diggers hotline - pigeon lake...date proj no des by dr by chk by sheet no. 12/27/2018...

9
DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb REVISION DATE REVISION DATE NO NO 26-1055.10 PIGEON LAKE DREDGING WAUPACA COUNTY, WISCONSIN PEH RJW PEH 1 TITLE DECEMBER 2018 EAU CLAIRE, WI PIGEON LAKE PROTECTION AND REHABILITATION COUNTY MAP NTS WAUPACA COUNTY, WISCONSIN NORTH PROJECT LOCATION, PIGEON LAKE DIGGERS HOTLINE 1-800-242-8511 OR 811 DIGGERS HOTLINE Dial or (800)242-8511 www.DiggersHotline.com PIGEON LAKE DREDGING PIGEON LAKE PROTECTION AND REHABILITATION WAUPACA COUNTY, WISCONSIN DECEMBER 2018 COUNTY MAP WAUPACA COUNTY NTS DIGGERS HOTLINE Dial or (800)242-8511 www.DiggersHotline.com Sheet Index Sheet Number Sheet Title 1 TITLE 2 LEGEND 3 SEDIMENT SAMPLE LOCATIONS 4 MATTHEWS BAY BATHYMETRIC SURVEY 5 MATTHEWS BAY DREDGING 6 CROSS SECTION 7 DISPOSAL SITE 8 DETAILS 9 DETAILS (2)

Upload: others

Post on 29-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\T

itle.

dwg,

Lay

out:

TITL

E

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

1TITLEDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION 

 

 

 

 

COUNTY MAPNTS

WAUPACA COUNTY, WISCONSIN

NORTH

PROJECT LOCATION,PIGEON LAKE

DIGGERS HOTLINE1-800-242-8511 OR 811

DIGGERS HOTLINEDial or (800)242-8511

www.DiggersHotline.com

PIGEON LAKE DREDGINGPIGEON LAKE PROTECTION AND REHABILITATIONWAUPACA COUNTY, WISCONSINDECEMBER 2018

COUNTY MAP

WAUPACACOUNTY

NTS

DIGGERS HOTLINEDial or (800)242-8511

www.DiggersHotline.com

Sheet IndexSheet Number Sheet Title

1 TITLE2 LEGEND3 SEDIMENT SAMPLE LOCATIONS4 MATTHEWS BAY BATHYMETRIC SURVEY5 MATTHEWS BAY DREDGING6 CROSS SECTION7 DISPOSAL SITE8 DETAILS9 DETAILS (2)

Page 2: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

T

TV

OH

SAN

SS

W

G

SAN

SF SF

X X X X X X X X X X X

E

FO

OH

DIGGERS HOTLINEDial or (800)242-8511

www.DiggersHotline.com

W W

FM

ABBREVIATIONS:

