di2 routing | measurement and wire selection · 2012. 4. 6. · di2 routing | measurement and wire...

3
1 © 2012 Shimano American. DI2 ROUTING | MEASUREMENT AND WIRE SELECTION REAR DERAILLEUR BATTERY JUNCTION A JUNCTION B FRONT DERAILLEUR External Routing Junction Box B = SM-JC40 REAR DERAILLEUR FRONT DERAILLEUR BATTERY JUNCTION A JUNCTION B Internal Routing Junction Box B = SM-JC41 To Select Proper Wire (EW-SD50) Length: 1. Determine internal or external routing* 2. Measure from Junction Box A to Junction Box B* 3. Measure from Junction Box B to Rear Derailleur* 4. Measure from Junction Box B to Front Derailleur* 5. Measure from Junction Box B to Battery* *Measurements will vary from frame to frame ** EW-SD50 differs only in length. Connectors are universal

Upload: others

Post on 20-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DI2 ROUTING | MEASUREMENT AND WIRE SELECTION · 2012. 4. 6. · DI2 ROUTING | MEASUREMENT AND WIRE SELECTION REAR DERAILLEUR BATTERY JUNCTION A JUNCTION B FRONT DERAILLEUR External

1© 2012 Shimano American.

DI2 ROUTING | MEASUREMENT AND WIRE SELECTION

REAR DERAILLEUR

BATTERY

JUNCTION A

JUNCTION B

FRONT DERAILLEUR

External Routing Junction Box B = SM-JC40

REAR DERAILLEUR

FRONT DERAILLEUR

BATTERY

JUNCTION A

JUNCTION B

Internal Routing Junction Box B = SM-JC41

To Select Proper Wire (EW-SD50) Length:1. Determine internal or external routing*2. Measure from Junction Box A to Junction Box B*3. Measure from Junction Box B to Rear Derailleur*

4. Measure from Junction Box B to Front Derailleur*5. Measure from Junction Box B to Battery*

*Measurements will vary from frame to frame ** EW-SD50 differs only in length. Connectors are universal

Page 2: DI2 ROUTING | MEASUREMENT AND WIRE SELECTION · 2012. 4. 6. · DI2 ROUTING | MEASUREMENT AND WIRE SELECTION REAR DERAILLEUR BATTERY JUNCTION A JUNCTION B FRONT DERAILLEUR External

2© 2012 Shimano American.

Be sure to use TL-EW02 Tool to connect and disconnect wire EW-SD50 at “B” junction for both internal and external routed systems.

NOTE: TL-EW02 is a new tool and is different than the TL-EW01 used for original Dura-Ace Di2 systems

Select From 13 Different Lengths6. After measuring each of four segments, select most appropriate EW-SD50 wire sizes**

** EW-SD50 differs only in length. Connectors are universal

Visit S-TEC.SHIMANO.COM for a full video on Ultegra Di2 installation procedures.

SM-JC40 External “B”

Connecting Disconnecting

SM-JC41 Internal “B”Connecting Disconnecting

USE TL-EW02 TO CONNECT AND DISCONNECT WIRES AT “B” JUNCTION

Page 3: DI2 ROUTING | MEASUREMENT AND WIRE SELECTION · 2012. 4. 6. · DI2 ROUTING | MEASUREMENT AND WIRE SELECTION REAR DERAILLEUR BATTERY JUNCTION A JUNCTION B FRONT DERAILLEUR External

3© 2012 Shimano American.

Be sure to use TL-EW02 Tool to connect and disconnect wire EW-SD50 at “B” junction for both internal and external routed systems.

NOTE: TL-EW02 is a new tool and is different than the TL-EW01 used for original Dura-Ace Di2 systems

SM-JC40 External “B”

Connecting Disconnecting

SM-JC41 Internal “B”Connecting Disconnecting

USE TL-EW02 TO CONNECT AND DISCONNECT WIRES AT “B” JUNCTION

ULTEGRA DI2 6770 SERIES | BATTERY MOUNTS: 3 DIFFERENT TYPESSM-BMR1-S (Short), SM-BMR1-I (Internal Long), SM-BMR1-L(External Long)

Select the battery mount that best fits the specifications and routing of your frame.