Page 1: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra
Page 2: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066

2. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai 400 093

3. 3.

Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066

4. 4.

Director (Operation) Maharashtra State Electricity Transmission Co. Ltd., 4th Floor, “Prakashganga”, Plot No. C-19, E-Block, Bandra – Kurla Complex, Bandra(East), Mumbai- 400051

5. 5.

Managing Director Gujarat Energy Transmission Corp. Ltd, Sardar Patel Vidyut Bhawan, Race Course, Vadodara -390 007

6. 6.

Chairman & Managing Director Madhya Pradesh Power Transmission Co. Ltd., Block No. 3, Shakti Bhawan, Rampur, Jabalpur-482 008

7. 7.

Managing Director Chhattisgarh State Power Transmission Co. Ltd., Dangania, Raipur- 492 013

8. 8.

The Chief Engineer Electricity Department The Government of Goa, Panaji

9. 9.

Executive Engineer Administration of Daman & Diu (U.T.) Department of Electricity Moti Daman - 396220

10. 10.

Executive Engineer Electricity Department UT of Dadra & Nagar Havelli, Post Naroli-396 235, Silvassa

11. 11.

Chief Executive Officer POSOCO B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110 016

12. 12.

General Manager Western Regional Load Despatch Centre F-3, M.I.D.C. Area, Marol, Andheri East, Mumbai-400 093

13. Executive Director (Engg.) NTPC Ltd., Engg. Office Complex, Plot no. A-8A, Sector-24, Post Box. 13, Noida 201 301 (U.P)

14. 14.

Chief Engineer (Transmission) Nuclear Power Corporation of India Ltd., 12th Floor, North wing, Vikram Sarabhai Bhawan, Anushakti Nagar, Mumbai-400 094

Page 3: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

15. Sh. Ashish Shukla Senior Manager Gamesa Renewable Pvt. Ltd. (Mathak, Gagodar, Latur, Ghat Pimpri, Tuljapur/Deosingh & Kod Wind Power Projects) Future IT Prk, B-Block, 8th Flr, No. 334, Rajiv Gandhi Salai, Shollinganallur, Chennai-119, Tamil Nadu [email protected] Mob. 07869913518

16. Sh. Lalit Birla AGM Orange Rajkot Wind Power Pvt. Ltd. & Orange Ashok North Wind Power Pvt. Ltd (Gagodar, Hajapar & Lohara Wind Projects) 301B, 3rd Floor, D21 Corporate Park, Sector-21 Dwarka, New Delhi – 110075 [email protected] Mob. 09650015982

17. Sh. Alok Gupta General Manager-P.E. Inox Wind Infrastructure Services Ltd. (Bhachau, Dayapar & Bhuj Wind Farms) Inox Towers, Plot No. 17, Sector 16A, Film City, Noida – 201301, Uttar Pradesh [email protected] Mob. 09717364276

18. Shri M.R. Krishna Rao Vice President Adani Green Energy Ltd. (Khavda Wind Farm) Achalraj, Opposite Mayor Bungalow, Law Garden, Ahmedabad – 380006, Gujarat [email protected] Mob. 09099005556

19. Sh . Naresh Panchal Senior GM & Head PE Suzlon Power Infrastructure Ltd. (Baranda & Fulra Wind Farms) Level 1, Left Wing, Tree Suzlon, One Earth, Opposite Magarpatta, Pune-411028, Maharashtra [email protected] Mob. 09850829701

20. Sh. Rakesh Rathore Asst. Vice President, Srijan Energy System Pvt. Ltd. 102, EL TARA Building, Orchard Avenue, Hiranandani, Powai, Mumbai, 400076 [email protected] Mob. 07738091123

21. Sh. Rakesh Garg AVP-Project Development Renew Power Ventures Pvt. Ltd. (Bhuvad Wind Farm) 10th Floor, DLF Square, Jacaranada Marg, Sector 25, DLF Phase-2, Gurgaon, Haryana [email protected] Mob. 09711486060

22. Sh. Pratik Poddar Head, Project Development Ostro Kutch Wind Pvt. Ltd. Unit No. G-0, Ground Floor, Mira Corporate Suites, 1&2, Ishwar Industrial Estate, Mathura Road, New Delhi-110065 [email protected] Mob. 09810200736

23. Sh. Dheeraj Jain AGM –Regulatory Affairs Regen Wind Farm (Vagarai) Pvt. Ltd. C/4, No. 22, Vaidya Rama Iyer Street, T Nagar, Chennai –600 017 [email protected] Mob. 09910778484

24. Sh. Rakesh Garg AVP-Project Development Renew Power Ventures Pvt. Ltd. (Pugalur Wind Park) 10th Floor, DLF Square, Jacaranada Marg, Sector 25, DLF Phase-2, Gurgaon, Haryana [email protected] Mob. 09711486060

25. Sh. V.K. Soni Head (Projects & New Initiatives) Gujarat Fluorochemicals Ltd. Inox Towers, Plot No. 17, Sector 16-A, Noida-201301, UP [email protected] Mob. 09891795111

26.