ABOVE FINISHED FLOOR

ABOVEADJUSTADJ

ALTERNATE

ALUMINUM

ALT/

AL

ANCHOR BOLT

APPROXIMATE

AT

AUTOMATICAVENUE

AB

APPROX

@

AUTOAVE

BACK OF CURB

BACK OF SIDEWALK

BALL VALVE

BASE COURSE

BASELINE

BEARING

BELOW

BENCHMARK

BETWEEN

BITUMINOUSBLIND

BLOCK

BOARD

BOTTOM

BOULEVARD

BRICK

BUILDING

BUTTERFLY VALVE

BC

BV

BS

BL

BRG

BM

BETWN

BITBLD

BLKBLKG

BD

BRK

BLDG

BFV

CAST IRON

CASTING

CEILING

CENTERLINE

CHECK VALVE

CHECKERED PLATE

CHLORINE

CLEANOUT

CLEAR

COLD WATER

CONCRETE

CONCRETE MASONRY UNIT

FENCE

FERTILIZER

FIBERGLASSFINISHED

FLANGEDFLOOR

FLOOR DRAIN

FLOWLINE

FOOTFOOTING

FORCE MAIN

FOUNDATION

FUTURE

GAGEGARAGE

GAS

GATE VALVE

GENERALGRADE, GROUND

GRAVELGROUNDWATER

CI

CTG

CB CATCH BASIN

CLG

CV

CHKD P

CO

CLR

CW

CONC

CMU

FN

FERT

FGLFIN

FLGFLR

FD

FL

FT (')FTG

FM

FDN

FUT

GAGAR

G

GV

GEN

GRAVGW

CONNECTION

CONTINUOUSCONTRACTOR

CONTROL JOINT

CORNER

CORRUGATED METAL PIPE

COUNTY TRUNK HIGHWAY

COUPLINGCOURSE

CUBIC FOOT

CUBIC YARD

CULVERT

CURB AND GUTTER

CONN

CONTCONTR

CJ

COR

CMP

CTH

CPLGCRS

CF

CY

DEFLECTION

DEPTH

DETAIL

DIAMETERDIMENSIONDISCHARGE

DOOR

DOWN

DRAWING

DRINKING FOUNTAIN

DRIVEWAY

DUCTILE IRON

DEFL

DP

DTL

DIADIMDISCH

DR

DN

DWG

DFDI

EACHEACH FACE

EACH WAY

EAST

EFFLUENT

ELBOWELECTRICAL

ELEVATION

END OF RADIUS

EQUALEQUIPMENT

ESTIMATE

EXHAUSTEXISTING

EXPANSIONEXTERIOR

EAEF

EW

E

EFF

ELBELEC

EL

ER

EQEQUIP

EST

EXHEXPEXT

JOINTJT

KNIFE GATE VALVEKGV

LABORATORYLAVATORY

LEFT

LENGTH

LENGTH OF CURVE

LIGHT POLE

LINEAL FEET

LOCATION

LONG RADIUSLUMP SUM

MANHOLEMANUFACTURER

MASONRY

MATERIAL

MAXIMUMMECHANICAL

MECHANICAL JOINT

MINIMUMMISCELLANEOUS

LABLAV

LT

LG

LC

LP

LF

LOC

LRLS

MHMFG

MAS

MTL

MAXMECH

MJ

MINMISC

HEIGHT

HOLLOW METALHORIZONTAL

HOSE BIB

HOT WATER

HOUSE

HYDRANT

NEAR FACENF

INCHESINCLUDEINFLUENTINLET

INSIDE DIAMETERINSIDE FACE

INSULATIONINTERIORINVERTIRON PIPEIRON PIPE SIZE

PARKING

PAVEMENT

PEDESTAL

PERCENT

PERFORATE

PLACEPLATE

PLUG VALVE

POINT OF INTERSECTION

POINT OF CURVE

POINT OF TANGENCY

POLYVINYL CHLORIDE

POTABLE WATER

POUNDS PER SQUARE INCHPOUNDS PER SQUARE FOOTPOWER POLEPROPERTY LINE

