Details of Contracts Awarded in April, 2006 from the Corporate Office Tender Number Date of Opening Description of Item/Work Contract No. & date of award Contractor's Name Quantity (for supply contract) Estimated Cost (for Engg./Elect./ S&T/Mech.) Rate (for supply contract) Tenderered Cost (for Engg./Elect./ S&T/Mech.) Value of Contract Scheduled completion date VNL/VM- MV/Chennai/ 01 dated Nov.21, 2005 09.01.06 Gauge Conversion of Metre Gauge Railway Line to Broad Gauge Line of Villupuram-Mayiladuturai Section on Southern Railway including all permanent way works including supply of ballast, P.Way material (except Rails and PSC Sleepers), connected electrical works in the entire section including OHE works in Villupuram yard, all civil works for bridges, buildings, footover bridges, platforms, earthwork, etc. and signaling and telecommunication works in the entire section from Villupuram – Mayiladuturai (122 kms) 17 th April ‘06 M/s Tata-Kalindi- Unity, Infra Projects Ltd. (JV), Suryodaya 1-10- 60/3, Begumpet, HYDERABAD-500 016 185.72 cr. 182.23 cr. 182.23 cr. 16.01.08

Upload: dangphuc

Post on 17-Apr-2018

219 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contracts Awarded in April, 2006 from the Corporate Office

Tender Number

Date of Opening

Description of Item/Work Contract No. & date of

award

Contractor's Name

Quantity (for supply contract)Estimated Cost

(for Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tenderered Cost (for

Engg./Elect./ S&T/Mech.)

Value of Contract

Scheduled completion date

VNL/VM-MV/Chennai/01 dated Nov.21, 2005

09.01.06 Gauge Conversion of Metre Gauge Railway Line to Broad Gauge Line of Villupuram-Mayiladuturai Section on Southern Railway including all permanent way works including supply of ballast, P.Way material (except Rails and PSC Sleepers), connected electrical works in the entire section including OHE works in Villupuram yard, all civil works for bridges, buildings, footover bridges, platforms, earthwork, etc. and signaling and telecommunication works in the entire section from Villupuram – Mayiladuturai (122 kms)

17th April ‘06 M/s Tata-Kalindi-Unity, Infra Projects Ltd. (JV), Suryodaya 1-10-60/3, Begumpet, HYDERABAD-500 016

185.72 cr. 182.23 cr. 182.23 cr. 16.01.08

Page 2: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contracts Awarded upto January, 2006 from the Corporate Office

Tender Number Date of Opening

Description of Item/Work

Contract No. & date of award

Contractor's Name

Quantity (for supply contract) Estimated Cost (for Engg./Elect./S&T/Mech.)

Rate (for supply contract) Tenderered Cost (for Engg./Elect./S&T/Mech.)

Value of Contract

Scheduled completion date

C/DEE-RE/CEE dt.07.07.05 14.07.05

Manufacture and Supply of PSC Monoblock Sleepers for BG (1673 mm) to RDSO drawing No. T. 2496 to suit 60 kg UIC Rail as per IRS Specification No. T39-85 (Third Revision May 1996) as amended from time to time duly loaded into wagons/road vehicle for Delhi Sarai Rohilla-Rewari GC

27.07.05

1. M/s Track Innovations (India) Pvt. Ltd 2. M/s Econ Antri Ltd. 3. M/s Daya Engineering Works 4. M/s Rural Engineering Co. Pvt. Ltd. 5. M/s Arvind Construciton Co. Pvt. Ltd. 6. M/s Engipress Industries Ltd.

25000 Nos. 25000 Nos. 25000 Nos. 25000 Nos. 27000 Nos. 25000 Nos.

Per Sleeper rate Rs.706.40 + Freight - do - - do - - do - - do - - do -

Per Sleeper Rate Rs.17660000/- - do - - do - -do - Rs.19072800/- Rs.17660000/-

15.11.05

Page 3: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

2005/RVNL/P/CC/PB dtd. 22.07.05 29.07.05

Design & Proof checking of Additional Openings in ROBs at Kosi Kalan and Bhuteshwar

03.08.05 M/s Unique Engineers 3.6 Lacs 3.33 Lacs 3.33 Lacs

23.08.05 (21 days from the date of issue of LOA)

2005/RVNL/CC/P/DEE/Palwal-Bhuteshwar dt.12.08.05 29.08.05

Detailed Design Engineering for Palwal - Bhuteshwar 3rd Line of NCR

12.09.05

M/s Scott Wilson Kirkpatrick India Pvt. Ltd.

53.01 Lacs 47.00 Lacs 47.00 Lacs

11.03.06 (06 months from the date of issue of LOA)

C/DEE/Aljn.-Gzb./3rd Line dt.12.08.05 29.08.05

Detailed Design Engineering for Aligarh - Ghaziabad 3rd Line (106 Km.) of NCR/NR

01.09.05

M/s Consulting Engineering Services (India) Pvt. Ltd., In JV with M/s Ntrust Technological Services Pvt. Ltd.

35.00 Lacs 31.00 Lacs 31.00 Lacs

28.02.06 (06 months from the date of issue of LOA)

2005/RVNL/CC/P/2005/Jn.-Tkd dt.16.09.05 29.09.05

Detailed Design Engineering for Jn. Cabin - Palwal 4th Line (34 Km.) of NR

07.10.05 M/s Dalal Mott Macdonald 16.94 Lacs 19.61 Lacs 19.61 Lacs

06.01.2006 (03 months from the date of issue of LOA)

Page 4: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

RVNL/Project/DEE-RE/Contract/2005/05 dtd.08.08.05

24.08.05

Contract for Civil Engineering & track works in connection with DEE-RE GC work

02.09.05

M/s Kalindee Rail Nirman (Engg) Ltd (JV) with M/s Unity Infra Projects Ltd.

47.44 Cr. 46.79 Cr. 46.79 Cr.

(I) Phase-I - 31.03.06 (with maximum mega block period of 04 months) (ii) Phase-II - 31.07.06 (iii) Final Phase- 18 months

C/BPM-011/04 dtd.30.06.05 03.08.05

Bid Process Management with Guage Conversion (MG to BG) of Rly. Track in Rewari-Ringus-Phulera-Ajmer section (294.57 Km.) of NWR.

19.08.05

M/s Wilbur Smith Associates Pvt Ltd. in association with M/s Parsons Brinckerhoff India Pvt. Ltd.