Page 4: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 1 of 16

Agenda for 24th Meeting of WR Constituents regarding Connectivity

& Long-term Access applications in Western Region

----------------------------------------------------------------------------------------------------------------

1. Confirmation of the minutes of 23rd Meeting of WR Constituents regarding

Connectivity & Long-term Access applications in Western Region held on 01-

06-2016 at NRPC, New Delhi

No comments on the MoM have been received till date. Members may confirm the

minutes of the 23rd Meeting of WR Constituents regarding Connectivity & Long-term

Access applications in Western Region held on 01.06.2016.

2. Connectivity Applications from RE Generation Developers in Western Region.

Total sixteen nos. of connectivity applications of about 5000MW quantum of power

have been received by CTU till August, 2016 for ISTS connectivity at Bhachau, Bhuj

Pool , Parli, Solapur and Rajgarh Substations of POWERGRID from RE generation

projects. Here it is to inform that CERC in its order dated 05.01.2016 in Petition No:

420/MP/2014 has directed that wind developers should comply to the provision of

LVRT (Low Voltage Ride Through). Further, the wind developers shall provide

adequate reactive compensation so that under all dispatch scenarios Power Factor

of 0.98 shall be maintained.

Further, it may be mentioned that as per the Connectivity Regulations, the Grant of

Connectivity shall not entitle an applicant to inter-change any power with the grid

unless it obtains LTA, MTOA or STOA. Further, since MTOA & STOA are granted on

the margins available in the grid and firm transfer of power is granted only with the

LTA, therefore, the applicants are advised to apply for the LTA to ensure power

evacuation & transfer to its beneficiaries under LTA.

Details of the connectivity applications in WR received till August, 2016 are given

below.

Table: 1

Sl Name of Applicant (Organization)

Date of receipt of Application

Date from which connectivity required

Distance from Nearest PS (km)

Name of the Power Plant

S/s for which Connectivity Requested

Installed capacity of Plant (in MW)

Application No

Aplication Status

Generation Projects in vicinity of Bhachau, Gujarat

1

Gamesa Renewable Pvt.

Ltd. (GRPL-Mathak)

22-Jul-

2016

31-Mar-2017 30.00 Mathak

Wind Power Project

Bhachau S/s 100 1200000444 Under

Process

2 Orange Rajkot

Wind Power Pvt. Ltd. (ORWPPL-

25-Jul- 30-Jun-2018 55.00 Gagodar Bhachau S/s 100 1200000447 Under

Process

Page 5: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 2 of 16

Gagodhar) 2016

3

Inox Wind Infrastructure Services Ltd.

(IWISL-Bhachau)

1-Aug-

2016

1-Jul-2017 45.00 Bhachau wind farm

Bhachau S/s 500 1200000457 Under

Process

4

Gamesha Renewables Pvt

Ltd. (GRPL-Gagodhar)

3-Aug-

2016

31-Mar-2018 60.00 Gagodhar Bhachau S/s 300 1200000459 Under

Process

Subtotal 1000

Generation Projects in vicinity of Bhuj PS, Gujarat

5

Inox Wind Infrastructure Services Ltd.

(IWISL-Dayapar)

1-Jun-

2016

30-Jul-2017 70.00 Dayapar wind farm

Bhuj PS 500 1200000390 Under

Process

6 Adani Green Energy Ltd.

(AGEL-Khavda)

2-Jun-

2016

31-Mar-2019 72.00 Khavda

Wind Farm Bhuj PS 500 1200000378

Under Process

7

Suzlon Power Infrastructure Ltd. (SPIL-Baranda)

6-Jul-

2016

31-Jan-2019 65.00 Baranda

Wind Farm Bhuj PS 250 1200000395

Under Process

8 Suzlon Power Infrastructure

Ltd. (SPIL-Fulra)

8-Jul-

2016

31-Jan-2019 25.00 Fulra Bhuj PS 250 1200000394 Under

Process

9

Orange Rajkot Wind Power Pvt. Ltd. (ORWPPL-

Hajapar)

25-Jul-

2016

31-Oct-2018 40.00 Hajapar Bhuj PS / Bhachau

100 1200000432 Under

Process

10

Inox Wind Infrastructure Services Ltd.

(IWISL-Kotda)

1-Aug-

2016

31-Dec-2018 42.00 Bhuj wind

farm (Kotda) Bhuj PS 500 1200000458

Under Process

Subtotal 2100

Generation Projects in vicinity of Parli, Maharashtra

11

Gamesa Renewable Pvt.