QUANTITY

RADIUS

RAILROAD

REDUCERREFERENCEREINFORCING

REINFORCED CONCRETE PIPE

REMOVEREPLACEREQUIREDREVISED

RIGHTRIGHT OF WAY

ROAD

ROADWAYROOF DRAIN

IN (")INCLINFINL

IDIF

INSULINTINVIPIPS

PKG

PVMT

PED

%

PERF

P

PE

PL

PV

PI

PC

PT

PVC

PW

PL PL

QTY

RAD

RR

REDREFREINF

RCP

REMREPLREQDREV

RTRW

RD

RDWYRD

NON-POTABLE WATER

NORTH

NOT IN CONTRACT

NOT TO SCALE

NUMBER

ON CENTER

OPENING

OUTSIDE DIAMETER

OUTSIDE FACEOVERHEAD

OVERHEAD ELECTRIC

OVERHEAD TELEPHONE

SANITARY

SCHEDULESECTION

SEWAGE TREATMENT PLANT

SEWER

SHEET

SIDEWALK

SPECIFICATION

SOUTH

SQUARE

SQUARE FOOT

SQUARE YARD

STAINLESS STEEL

STANDARDSTATE TRUNK HIGHWAYSTEELSTORM

STREET

SURFACE

SYSTEM

TELEPHONE

TELEPHONE POLE

THICKNESSTHROUGH

TOP & BOTTOMTOP OF CURB

TYPICAL

NPW

N

NICNO

OC

OPG

OD

OFOH

OE

OT

SAN

SCHSEC

STP

SWR

SHT

SW

S

SPECSQ

SF

SY

SS

STDSTHSTLSTM

ST

SURF

SYS

TELE

TP

THKTHRU

TC

TYP

UNEXCAVATEDUNLESS NOTED OTHERWISEUNITED STATES HIGHWAY

UNEXCUNOUSH

ROOMRM

VARIABLE

VALVE

VERTICALVERTICAL CURVE

WATER

WATER MAINWATER SURFACEWATER TREATMENT PLANT

WELDED WIRE FABRIC

WEST

WIDTH

WITHWITHOUT

WOVEN WIRE MESHWWTP

WTPWTR

WSWM

WWF

W

WD

W/W/O

WWM

VAR

V

VERVC

ABV

AFF

BLVD

CULV

GRD

HT

HMHORZ

HB

HW

HSE

HYD

PP

PRIVATE ENTRANCE

BEL

BLOCKING

B CRS

PSFPSI

UE UNDERGROUND ELECTRICALUNDERGROUND GASUG

UNDERGROUND TELEPHONEUTUNDERGROUND VIDEOUV

ASPHALTASPH

CORRUGATED STEEL PIPECSP

HOT WATER RETURNHWR

ELECTRIC WATER COOLEREWC

NTS

WASTEWATER TREATMENT PLANT

BF BACK FACE

BOTTOM OFB/

T/ TOP OF

SLOPESLSIM SIMILAR

ALT ALTERNATE WITH

EJ EXPANSION JOINT

CONSTRUCTIONCONSTCONST JT

CONTR JT CONTRACTION JOINT

CONSTRUCTION JOINT

DEGREE

V&B VALVE & BOX

C&G

T&B

NOM NOMINAL

BTM

SPA SPACE

MP MID POINT

CL / C

DEG / °

LCHL

BO BREAKOFF

DW

CP CONTROL POINT

SSMH STORM SEWER MANHOLE

SANITARY MANHOLESAMH

EX

F-F FACE TO FACE

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\T

itle.

dwg,

Lay

out:

LEG

EN

D

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

2LEGENDDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION 

 

 

 

 