1.05 Cr. 0.89 Cr. 0.89 Cr.

18.05.06 (09 months from the date of issue of LOA)

RVNL/Projects/RE-AJ/Contracts2005/02 dtd.09.08.05

29.09.05

All Permanent way works including supply of ballast, P.Way material (except rails and PSC sleepers) and connected electrical works in the entire section from rewari to Ajmer (294.56 kms.) in connection with

7.11.05 M/s IRCON International Ltd.

189.16 Cr. 173.31 Cr. 158.00 Cr.

16.08.07 (21 months from the date of issue of LOA)

Page 5: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

the work of G.C. of Rewari - Ringus - Phulera - Ajmer section of NWR.

RVNL/Projects/RE-AJ/Contracts2005/02 dtd.09.08.05

29.09.05

All civil & electrical works for GC of MG Railway line to BG from Rewari to Ajmer (294.54 kms.) for converting the existing twin MG & BG single line section to BG double line section on NWR.

1.11.05

M/s Rani Constrictiom Pvt. Ltd. in JV with M/s Era Construction (India) Ltd.

52.00 Cr. 63.74 Cr. 63.74 Cr.

10.05.07 (18 months from the issue of LOA)

2005/RVNL/P/CC/MFBW dtd.17.10.05 09.12.05

Mobile Flash Butt Welding of 52 kg. Rail at site using Mobile Butt Welding plant for different construction projects under RVNL on Indian Rlys.

09.01.06 M/s Royal Forging Pvt. Ltd., Kolkata

11.03 Cr. 10.70 Cr. 10.70 Cr.

08.05.08 (28 months from the date of issue of LOA)

Page 6: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

RVNL/GM/P/III/05/PSC Sleepers dtd.31.10.05 16.11.05

Manufacture and supply of PSC Mono Blcok sleepers for BG (1672 mm) to RDSO drawing No.T-2496 to suit 60 kg. UIC rail as per IRS specification MOT - 39 - 85 (3rd revision May 1996) as ammended from time to time, duly loaded into wagons/road vehicles for Keonjhar - Tomka new line Project, ECR.

10.12.05

1. M/s Mazda Concrete Products Ltd. 2. M/s Neelgiri Sleepers Pvt. Ltd. 3. M/s Pre-stressed Udyog (India) Pvt. Ltd.

130340 Nos. 30000 Nos. 40000 Nos.

Per Sleeper rate Rs.865/- + Freight - do - - do -

Per Sleeper Rate Rs.112744100/- Rs.25950000/- Rs.34600000/-

09.06.06 (6 months from the date of issue of LOA)

Page 7: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contracts Awarded upto January 2006 from the Corporate Office (S&T)

Tender No. Date of opening

Description of Item/work

Contract No.&date Contractor's Name Quantity(for supply contract) Estimated

Cost(for Engg.Elect.S&T/Mech.)

Rate (for supply contract) Tendered

Cost(for Engg/Elect/S&T/Mech,)

Value of Contract

Scheduled completion date

S&T/DEE-RW/BID dated

20.04.2005

16.06.2005 Supply & Installation of Signalling for replacement of existing signalling and Gauge Conversion of 2nd Meter Gauge to Broad Gauge line on Delhi Sarai Rohilla- Rewari Section (79 Km) of Northern Railway

S&T/DEE-RW/BID dated 21.10.2005

Consortium (Joint Venture) of M/s Bharat Rail Automation(P)Ltd, B-107 Mandpeshwar Ind.Estate, S.V.P. Road, Borivali(W), Mumbai-400092 and M/s Siemens Ltd, Pandurang Budhkar Marg, Worli, Mumbai-400018

39.00 crores 35.14 crores 35.14 crores 30.04.2007(20 months from the date of issue of

LOA)

Page 8: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

CHENNAI PROJECT OFFICE Details of Contract placed during the month of October 2005 and November 2005

Tender No. Date of

opening. Description of item/work.

Contract No & date

Contractor’s Name. Qty. [for supply contract] Tendered Cost [for Engg./Elect./S & T/Mech.]

Rate [for supply contract] Tendered Cost [for Engg./Elect/S & T. /Mech.]

Value of contract.

Scheduled completion date.

RVNL/ATU-SA/Chennai/01

22.9.2005 GC bet. SA - ATU section [including Civil Engg., Electrical and S & T works

LOA No. RVNL/CPM/ATU-SA/Chennai/01/ dated 31.10.2005

M/S D.S. Constructions Ltd., C.66, South Extension II, New Delhi. 110 049.

56.69 Cr. -- 61,46,90,485.95 12 months from the date of award.

RVNL/ATU-SA/Chennai/02

20.9.12005 PMC for GC bet .SA - ATU

RVNL/CPM/ATU-SA/Chennai/02 dated 14.112005

M/S Aarvee Associates, Ravula Residency, Srinagar Colony, Hyderabad 82.

-- --- 1,01,18,500.00 12+ 12 months from the date of award.

[Pradeep Gaur] Chief Project Manager.

Page 9: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of tenders for Consultancy Services for Bankability , Financial Advisory & Marketing Studies for different Projects in 2005-06. Tender No. Date of

Opening Description of item/ Work Contract

No. & Date of award

Name of Contractor Rate of Supply

Quantity for supply

Contract Amount

Scheduled completion date

PP&D/BSPX-PRDP/TMS/2005

01/07/2005 Financial Advisory Services for Banaspani - -Paradip BG Doubling of Rly Line

04/7/2005 M/S Feedback Ventures (P) Ltd. New Delhi

N.A. N.A. Rs.1,84,034/- 04/8/2005

2005/Rajgoda-Haldia/BS/PP&D

01/07/2005 Consultancy services for Bankablility Services for Rajgoda – Haldia Doubling of Rly Line

20/7/2005 M/S P.W.C. Pvt. Ltd. New Delhi

N.A. N.A. Rs.7,50,000/- 17/10/2005

2005/Angul-Dub.- Sukinda Rd/BS/PP&D

01/07/2005 Consultancy services for Bankablility Services for Angul – Dubri – Sukinda Rd. New Rly Line Project

20/7/2005 M/S P.W.C. Pvt. Ltd. New Delhi

N.A. N.A. Rs.7,75,000/- 17/10/2005

2005/Igatpuri -Bhusaval/BS/PP&D

01/07/2005 Consultancy services for Bankablility Services for Igatpuri Bhusaval 3rd Line Project

20/7/2005 M/S P.W.C. Pvt. Ltd. New Delhi

N.A. N.A. Rs.7,50,000/- 17/10/2005

2005/Naupada-Gunupur-Thiruvali/BS/PP&D

01/07/2005 Consultancy services for Bankablility Services for Naupada - Gunupur – Thiruvali Guage Conversion

20/7/2005 M/S SBI Capital Markets Ltd. New Delhi

N.A. N.A. Rs.8,25,000/- 17/10/2005

2003/RFP/FA/PP&D

25/o6/2005 Financial Advisory Services for TKD – Dadri New Line Project

o5/8/2005 M/S Feedback Ventures (P) Ltd. New Delhi

N.A. N.A. Rs.3,50,000/- 04/11/2005

Page 10: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of tenders for Consultancy Services for implementation of RRAP for different Projects in 2005-06. Tender No. Date of

Opening Description of item / Work Contract No.