Ltd. (GRPL-Latur)

22-Jul-

2016

30-Sep-2018 40.00 Latur wind

power project

Parli (PG) S/s

400 1200000441 Under

Process

12

Gamesha Renewables Pvt Ltd. (GRPL-Ghat

Pimpri)

3-Aug-

2016

30-Sep-2018 45.00 Ghat Pimpri Parli (PG)

S/s 500 1200000460

Under Process

13

Gamesha Renewables Pvt Ltd. (GRPL-Ghat

Pimpri)

4-Aug-

2016

30-Sep-2018 45.00 Ghat Pimpri Parli (PG)

S/s 100 1200000465

Under Process

Subtotal 1000

Page 6: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 3 of 16

Generation Projects in vicinity of Solapur, Maharashtra

14

Gamesa Renewable Pvt.

Ltd. (GRPL-Tuljapur)

22-Jul-

2016

30-Sep-2018 60.00

Tuljapur & Deosingh

Wind Power Project

Solapur 765/400kV

400 1200000440 Under

Process

15

Orange Ashok North Wind

Power Pvt. Ltd. (OANWPPL-

Lohara)

25-Jul-

2016

31-Mar-2020 43.00 Lohara Wind

Farm Solapur

765/400kV 200 1200000433

Under Process

Subtotal 600

Generation Project in vicinity of Rajgarh, Madhya Pradesh

16

Gamesa Renewable Pvt.

Ltd. (GRPL-Khod)

22-Jul-

2016

31-Mar-2017 40.00 Khod wind

power project

Rajgarh S/s 218 1200000445 Under

Process

Subtotal 218

Total 4918

2.1 Connectivity Applications received in the vicinity of Bhachau :

Three nos of applicants have already been granted connectivity at Bhachau

substation. Details of these connectivity applications are as given below:

Table: 2

Sl

Name of Applicant Name of the Power Plant

S/s at which Connectivity Requested

Distance from Connected S/s (km)

Installed capacity of Plant (in MW)

Application No Connectivity Status

1 Ostro Kutch Wind Pvt. Ltd. (OKWPL-Kutch)

Kutch, Gujarat Bhachau 5 300 1200000409 Granted

2 Renew Power Ventures Pvt. Ltd. (RPVPL-Bhuvad)

Bhuvad Wind Power

Bhachau 45 400 1200000326 Granted

3 Gujarat Floro Ltd (GFL-Maliya)

Maliya, Rajkot, Gujarat

Bhachau 45 300 - Granted

Total 1000

Page 7: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 4 of 16

Figure 1: Connectivity to RE generations in the vicinity of Bhachau and Bhuj

As per details given in table 1, four nos. of new connectivity applications have been

received at Bhachau S/s. Due to the severe ROW issues in the vicinity of Bhachau

and space constraints in Bhachau S/s, it is not possible to provide the connectivity to

new applicants at existing Bhachau S/s.

Considering the above and high RE potential in vicinity of Bhachau, it is proposed to

develop a new 400/220kV pooling station in vicinity of Lakadia in Bhachau Taluka,

Kutch district, Gujarat (Lakadia PS). The substation shall act as a pooling station for

the 4 nos. of new RE generations as well as for future RE generations that come up

in the area.

Here, it is to mention that Gujarat Flurochemicals Ltd. (GFL) was granted

connectivity to Bhachau s/s way back in 2011 through 220kV line (twin conductor) for

their 300MW wind farm at Maliya, Rajkot, Gujarat. It is understood that the line,

which was agreed to be constructed by GFL has not yet been taken up by them.

Accordingly, looking into severe ROW issues in the vicinity of Bhachau and space

contraints at Bhachau S/s, it is proposed to revise the connectivity of GFL to Lakadia

PS.

Accordingly, following is proposed for connectivity:

Common Transmission System for Connectivity of renewable generations in

Bhachau area (viz GRPL-Mathak, ORWPPL-Gagodhar, IWISL-Bhachau, GRPL-

Gagodhar):

Page 8: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 5 of 16

LILO of both circuits of EPGL – Bhachau 400kV D/c (Triple) line at Lakadia

PS

Establishment of 1x500MVA, 400/220kV Lakadia PS.

1x125MVAR, 420kV Bus Reactor at Lakadia PS.

Dedicated connectivity system for RE applicants proposed to be pooled at

Lakadia PS:

Table: 3

Sr.

No.

Name of Applicant Connectivity

Quantum

(MW)

Proposed Connectivity System* Implemeting

Agency

1.

Gamesha

Renewables Pvt

Ltd. (Gagodhar)

(GRPL-Gagodhar)

300 GRPL (Gagodhar) – Lakadia PS 220kV S/c line (High Capacity) alongwith associated line bays at both ends

GRPL / TBCB as per deliberations in the meeting

2. Gamesha

Renewable Pvt.

