PSB H- Injection - Design Technical Meeting – 3 rd July 2013. Discussions on Workdose Planning. Radiation Protection Assessment: Objectives. From RP presentation (R. Froeschl) @ H0/H- Dump Review. Design Beam Parameters : 2% of 1e14 proton pulses (160MeV, over 4 dumps). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Discussions on  Workdose  Planning

En

gin

eeri

ng

Dep

art

men

tEN

DISCUSSIONS ON WORKDOSE PLANNING

PSB H- Injection - Design Technical Meeting – 3rd July 2013

7/3/2013 Marco Garlasché

Page 2: Discussions on  Workdose  Planning

En

gin

eeri

ng

Dep

art

men

tEN

Marco Garlasché

Radiation Protection Assessment: Objectives

2mSv per person/intervention/year

Design Beam Parameters:2% of 1e14 proton pulses (160MeV, over 4 dumps)

7/3/2013

From RP presentation (R. Froeschl) @ H0/H- Dump Review

Presentation RF (@17/04/2013)

Page 3: Discussions on  Workdose  Planning

En

gin

eeri

ng

Dep

art

men

tEN

• (Dose on coils can be tolerated)Review definition of WDP

Bakeout

Design Issues (plug-in)

SiC preferred

Optimize design:• Shielding at intervention

positions• Shielded container for

BSW4 transport

SiC chosen as baseline

Note taken for design

7/3/2013 Marco Garlasché

Radiation Protection Assessment: Conclusions

Page 4: Discussions on  Workdose  Planning

En

gin

eeri

ng

Dep

art

men

tEN

Marco Garlasché7/3/2013

Radiation Protection Assessment: WD Planning

WDP (@17/04/2013)

Page 5: Discussions on  Workdose  Planning

En

gin

eeri

ng

Dep

art

men

tEN

Marco Garlasché7/3/2013

General recurrence values to be reviewed. Are they accepted by all?

Baseline design (*):• Evaluation by EN/HE of BSW4 transport time (with shielding box) • Alignment:

o 1 or 2 persons?o check and complete re-alignment of magnets have same timeo Alignment of chamber missing/not needed

• Update of task times / interventions?

What about other sectorization proposals?• Task times / interventions• definition of new locations

Radiation Protection Assessment: WD Planning

(*) SiC, no bake-out, Plug-in system, current sectorization

What do we need?

WDP (@17/04/2013)