& Date of award

Name of Contractor

Rate of Supply

Quantity for supply

Contract Amount

Scheduled completion date

RVNL/CUT-BAR/PP&D/2005

T.B.25/5/2005 F.B.14/6/2005

implementation of RRAP for Cuttack – Barang Doubling of Rly Line

07 / 7 / 2005 M/S Advantage India Community Development New Delhi

N.A. N.A. Rs.4,81,250/- 06/11/2005

RVNL/Gooty-Pull. /PP&D/2005

T.B.30/6/2005 F.B. 2/7/2005

implementation of RRAP for Gooty – Pullampet Doubling of Rly Line

08 / 7 / 2005 M/S CRADLE Ranchi

N.A. N.A. Rs.7,14,000/- 08/01/2006

RVNL/ALJN-GZB /PP&D/2005

T.B.04/7/2005 F.B. 14/7/2005

implementation of RRAP for ALJN – GZB 3rd Line Project

01 / 8 / 2005 M/S Study Point Samiti, LKO

N.A. N.A. Rs.2,82,210/- 28/11/2005

RVNL/ThIr.-Arakonam /PP&D/2004

T.B.18/8/2005 F.B.26/10/2005

implementation of RRAP for Tiruvallur – Arakonnam 3rd Line Project

03 /01/2006 Sugam International Sansthan, LKO

N.A. N.A. Rs.3,83,648/- 02/6/2006

2005/RVNL/Barang-Khurda Rd. /PP&D

T.B. 20/8/2005 F.B.17/10/2005

implementation of RRAP for Barang - Khurda Rd. 3rd Line Project

03/01/2006 SugamInternational Sansthan, LKO

N.A. N.A. Rs.5,61,482/- 02/9/2006

2004/RVNL/Raichur-Guntakal /PP&D

T.B.22/8/2005 F.B.18/10/2005

implementation of RRAP for Raichur – Guntakal Doubling of Rly Line

03/01/2006 M/S D.M.T., New Delhi

N.A. N.A. Rs.7,88,006/- 31/10/2005

RVNL/Rajat.-Barang Doub. /PP&D/2005

T.B. 12/8/2005 F.B. 24/10/2005

implementation of RRAP for Rajatgarh – Barang Doubling of Rly Line

03/01/2006 M/S D.M.T., New Delhi

N.A N.A Rs.7,04,396/- 02/9/2006

Page 11: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Contracts awarded by Electrical Deptt./Rail Vikas Nigam Ltd.

S No. Name of work and location

Est. cost of project

Tendered cost

% above/ below SOR

Agreement No.

Agency Date of start

Time of completion

Physical progress

Name of E in C with

Address

Remarks

1 Updation of Detailed Project Report for Electrification of Nandlur-Guntkal Section

30.68 lacs 30.68 at par 2005/Elect/Gooty-Renigunta RE Dated 18.04.2006

RITES Ltd.

18.04.2006 Three month M/s RITES Ltd RITES Bhawan, No. 1, Sector - 29, Gurgaon 122001

2 Study in connecton with availing of new service connection at proposed TSS at Chhata

5.0 lacs 5.0 lacs at par 2005/Elect/Palwal-Bhuteshwar 3rd line date-18.08.2005

RITES Ltd.

19.08.2005 One month Completed M/s RITES Ltd RITES Bhawan, No. 1, Sector - 29, Gurgaon 122001

Page 12: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender Number Date of Opening

Description of Item/Work Contract No. & date of

award

Contractor's Name

Quantity (for supply

contract)Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply

contract)Tenderered

Cost (for Engg./Elect./S&T/Mech.)

Value of Contract

Scheduled completion date

2006/RVNL/GM-P-I/PCDE/ALJN-GZB

12.04.06 Proof Checking of designs/drawings for provision of 3rd line from Aligarh - Ghaziabad section (106 km.) on North Central Railway.

23.05.06 M/s Scott Wilson Kirkpatric India Pvt. Ltd. in association with M/s Scott Wilson Railways of Birmingham, U.K.

- 9.50 Lacs 9.50 Lacs 22.07.06

2005/RVNL/P-I/ALJN-GZB/02

23.12.05 Construction of Roadbed, Bridges, Facilities, Installation of Track (excluding Supply of Rails, Thick Web Switches & Weldable CMS Crossings) & Electrical (Railway Electrification & General Electrification) in connection with Provision of 3rd line on Aligarh - Ghaziabad Section (106 Kms.) in the State of Uttar Pradesh (India).

08.06.06 M/s IRCON - GANNON - Dunkerly - JV

188.03 Cr. 223.94 Cr. 223.45 Cr. 24 months from the date of

Commencement.

Details of Contracts Awarded in May-June, 2006 from the Corporate Office

Page 13: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender Number Date of Opening Description of Item/Work Contract No. & date of

award

Contractor's Name

Quantity (for supply contract)Estimated Cost

(for Engg./Elect./S&T/Mech.)

Rate (for supply

contract)Tenderered

Cost (for Engg./Elect./S&T/Mech.)

Value of Contract

Scheduled completion

date

PMC/RVNL/NDLS/ALJ-GZB/2005/02

28.12.2005 Project Management Consultancy for Construction of Roadbed, Bridges, Facilities, Installation of Track (Excluding Supply of Rails, Thick Web Switches & Weldable CMS Crossings) & Electrical Works (Railway Electrification and General Electrification) in connection with provision of 3rd Line on Aligarh – Ghaziabad Section (106 kms.) in the State of Uttar Pradesh (india).

10.07.06 M/s Lea Associates South Asia Pvt. Ltd.B-1/E-27, Mohan Cooperative Industrial Estate,Mathura Road, New Delhi-110044.

- Rs.4.90 Cr. Rs.4.90 Cr. 06.03.09

Details of Contracts Awarded in August, 2006 from the Corporate Office - Projects

Page 14: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DETAILS OF CONTRACTS AWARDED FROM MARCH 2005 TO AUGUST, 2006 BY RVNL OFFICE, SECUNDERABAD

S. No.

TENDER NO. & DATE

DATE OF OPENING

DESCRIPTION OF ITEM/WORK

CONTRACT NO.

DATE OF

AWARDCONTRACTORS'

NAME Estimated

Value of the Contract In Rs.