Ltd. (Mathak)

(GRPL-Mathak)

100 GRPL (Mathak) – Lakadia PS 220kV S/c line alongwith associated line bays at both ends

GRPL

3. Orange Rajkot

Wind Power Pvt.

Ltd. (ORWPL-

Gagodhar)

100 ORWPL(Gagodhar) – Lakadia PS

220kV S/c line alongwith associated

line bays at both ends

ORWPL

4. Inox Wind

Infrastructure

Services Ltd.

(IWISL-Bhachau)

500 IWISL (Bhachau) – Lakadia PS

220kV D/c line (High Capacity)

alongwith associated line bays at

both ends

IWISL / TBCB as per deliberations in the meeting

5. Gujarat Floro Ltd

(GFL-Maliya)

300 GFL(Maliya) – Lakadia PS 220kV S/c line (High Capacity) alongwith associatged line bays at both ends.

GFL / TBCB as

per

deliberations in

the meeting

Total 1300

*As per the Manual on Transmission Planning Criteria, the ‘N-1’ criteria may not be applied to the

immediate connectivity of wind / solar farms with the ISTS / Intra-STS grid i.e. the line connecting the

farm to the grid and the step-up transformers at the grid station. In case, wind farm developer

envisages expansion in generation capacity, the same may be informed so that connectivity system

may be appropriately modified.

Since connectivity required by the 4 nos. of applicants mentioned above is from

Mar’17 to June’18, efforts may be made to implement Dedicated connectivity

system as well as Common Transmission System for Connectivity of

renewable generations in Bhachau area at an early date.

Page 9: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 6 of 16

2.2 Connectivity Applications received in the vicinity of Bhuj :

Six nos. of new connectivity applications have been received at Bhuj PS as per the

details given in table 1. In view of project capacity and proximity of generation to

Bhuj PS, following transmission system is proposed for connectivity:

Table: 4

Sr.

No.

Name of

Applicant

Connectivity

Quantum (MW)

Proposed Connectivity System Implemeting

Agency

1 Orange Rajkot

Wind Power Pvt.

Ltd. (ORWPL-

Hajapar)

100

ORWPL(Hajapar) – Bhuj PS 220kV

S/c line along with associated line

bays at both ends ORWPL

2. Suzlon Power

Infrastructure Ltd

(SPIL-Fulra) 250

SPIL (Fulra) – Bhuj PS 220kV S/c

line (high capacity) along with

associated line bays at both ends

SPIL/ TBCB as per deliberations in the meeting

3 Suzlon Power

Infrastructure Ltd

(SPIL-Baranda) 250

SPIL (Baranda) – Bhuj PS 220kV

S/c line (high capacity) along with

associated line bays at both ends

SPIL/ TBCB as per deliberations in the meeting

4. Adani Green

Energy Ltd.

(AGEL-Khavda) 500

AGEL (Khavda) – Bhuj PS 220kV

D/c line (high capacity) along with

associated line bays at both ends

AGEL / TBCB as per deliberations in the meeting

5 Inox Wind

Infrastructure

Services Ltd.

(IWISL-Kotda)

500

IWISL(Kotda) – Bhuj PS 220kV D/c

line (high capacity) along with

associated line bays at both ends

IWISL/ TBCB as per deliberations in the meeting

6 Inox Wind

Infrastructure

Services Ltd.

(IWISL-Dayapar)

500

IWISL(Dayapar) – Bhuj PS 220kV

D/c line (high capacity) along with

associated line bays at both ends

IWISL / TBCB as per deliberations in the meeting

Total 2100

Note:

1. As per the Manual on Transmission Planning Criteria, the ‘N-1’ criteria may not be applied to

the immediate connectivity of wind / solar farms with the ISTS / Intra-STS grid i.e. the line

connecting the farm to the grid and the step-up transformers at the grid station. In case, wind

farm developer envisages expansion in generation capacity, the same may be informed so

that connectivity system my be appropriately modified.

2. Connectivity of all six applicants with the grid shall be established with the commissioning of

above mentioned dedicated line and Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) –

Sankhari (400kV) Corridor or Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) –

Chittorgarh PS (765kV) – Chittorgarh (RVPN) (400kV) corridor.

Page 10: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 7 of 16

2.3 Connectivity Applications received in the vicinity of Parli & Solapur :

Three nos. of new connectivity applications desired to be connected at Parli (PG) &

two nos of connectivity applications desired to be connected at Solapur (PG) have

been received. The details of the connectivity applications are mentioned in table 1.

From the GPS co-ordiantes of these RE generations, it is observed that they are

mainly located in the vicinicty of Latur area. Hence, considering the large quantum of

RE generation, it is proposed to develop a new 400/220kV substation near Latur.

