Company Introduction Multinational company
Head office in Valencia (Spain) Established in 1985 20 branches all over the world including Nepal
Area of interest GI Technology Environmental planning and management Software development Urban planning and management Disaster management and climate change Transportation planning and management
Company Introduction (II) Company reputation Providing high quality, cost-effective and timely services Constantly exploring and implementing innovative solutions Strong management capabilities Experienced and hard-working personnel
Working environment Mixture of both national and international personnel
Collaboration ESRI, ERDAS, Google, Microsoft, Autodesk, NASA UNDP, World Bank, ADB, Save the Children, ADPC World Wildlife Fund, Tiger Foundation, Bird Conservation Network,
Kangaroo Conservation Center, Save the Whales, Save the Rainforest
Motivation
Provide consultancy services to the Nepali Ministry of Forests and Soil Conservation
Achieve the goal to develop a system to measure and monitor forest carbon stock in the Chitwan National Park, Nepal
Target Fulfill the customer requirements specification
based on the goals and objectives as provided
Develop a system for the customer Within required timeframe Cost-effective way High quality Precision Replicable
Integrating both local and international knowledge and expertise
Work Breakdown Structure (WBS)Definition of a system for measuring & monitoring
forest carbon stock in Nepal
Project Management
Develop Prototype
Advanced test system
Final Implementation Closing out
Meetings
Design/detailing requirements
Make functional prototype
Perform usability test
Write usability test reports
Component testing
Implement workflows
Controlling /monitoring
Reporting
Set Objectives
Identify System requirements
Define Key issues
Methodology definition
Database Design
Graphic user interface
Methodology programming
Middleware development
GUI programming
User training
System Maintenance
Overall system test
Define System Architecture
Draft user manual
Test Case reporting
Finalize documentation /
User manual
Integration of the components
Database implementation
Work Breakdown Structure (WBS) Six major activities Meetings and report submission at the end of each one
Weekly monitoring
Detailing the requirements
Methodology development
Graphic user interface design before the implementation
Develop a functional prototype for testing the system
Implementation of the final system
Closing out
Methodology Development Personnel involved
Experienced environmental expert GI and Remote sensing expert
Methodological steps: Investigate available documentation Analyze and evaluate different methods Compare methodologies Finalize appropriate methodology in local context Approve methodology
Closing Out Final deliverables
Desktop application-software User manual Final report
User training
Establish system maintenance
Internal project evaluation
Social and cultural ceremonies
Project Team Project manager
Two computer engineers
Software engineer
Designer and usability expert
Remote sensing and GI specialist
Environmental expert
Project Schedule Total duration: 323 working days
Designing/detailing system requirements: 60 working days
Develop prototype: 65 working days Advanced test system: 30 working days Final implementation: 120 working days Closing out: 26 working days
Cost EstimationPersonnel Daily Salary (€)* Daily Salary/hour
(€)Environmental Expert
(External)90 11.25
Remote Sensing and GI Specialist
60 7.5
Software Engineer 75 9.375Designer and
Usability Expert75 9.375
Computer Engineer A 75 9.375Computer Engineer B 75 9.375
Project Manager (Partial time)
100 12.5
*Considering all types of taxes, VAT, health insurance and other risk factors
Total Costs
Sector Total (€)Project management 9. 575
Design/detailing requirements 15.750Developing prototype 11.625Advanced test system 9.000Final implementation 22.500
Closing out 7.875Consultancy fees (12%) 12.000
Other costs 2.500Total 91.825 €
Summary Project costs:
Total: 91.825 € Buffer: 8.175 €
Project schedule: Start 1st September 2010 End 6th December 2011
Total months (including holidays): 16 Buffer: 2 months
Background Global climate is being affected by human activities
that result from the emission of certain greenhouse gases (GHG) into the atmosphere
Forests are relevant to climate change issues due to its function as a reservoir of carbon
Loss of forests is a significant contributing factor in climate change
On the other hand, the possibility of expanding carbon storage in forests has been identified as a potential measure to mitigate climate change
Why Choose Us? Other than providing the clients high quality services timely
in a cost effective way, we also do some volunteer works and pay for charity for different global issues
Currently we are involved in some projects like: Deforestation in the Brazilian Amazon Protection of Siberian tiger and its habitat Volunteer research on Cross River Gorillas in South West of
Cameroon and many more Saving the endangered Scotts Tree Kangaroo in Papua New Guinea
Our motto Not only earning revenue, also serving humanity, protecting
environment and save the globe.
“A person's true wealth is the good he or she does to the World”
Hoping for a Much Better and Livable World….!
Thank you all for the overall support