Date of completion REMARKS

1 RVNL/SC/GEOTECH/GTL-RC/4, DT. 14.02.2005

01.03.05 CONDUCTING GEOTECHNICAL INVESTIGATION FOR CONSTRUCTION OF MAJOR BRIDGES

RVNL/SC/GTL-RC/GEOTECH, DT. 19.03.2005

19.03.05 J.J.SOIL INVESTIGATIONS, VISAKHAPATNAM

434808 15.09.05 Work completed

2 RVNL/SC/GTL-RC/PMSC, DT. 22.03.2005

28.03.05 PROVIDING PROJECT MANAGEMENT SUB- CONSULTANCY SERVICES

RVNL/SC/GTL-RC/PMSC, dt. 01.04.2005

01.04.05 N.SURYANARAYANA, HYDERABAD

149500 30.09.05 Work completed

3 RVNL/SC/GTL-RC/FLS/6 , DT. 24.03.2005

02.04.05 FLS OF BG TRACK DOUBLING BETWEEN GTL - RC SECTION.

RVNL/SC/GTL- RC/FLS, DT. 06.04.2005

06.04.05 M/S. MAP WORLD TECHNOLOGIES, HYDERABAD

484970 15.06.05 Work completed

4 RVNL/SC/GTL-RC/6/MAPING , DT. 24.03.2005

04.04.05 MAPING OF EXISTING RLY. CORRIDOR AND PROVIDING DESIGNS, DRAWINGS, ETC. GTL- RC SECTION

RVNL/SC/GTL-RC/MAPING, DT. 05.04.2005

05.04.05 M/S. MAP WORLD TECHNOLOGIES, HYDERABAD

320000 07.05.05 Work completed

5 RVNL/SC/GTL-RC/L SECTIONS, DT. 18.04.2005

29.04.05 PREPARATION OF PLANS AND L SECTIONS AND YARD DRAWINGS - GTL-RC

RVNL/SC/GTL-RC/L SECTIONS, DT. 04.05.2005

04.05.05 K.VENUGOPAL, SECUNDEABAD

135500 04.09.05 Work completed

6 RVNL/SC/GTL-RC/ PILLERS, DT. 24.05.2005

03.05.05 FIXING OF CONCRETE PILLARS - FLS - DOUBLING BETWEEN GTL - RC SECTION.

RVNL/SC/GTL-RC/PILLARS0, DT. 04.05.2005

04.05.05 RAAGA CONSTRUCTIONS, HYDERABAD

243000 15.10.05 Work Completed

Page 15: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7 RVNL/SC/GTL-RC/BR. DRAWINGS, DT. 23.05.2005

03.06.05 PREPARATION OF DRAWINGS OF BRIDGES- GTL-RC DOUBLING WORKS

RVNL/SC/GTL-RC/BR. DRAWINGS, DT. 07.06.2005

07.06.05 K.VENUGOPAL, SECUNDEABAD

438000 15.06.05 Work completed

8 RVNL/SC/GTL-RC/FLS - KSG, DT. 08.06.2005

15.06.05 FLS OF BG TRACK DOUBLING BETWEEN KOSGI AND MATAMARRI STNS.

RVNL/SC/GTL-RC/FLS - KSG, DT. 15.06.2005

15.06.05 TOP VIEW TOPO MAPPERS, HYDERABAD

233042 31.08.05 Work Completed

9 RVNL/SC/GTL-RC/ S&T, DT. 05.08.2005

19.08.05 PREPARATION OF DESINGS AND DRAWINGS AND ESTIMATES FOR S&T WORKS. GTL - RC SECTION.

RVNL/SC/GTL-RC/S&T , DT. 05.09.2005

05.09.05 C. SUBRAHMANYAM, HYDERABAD.

349000 31.12.05 Work Completed

10 RVNL/SC/GTL-RC/ BUILDINGS, DT. 05.08.2005

19.08.05 PREPARATION OF GADs AND ESTIMATES FOR STATIONS AND SERVICE BUILDINGS

RVNL/SC/GTL-RC/BUILGINS , DT. 05.09.2005

08.09.05 VISION PLANNERS, HYDERABAD

42100 31.10.05 Work in progress

11 RVNL/SC/GY - PMT/ CONCRETE PILLARS0, DT. 10.10.2005

19.10.05 FIXING OF CONCRETE PILLARS IN CONNECTION WITH FIXING LAND BOUNDARIES - GY - PMT SECTION.

RVNL/SC/GY-PMT, DT. 22.10.2005

22.10.05 GAYATRI FLY ASH BRICK INDUSTRY, KAMALAPURAM

409500 18.12.05 Work completed

12 RVNL/SC/GY - PMT/ LAND PLANS, DT. 10.10.2005

19.10.05 PREPARATION & SUBMISSION OF LAND AQUISITION PROPOSALS AND PLANS TO REVENUE AUTHORITIES. GY-PMT SECTION.

RVNL/SC/GY-PMT, DT. 22.10.2005

22.10.05 P. KUMARASWAMY, KURNOOL

442800 21.12.05 Work in progress

Page 16: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

13 12/DY.CE/C/RC-2005, LAND ACQUISITION SURVEY, DT. 28.09.2005

20.10.05 GTL - RC WORKS PROPOSED LAND ACQUISITION SURVEY FOR ISSUE OF 4 (i) NOTIFICATION. FIXING OF CENTER LINE PEGS.

RVNL/SC/GTL-RC, DT. 20.10.2005

20.10.05 NIKETAN CONSULTANTS, BANGALORE

334800 31.03.06 Work Completed

14 11/DY.CE/C/RC-2005, LAND ACQUISITION SURVEY, DT. 21.09.05

20.10.05

PORPOSED FIXING OF LAND BOUNDARIES WITH PRE-CASTE RCC PILLARS

RVNL/SC/GTL-RC, DT. 20.10.2005

20.10.05 NIKETAN CONSULTANTS, BANGALORE

451980 15.03.06 Work completed

15 RVNL/SC/GTL-RC/ GEOTECH/BR.1016, DT. 01.12.2005

14.12.05 PROPOSED PATCH DOUBLING OF TRACK BETWEEN GTL-RC - CONDUCTING GEOTECHNICAL INVESTIGATION FOR COSTRUCTION OF BR. NO.1016

RVNL/SC/ GEOTECH/ GTL-RC/BR.1016, DT. 15.12.2005

15.12.05 J.J.ASSOCIATES PVT. LTD., HYDERABAD

53850 14.01.06 Work completed

16 RVNL/SC/GTL-RC/PPM dated 18.11.05

02.12.05 Providing Project Management Sub-consultancy Services for GTL-RC and GY-PMT Projects

RVNL/SC/GTL-RC/PPM dated 18.11.05

02.12.05 Sri.N.Suryanarayana/Secunderabad

142000 01.04.06 Work Completed

17 RVNL/SC/GTL-RC/Conc Pillar/2 Dated 06.03.06

14.03.06 Fixing of Concrete Pillars in connection with fixing Land Boundaries for the proposed patch Doubling between Mantralayam Road

