determining ordinary high water corps of engineers and dept. of state lands jurisdictional...

12
Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503 986-3370 Natural Resource Unit Manager, ODOT Technical Services

Upload: frederick-cummings

Post on 12-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Determining Ordinary High Water

Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal

Waterways ACEC

Frannie Brindle 503 986-3370Natural Resource Unit Manager, ODOT Technical Services

Page 2: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Dept. of State Lands and Corps of Engineers

DSL and CORPS of ENGINEERS’ REGULATORY JURISDICTION

Section 404 and State R/F LawSection 404 and State R/F Law

Page 3: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

OHW is Defined by Field Characteristics

Page 4: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Drift material (or wrack) in fence?

Clear line impressed along shore?

Antelope Creek, Jackson Co. March 2006

Page 5: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Field Characteristics

Culvert staining–not appropriate for determining fish passage design criteria

Page 6: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Relation to Other ‘Lines’• 2-year flood elevation

– Calculated based on modeling – OHW is usually lower on the bank than the 2-year

• Bank full stage– Often used interchangeably with OHW in literature– Channel forming flows – Defined by DSL as the two-year recurrence interval flood

elevation

• Edge of Water• Top of bank

– Easily identifiable on some streams– OHW is usually below the top of the bank

Page 7: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Context

In-water work timing

Resource Impacts

Fish Passage Design

Page 8: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503
Page 9: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Procedures• Flag OHW in field (flag only one side of stream if

access is limited and project line to the other side in CAD)

• Use painted stakes or flags where possible

• Take photos up- and down-stream showing flag placement

Page 10: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Procedures (cont)• Complete form:

– OHW field characteristics observed– If 2-year used instead, should be stated

• Develop site sketch showing flag locations, photo-points

• Final Documentation includes OHW Determination Form, Photos, Site Sketch

Page 11: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

Completing the Form

Page 12: Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal Waterways ACEC Frannie Brindle 503

2

Sample Site Sketch

Low hanging vegetation- willows, other riparian

Steep bank- visible indicators

N

1

3

4Elevation point

flow

P1

P2, 3