AutoCAD SHX Text
100
AutoCAD SHX Text
99
AutoCAD SHX Text
100
AutoCAD SHX Text
99
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
GAS MH
AutoCAD SHX Text
STM MH
AutoCAD SHX Text
CB
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
HYD
AutoCAD SHX Text
SECTION CORNER
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
SAN MH
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
GATE VALVE & BOX
AutoCAD SHX Text
UNDERDRAIN
AutoCAD SHX Text
STM MH
AutoCAD SHX Text
ASPHALT, CONCRETE, ETC.
AutoCAD SHX Text
GRAVEL, DIRT, ETC.
AutoCAD SHX Text
GUARD RAIL
AutoCAD SHX Text
INL
AutoCAD SHX Text
POLE
AutoCAD SHX Text
PULLBOX
AutoCAD SHX Text
WTR MH
AutoCAD SHX Text
INL
AutoCAD SHX Text
TOP OF FILL
AutoCAD SHX Text
OVER/DECK
AutoCAD SHX Text
+800.80
AutoCAD SHX Text
10+00
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
UNDERGROUND GAS
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
UNDERGROUND FIBER OPTIC
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
UNDERGROUND VIDEO
AutoCAD SHX Text
OVERHEAD ELECTRIC
AutoCAD SHX Text
CURB AND GUTTER
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
HARD SURFACED ROADWAY
AutoCAD SHX Text
NON-SURFACED ROADWAY
AutoCAD SHX Text
TREE LINE
AutoCAD SHX Text
CONTOURS
AutoCAD SHX Text
DITCH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
RIGHT OF WAY
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
SECTION LINE
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
STREET CENTERLINE
AutoCAD SHX Text
WATER'S EDGE
AutoCAD SHX Text
SWAMP EDGE
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
FORCE MAIN
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
STORM SEWER
AutoCAD SHX Text
CURB AND GUTTER
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
HARD SURFACE ROADWAY
AutoCAD SHX Text
NON-SURFACED ROADWAY
AutoCAD SHX Text
CONTOURS
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
BASELINE
AutoCAD SHX Text
PERMANENT EASEMENT
AutoCAD SHX Text
TEMPORARY EASEMENT
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
EROSION BALES
AutoCAD SHX Text
EROSION MAT
AutoCAD SHX Text
EROSION LOG
AutoCAD SHX Text
SAW CUT
AutoCAD SHX Text
DITCH
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
POND
AutoCAD SHX Text
SPOT ELEVATION
AutoCAD SHX Text
CONSTRUCTION EASEMENT
AutoCAD SHX Text
UTILITY EASEMENT
AutoCAD SHX Text
SETBACK
AutoCAD SHX Text
IRON PIPE
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
GRAVEL, DIRT, ETC
AutoCAD SHX Text
ASPHALT, CONCRETE, ETC
AutoCAD SHX Text
UTILITY POLES:
AutoCAD SHX Text
TELEPHONE POLE
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
TREES
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text
STORM SEWER
AutoCAD SHX Text
DECIDUOUS
AutoCAD SHX Text
CONIFEROUS
AutoCAD SHX Text
BUSH / SHRUB
AutoCAD SHX Text
HEDGE OR BUSH LINE
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
CONTROL BOX
AutoCAD SHX Text
PARKING METER
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
SPRINKLER HEAD
AutoCAD SHX Text
METER
AutoCAD SHX Text
RR SIGNAL FLASHER / BOX
AutoCAD SHX Text
TRAFFIC SIGNAL
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
CONTROL POINT
AutoCAD SHX Text
RAILROAD
AutoCAD SHX Text
TOP OF CUT
AutoCAD SHX Text
SAN MH
AutoCAD SHX Text
W/ LIGHT
AutoCAD SHX Text
ELECTRIC MH
AutoCAD SHX Text
TELEPHONE MH
AutoCAD SHX Text
TELEVISION MH
AutoCAD SHX Text
FIBER MH
AutoCAD SHX Text
W/ MAST
AutoCAD SHX Text
ARM
AutoCAD SHX Text
TRACER BOX
AutoCAD SHX Text
OVERHEAD UTILITY
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NEW
AutoCAD SHX Text
SAN
AutoCAD SHX Text
VLV
AutoCAD SHX Text
PED
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
T
AutoCAD SHX Text
WELL
AutoCAD SHX Text
SAN MH
AutoCAD SHX Text
SS MH
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TV MH
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TVPD
AutoCAD SHX Text
EPED
AutoCAD SHX Text
MON
AutoCAD SHX Text
xx
AutoCAD SHX Text
xx
AutoCAD SHX Text
xx
AutoCAD SHX Text
xx
AutoCAD SHX Text
xx
AutoCAD SHX Text
xx
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
VLV
AutoCAD SHX Text
T
AutoCAD SHX Text
CS
AutoCAD SHX Text
WAT MH
AutoCAD SHX Text
WV
AutoCAD SHX Text
SS MH
AutoCAD SHX Text
GAS MH
AutoCAD SHX Text
ELEC MH
AutoCAD SHX Text
FIBER MH
AutoCAD SHX Text
TEL MH
AutoCAD SHX Text
GV
AutoCAD SHX Text
ETRAN
AutoCAD SHX Text
CB
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
GUARD RAIL
AutoCAD SHX Text
TRACER WIRE ACCESS BOX
AutoCAD SHX Text
SAN LATERAL WITH CLEAN OUT
AutoCAD SHX Text
STRUCTURE LABEL ID, STRUCTURE TYPE SIZE-CASTING
AutoCAD SHX Text
APRON ENDWALL AND RIP RAP
AutoCAD SHX Text
ELECTRIC TRANSFORMER
AutoCAD SHX Text
ELECTRIC PED
AutoCAD SHX Text
W/ MAST ARM
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text
ROW MARKER
AutoCAD SHX Text
W/ MAST ARM
AutoCAD SHX Text
CP1
AutoCAD SHX Text
BM100
AutoCAD SHX Text
DEMOLITION / REMOVAL
AutoCAD SHX Text
WTR SERVICE & CURB STOP
AutoCAD SHX Text
BEND
Page 3: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

