugars Limited

NSL Sugars Ltd (Koppa), Karnataka

SR 6.91 Jul-14 1-Jan-2015

28-May-2015

TSSPDCL, Telangana

SR Granted & operational

41 NSL Sugars (Tungabhadra) Ltd

NSL Sugars Ltd

(Tungabhadra Unit),

Karnataka

SR 8.27 Jul-14 1-Jan-2015

28-May-2015

TSSPDCL, Telangana

SR Granted & operational

42 NSL Sugars Limited

NSL Sugars Ltd (Aland), Karnataka

SR 6.53 Jul-14 1-Jan-2015

28-May-2015

APSPDCL, Andhra Pradesh

SR Granted & operational

43 NSL Sugars Limited

NSL Sugars Ltd (Koppa), Karnataka

SR 5,91 Jul-14 1-Jan-2015

28-May-2015

APSPDCL, Andhra Pradesh

SR Granted & operational

44 NSL Sugars (Tungabhadra) Ltd

NSL Sugars Ltd (Tunga-

bhadra), Karnataka

SR 7.08 Jul-14 1-Jan-2015

28-May-2015

APSPDCL, Andhra Pradesh

SR Granted & operational

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 18 of 20

Sl. No.

Name of the Applicant

Injection of Power Seeking MTOA

for (MW)

Month of

Application

Date from which MTOA

required / Granted

Date upto which MTOA

required / Granted

Drawl of Power Status / Remarks

Entity / Location of Generating

Station

Region Entity / Location of

Loads

Region

45 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 200 Sep-14 1-Jun-2015

31-May-2016

KSEB, Kerala

SR Not considered as MTOA sought within SR & has already been granted for their application against Nov’ 2014

46 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 100 Sep-14 1-Jun-2015

31-May-2016

KSEB, Kerala

SR

47 JSW Power Trading Co. Ltd.

JSW Energy Ltd.,

Karnataka

SR 200 Sep-14 1-Mar-2015

31-May-2015

KSEB, Kerala

SR Application closed, as not in conformity with the regulations

48 JSW Power Trading Co. Ltd.

JSW Energy Ltd.,

Karnataka

SR 300 Sep-14 1-Aug-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Application closed, incomplete application as per regulations

49 Adani Enterprises Ltd.

Adani Power Ltd. St-I, Mundra, Gujarat

WR 100 Oct-14 1-Sep-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Application closed, incomplete application as per regulations

50 Shree Cement Ltd

IPP, Odisha ER 300 Oct-14 29-May-2015

26-May-2016

TSSPDCL, Telangana

SR Approved for grant of 62MW from 29.5.15-26.5.16, 93.3MW from 29.5.15-31.12.15 and 144.7MW from 29.5.15-30.11.15

51 GMR Energy Trading Limited

GMR Chhattisgarh Energy Ltd., Chhattisgarh

WR 200 Oct-14 1-Jun-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Approved for grant of 26MW from 01.06.2015 to 30.11.2015

52 Shree Cement Limited

IPP of Shree Cement Ltd, Rajasthan

NR 50 Oct-14 1-Jun-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Approved for grant of 7MW from 01.06.2015 to 30.11.2015

53 NTPC Vidyut Vyapar Nigam Limited

Essar Power M.P. Ltd., Madhya Pradesh

WR 250 Oct-14 1-Jun-2015

26-May-2016

APCPDCL, Andhra Pradesh

SR Approved for grant of 33MW from 01.06.2015 to 30.11.2015

54 PTC India Ltd.

SESA Sterlite Limited, Odisha

ER 300 Oct-14 1-Jun-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Approved for grant of 39MW from 01.06.2015 to 30.11.2015

55 PTC India Ltd.

Jaypee Nigrie Super

Thermal Power Plant,

Madhya Pradesh

WR 200 Oct-14 1-Sep-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR No ATC for allocation is available as per priority, so application closed.

56 Manikaran Power Limited

Madhya Pradesh Power

Managemen

WR 300 Oct-14 1-Jun-2015

30-Sep-2015

APCPDCL, Andhra Pradesh

SR Not eligible for grant as the period has already expired,

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 19 of 20

Sl. No.

Name of the Applicant

Injection of Power Seeking MTOA

for (MW)

Month of

Application

Date from which MTOA

required / Granted

Date upto which MTOA

required / Granted

Drawl of Power Status / Remarks

Entity / Location of Generating

Station

Region Entity / Location of

Loads

Region

t Company Ltd.

so application closed.