The substation shall act as a pooling station for the 5 nos. of RE generations as well

as for future RE generations that come up in this area.

Accordingly, following transmission system is proposed for connectivity:

Common Transmission System for Connectivity of renewable generations

around Latur area (viz GRPL-Ghat Pimpri (100MW), GRPL-Ghat Pimpri

(500MW), GRPL-Latur, GRPL-Tuljapur-Desingh, OANWPPL-Lohara):

Establishment of 1x500MVA, 400/220kV Latur PS.

Latur PS – Solapur (PG) 400kV D/c (Quad) line

1x125MVAR, 420kV Bus Reactor at Latur PS.

Dedicated connectivity system for RE applicants proposed to be pooled at

Latur PS:

Table: 5

Sr.

No.

Name of

Applicant

Connectivity

Quantum

(MW)

Proposed Connectivity System* Implemeting

Agency

Connectivity Applications received in the vicinity of Parli:

1

Gamesha

Renewables Pvt.

Ltd. (GRPL-Ghat

Pimpri)

100

GRPL(Ghat Pimpri) – Latur PS

220kV S/c line along with

associated line bays at both ends

GRPL

2

Gamesha

Renewables Pvt.

Ltd. (GRPL-Ghat

Pimpri)

500

GRPL(Ghat Pimpri) – Latur PS

220kV D/c line (high capacity)

along with associated line bays at

both ends

GRPL / TBCB as per

deliberations in the meeting

3

Gamesha

Renewables Pvt.

Ltd. (GRPL-Latur) 400

GRPL (Latur) – Latur PS 220kV

D/c line along with associated line

bays at both ends

GRPL / TBCB as per

deliberations in the meeting

Sub-total 1000

Page 11: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 8 of 16

Connectivity Applications received in the vicinity of Solapur:

4

Gamesha Renewable Pvt. Ltd. (GRPL-Tuljapur-Desingh)

400

GRPL (Tuljapur-Deosingh) – Latur PS 220kV D/c line along with associated line bays at both ends

GRPL / TBCB as per

deliberations in the meeting

5

Orange Ashok North Wind Power Pvt. Ltd. (OANWPPL-Lohara)

200

OANWPPL (Lohara) – Latur PS 220kV D/c line along with associated line bays at both ends

OANWPPL / TBCB as per deliberations

in the meeting

Sub-total 600

Total 1600

*As per the Manual on Transmission Planning Criteria, the ‘N-1’ criteria may not be applied to the

immediate connectivity of wind / solar farms with the ISTS / Intra-STS grid i.e. the line connecting the

farm to the grid and the step-up transformers at the grid station. In case, wind farm developer

envisages expansion in generation capacity, the same may be informed so that connectivity system

my be appropriately modified.

Since connectivity required by the applicants mentioned above is from Sep’18 to

Oct’18, efforts may be made to implement Dedicated Connectivity System as well

as Common Transmission System for Connectivity of renewable generations

around Latur area at an early date.

Figure 2: Connectivity to RE generations in the vicinity of Parli and Solapur

Page 12: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 9 of 16

2.4 Connectivity Applications received in the vicinity of Rajgarh :

The following new connectivity application has been received at Rajgarh S/s as per

details given in table 1. In view of project capacity & proximity of generation,

following transmission system is proposed for connectivity:

Table: 6

Sr.

No

.

Name of Applicant Connectivity

Quantum (MW)

Proposed Connectivity

System*

Implemeting

Agency

1 Gamesha

Renewables Pvt.

Ltd. (GRPL-Khod)

218

GRPL (Khod) – Rajgarh(PG)

220kV S/c line along with

associated line bays at both

ends

GRPL

*As per the Manual on Transmission Planning Criteria, the ‘N-1’ criteria may not be applied to the

immediate connectivity of wind / solar farms with the ISTS / Intra-STS grid i.e. the line connecting the

farm to the grid and the step-up transformers at the grid station. In case, wind farm developer

envisages expansion in generation capacity, the same may be informed so that connectivity system

my be appropriately modified.

The connectivity of GRPL(Khod) with the grid shall be established after the

commissioning of above connectivity system or 31-03-2017 whichever is later.

