diggers hotline - pigeon lake...date proj no des by dr by chk by sheet no. 12/27/2018...
TRANSCRIPT
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\T
itle.
dwg,
Lay
out:
TITL
E
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
1TITLEDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION
COUNTY MAPNTS
WAUPACA COUNTY, WISCONSIN
NORTH
PROJECT LOCATION,PIGEON LAKE
DIGGERS HOTLINE1-800-242-8511 OR 811
DIGGERS HOTLINEDial or (800)242-8511
www.DiggersHotline.com
PIGEON LAKE DREDGINGPIGEON LAKE PROTECTION AND REHABILITATIONWAUPACA COUNTY, WISCONSINDECEMBER 2018
COUNTY MAP
WAUPACACOUNTY
NTS
DIGGERS HOTLINEDial or (800)242-8511
www.DiggersHotline.com
Sheet IndexSheet Number Sheet Title
1 TITLE2 LEGEND3 SEDIMENT SAMPLE LOCATIONS4 MATTHEWS BAY BATHYMETRIC SURVEY5 MATTHEWS BAY DREDGING6 CROSS SECTION7 DISPOSAL SITE8 DETAILS9 DETAILS (2)
T
TV
OH
SAN
SS
W
G
SAN
SF SF
X X X X X X X X X X X
E
FO
OH
DIGGERS HOTLINEDial or (800)242-8511
www.DiggersHotline.com
W W
FM
ABBREVIATIONS:
ABOVE FINISHED FLOOR
ABOVEADJUSTADJ
ALTERNATE
ALUMINUM
ALT/
AL
ANCHOR BOLT
APPROXIMATE
AT
AUTOMATICAVENUE
AB
APPROX
@
AUTOAVE
BACK OF CURB
BACK OF SIDEWALK
BALL VALVE
BASE COURSE
BASELINE
BEARING
BELOW
BENCHMARK
BETWEEN
BITUMINOUSBLIND
BLOCK
BOARD
BOTTOM
BOULEVARD
BRICK
BUILDING
BUTTERFLY VALVE
BC
BV
BS
BL
BRG
BM
BETWN
BITBLD
BLKBLKG
BD
BRK
BLDG
BFV
CAST IRON
CASTING
CEILING
CENTERLINE
CHECK VALVE
CHECKERED PLATE
CHLORINE
CLEANOUT
CLEAR
COLD WATER
CONCRETE
CONCRETE MASONRY UNIT
FENCE
FERTILIZER
FIBERGLASSFINISHED
FLANGEDFLOOR
FLOOR DRAIN
FLOWLINE
FOOTFOOTING
FORCE MAIN
FOUNDATION
FUTURE
GAGEGARAGE
GAS
GATE VALVE
GENERALGRADE, GROUND
GRAVELGROUNDWATER
CI
CTG
CB CATCH BASIN
CLG
CV
CHKD P
CO
CLR
CW
CONC
CMU
FN
FERT
FGLFIN
FLGFLR
FD
FL
FT (')FTG
FM
FDN
FUT
GAGAR
G
GV
GEN
GRAVGW
CONNECTION
CONTINUOUSCONTRACTOR
CONTROL JOINT
CORNER
CORRUGATED METAL PIPE
COUNTY TRUNK HIGHWAY
COUPLINGCOURSE
CUBIC FOOT
CUBIC YARD
CULVERT
CURB AND GUTTER
CONN
CONTCONTR
CJ
COR
CMP
CTH
CPLGCRS
CF
CY
DEFLECTION
DEPTH
DETAIL
DIAMETERDIMENSIONDISCHARGE
DOOR
DOWN
DRAWING
DRINKING FOUNTAIN
DRIVEWAY
DUCTILE IRON
DEFL
DP
DTL
DIADIMDISCH
DR
DN
DWG
DFDI
EACHEACH FACE
EACH WAY
EAST
EFFLUENT
ELBOWELECTRICAL
ELEVATION
END OF RADIUS
EQUALEQUIPMENT
ESTIMATE
EXHAUSTEXISTING
EXPANSIONEXTERIOR
EAEF
EW
E
EFF
ELBELEC
EL
ER
EQEQUIP
EST
EXHEXPEXT
JOINTJT
KNIFE GATE VALVEKGV
LABORATORYLAVATORY
LEFT
LENGTH
LENGTH OF CURVE
LIGHT POLE
LINEAL FEET