RVNL/SC/GTL-RC/Conc Pillar/2 Dated 14.03.06

14.03.06 M/s Inland Surveyors /Bellary

238560 31.05.06 Work completed

Page 17: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

and Matmari Stations and Digitisation of Land Plans

18 RVNL/SC/GTL-RC/Addl.Drawings Dated 06.03.06

14.03.06 Patch Doubling of Track between GTL-RC Preparation of Conceptual Drawings,Scaled kEngg.Plans Etc

RVNL/SC/GTL-RC/Addl.Drawings/03 Dated 14.03.06

14.03.06 Sri.K.Venugopal /Sec.Bad

209100 13.09.06 Work in progress

19 RVNL/SC/OBVP-KP/Land Prop dated 01.03.06

10.03.06 Construction of New BG line between Obulvaripalli to Krishnapatnam Preparation and submissin of Land Acquisition proposals

RVNL/SC/OBVP-KP/Land Prop dated 10.03.06

10.03.06 M/s Top View Consultants/Hyderabad

477150 09.06.06 Work in progress

20 RVNL/SC/OBVP-KP/Conc.Pillars dated 24.03.06

10.04.06 Construction of New BG line between Obulvaripalli to Krishnapatnam Preparation and submissin of Land Acquisition proposals

RVNL/SC/OBVP-KP/Conc.Pillars dated 13.04.06

13.04.06 Sri.N.Nagabhushanam/Vijayawada

459000 12.06.06 Work completed

21 RVNL/SC/GY-PMT/Elec/X ings dated 31.03.06

12.04.06 Survey of Existing Powerline Crossings between GTL-PMT

RVNL/SC/GY-PMT/Elec/X ings dated 17.04.06

17.04.06 M/s Top View Consultants/Hyderabad

454250 01.06.06 Work completed

22 RVNL/SC/Transportation dated 28/04/06

28.04.06 Providing Transport Services to RVNL Secunderabad office.

RVNL/SC/Transportation dt. 29/4/06

29/04/06 M/s. SSV Tours and Travels, Hyderabad

99,000 4/11/06 Work in progress

Page 18: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

23 RVNL/SC/GY-PMT/107/KP-RLO dated 06/04/2006

3/5/2006 Proposed soil investigation through Explortory Boring-cum-Lab Test at various bridge locations at Service-cum-Residential bldgs. bet. .Kondapuram-Rayalacheruvu Sec. of GTL division of SC Rly.

RVNL/SC/GY-PMT/107/KP-RLO dated 12/7/06.

12/7/06 M/s. Design Bureau, Plot No.N 3/91 IRC Village, Nayapalli. BHUBANESWAR

6,74,901 11/10/06 Work in progress

24 RVNL/SC/GY-PMT/107/PMT-MOO dated 06/04/2006

3/5/2006 Proposed soil investigation through Explortory Boring-cum-Lab Test at various bridge locations at Service-cum-Residential bldgs. bet. Pullampet-.Muddanuru Sec, of GTL division of SCR

RVNL/SC/GY-PMT/107/PMT-MOO dated 12/7/06.

12/7/06 M/s. Design Bureau, Plot No.N 3/91 IRC Village, Nayapalli. BHUBANESWAR

9,35,277 11/10/06 Work in progress

25 RVNL/SC/KP-OBVP/Soil.Inv. 1 dated 3/7/06

9/6/2006 Proposed soil investigation through Explortory Boring-cum-Lab Test at various bridge locations bet. Venkatachalam-Krishnapatnam port..

RVNL/KP-OBVP/Soil.Inv.1 dated 03/07/06

3/7/06 M/s. RITES Limited, RITES Bhavan, Kadbi Chowk, Nagpur 440 004

22,77,166 2/10/06 Work in progress

26 RVNL/SC/OBVP-KP/Transport dated 26/5/06

13/6/06 Providing transport services to RVNL at their Project office in Nellore

RVNL/SC/OBVP-KP/Transport dt. 13/6/06

13/6/06 M/s. Dhanya Car Travels, D. No.203, Vine yard castle, Secunderabad.

1,98,000 12/5/07 Work in progress

27 RVNL/SC/GY-PMT/104 dated 18/10/05

29/12/05 Patch doubling of Track between Gooty-Pullampet.

RVNL/SC/GY-PMT/104 dt. 7/7/06

7/7/06 M/s. Simplex Infrastructures Limited, Mumbai

170,74,07,793

6/1/09 Work in progress

Page 19: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

28 RVNL/SC/House Keeping/2006-07 dated 25/7/06

29/07/006 Complete House Keeping of Regional Office of RVNL at Secunderabad.

RVNL/SC/House Keeping/20060-07 dated 01/08/06

1/8/06 M/s Sri Sai Associates/Neredmet/Secunderabad

1,40,000/- 31.07.07 Work in progress

29 RVNL/SC/Transport Services/2006-07 dated 20/8/06

29/07/06 Providing transport services to RVNL at their Project office in Secunderabad

RVNL/SC/Transport Services/2006-07 dt.01/08/06

1/8/06 M/s. Saptagiri Travels, Secunderabad.

3,78,000/- 31.07.07 Work in progress

Page 20: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contracts Placed during September 2006 from the Corporate Office (S&T) Tender No. Date of

opening Description of

Item/work Contract No.&

date Contractor's Name Quantity(for

supply contract) Estimated Cost(for

Engg.Elect. S&T/Mech.)

Rate (for supply

contract) Tendered Cost(for

Engg/Elect/ S&T/Mech,)

Value of Contract

Scheduled completion date

RVNL/S&T/RE-AII/BID dated 06.05.2006

12.07.2006 Supply & Installation of Signalling and Telecommunication equipment in connection with MG to BG Gauge Conversion on Rewari-Ringus-Phulera-Ajmer Section (294.57 km) of North Western Railway.

LOA No.RVNL/ S&T/RE-AII/Gen/ Vol.III dated 06.09.2006

Kiran Infra Engineers Ltd. B-141, Road No.9-D, Vishwakarma Industrial Area, Jaipur-302 013(Joint Venture with M/s Mangla Ispat(Jaipur) Ltd. B-234, Road No.9, V.K.I Area, Jaipur-302 013 & M/s Tirupati Plastomatics Pvt.Ltd, B-141, A-Road No. 9D, Vishkarma, Industrial Area, jaipur-302 013

Rs. 66.00 cr.