Figure 3: Connectivity to RE generations in the vicinity of Rajgarh

Page 13: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 10 of 16

3 Revision in Grant of Connectivity & LTA to M/s Srijan Energy System Pvt Ltd.

(SESPL)

In the 23rd meeting of WR Constituents regarding Connectivity / Open Access

Applications held at NRPC, New Delhi on 01.06.2016, Connectivity (300MW) and

LTA (300MW) application of Srijan Energy System Pvt. Ltd. (SESPL) was discussed

and following system was agreed for connectivity & LTA (NR &SR):

Transmission System for Connectivity

SESPL switchyard – Bhuj PS 220kV D/c line along with line bays at both ends

(to be constructed by SESPL)

Installation of 2x500MVA, 400/220kV ICT at Bhuj PS (to be implemented by

POWERGRID under Green Energy Corridor)

Transmission System for LTA – WR (90 MW)

Existing & under construction transmission system shall be sufficient to enable

dispersal of power within WR

Transmission System for LTA – NR (150 MW)

Bhuj PS - Banaskantha PS 765kV D/c line

Banaskantha PS- Chittorgarh PS 765kV D/c line

Chittorgarh PS- Chittorgarh (RVPN) 400kV D/c (quad) line

Transmission System for LTA – SR (60 MW)

Wardha – Nizamabad 765kV D/c line along with Nizamabad – Dichpally

400kV D/c line (HTLS)

Nizamabad – Hyderabad (Maheshwaram) 765kV D/c line along with

associated 400kV transmission system

Subsequently, some more proposals have been received for interconnection of RE

generations at Bhuj PS. Accordinlgy, the scheme was reviewed comprehensively

and it is proposed to provide connectivity to SESPL at 220kV level at Bhuj PS.

Therefore, grant of Connectivity/LTA to SESPL is proposed with following

transmission system :

Transmission System for Connectivity:

SESPL switchyard – Bhuj PS 220kV D/c line along with line bays at both ends

(to be constructed by SESPL)@

@

Connectivity with the grid shall be established with the commissioning of above mentioned

dedicated line and Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Sankhari (400kV)

Corridor or Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Chittorgarh PS (765kV) –

Chittorgarh (RVPN) (400kV) corridor

Page 14: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 11 of 16

Common Transmission System for LTA to WR, NR & SR

Installation of 2x500MVA, 400/220kV ICT at Bhuj PS

Transmission System for LTA to WR (90 MW)

Existing & under construction transmission system shall be sufficient to

enable dispersal of power within WR

Transmission System for LTA to NR (150 MW)

Bhuj PS- Banaskantha PS 765kV D/c line

Banaskantha PS- Chittorgarh PS 765kV D/c line

Chittorgarh PS- Chittorgarh (RVPN) 400kV D/c (quad) line

Transmission System for LTA to SR (60 MW)

Wardha – Nizamabad 765kV D/c line along with Nizamabad – Dichpally

400kV D/c line (HTLS)

Nizamabad – Hyderabad (Maheshwaram) 765kV D/c line along with associated

400kV transmission system

4 LTA Applications from RE developers in Western Region & Southern Region

Details of the three nos of applicants from generation projects in WR and from five

nos of applicants from generation projects in SR (seeking transfer of power from

Southern Region to Northern Region) who have applied for LTA are tabulated below:

Table: 7

Sl

Name of the Applicant

Location of Generating

Station

Installed Capacity

(MW) Connectiv

ity provided/proposed

at

Seeking LTA for (MW)

Type of

Fuel

Date of Receipt of App.

Date from which LTA required

Date upto which LTA required

Quantum allocated in the region

SR WR NR ER NER

LTA Applications in Western Region

1 Adani Green Energy Ltd (AGEL-Khavda)

WR (Khavda,

Kutch, Gujarat)

500 Bhuj PS 500 Wind 2-Jun-2016

31-Mar-2019

30-Mar-2044

- - 400 100 -

2

Renew Power Ventures Pvt. Ltd. (RPVPL-Bhuvad)

WR (Bhuvad,

Kutch, Gujarat)

400 Bhachau

S/s 400 Wind

30-Jun-2016

15-Dec-2017

14-Dec-2042

- 50 200 150 -

3 Ostro Kutch Wind Pvt. Ltd. (OKWPL-Kutch)

WR (Kutch, Gujarat)

300 Bhachau

S/s 300 Wind

8-Jul-2016

31-Mar-2018

30-Mar-2043

- - 300 - -

Subtotal 1200 - 50 900 250 -

Page 15: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 12 of 16

LTA Applications in Southern Region

4 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

40 Wind 30-May-

2016 01-May-

2017 30-Apr-

2042 - - 40 - -

5 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

80 Wind 30-May-

2016 01-Apr-

2018 31-Mar-

2043 - - 80 - -

6 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

80 Wind 30-May-

2016 01-June-

2018 31-May-

2043 - - 80 - -

7 Regen Wind farm Pvt. Ltd. (RWFPL-Vagari)

SR (Tamil Nadu)

600 Pugalur

400/230kV S/s

40 Wind 30-May-

2016 1-Sep-2017

31-Aug-2042

- - 40 - -

8

Renew Power Ventures Pvt. Ltd. (RPVPL-Karur)

SR (Karur, Tamil Nadu)

400 Pugalur

400/230kV S/s

400 Wind 30-

June-2016

31-03-2018

30-03-2043

50 - 250 100 -

Subtotal 640 50 - 490 100 -

Grand Total 50 50 1390 350 0

System studies were conducted considering the LTA applications mentioned in

Table:7 as well as the Connectivity applicants mentioned in table 1 and study results

are enclosed at Annexure-I.