LOCATION
LONG RADIUSLUMP SUM
MANHOLEMANUFACTURER
MASONRY
MATERIAL
MAXIMUMMECHANICAL
MECHANICAL JOINT
MINIMUMMISCELLANEOUS
LABLAV
LT
LG
LC
LP
LF
LOC
LRLS
MHMFG
MAS
MTL
MAXMECH
MJ
MINMISC
HEIGHT
HOLLOW METALHORIZONTAL
HOSE BIB
HOT WATER
HOUSE
HYDRANT
NEAR FACENF
INCHESINCLUDEINFLUENTINLET
INSIDE DIAMETERINSIDE FACE
INSULATIONINTERIORINVERTIRON PIPEIRON PIPE SIZE
PARKING
PAVEMENT
PEDESTAL
PERCENT
PERFORATE
PLACEPLATE
PLUG VALVE
POINT OF INTERSECTION
POINT OF CURVE
POINT OF TANGENCY
POLYVINYL CHLORIDE
POTABLE WATER
POUNDS PER SQUARE INCHPOUNDS PER SQUARE FOOTPOWER POLEPROPERTY LINE
QUANTITY
RADIUS
RAILROAD
REDUCERREFERENCEREINFORCING
REINFORCED CONCRETE PIPE
REMOVEREPLACEREQUIREDREVISED
RIGHTRIGHT OF WAY
ROAD
ROADWAYROOF DRAIN
IN (")INCLINFINL
IDIF
INSULINTINVIPIPS
PKG
PVMT
PED
%
PERF
P
PE
PL
PV
PI
PC
PT
PVC
PW
PL PL
QTY
RAD
RR
REDREFREINF
RCP
REMREPLREQDREV
RTRW
RD
RDWYRD
NON-POTABLE WATER
NORTH
NOT IN CONTRACT
NOT TO SCALE
NUMBER
ON CENTER
OPENING
OUTSIDE DIAMETER
OUTSIDE FACEOVERHEAD
OVERHEAD ELECTRIC
OVERHEAD TELEPHONE
SANITARY
SCHEDULESECTION
SEWAGE TREATMENT PLANT
SEWER
SHEET
SIDEWALK
SPECIFICATION
SOUTH
SQUARE
SQUARE FOOT
SQUARE YARD
STAINLESS STEEL
STANDARDSTATE TRUNK HIGHWAYSTEELSTORM
STREET
SURFACE
SYSTEM
TELEPHONE
TELEPHONE POLE
THICKNESSTHROUGH
TOP & BOTTOMTOP OF CURB
TYPICAL
NPW
N
NICNO
OC
OPG
OD
OFOH
OE
OT
SAN
SCHSEC
STP
SWR
SHT
SW
S
SPECSQ
SF
SY
SS
STDSTHSTLSTM
ST
SURF
SYS
TELE
TP
THKTHRU
TC
TYP
UNEXCAVATEDUNLESS NOTED OTHERWISEUNITED STATES HIGHWAY
UNEXCUNOUSH
ROOMRM
VARIABLE
VALVE
VERTICALVERTICAL CURVE
WATER
WATER MAINWATER SURFACEWATER TREATMENT PLANT
WELDED WIRE FABRIC
WEST
WIDTH
WITHWITHOUT
WOVEN WIRE MESHWWTP
WTPWTR
WSWM
WWF
W
WD
W/W/O
WWM
VAR
V
VERVC
ABV
AFF
BLVD
CULV
GRD
HT
HMHORZ
HB
HW
HSE
HYD
PP
PRIVATE ENTRANCE
BEL
BLOCKING
B CRS
PSFPSI
UE UNDERGROUND ELECTRICALUNDERGROUND GASUG
UNDERGROUND TELEPHONEUTUNDERGROUND VIDEOUV
ASPHALTASPH
CORRUGATED STEEL PIPECSP
HOT WATER RETURNHWR
ELECTRIC WATER COOLEREWC
NTS
WASTEWATER TREATMENT PLANT
BF BACK FACE
BOTTOM OFB/
T/ TOP OF
SLOPESLSIM SIMILAR
ALT ALTERNATE WITH
EJ EXPANSION JOINT
CONSTRUCTIONCONSTCONST JT
CONTR JT CONTRACTION JOINT
CONSTRUCTION JOINT
DEGREE
V&B VALVE & BOX
C&G
T&B
NOM NOMINAL
BTM
SPA SPACE
MP MID POINT
CL / C
DEG / °
LCHL
BO BREAKOFF
DW
CP CONTROL POINT
SSMH STORM SEWER MANHOLE
SANITARY MANHOLESAMH
EX
F-F FACE TO FACE
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\T
itle.