Rs.72.30 cr. Rs.72.30 cr. 18 Months from the date of issue of LOA(out of which the work in Rewari-Phulera section shall be completed in first 12 months time).

Page 21: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DETAILS OF CONTRACTS PLACED DURING THE CURRENT YEAR UPTO SEPTEMBER 2006 OF PROJECT DEPTT. CORPORATE OFFICE

S. No.

Tender/ICB No. Date of Opening

Description of Item/Work Contract No. & Date Contractor’s Name

Qty. (for supply

contract) Estimated Cost

(for Engg./Elect./ S&T/Mech.)

Rate (for supply

contract) Contract Cost (for

Engg./Elect. /S&T/Mech.)

Value of Contract

Scheduled Completion

Date

1 RVNL/BBS/Doubling-Third Line/Roadbed/ 2005/02

30-12-05 Contruction of Roadbed (except major bridges), facilities and general electrification in onnection with doubling of railway line between Barang-Rajatgarh (25 Km), Cuttack-Barang (12 Km) and 3rd line between Barang-Khurda Road (35 Km) in the state of Orissa.

RVNL/BBS/012/Tenders/ADB-Roadbed/25/4 dated 08-06-2006

M/s. HCIl-Adhikarya-ARSS (JV), Delhi.

1517213941 1535237906 1535237906 24 Months (From the date

of commencement

of work)

2 RVNL/BBS/Doubling-Third Line/ Major Bridges/2005/ 03

30-12-05 Construction of Major Bridges in connection with doubling of railway line between Barang-Rajatgarh (25 Km), Cuttack-Barang (12 Km) and 3rd line between Barang-Khurda Road (35 Km) in the state of Orissa, India.

RVNL/BBS/Tenders/ADB-Major Bridges/25/5 dated 28-06-2006

M/s. HCIl-Adhikarya-ARSS (JV), Delhi.

1236104235 1310294667 1310294667 24 Months (From the date

of commencement

of work)

3 RVNL/SC/GY-PMT/104 29-12-05 Patch Doubling of Track on Gooty-Pullampet Section of South Central Railway.

RVNL/SC/GY-PMT/104 dated 07-07-2006

M/s. Simplex Concrete Piles (India) Ltd., Mumbai.

1574479651 1707407793 1707407793 30 Months (From the date

of commencement

of work) 4 RVNL/BBS/Doubling-Third

Line/Track/2005/02-04 30-12-05 Suplly and Installation of Track

(excluding supply of rails), Signaling and OHE & associated equipment for 25 KV AC traction in connection with doubling of railway line between Barang-Rajatgarh (25 Km), Cuttack-Barang (12 Km) and 3rd line between Barang-Khurda Road (35 Km) in the state of Orissa.

RVNL/BBS/Tenders/Track/25/6 dated 08-08-2006

M/s. HCIl-Adhikarya-ARSS (JV), Delhi.

1383228297 1308585026 1308585026 24 Months (From the date

of commencement

of work)

5 RVNL/RPR/BYT-URK/01 28-12-05 Construction of Roadbed, Major & Minor Bridges and facilities, supply & instatllation of track (excluding supply of rails, thick web switches and weldable CMS crossing), signaling & Electrical (Rly. Electrification & general services) work in connection with provision of 3rd line in Bhatapara-Urkura section (58.71) in the state of Chhatisgarh, India.

RVNL/RPR/BYT-URK/01 dated 01-09-2006

M/s.Era-Patel-Advance-Kiran (JV), New Delhi.

1170590654 1147803541 1147803541 30 Months (From the date

of commencement

of work)

Page 22: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

6 PMC/RVNL/BBS/ADB/DBL-Third Line/Roadbed-Track/2005/2

27-01-06 PMC for (i) Contruction of Roadbed (except major bridges), facilities and general electrification in connection with doubling of railway line between Barang-Rajatgarh (25 Km), Cuttack-Barang (12 Km) and 3rd line between Barang-Khurda Road (35 Km) in the state of Orissa; and (ii) Suplly and Installation of Track (excluding supply of rails), Signaling and OHE & associated equipment for 25 KV AC traction in connection with doubling of railway line between Barang-Rajatgarh (25 Km), Cuttack-Barang (12 Km) and 3rd line between Barang-Khurda Road (35 Km) in the state of Orissa.

PMC/RVNL/BBS/ADB/DBL-Third Line/Roadbed-Track/2005/2 dated 13-09-2006

M/s. Wilbur Smith Associates Pvt. Ltd., Bangalore.

-- 60966085 60966085 30 Months with defect liability period (From the date of

commencement of work)

7 RVNL/JP/T&Q/PMC/002 22-08-06 Project Management Consultancy Services for Gauge Conversion (MG to BG) of Railway Track in Rewari-Ringus-Phulera-Ajmer (294.57 KM) Section including electrical works, supply and replacement of existing signaling system of N. W. Railway

RVNL/JP/T&Q/PMC/2006/002/Part III dated 13-09-2006

M/s. Sowil Ltd. & Halcrow Consulting Indig Ltd. (JV), Noida.

68000000 57503600 57503600 33 Months with defect

liability period (From the date

of commencement

of work)

8 RVNL/SC/GY-PMT/PMC/106

3/4/2006 PMC for Patch Doubling of Track on Gooty-Pullampet Section of South Central Railway.

RVNL/SC/GY-PMT/ PMC/106 dated 29-09-2006

M/s. Aarvee Associates, Hyderabad.

60000000 57532019 57532019 30 Months excluding

defect liability period (From the date of

commencement of work)

Page 23: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender Number Date of Opening Description of Item/Work Contract No. & date of

award

Contractor's Name

Quantity (for supply contract)Estimated Cost

(for Engg./Elect./S&T/Mech.)

Rate (for supply

contract)Tenderered

Cost (for Engg./Elect./S&T/Mech.)

Value of Contract

Scheduled completion date

2006/RVNL/P/CC/PMC(PB) dt 25.04.2006

23.6.2006 Project Management Consultancy for “Construction of Palwal-Bhuteshwar 3rd Line Doubling(81 Kms) in the state of Haryana and Uttar Pradesh (India) including road bed facilities, bridge works, box pushing, flash butt welding, P. Way, miscellaneous civil works, electrical works including OHE and signaling and interlocking works on North Central Railway”

27.09.2006 M/s Scott Wilson,Kirkpatrick India Pvt Ltd.New Delhi-10044

- Rs.4.29 Cr. Rs.4.29 Cr. 27 Months from Commencement

date.