4.1 Transmission system for LTA for Adani Green Energy Ltd. (Khavda Wind

Farm) (AGEL-Khavda)

Details of the application are given in Table: 7. The high capacity Green Energy

Corridor starting from Bhuj PS (WR) to Moga (NR) is under implementation by

POWERGRID for evacuation and dispersal of power from renewable generations

coming up in Gujarat (especially Kutch complex) and Rajasthan. The proposed

project is a wind generation in Kutch area of Gujarat. The applicant has requested

LTA quantam of 400 MW for NR and 100 MW for ER.

The proposed transmission system for connectivity for AGEL (Khavda)

project as mentioned in item no. 3.2 is as below:

AGEL (Khavda) – Bhuj PS 220kV D/c line (high capacity) along with

associated line bays at both ends (AGEL / TBCB as per deliberations in the

meeting)

Transmission system for LTA AGEL (Khavda) project:

It can be seen that total LTA quantum of 800MW (300MW form SESPL & 500MW

from AGEL) will be injected on Bhuj PS at 220kV level for which total of 3x500MVA,

Page 16: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 13 of 16

400/220kV ICTs will be required. 2x500MVA, 400/220kV ICTs has already been

planned under LTA system of SESPL (proposed under item no. 3).

Accordingly, following Transmission System for LTA of AGEL (Khavda) for transfer

of power to ER (100MW) & NR (400MW) is proposed:

Transmission System for LTA to ER (100 MW)

Installation of 1x500MVA, 400/220kV (3rd) ICTs at Bhuj PS

Transmission System for LTA to NR (400 MW)

Installation of 1x500MVA, 400/220kV (3rd) ICTs at Bhuj PS

Bhuj PS- Banaskantha PS 765kV D/c line#

Banaskantha PS- Chittorgarh PS 765kV D/c line#

Chittorgarh PS- Chittorgarh (RVPN) 400kV D/c (quad) line#

#under implementation as part of Green Energy Corridors and expected to get commissioned by

July’18

4.2 Transmission system for LTA for Renew Power Ventures Pvt. Ltd. (Bhuvad

Wind Park, Gandhidham) (RPVPL-Bhuvad)

Details of the application are given in the table 7. The proposed project is a wind

generation in Kutch area of Gujarat. The applicant has requested LTA quantam of

200 MW for NR,150 MW for ER and 50 MW for WR.

In 23rd meeting of WR constituents held on 01.06.2016, following Transmission

System for Connectivity was agreed for RPVPL(Bhuvad) project:

RPVPL (Bhuvad) – Bhachau 220kV D/c line along with associated line bays at

both ends (to be constructed by RPVPL)*

*Line bays at Bhachau end to be implemented as GIS (on account of space constraints at

Bhachau S/s)

Transmission system for LTA RPVPL (Bhuvad) project:

Regarding power transfer under LTA within WR (50MW) and to ER (150MW), it may

be mentioned that existing and planned transmission infrastructure shall be

sufficient to enable dispersal of power within WR and from WR to ER.

LTA for transfer of power to beneficiaries in NR is proposed to be granted with the

commissioning of following transmission system.

Green Energy Corridor – ISTS (part system) (under implementation as part of Green

Energy Corridors and expected to get commissioned by July’18):

Bhuj PS – Banaskantha 765kV D/c line

Banaskantha PS – Chittorgarh 765kV D/c line

Chittorgarh – Chittorgarh (RVPN) 400kV D/c (quad) line

Page 17: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 14 of 16

Transmission System Strengthening associated with Mundra UMPP (Part B) (under implementation by POWERGRID):

Mundra UMPP – Bhuj PS 400kV D/c (Triple) line

4.3 Transmission system for LTA for Ostro Kutch Wind Pvt. Ltd. (Kutch Wind

Park) (OKWPL-Kutch)

Details of the application are given in the table 7. The high capacity Green Energy

Corridor starting from Bhuj PS (WR) to Moga(NR) is under implementation by

POWERGRID for evacuation and dispersal of power from renewable generations

coming up in Gujarat (especially Kutch complex) and Rajasthan. The proposed

project is a wind generation in Kutch area of Gujarat. The applicant has requested

LTA quantam of 300 MW for NR.