dwg,
Lay
out:
LEG
EN
D
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
2LEGENDDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION
SAMPLE 9 (SEDIMENT)SAMPLE 10 (NATIVE)
SAMPLE 7 (SEDIMENT)SAMPLE 8 (NATIVE)
LOCATION OF STREAM BEDAFTER DRAW DOWN
BM 1
BM 2
BM 3
BM 4
NORTH
0 250 500
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\E
xist
ing
Con
tour
s.dw
g, L
ayou
t: S
AM
PLE
LO
CA
TIO
NS
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
3SEDIMENT SAMPLE LOCATIONSDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION
NOTES:1. SEDIMENT COLLECTED ON 8/21/2018 WITH AMS MULTI-STAGE SAMPLER.2. SAMPLING EQUIPMENT WAS PUSHED INTO THE NATIVE SANDY LAYER UNTIL REFUSAL
(APPROXIMATELY TWO FEET) IN MOST AREAS.3. THE SEDIMENT OBSERVED WAS TYPICALLY IN TWO DISTINCT LAYERS. A NATIVE LAYER OF
GRAY SANDY MATERIAL AND A MORE RECENTLY DEPOSITED LAYER OF BLACK MUCKYSILTY MATERIAL.
4. A SAMPLE WAS COLLECTED IN BOTH LAYERS FOR EACH OF THE SEDIMENT CORELOCATIONS.
805
805
805
805
801
801
801801
802 802
802
802
802
802
803
803
803
803
803
803
804804
804
804
804
804
806
806
806
806
NORTH
0 100 200
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\E
xist
ing
Con
tour
s.dw
g, L
ayou
t: M
ATT
HE
WS
BA
Y
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
4MATTHEWS BAY BATHYMETRIC SURVEYDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION
NOTES:1. 8/21/2018 WATER SURFACE ELEVATION = 806.65'2. SOUNDINGS WERE OBTAINED USING A 235 SONARMITE BT kHz
ECHOSOUNDER AND POSITIONED WITH A SUBMETER TRIMBLE GEOXH.
MATTHEWS BAY6.4 ACRES (280,182 SQ. FT.)
56,000 CY OF SEDIMENT
STONE TRACKING PAD
TOE OF SLOPE(5:1 MAX SLOPE)
MAX DREDGEDELEVATION 796.5
LOCATION OF STREAMAFTER DRAW DOWN
PROPOSED HAUL ROUTE(SEE DETAIL 3, SHEET 10)
PROPOSED STREAM CROSSING(SEE DETAIL 4, SHEET 8)
PROPOSED STREAM CROSSING(SEE DETAIL 4, SHEET 8)
BM 4
NORTH
0 100 200
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\E
xist
ing
Con
tour
s.dw
g, L
ayou
t: M
ATT
HE
WS
BA
Y D
RE
DG
ING
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
5MATTHEWS BAY DREDGINGDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION----
----
----
----
----
10 FOOT OFFSETFROM SHORELINE(DREDGING LIMIT)
NOTES:1. NO DREDGING WITHIN 10 FEET OF ANY SHORELINE.2. ALL MATERIALS ENCOUNTERED WILL BE REMOVED WITHIN DREDGING LIMITS.3. REMOVE AND STOCKPILE WOODY DEBRIS TO BE REINCORPORATED AFTER DREDGING.4. DREDGING EQUIPMENT MUST BE REMOVED FROM LAKE BED AT THE END OF EACH WORK DAY.5. PLACE 3" CRUSHED STONE IF UNFROZEN AREAS ARE ENCOUNTERED DURING SEDIMENT
TRANSPORTATION. CRUSHED STONE MUST BE REMOVED FROM LAKE BED.
