Discussion on TE/CRG equipment at H4IRRADMarco Pezzetti
(A. Tovar – B. Ivens / Support CE for cryo LHC)& TE-CRG-OA – TE-CRG-CI
1TECRGCE M.PEZZETTI
Discussion on TE/CRG equipment at H4IRRAD:- SEU Summary 2011/2012- AMB introduction- SEU signature protocol on AMB- Discussion on possible November 2012 test at H4IRRAD
2TECRGCE M.PEZZETTI
3TECRGCE M.PEZZETTI
CV891 TT893 TT891 PLC 24 Vdc AMB AUTRES TotalBeam Dumped 9 2 6 6 2 1 0 25
Beam Saved 10 10 0 0 0 0 0 20Total SEU 19 12 6 6 2 1 0 45
Rate (of beam dumped) 0.39 0.09 0.26 0.26 0.09 0.04 0.00 1.09Rate (of beam saved) 0.43 0.43 0.00 0.00 0.00 0.00 0.00 0.87
1.96
23 weeks with stable beam > 640 bunches
CV891 TT893 TT891 PLC 24 Vdc AMB AUTRE TotalBeam Dumped 0 0 0 0 0 3 1 4
Beam Saved 18 0 0 0 0 0 0 18Total SEU 18 0 0 0 0 3 1 22
15Rate (of beam dumped) 0.00 0.00 0.00 0.00 0.00 0.20 0.07 0.27
Rate (of beam saved) 1.20 0.00 0.00 0.00 0.00 0.00 0.00 1.201.47
15 weeks with stable beam > 640 bunches
SEU: summary 2011-2012
Actions @ Xmas, not bad!
Courtesy A. Suraci TE-CRG-OA
QURCB_P8: 3xQURA_P4: 1xQUI_P4 : 1xQURCB_P6: 1x
Actions @ Xmas, not bad!
Relocation during Xmas 2011 P8: QURCB electrical cabinets & CPU of
QURA P6: CPU’s of: QUI, QURA, QURCA & QURCB P4: CPU’s of: QUI, QURA, QURCA, QURCB,
QURCACC & QURCBCC
TE/CRG equipment - AMB introduction
6TECRGCE M.PEZZETTI
TE/CRG equipment - AMB introduction
7TECRGCE M.PEZZETTI
LINDE IHI QURC Layout
8TECRGCE M.PEZZETTI
(13/08/2011) P8 stop SEU signature..
(27/08/2012) P4 SEU signature…
Rebooting (20s)…
SEU signature protocol…
TE/CRG technical procedure for SEU signature identification:1) Trend analyzing (20 s reboot)2) AMB Test on TECRGCE test bench3) Manufacture electronic stressing test
In accord with TE/MPE (F. Formenti).
TECRGCE M.PEZZETTI
QURCs- AMB UX45 localisation
12TECRGCE M.PEZZETTI
PLC Siemens & Profibus network
QURCs- AMB UX45 localisation
13TECRGCE M.PEZZETTI
PLC Siemens & Schneider
QURCs- AMB UX45 localisation
14TECRGCE M.PEZZETTI
AMB & VFD
Discussion on possible November 2012 test at H4IRRAD.
15TECRGCE M.PEZZETTI
H4IRRAD area testNo radiation for CCS cartouche.
R2E strategy for P4?
-Blindage
-Delocalisation <20m
-Delocalisation >20m
SEU: Balance 2011-2012
END
22.08.12 CRG/OA-as
SEU: Balance 2011-2012
Number of weeks with Stable Beam > 640 bunches:
2011 2012
• ~23 weeks ~15 weeks
TS TS TS TS TS
22.08.12 CRG/OA-as
640 bunches
TS TS
Courtesy A. Suraci TE-CRG-OA
SEU: Balance 2011-2012
Actions taken to improve robustness :
• CV891: automatic reset implemented into PLC (action: cut off 24 Vdc).• TT89x: modification of electronics card (capacitor removed), timer• PLC: moved into better protected zone (P4-P6-P8 caverns)• 24 Vdc: longer term, to be moved into a safer protected zone and better
distribution of power consumption to be done.• AMB (Magnetic bearing controlers): relocation 2nd unit of P8 (Phase III),
additional shielding required?
22.08.12 CRG/OA-as Courtesy A. Suraci TE-CRG-OA
R2E P8 Ph 3 Relocation, long and complex project well prepared a success!!
QURCs- AMB UX45 localisation
21TECRGCE M.PEZZETTI
20 m maximum…
R2E- P8 Ph3 P8 QURCB Transfert US85 to UL84
QURCA-EMC1
QURCA/B&QUICC Valves Positionners Racks
US85
QURCB-EM01=US85
Blocs Phoenix
Caverne UX85
8 NE48 Cables controle from QURC-EMC1 to EMC4
22 specific Cables controle depuis Blocs Phoenix QURCB-EM01=US85
12 Cables CCS 24VDC/230VAC UPS
/400VAC
3 Cables Profibus PA
1 Cables 24VDC I/O depuis rack 24VDC US851
12 specific Cables
Compr. Froids
2 Cables NE48 vers PLCSiemens + 1 cable NE18
UL84
UJ84
Existing cabinets from US852 new location
22
24 Cables NE8
QURCA-EMC2
QURCA-EMC3
QURCA-EMC4
QURCA-EM02=UL84QURC_QUI-
EM03=UL84 QUICC-EM02=UL84
Cold Compressors
QURCB-SchneiderNew Cabinet
US852
CCS Cabinet QURCA
CCS Cabinet QURCB
2 Cables Ethernet depuis Start Point US851
Longueur cables US852 a US85 CCS: 20mLongueur cables de US852 vers UJ84: 70 a 75mLongueur cables Armoires CCS US85 vers UJ84: 40 a 45m
US851
QURCB-EMC1
QURCB-EMC2
QURCB-EMC3
QURCB-EMC4
QURCB-EM02=UL84
Realisation new chassis
QURA-Existing Schneider
Cab. +Turbines cab.-
NewLocation
Partie elec Vannes CV + 8 EV
P4/P6 PLC CPU relocation