In 23rd meeting of WR constituents held on 01.06.2016, following Transmission

System for Connectivity was agreed for OKWPL (Kutch) project:

OKWPL (Kutch) – Bhachau 220kV D/c line along with associated line bays at

both ends (to be constructed by OKWPL)*

*Line bays at Bhachau end to be implemented as GIS (on account of space constraints at

Bhachau S/s)

Transmission system for LTA:

LTA for transfer of power to beneficiaries in NR (300 MW) is proposed to be

granted with the commissioning of following transmission system:

Green Energy Corridor – ISTS (part system) (under implementation as part of Green

Energy Corridors and expected to get commissioned by July’18)

Bhuj PS – Banaskantha 765kV D/c line

Banaskantha PS – Chittorgarh 765kV D/c line

Chittorgarh – Chittorgarh (RVPN) 400kV D/c (quad) line

Transmission System Strengthening associated with Mundra UMPP (Part B) (under implementation by POWERGRID)

Mundra UMPP – Bhuj PS 400kV D/c (Triple) line

4.4 Transmission System for LTA for Regen Wind farm Pvt Ltd. (RWFPL-Vagari)

The details of the applications are given in Table: 7 (Sl.4 to 7). M/s Regen Wind Farm

Pvt Ltd. has applied for LTA for transfer of 240MW from Sourthern Region to Nothern

Region. The LTA applications were disucussed in 20th meeting of Southern Region

constituents regarding Connectivity / LTA applications of IPPs in SR held on

13.07.2016 at Gurgaon. In the meeting, following transmission system was agreed for

transfer of power to Northern Region:

Page 18: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 15 of 16

WR- NR 765kV Inter-regional corridor

Jabalpur PS - Orai 765 kV D/C line

System studies indicate no problems in transfer of 240MW power to NR with the

commissioning of Jabalpur - Orai 765 kV corridor under implementation as “Inter-

Regional System Strengthening Scheme in WR and NR Part-B” and Champa –

Kurukshetra HVDC Phase II under implementation as “Transmission System

Strengthening in WR-NR Transmission Corridor For IPPs in Chhattisgarh”. Details of

both the schemes are as given below:

Inter-Regional System Strengthening Scheme in WR and NR Part-B

Jabalpur PS - Orai 765kV D/C line

Orai - Aligarh 765kV D/C line

Orai - Orai 400kV D/C (Quad) line

LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai

LILO of Agra - Meerut 765kV S/C at Aligarh

LILO of Kanpur - Jhatikara 765kV S/C at Aligarh

Transmission System Strengthening in WR-NR Transmission Corridor For

IPPs in Chhattisgarh

Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS –

Kurukshetra (NR) to 6000MW

Kurukshetra (NR) – Jind 400kV D/c (Quad)

Hence, it is proposed to grant LTA to M/s Regen Wind farm Pvt Ltd. with the

transmission system mentioned above.

4.5 Transmission System for LTA for Renew Power Ventures Pvt. Ltd. (RPVPL-

Karur)

The details of the application are given in table 7.

M/s Renew Power Ventures Pvt. Ltd. has applied for LTA for transfer of 400MW with

the target beneficiaries as follows: SR- 50MW, NR-250MW & ER – 100MW.

System studies indicate no problems in transfer of power to NR with the

commissioning of Jabalpur - Orai 765 kV corridor under implementation as “Inter-

Regional System Strengthening Scheme in WR and NR -Part B” and Champa –

Kurukshetra HVDC Phase II under implementation as “Transmission System

Strengthening in WR-NR Transmission Corridor For IPPs in Chhattisgarh”. Details of

both the schemes are as given below:

Page 19: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra

Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications

Page 16 of 16

Inter-Regional System Strengthening Scheme in WR and NR Part-B

Jabalpur PS - Orai 765kV D/C line

Orai - Aligarh 765kV D/C line

Orai - Orai 400kV D/C (Quad) line

LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai

LILO of Agra - Meerut 765kV S/C at Aligarh

LILO of Kanpur - Jhatikara 765kV S/C at Aligarh

Transmission System Strengthening in WR-NR Transmission Corridor For

IPPs in Chhattisgarh

Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS –

Kurukshetra (NR) to 6000MW

Kurukshetra (NR) – Jind 400kV D/c (Quad)

Hence, it is proposed to grant LTA for transfer of power to NR to M/s Renew Power

Ventures Pvt. Ltd. (RPVPL-Karur) with the transmission system mentioned above.

Transmission system for transfer of power to ER and within SR shall be taken up for

discussion in the forthcoming meeting of SR Constituents regarding Connectivity &

Long-term Access Applications.

x----------x----------x

Page 20: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra
60002754
Text Box
24th WR LTA - Annexure-I
Page 21: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra
Page 22: Director (Operation) - POWERGRID...Agenda of 24th Meeting of WR constituents for Connectivity & LTA applications Page 3 of 16 Generation Projects in vicinity of Solapur, Maharashtra