Details of Contracts Awarded from Sept.-Nov. 2006 from the GM/P-I Unit

Page 24: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl No

Tender Number

Date of Opening

Description of Item /Work Contract No & Date

Contractor's Name

Quantity (for supply contract )

Estimated Cost (for Engg/Elect./S & T

/Mech.)

Rate (for supply contract)Tendered

Cost (for Engg./Elect./S & T

/Mech.)

Value of Contract

Scheduledcomplection

date.

1 ADB/RAIL IMP PROJ/01 12/1/2004

Construction of 2nd BG overriver Mahanadi in connectionto doubling of Talcher-Cuttack-paradeep section inOrissa,India

29.4.2005 M/s BBJ-GAMMON JV Rs 109,45,00,000 Rs 121,29,05,652 36 months

2 CUTTACK-BARANG SECTION

Construction of Substructureand foundation of KuakhaiBR No 557.

08.11.2004 M/s. TRG Industries Pvt. Ltd, /NewDelhi

Rs 31,41,22,088 Rs 29,08,59,908 Rs 29,08,59,908 540 days

3 RAJATHGARH-BARANG SECTION.

Construction of Substructureand foundation Mahanadi BRNO 22 at NARAJ.

25.11.2004 M/s. GAMMON India Pvt. Ltd.,/NewBombay

Rs 30,46,87,025 Rs 24,38,57,411 Rs 24,38,57,411 540 days

4 RAJATHGARH-BARANG SECTION.

Construction of Substructureand foundation of Major BRNo 17,18,19,32,34

10.11.2004 M/s. Hindustan Steel ConstructionLimited, Kolkata

Rs 10,02,99,249 Rs 9,67,94,412 Rs 9,67,94,412 240 days

Details of Contract Awarded by Project Office Bhubaneshwar upto Dec' 2006

Page 25: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

5 RVNL/HDS-PRDP/BHUBANESHWAR/1/2005

6/27/2005 Construction of Br. No.134over Mahanadi 22 x 43.846mand Br. No.115 over Luna 13x 43.846m in connection withconstruction of new BG linebetween Haridaspur &Paradeep of East Coast

RVNL/BBSHDS-PRDP/MAHA-LUNA/SIMPLEX/14/13/2006/02 Dt30/01/2006

M/s Simplex Infrastructures Ltd.,502A, Poonam Chambers, 'A' Wing,5th Floor, Dr. A.B.Road, Worli,Mumbai - 400 018.

Rs 69,67,45,876 Rs 67,51,46,754 Rs 67,51,46,754 30 months

6 RVNL/BBS/TOMKA-KOENJHAR/1 dtd31/08/2005

10/24/2005 Supply and installation ofTrack, Signalling and YardLighting works forconstruction of Keonjhar -Tomka new BG Railway Linein Orissa, India.

RVNL/BBS/TOMKA-KDJR/14/10/2006/01 Dt20/12/2005

M/s HCIL-Kalindee-ARSS JV, F-5,Gautam Nagar, Gulmohar Park Road,New Delhi - 110 049

Rs 66,75,14,539 Rs 72,39,29,164 Rs 72,39,29,164 12 months

7 RFP/PMC/RVNL/BBS/HDS-PRDP/MAHA-LUNA/2005/1 Dtd.16.12.05

1/25/2006 Project managementconsultancy services forconstruction of Br.No.134over Mahanadi 22 x 43.846M& Br. No. 115 over LUNA 13x 43.846 M in connectionwith construction of new BGline between Haridaspur &Paradeep of East CoastRailway.

LOA-RVNL/BBS/TENDER/PMC-1-MAHA-LUNA/25/7/1332 Dt10/05/2006

M/s. SM Consultants,Plot No3489/6705, Near Kaling House , Po-RasulgarhBhubaneshwar

Rs 1,70,00,000 Rs. 1,38,24,000 Rs. 1,38,24,000 30 months

Page 26: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

8 IFB-RVNL/BBS/Doubling-Third Line/2005/02-04 Dtd 16-10-2005

12/30/2005 “Construction of Roadbed(except Major bridges),Facilities and GeneralElectrification for doubling ofRailway line between Barang-Rajatgarh (25 km), Cuttack –Barang (12 km) and 3rd linebetween Barang-Khurda Road(35 km) in the state of Orissa,India”

LOA-RVNL/BBS/TENDER/ADB-Roadbed/25/4 Dt08/06/2006

M/s HCIL-ADHIKARYA-ARSS JV,113-A, Kamla Nagar New Delhi -110 007

Rs 151,72,13,941 Rs 153,52,37,906 Rs 153,52,37,906 24 months

9 IFB-RVNL/BBS/Doubling-Third Line/2005/02-04 Dtd 16-10-2005

12/30/2005 “Construction of MajorBridges in connection withdoubling of railway linebetween Barang-Rajatgarh(25 km), Cuttack – Barang(12 km) and 3rd line betweenBarang-Khurda Road (35km) in the state of Orissa,India”.

LOA-RVNL/BBS/TENDER/ADB-Major Bridges/25/5 Dt 28/06/2006

M/s HCIL-ADHIKARYA-ARSS JV,113-A, Kamla Nagar New Delhi -110 007

Rs 123,61,04,234 Rs 131,02,94,667 Rs 131,02,94,667 24 months

10 RVNL/Bhubaneswar/KEONJHAR-TOMKA/2 Dtd 21/03/2006

4/17/2006 “Flash butt welding of 60 KgRails at site using MobileFlash Butt Welding Plant inConstruction of Keonjhar –Tomka New BG Railway Linein the State of Orissa, India”

LOA-RVNL/BBS/TENDERS/TOMKA-KEONJHAR/1404 Dt29/05/2006

M/s RAIL WELDERS JVCENTURY TOWERS 5th Floor,Shakespere Sarini, Kolkata - 700017

Rs 3,50,00,000 Rs 3,30,60,000 Rs 3,30,60,000 6 months

Page 27: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

11 Bid NoticeNo. PMC/RVNL/BBS/ADB/DBL-Third Line/Major Bridges/2005/3 Dt.15/12/2005,

27/01/2006 Project ManagementConsultancy Services forConstruction of MajorBridges in connection withdoubling of railway linebetween Barang-Rajatgarh(25 km), Cuttack – Barang(12 km) and 3rd line betweenBarang-Khurda Road (35km) in East Coast Railway inthe

LOA-RVNL/BBS/Contract/Expert Resort-SPA(PMC-Major Bridges) 14/25/1517 Dt 23/06/2006

EXPERT RESORTS & LAYOUTSPRIVATE LIMITED , 16/1, BhavaniMansion Road, American Colony,Kumar Park East, Bangalore- 560001

Rs 3,00,00,000 Rs 2,61,88,500 Rs 2,61,88,500 30 months

12 IFB-RVNL/BBS/Doubling-Third Line/2005/02-04 Dtd 16-10-2005

12/30/2005 Supply & Installation ofTrack (excluding supply ofrails), Signaling andOverhead Equipment(OHE) & associatedequipment for 25 KV, ACtraction in connection withdoubling of Railway linebetween Barang Rajatgarh

LOA-RVNL/BBS/TENDER/ADB-Track/25/6 Dt 08/08/2006

M/s HCIL-ADHIKARYA-ARSS JV,113-A, Kamla Nagar New Delhi -110 007

Rs 138,32,28,297 Rs 130,85,85,026 Rs 130,85,85,026 30 months

13 RVNL/Bhubaneswar/KEONJHAR-TOMKA/2 Dtd 21/03/2006

4/17/2006 Depot Supply of Stone ballastin connection withconstruction of Keonjhar-Tomka new BG Railway Linein the state of Orissa, India."