SAMPLE 9 (SEDIMENT)SAMPLE 10 (NATIVE)

SAMPLE 7 (SEDIMENT)SAMPLE 8 (NATIVE)

LOCATION OF STREAM BEDAFTER DRAW DOWN

BM 1

BM 2

BM 3

BM 4

NORTH

0 250 500

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\E

xist

ing

Con

tour

s.dw

g, L

ayou

t: S

AM

PLE

LO

CA

TIO

NS

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

3SEDIMENT SAMPLE LOCATIONSDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION 

 

 

 

 

NOTES:1. SEDIMENT COLLECTED ON 8/21/2018 WITH AMS MULTI-STAGE SAMPLER.2. SAMPLING EQUIPMENT WAS PUSHED INTO THE NATIVE SANDY LAYER UNTIL REFUSAL

(APPROXIMATELY TWO FEET) IN MOST AREAS.3. THE SEDIMENT OBSERVED WAS TYPICALLY IN TWO DISTINCT LAYERS. A NATIVE LAYER OF

GRAY SANDY MATERIAL AND A MORE RECENTLY DEPOSITED LAYER OF BLACK MUCKYSILTY MATERIAL.

4. A SAMPLE WAS COLLECTED IN BOTH LAYERS FOR EACH OF THE SEDIMENT CORELOCATIONS.

Page 4: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

805

805

805

805

801

801

801801

802 802

802

802

802

802

803

803

803

803

803

803

804804

804

804

804

804

806

806

806

806

NORTH

0 100 200

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\E

xist

ing

Con

tour

s.dw

g, L

ayou

t: M

ATT

HE

WS

BA

Y

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

4MATTHEWS BAY BATHYMETRIC SURVEYDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION 

 

 

 

 

NOTES:1. 8/21/2018 WATER SURFACE ELEVATION = 806.65'2. SOUNDINGS WERE OBTAINED USING A 235 SONARMITE BT kHz

ECHOSOUNDER AND POSITIONED WITH A SUBMETER TRIMBLE GEOXH.

Page 5: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

MATTHEWS BAY6.4 ACRES (280,182 SQ. FT.)

56,000 CY OF SEDIMENT

STONE TRACKING PAD

TOE OF SLOPE(5:1 MAX SLOPE)

MAX DREDGEDELEVATION 796.5

LOCATION OF STREAMAFTER DRAW DOWN

PROPOSED HAUL ROUTE(SEE DETAIL 3, SHEET 10)

PROPOSED STREAM CROSSING(SEE DETAIL 4, SHEET 8)

PROPOSED STREAM CROSSING(SEE DETAIL 4, SHEET 8)

BM 4

NORTH

0 100 200

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\E

xist

ing

Con

tour

s.dw

g, L

ayou

t: M

ATT

HE

WS

BA

Y D

RE

DG

ING

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

5MATTHEWS BAY DREDGINGDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION----

----

----

----

----

10 FOOT OFFSETFROM SHORELINE(DREDGING LIMIT)

NOTES:1. NO DREDGING WITHIN 10 FEET OF ANY SHORELINE.2. ALL MATERIALS ENCOUNTERED WILL BE REMOVED WITHIN DREDGING LIMITS.3. REMOVE AND STOCKPILE WOODY DEBRIS TO BE REINCORPORATED AFTER DREDGING.4. DREDGING EQUIPMENT MUST BE REMOVED FROM LAKE BED AT THE END OF EACH WORK DAY.5. PLACE 3" CRUSHED STONE IF UNFROZEN AREAS ARE ENCOUNTERED DURING SEDIMENT

TRANSPORTATION. CRUSHED STONE MUST BE REMOVED FROM LAKE BED.