TEMPORARY STOCKPILE AREAOF FROZEN DREDGE MATERIAL(BEFORE LOADED ONTO ON-ROAD TRUCKS)
ON-ROAD TRUCK ACCESS
EXISTING BOAT RAMP USED AS ACCESS RAMP
COIR FIBER LOG
10 FOOT OFFSETFROM SHORELINE(DREDGING LIMIT)
STAKED TURBIDITY CURTAINSEE SHEET 9, DETAIL 6
Ele
vatio
n
790
795
800
805
810
790
795
800
805
810
0 25 50 750-25-50-75
10 FEET MIN OFFSET FROM SHORE 10 FEET MIN OFFSET FROM SHORE
806.65' WATER SURFACE2018 BATHYMETRIC SURVEY
5:1 MAX SLOPES
DREDGE LIMIT ELEVATION = 797.5'(MAXIMUM DREDGING EXPECTED)
MATTHEWS BAY DREDGING TYPICAL CROSS SECTION
5:1 MAX SLOPES
APPROXIMATE TRANSITIONBETWEEN MUCK AND SAND(MINIMUM DREDGING EXPECTED)
SAMPLE 10 APPROXIMATEBOTTOM EL 796.5'
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\E
xist
ing
Con
tour
s.dw
g, L
ayou
t: C
RO
SS
SE
CTI
ON
S
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
6CROSS SECTIONDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION
APPROXIMATE LOCATION OF "RIGHT" SAMPLE
APPROXIMATE LOCATION OF "LEFT" SAMPLE
SF SF SF
SF
SF
SF
NRCS MAPPED HYDRIC SOILS
DNR MAPPED WETLANDS
DISPOSAL SITE
300 FOOT SETBACKFROM MAPPED HYDRIC SOILS
300 FOOT SETBACKFROM MAPPED HYDRIC SOILS
CLINTONVILLE MUNICIPAL AIRPORT
18 ACRES
COIR FIBER ROLL
STONE TRACKING PAD
DISPOSAL SITE NOTES:1. INSTALL STONE TRACKING CONTROL AT DRIVEWAY ACCESS.2. INSTALL COIR FIBER ROLL PRIOR TO SEDIMENT DISPOSAL3. INSTALL SILT FENCE IN SPRING PRIOR TO SPRING MELT.4. ONCE SEDIMENT IS APPROVED FOR SPREADING, SPREAD THE SEDIMENT TO A MAX
THICKNESS OF TWO FEET WITHIN THE OUTLINED DISPOSAL AREA.
HAULING NOTES:1. CONTRACTOR MUST DO DAILY VISUAL INSPECTIONS OF THE HAUL ROUTE.2. A SKID STEER MUST BE AVAILABLE IF A SPILL OCCURS ON THE HAUL ROUTE.