57 Instinct Infra & Power Ltd.

Aarti Steels Ltd, Odisha

ER 40 Nov-14 1-Jul-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR

Not eligible for grant as next ATC is available after one year, so applications closed.

58 Knowledge infrastructure Systems Private Ltd.

Jindal Power Ltd.

St-2, Chhatisgarh

WR 400 Nov-14 1-Jun-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR

59 GMR Energy Trading Ltd

GMR Chhattisgarh Energy Ltd., Chhattisgarh

WR 200 Nov-14 29-May-2015

26-May-2016

SPDCTL, Telangana

SR

60 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 200 Nov-14 1-Jun-2015

31-May-2016

KSEB, Kerala

SR Already granted, subject to availability of 400 kV Somnahally-Dharmapuri D/c, Gooty-Madhugiri-Yelahanka D/c & Mysore-Kozhikode D/c lines

61 PTC India Ltd.

Simhapuri Energy Pvt Ltd, Andhra

Pradesh

SR 100 Nov-14 1-Jun-2015

31-May-2016

KSEB, Kerala

SR

62 JSW Power Trading Co. Ltd.

JSW Energy Ltd.,

Karnataka

SR 300 Nov-14 1-Aug-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Granted, subject to condition imposed in the NoC issued by Karnataka SLDC

63 JSW Power Trading Co. Ltd.

Shree Renuka

Sugars Ltd., Munoli,

Karnataka

SR 10 Nov-14 1-Dec-2015

31-Mar-2016

APSPDCL, Andhra Pradesh

SR Application closed, as not in conformity with the regulations

64 NSL Sugars Limited

NSL Sugars Ltd.

(Koppa), Karnataka

SR 12.15 Dec-14 1-Jul-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Granted & operational

65 NSL Sugars (Tungabhadra) Ltd

NSL Sugars Ltd. (Tunga-

bhadra), Karnataka

SR 15.91 Dec-14 1-Jul-2015

26-May-2016

APSPDCL, Andhra Pradesh

SR Granted & operational

66 NSL Sugars Limited

NSL Sugars Ltd (Aland), Karnataka

SR 16.9 Dec-14 1-Jul-2015

26-May-2016

TSSPDCL, Telangana

SR Granted & operational

67 PTC India Ltd.

Jaypee Nigrie Super

Thermal Power Plant,

Madhya Pradesh

WR 175 Dec-14 1-Sep-2015

26-May-2016

KSEB, Kerala

SR

Not eligible for grant as next ATC is available after one year, so applications closed.

68 Bangalore Electricity Supply Company Ltd

Mejia TPS (Unit-7&8),

DVC, Kolkata

ER 200 Dec-14 1-Jun-2015

31-May-2017

BESCOM, Karnataka

SR

Minutes of WR & SR Constituents Meeting for LTA & MTOA applications of Jan-Dec’14 & June15

Page 20 of 20

Sl. No.

Name of the Applicant

Injection of Power Seeking MTOA

for (MW)

Month of

Application

Date from which MTOA

required / Granted

Date upto which MTOA

required / Granted

Drawl of Power Status / Remarks

Entity / Location of Generating

Station

Region Entity / Location of

Loads

Region

69 Bangalore Electricity Supply Company Ltd

Koderma TPS (Unit-1&2), DVC, Jharkhand

ER 250 Dec-14 1-Jun-2015

31-May-2017

BESCOM, Karnataka

SR

70 Jindal Power Limited

JPL, 4x250MW Tamnar,

Chhattisgarh

WR 200 Dec-14 1-Dec-2015

31-Aug-2017

TANGEDCO, Tamil

Nadu

SR

71 Shree Cement Limited

IPP of Shree Cement Ltd, Rajasthan

NR 50 Dec-14 1-Jun-2015

26-May-2016

TSSPDCL, Telangana

SR

72 NTPC Vidyut Vyapar Nigam Ltd.

Jindal Power Ltd.,

Chhattisgarh

WR 400 Dec-14 1-Jun-2015

26-May-2016

TSSPDCL, Telangana

SR

73 NTPC Vidyut Vyapar Nigam Ltd.

Vandana Vidyut Ltd.,

Chhattisgarh

WR 120 Dec-14 1-Jun-2015

26-May-2016

TSSPDCL, Telangana

SR