TEMPORARY STOCKPILE AREAOF FROZEN DREDGE MATERIAL(BEFORE LOADED ONTO ON-ROAD TRUCKS)

ON-ROAD TRUCK ACCESS

EXISTING BOAT RAMP USED AS ACCESS RAMP

COIR FIBER LOG

10 FOOT OFFSETFROM SHORELINE(DREDGING LIMIT)

STAKED TURBIDITY CURTAINSEE SHEET 9, DETAIL 6

Page 6: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

Ele

vatio

n

790

795

800

805

810

790

795

800

805

810

0 25 50 750-25-50-75

10 FEET MIN OFFSET FROM SHORE 10 FEET MIN OFFSET FROM SHORE

806.65' WATER SURFACE2018 BATHYMETRIC SURVEY

5:1 MAX SLOPES

DREDGE LIMIT ELEVATION = 797.5'(MAXIMUM DREDGING EXPECTED)

MATTHEWS BAY DREDGING TYPICAL CROSS SECTION

5:1 MAX SLOPES

APPROXIMATE TRANSITIONBETWEEN MUCK AND SAND(MINIMUM DREDGING EXPECTED)

SAMPLE 10 APPROXIMATEBOTTOM EL 796.5'

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\E

xist

ing

Con

tour

s.dw

g, L

ayou

t: C

RO

SS

SE

CTI

ON

S

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

6CROSS SECTIONDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION 

 

 

 

 

Page 7: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

APPROXIMATE LOCATION OF "RIGHT" SAMPLE

APPROXIMATE LOCATION OF "LEFT" SAMPLE

SF SF SF

SF

SF

SF

NRCS MAPPED HYDRIC SOILS

DNR MAPPED WETLANDS

DISPOSAL SITE

300 FOOT SETBACKFROM MAPPED HYDRIC SOILS

300 FOOT SETBACKFROM MAPPED HYDRIC SOILS

CLINTONVILLE MUNICIPAL AIRPORT

18 ACRES

COIR FIBER ROLL

STONE TRACKING PAD

DISPOSAL SITE NOTES:1. INSTALL STONE TRACKING CONTROL AT DRIVEWAY ACCESS.2. INSTALL COIR FIBER ROLL PRIOR TO SEDIMENT DISPOSAL3. INSTALL SILT FENCE IN SPRING PRIOR TO SPRING MELT.4. ONCE SEDIMENT IS APPROVED FOR SPREADING, SPREAD THE SEDIMENT TO A MAX

THICKNESS OF TWO FEET WITHIN THE OUTLINED DISPOSAL AREA.

HAULING NOTES:1. CONTRACTOR MUST DO DAILY VISUAL INSPECTIONS OF THE HAUL ROUTE.2. A SKID STEER MUST BE AVAILABLE IF A SPILL OCCURS ON THE HAUL ROUTE.

SILT FENCE

NORTH

0 200 400

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\D

ispo

sal S

ite.d

wg,

Lay

out:

DIS

PO

SA

L S

ITE

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

7DISPOSAL SITEDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION 

 

 

 

 

Page 8: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

diam

eter

2 to

4"

1x2x24" Stake

Uphill stake for overtopping areas

Normal Water

1x2x24" Stake6"

4 ft max

12"6"

Uphill stake for overtopping areas

Rope tie-downs for overtopping areas

overtopped joint

50' MIN

EXISTING PAVED ROADWAY

12' MIN

5'

5'

10' MINMIN

MIN

SECTION

PLAN

GEOTEXTILE FABRIC

MATCH EXISTING GRADE

3" TO 6" AGGREGATE

12' MIN

12' M

IN

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\D

ispo

sal S

ite.d

wg,

Lay

out:

DE

TAIL

S

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

8DETAILSDECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION----

----

----

----

----

1 STONE TRACKING PAD DETAILNOT TO SCALE 2 COIR FIBER LOG DETAIL

NOT TO SCALE

4 STREAM CROSSING DETAILNOT TO SCALE3 HAUL ROUTE DETAIL

NOT TO SCALE

10'

