development application - city of clarence · 2018. 12. 6. · development application d-2018/608...
TRANSCRIPT
DEVELOPMENT APPLICATION
D-2018/608
APPLICANT: Samell (Tas) Pty Ltd
PROPOSAL: Warehouse Development (7 Units)
LOCATION: 122 Cambridge Park Drive, CAMBRIDGE
RELEVANT PLANNING SCHEME: Clarence Interim Planning
Scheme 2015
ADVERTISING EXPIRY DATE: 27 December 2018.
In addition to the Application Form(s), Certificate of Title(s) and any associated
consent documents the following information is available on request:
• Supporting planning report and title documentation.
The relevant plans and documents can be inspected at the Council offices, 38 Bligh Street, Rosny Park,
during normal office hours until 27 December 2018.
Any person may make representations about the application to the General Manager, by writing to PO
Box 96, Rosny Park, 7018 or by electronic mail to [email protected]. Representations must be
received by Council on or before 27 December 2018.
To enable Council to contact you if necessary, would you please also include a day time contact
number in any correspondence you may forward.
Any personal information submitted is covered by Council’s privacy policy, available at
www.ccc.tas.gov.au or at the Council offices.
ADDA R C H I T E C T S
+ HERITAGE CONSULTANTS
DAVID DENMANassociates+
Revision Change ID Description Date
E
F
REVISED PLANNING APPLICATIONFOR ADJUSTED TAS HWG SETBACK
ADJUSTED LANDSCAPE BUFFER ONTAS HWG
20/11/2018
3/12/2018
drawingscaledate
dwg #A00_RevF
PROJECT:
ADDRESS:
CLIENT:
Storage Units
122 Cambridge Park Dr Cambridge TAS 7170
Hobart Premium Storage
COVER PAGE1:2.29 (A3 paper)3/12/2018
7/59 WILLIAM STREETLAUNCESTON TAS 7250
P: 03 6334 4899E: [email protected]
TOWN PLANNINGNOT FOR CONSTRUCTION
CONTENTSARCHITECTURALS
NUMBER
A00A01A02A03A04A05
DRAWING NAME
COVER PAGESITE & LANDSCAPE PLANGROUND FLOOR PLANELEVATIONSELEVATIONSEXTERNAL LIGHTING PLAN
CURRENT ISSUE ID
FFFFDE
ISSUED
Storage Units122 Cambridge Park Dr Cambridge TAS 7170
Hobart Premium Storage
TOWN PLANNING
ADDA R C H I T E C T S
+ HERITAGE CONSULTANTS
DAVID DENMANassociates+
Revision Change ID Description Date
E
F
REVISED PLANNING APPLICATIONFOR ADJUSTED TAS HWG SETBACK
ADJUSTED LANDSCAPE BUFFER ONTAS HWG
20/11/2018
3/12/2018
drawingscaledate
dwg #A01_RevF
PROJECT:
ADDRESS:
CLIENT:
Storage Units
122 Cambridge Park Dr Cambridge TAS 7170
Hobart Premium Storage
SITE & LANDSCAPE PLAN1:500 (A3 paper)3/12/2018
7/59 WILLIAM STREETLAUNCESTON TAS 7250
P: 03 6334 4899E: [email protected]
TOWN PLANNINGNOT FOR CONSTRUCTION
DN
225
U-P
VC 'S
N8'
100PVCSRE orIO -Check
6,000SETBACK
6,000W
IDE M
IN.