SILT FENCE
NORTH
0 200 400
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\D
ispo
sal S
ite.d
wg,
Lay
out:
DIS
PO
SA
L S
ITE
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
7DISPOSAL SITEDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION
diam
eter
2 to
4"
1x2x24" Stake
Uphill stake for overtopping areas
Normal Water
1x2x24" Stake6"
4 ft max
12"6"
Uphill stake for overtopping areas
Rope tie-downs for overtopping areas
overtopped joint
50' MIN
EXISTING PAVED ROADWAY
12' MIN
5'
5'
10' MINMIN
MIN
SECTION
PLAN
GEOTEXTILE FABRIC
MATCH EXISTING GRADE
3" TO 6" AGGREGATE
12' MIN
12' M
IN
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\D
ispo
sal S
ite.d
wg,
Lay
out:
DE
TAIL
S
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
8DETAILSDECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION----
----
----
----
----
1 STONE TRACKING PAD DETAILNOT TO SCALE 2 COIR FIBER LOG DETAIL
NOT TO SCALE
4 STREAM CROSSING DETAILNOT TO SCALE3 HAUL ROUTE DETAIL
NOT TO SCALE
10'
32'
35'
SOCKET ENDUPSTREAM
24" RCP CULVERTS
24" RCP CULVERTS
4' TYPICAL
3" CRUSHED STONE
3" CRUSHED STONE
MAX 16'
1.5
1
1.5
1
3" CRUSHED STONE
MAX 30' 3' M
IN
SILT FENCE TIE BACKTWIST METHOD
SILT FENCE
TRENCH DETAILJOINING 2 LENGTHS OF SILT FENCE
HOOK METHOD
GENERAL NOTES
WOOD POSTS 2LENGTH 3'-4"20" DEPTH IN GROUND
GEOTEXTILEFABRIC ONLY
BACKFILL & COMPACTTRENCH WITH EXCAVATED SOIL
SUPPORTCORD
GEOTEXTILEFABRIC
TIEBACK BETWEENFENCE POST ANDANCHOR
ANCHOR STAKEMIN 18" LONG
SILTFENCE
GEOTEXTILEFABRIC
EXCESSFABRIC
GEOTEXTILE FABRIC
WOODPOST
GEOTEXTILEFABRIC
WOOD POST
GEOTEXTILE FABRIC
GEOTEXTILE FABRIC
WOOD POST
WOOD POST
GEOTEXTILEFABRIC
WOOD POST
TRENCH SHALL BE A MIN OF 4" WIDE & 6" DEEP TO BURYAND ANCHOR THE GEOTEXTILE FABRIC, FOLD THE MATERIAL TO FITTRENCH AND BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL.
WOOD POSTS SHALL BE A MIN SIZE OF 118" x 11
8" OAK OR HICKORY.
CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE BY CUTTINGLENGTHS TO AVOID JOINTS. IF A JOINT IS NECESSARY, USE ONE OF THEFOLLOWING TWO METHODS;A. TWIST METHOD -- OVERLAP THE END POSTS AND TWIST, OR ROTATE, AT LEAST 180 DEGREES.B. HOOK METHOD -- HOOK THE END OF EACH SILT FENCE LENGTH.
NOTE:ADDITIONAL POST DEPTH OR TIE BACKSMAY BE REQUIRED IN UNSTABLE SOLS
ATTACH FABRIC TOTIE POSTS WITH WIRESTAPLES OR WOODENLATH AND NAILS
*NOTE: 8'-0" POST SPACING ALLOWED IF A WOVEN GEOTEXTILE FABRIC IS USED
1
2
3
FOLD3" MAX
1'-0" MIN
FLOW DIRECTION
FLOW DIRECTION
2' MIN
(WHEN ADDITIONAL SUPPORT REQUIRED)
FLOW
FLOW
FLOW
3' MAX*3' MAX*
3' MAX*3' MAX*
DATE
PROJ NO
DES BY
DR BY
CHK BY
SHEET NO.
12/2
7/20
18V
:\WR
-EC
\Clin
tonv
ille\
Pig
eon
Lake
Dam
\201
8 D
redg
ing\
CA
D\D
ispo
sal S
ite.d
wg,
Lay
out:
DE
TAIL
S (2
)
AA
-Sta
ndar
d.st
b
REVISIONDATEREVISIONDATENO NO
26-1055.10
PIGEON LAKE DREDGING
WAUPACA COUNTY, WISCONSIN
PEH
RJW
PEH
9DETAILS (2)DECEMBER 2018 EAU CLAIRE, WI
PIGEON LAKE PROTECTION AND REHABILITATION
5 SILT FENCE DETAILNOT TO SCALE 6 STAKED TURBIDITY CURTAIN DETAIL
NOT TO SCALE