32'

35'

SOCKET ENDUPSTREAM

24" RCP CULVERTS

24" RCP CULVERTS

4' TYPICAL

3" CRUSHED STONE

3" CRUSHED STONE

MAX 16'

1.5

1

1.5

1

3" CRUSHED STONE

MAX 30' 3' M

IN

Page 9: DIGGERS HOTLINE - Pigeon Lake...DATE PROJ NO DES BY DR BY CHK BY SHEET NO. 12/27/2018 V:\WR-EC\Clintonville\Pigeon Lake Dam\2018 Dredging\CAD\Title.dwg, Layout: TITLE AA-Standard.stb

SILT FENCE TIE BACKTWIST METHOD

SILT FENCE

TRENCH DETAILJOINING 2 LENGTHS OF SILT FENCE

HOOK METHOD

GENERAL NOTES

WOOD POSTS 2LENGTH 3'-4"20" DEPTH IN GROUND

GEOTEXTILEFABRIC ONLY

BACKFILL & COMPACTTRENCH WITH EXCAVATED SOIL

SUPPORTCORD

GEOTEXTILEFABRIC

TIEBACK BETWEENFENCE POST ANDANCHOR

ANCHOR STAKEMIN 18" LONG

SILTFENCE

GEOTEXTILEFABRIC

EXCESSFABRIC

GEOTEXTILE FABRIC

WOODPOST

GEOTEXTILEFABRIC

WOOD POST

GEOTEXTILE FABRIC

GEOTEXTILE FABRIC

WOOD POST

WOOD POST

GEOTEXTILEFABRIC

WOOD POST

TRENCH SHALL BE A MIN OF 4" WIDE & 6" DEEP TO BURYAND ANCHOR THE GEOTEXTILE FABRIC, FOLD THE MATERIAL TO FITTRENCH AND BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL.

WOOD POSTS SHALL BE A MIN SIZE OF 118" x 11

8" OAK OR HICKORY.

CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE BY CUTTINGLENGTHS TO AVOID JOINTS. IF A JOINT IS NECESSARY, USE ONE OF THEFOLLOWING TWO METHODS;A. TWIST METHOD -- OVERLAP THE END POSTS AND TWIST, OR ROTATE, AT LEAST 180 DEGREES.B. HOOK METHOD -- HOOK THE END OF EACH SILT FENCE LENGTH.

NOTE:ADDITIONAL POST DEPTH OR TIE BACKSMAY BE REQUIRED IN UNSTABLE SOLS

ATTACH FABRIC TOTIE POSTS WITH WIRESTAPLES OR WOODENLATH AND NAILS

*NOTE: 8'-0" POST SPACING ALLOWED IF A WOVEN GEOTEXTILE FABRIC IS USED

1

2

3

FOLD3" MAX

1'-0" MIN

FLOW DIRECTION

FLOW DIRECTION

2' MIN

(WHEN ADDITIONAL SUPPORT REQUIRED)

FLOW

FLOW

FLOW

3' MAX*3' MAX*

3' MAX*3' MAX*

DATE

PROJ NO

DES BY

DR BY

CHK BY

SHEET NO.

12/2

7/20

18V

:\WR

-EC

\Clin

tonv

ille\

Pig

eon

Lake

Dam

\201

8 D

redg

ing\

CA

D\D

ispo

sal S

ite.d

wg,

Lay

out:

DE

TAIL

S (2

)

AA

-Sta

ndar

d.st

b

REVISIONDATEREVISIONDATENO NO

26-1055.10

PIGEON LAKE DREDGING

WAUPACA COUNTY, WISCONSIN

PEH

RJW

PEH

9DETAILS (2)DECEMBER 2018 EAU CLAIRE, WI

PIGEON LAKE PROTECTION AND REHABILITATION

5 SILT FENCE DETAILNOT TO SCALE 6 STAKED TURBIDITY CURTAIN DETAIL

NOT TO SCALE