3,00
0SE
TBA
CK
10,000SETBACK
5,000
EXISTING SMHLID 7.83225DIA. INLET5.41300DIA. INVERT5.39
EXISTING VALVE CASING
SECURITY ENTRYACCESS PANEL
NEW CROSSOVER
WATER METERCONNECTION WITH RPZD
DEVICE INSTALLED AFTERTHE WATER METER
PROPRIETARY IN GROUND STORMWATERIMPROVEMENT SYSTEM TO ENGINEER'S
SPECIFICATIONS
EXTENT OF BUILDINGENCROACHMENT INTOSIDE SETBACK
FIREPLUG
SLC
6 KYEEMA PLACE2 KYEEMA PLACE
9 KYEEMA PLACEAPPROVED DEVELOPMENT CURRENTLY UNDER DEVELOPMENT
DRAINAGE EASEM
ENT
EXISTINGBUILDING
7.6
AHD
7.4
AHD
7.2
AHD
TASM
AN H
IGHW
AY
TASM
AN H
IGHW
AY
8.0 AHD
116 CAMBRIDGE PARK DRIVE
DR
AIN
AGE
EASE
MEN
T
SITE BOUNDARY
SITE BOUNDARY
SITE BOU
ND
ARY
PLAN KEY
LINE MARKING
CONCRETE
CONCRETE -COLOURED
GRASS - COOL CLIMATE CULTIVAR
PROPRIETARY 600X600mm TRASH AND SEDIMENT PITS TO ENGINEER'S SPECIFICATIONS
STORMWATER LINE
LANDSCAPING KEY
LARGE FEATURE TREE 10-15M HIGH, 4-6M CANOPY (SPOTTED GUM OR SIMILAR)
SMALL TREES - SHE OAKS OR SIMILAR 4-5M HIGH, 2-3M CANOPY
MEDIUM SHRUBS/ BUSHES - SILVER BANKSIA 3M HIGH, 1.2 DIAMETER
SITE
BOU
NDAR
Y
3. 4.
FALL
FALL
FALL FALL
FALL
FALL
FALLFA
LL
FALL
FALL
6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.18.
19. 20. 21. 22. 23. 24. 25.
34. 35.
5.
DN
150 OPVC
PN 16 (R
RJ)
FALL
FALL
2.1.
26. 27. 28. 29. 30.STRATA 1 STRATA 2 STRATA 3 STRATA 4 STRATA 5 STRATA 6
FALL
1 2 3 4 5 6 7
FALL
31. 32. 33.
STRATA 7
36.
FALL
FALL
FALL
FALL
Building 1GR: 966.84 m2
Building 2GR: 229.73 m2
3,00
0SE
TBA
CK
10,000SETBACK
BICYCLE PARKING X 2
MOTOR BICYCLE PARKING
PROPOSED GROUNDBASE SIGN
0m 25m
SITE & LANDSCAPING PLANScale 1:500
SCALE 1:500
ADDA R C H I T E C T S
+ HERITAGE CONSULTANTS
DAVID DENMANassociates+
Revision Change ID Description Date
F
G
ADJUSTED LANDSCAPE BUFFER ONTAS HWG
UPDATED AREAS
3/12/2018
5/12/2018
drawingscaledate
dwg #A02_RevG
PROJECT:
ADDRESS:
CLIENT:
Storage Units
122 Cambridge Park Dr Cambridge TAS 7170
Hobart Premium Storage
GROUND FLOOR PLAN1:200 (A3 paper)5/12/2018
7/59 WILLIAM STREETLAUNCESTON TAS 7250
P: 03 6334 4899E: [email protected]
TOWN PLANNINGNOT FOR CONSTRUCTION
1,2015,000 1,835
6,845
10,825
4,15
02,
300
2,700
910
14,2
50
15,3
22
5,40
0
2,500 2,500 2,400
COL.1
COL.1
COL.1
7.6
AHD
7.4
AHD
DR
AIN
AGE
EASE
MEN
T
SITE BOUNDARY
MEZ
ZAN
INE
OVE
R
MEZ
ZAN
INE
OVE
R
MEZ
ZAN
INE
OVE
R
MEZ
ZAN
INE
OVE
R
MEZ
ZAN
INE
OVE
R
3.4.
GARAGE DOORGARAGE DOOR
GARAGE DOORGARAGE DOOR
GARAGE DOORGARAGE DOOR
MEZ
ZAN
INE
OVE
R
6.7. 8. 9.
10. 11. 12.13. 14. 15.
16. 17.18.
5.
USAT
OFFICE
USAT
OFFICE
USAT
OFFICE
USAT
OFFICE
USAT
OFFICE
USAT
OFFICE
AWNINGOVER AWNING
OVER
AWNINGOVER
AWNINGOVER
AWNINGOVER
AWNINGOVER
2.1.
1 2 3 4 5 6
STRATA 02GROUND FLOORGR: 157.87 m2
STRATA 01GROUND FLOORGR: 156.95 m2
STRATA 03GROUND FLOORGR: 159.81 m2
STRATA 04GROUND FLOORGR: 161.76 m2
STRATA 05GROUND FLOORGR: 163.70 m2
STRATA 06GROUND FLOORGR: 166.75 m2
13,3
64
0m 10m
15,3
22
1,200
DR
AIN
AGE
EASE
MEN
T
MEZ
ZANI
NE O
VER
GARAGE DOOR
USAT
OFFICE
USAT
OFFICE
AWNI
NGO
VER
7
AWNINGOVER
STRATA 07GROUND FLOORGR: 229.73 m2
GROSS FLOOR AREA SCHEDULESTRATA
STRATA 01STRATA 01STRATA 02STRATA 02STRATA 03STRATA 03STRATA 04STRATA 04STRATA 05STRATA 05STRATA 06STRATA 06STRATA 07STRATA 07
STORYGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINE
GROSS AREA156.948.9157.949.6159.850.3161.851.0163.751.7166.852.4229.775.01,575.5 m²
Nett Area Per UnitSTRATA
STRATA 01STRATA 01STRATA 02STRATA 02STRATA 03STRATA 03STRATA 04STRATA 04STRATA 05STRATA 05STRATA 06STRATA 06STRATA 07STRATA 07
STORYGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINEGROUND FLOORMEZZANINE
NETT AREA150.548.3152.449.0154.349.7156.250.8158.151.3160.151.8220.475.01,527.9 m²
PROPOSED GROUND FLOOR - BUILDING 01Scale 1:200
PROPOSED GROUND FLOOR - BUILDING 02Scale 1:200
SCALE 1:200
ADDA R C H I T E C T S
+ HERITAGE CONSULTANTS
DAVID DENMANassociates+
Revision Change ID Description Date
E
F
REVISED PLANNING APPLICATIONFOR ADJUSTED TAS HWG SETBACK
ADJUSTED LANDSCAPE BUFFER ONTAS HWG
20/11/2018
3/12/2018
drawingscaledate
dwg #A03_RevF
PROJECT:
ADDRESS:
CLIENT:
Storage Units
122 Cambridge Park Dr Cambridge TAS 7170
Hobart Premium Storage
ELEVATIONS1:200 (A3 paper)3/12/2018
7/59 WILLIAM STREETLAUNCESTON TAS 7250
P: 03 6334 4899E: [email protected]
TOWN PLANNINGNOT FOR CONSTRUCTION
±00 Ground Floor
+3,2001 Mezzanine
7,50
0
BUILDING 1
EASE
MEN
T
SITE
BO
UN
DAR
Y
ROLLER DOOR ROLLER DOOR ROLLER DOOR ROLLER DOOR ROLLER DOOR ROLLER DOOR
NGL7.4 AHD
±00 Ground Floor
+3,2001 Mezzanine
2100H CYCLONEFENCING - BLACK
SITE
BO
UN
DAR
Y
NGL7.4 AHD
BUILDING 1
±00 Ground Floor
+3,2001 Mezzanine
BUILDING 2
SITE
BO
UN
DAR
Y
EASE
MEN
T
ROLLER DOOR
NGL7.4 AHD
±00 Ground Floor
+3,2001 Mezzanine
BUILDING 1BUILDING 2
PRECAST CONCRETE
SITE
BO
UN
DAR
Y
PRECAST CONCRETE
EASE
MEN
T
EASE
MEN
T
NGL7.4 AHD
SOUTH WEST UNITS 01-06Scale 1:200
NORTH EAST (CONT.)Scale 1:200
SOUTH WEST (CONT.) UNITS 07-08Scale 1:200
NORTH EASTScale 1:200
0m 10m
SCALE 1:200
ADDA R C H I T E C T S
+ HERITAGE CONSULTANTS
DAVID DENMANassociates+
Revision Change ID Description Date
C
D
REVISED PLANNING APPLICATIONFOR ADJUSTED TAS HWG SETBACK
ADJUSTED LANDSCAPE BUFFER ONTAS HWG
20/11/2018
3/12/2018
drawingscaledate
dwg #A04_RevD
PROJECT:
ADDRESS:
CLIENT:
Storage Units
122 Cambridge Park Dr Cambridge TAS 7170
Hobart Premium Storage
ELEVATIONS1:200 (A3 paper)3/12/2018
7/59 WILLIAM STREETLAUNCESTON TAS 7250
P: 03 6334 4899E: [email protected]
TOWN PLANNINGNOT FOR CONSTRUCTION
±00 Ground Floor
±00 Ground Floor
+3,2001 Mezzanine
+3,2001 Mezzanine
PROPOSED WALL SIGNMAX 2m² SURFACE
2100H CYCLONEFENCING - BLACK
2100H STEEL PICKETFENCE AND SLIDINGGATE - BLACK
PROPOSED GROUNDBASE SIGN - MAX 3M²
PRECAST CONCRETESITE
BO
UN
DAR
Y
SITE
BO
UN
DAR
Y
SITE
BO
UN
DAR
Y
NGL7.4 AHD
COLOUR SCHEDULE
DULUX - EXPLODING STAR
DULUX - AFFINITY
CONCRETE NATURAL FINISH
±00 Ground Floor
±00 Ground Floor
+3,2001 Mezzanine
+3,2001 Mezzanine
7,50
0
6,70
0
4000
500
PERMITTED WALLSIGN 2m2
PRECASTCONCRETE
SITE
BO
UN
DAR
Y
SITE
BO
UN
DAR
Y
SITE
BO
UN
DAR
Y
NGL7.4 AHD
NGL7.4 AHD
NORTH WESTScale 1:200
SOUTH EASTScale 1:200
ADDA R C H I T E C T S
+ HERITAGE CONSULTANTS
DAVID DENMANassociates+
Revision Change ID Description Date
D
E
REVISED PLANNING APPLICATIONFOR ADJUSTED TAS HWG SETBACK
ADJUSTED LANDSCAPE BUFFER ONTAS HWG
20/11/2018
3/12/2018
drawingscaledate
dwg #A05_RevE
PROJECT:
ADDRESS:
CLIENT:
Storage Units
122 Cambridge Park Dr Cambridge TAS 7170
Hobart Premium Storage
EXTERNAL LIGHTING PLAN1:500 (A3 paper)3/12/2018
7/59 WILLIAM STREETLAUNCESTON TAS 7250
P: 03 6334 4899E: [email protected]
TOWN PLANNINGNOT FOR CONSTRUCTION
DN
225
U-P
VC 'S
N8'
100PVCSRE orIO -Check
6,000SETBACK
6,000W
IDE M
IN.
3,00
0SE
TBA
CK
10,000SETBACK
5,000
SECURITY ENTRYACCESS PANEL
NEW CROSSOVER
WATER METERCONNECTION WITH RPZD
DEVICE INSTALLED AFTERTHE WATER METER
PROPRIETARY IN GROUND STORMWATERIMPROVEMENT SYSTEM TO ENGINEER'S
SPECIFICATIONS
EXTENT OF BUILDINGENCROACHMENT INTOSIDE SETBACK
FIREPLUG
SLC
6 KYEEMA PLACE2 KYEEMA PLACE
7.6
AHD
7.4
AHD
7.2
AHD
TASM
AN H
IGHW
AY
TASM
AN H
IGHW
AY
8.0 AHD
116 CAMBRIDGE PARK DRIVE
DR
AIN
AGE
EASE
MEN
T
SITE BOUNDARY
SITE BOUNDARY
SITE BOU
ND
ARY
SITE
BOU
NDAR
Y
3. 4.
FALL
FALL
FALL FALL
FALL
FALL
FALLFA
LL
FALL
FALL
6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.18.
19. 20. 21. 22. 23. 24. 25.
34. 35.
5.
DN
150 OPVC
PN 16 (R
RJ)
FALL
FALL
2.1.
26. 27. 28. 29. 30.STRATA 1 STRATA 2 STRATA 3 STRATA 4 STRATA 5 STRATA 6
FALL
1 2 3 4 5 6 7
FALL
31. 32. 33.
STRATA 7
36.
FALL
FALL
FALL
FALL
Building 1GR: 966.84 m2
Building 2GR: 229.73 m2
3,00
0SE
TBA
CK
10,000SETBACK
BICYCLE PARKING X 2
MOTOR BICYCLE PARKING
PROPOSED GROUNDBASE SIGN
LIGHTING KEY
SHEILDED FLOOD LIGHT
SHEILDED DIRECTIONAL SIGNAGE AND SECURITY LAMP
NOTES:EXTERNAL LIGHTING TOILLUMINATE CARPARKINGPATHWAYS AND TO PROVIDEADEQUATE LIGHTING FORASSISTING PASSIVESURVEILLANCE.
LIGHTING INSTALLATIONSHOULD INCLUDE FITTINGSSELECTED AND INSTALLED TOAVOID IMPACTS THROUGHLIGHT OVERSPILL.
EXTERNAL LIGHTING PLANScale 1:500