LOA No.RVNL/BBS/Tenders/DKB-Supply ofBallast (Keonjhar-Tomka)/25/13/1774, dated 26/08/2006.

M/s ARSS InfrastructureProjects Limited.

Rs2,50,00,000 Rs2,50,00,000 Rs2,20,20,000 6 months

Page 28: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

14 PMC/RVNL/BBS/ADB/DBL-Third Line/Road Bed/Track/2005/2 dated15/12/2005.

1/25/2006 (a) Project ManagementConsultancy for Constructionof Roadbed (except Majorbridges), Facilities andGeneral Electrification fordoubling of Railway linebetween Barang-Rajatgarh(25 km), Cuttack – Barang(12 km) and 3rd line betweenBarang-Khurda Road (35km) in the state of Orissa,India.(b) Project ManagementConsultancy for Supply andinstallation of track(excluding supply of rails,signaling and overheadequipment (OHE) &associated equipment for 25kV, AC traction, inconnection with doubling ofrailway line between Barang-Rajatgarh (25 km), Cuttack –Barang (12 km) and 3rd line

Notice ofAward No.PMC/RVNL/BBS/ADB/DBL-Third Line Bed -Track/2005/2, dated13/09/2006

M/s Wilbur SmithAssociates Pvt Ltd/Bangalore.

Rs 5,60,00,000 Rs 5,60,00,000 Rs6,09,66,085 30 months

15 FB-RVNL/BBS/Doubling-Third Line/2005/02-04 Dtd 16-10-2005

38716 b) Project ManagementConsultancy for Supply andinstallation of track(excluding supply of rails,signaling and overheadequipment (OHE) &associated equipment for 25kV, AC traction, inconnection with doubling ofrailway line between Barang-Rajatgarh (25 km), Cuttack –Barang (12 km) and 3rd linebetween Barang-Khurda Road(35 km) in the state of Orissa,India

RVNL/BBS/ADB-Track/14/29/9, dated08/08/06

M/s HCIL-ADHIKARYA-ARSS JV,113-A, Kamla Nagar New Delhi -110 007

Rs 138,32,28,297 Rs 130,85,85,026 Rs 130,85,85,026

Page 29: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

16 No.C/CPM/RVNL/BBS/LT/NIT/01, dtd.28/02/2006

3/31/2006 Providing consultancyservices for DetailedEngineering Design of majorbridges in connection withConstruction of new BG linebetween Haridaspur-Paradeep in East CoastRailway

RVNL/BBS/HDS-PRDP/14/ /15, dated

STUP Consultants P Ltd, P-11,DargaRoad,Park Circus,Kolkata-700017

Rs 45,00,000 Rs 39,69,000 Rs 39,69,000 3 months

17 RVNL/BBS/Limited TenderGoomty/4/25/19/18

9/8/2006 Proposal for execution ofstation GOOMTY with otherallied works for station NKW,HCNR,CLDR, SGDP andTGRL of Keonjhar-Tomkanew BG Rail Project of EastCoast Railway.

RVNL/BBS/GOOMTY/TAMKA-KDJR/PKM/14/34/2006/05,dated 12/10/2006

Mr. P K Mohanty,At/Po.-Patalda,Via-Astaranga,Dist.-Puri.

Rs 14,10,753 Rs 14,10,753 45 days

Page 30: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DETAILS OF CONTRACTS AWARDED BY PROJECT DEPTT. CORPORATE OFFICE UPTO DEC 2006 Tender No. Date of

Opening Description of item/work

Contact No/Date of Award

Contractor Name

Estimated Cost

Rate for Supply/Tender Cost

Value of Contract

Scheduled completion date.

RVNL/P/DEE-RE/Contract/2005 dt. 8.8.05

24.8.05 Civil,Track & Electrical work for DEE-RE GC

02.9.05 C/DEE-RE/05

M/s Kalindee Rail Nirman Engg Ltd (JV) with M/s Unity Infra Projects.

47.44 Cr 46.79 Cr 46.79 Cr 2.3.07

PMC/DEE-RE dt 23.11.05 PMC for DEE-RE GC work

2.12.05 M/s Lea Associates South Asia with Wilbur Smith, PNCS

1.82 Cr 1.82 Cr 1.82 Cr 2.3.07 + 12 months during defect liability period.

2005/RVNL/P/CC/ MPBW dt 17.10.05

9.12.05 Mobile flash butt welding of 52 kg rail for different projects under RVNL on Indian Rly

9.1.06 M/s Royal Forging Pvt Ltd, Kolkata

11.03 Cr 10.70 Cr 10.70 Cr 8.5.08

Page 31: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

C/GHH-FN/044/ 2006

3.4.06 GC of GHH-Fn Branch Line, track works in connection with RRI of DEE, DEC, PTNR on N. Rly

21.6.06 M/s SMCC-SCC-PVCC JV, Jaisalmer

12.52 Cr 11.44 Cr 11.44 Cr 8.6.07

RVNL/CMS Xing Procurement/4 of 2006

20.7.06 Manufacture & supply of CMS xings for BG conforming to IRS-T-29-2000 for various Rail road projects in different regions of India.

15.12.06 M/s Bhilai Engg. Corporation Ltd.

8.84 Cr 9.13 Cr 9.13 Cr 14.9.07

RVNL/PIII/STM & PMC

17.10.06 Supply of small track machine for p.way work at different locations on Indian Railways.

28.11.06 28.11.06 6.12.06

M/s Kalindee Enterprises. New Delhi. M/s Laxmi Indl.Corp. Meerut. M/s Parikh

- 24.47 Lacs 1.47 lacs 9.30 lacs

24.47 lacs 1.47 lacs 9.30 lacs

27.2.07 27.2.07 5.3.07

Page 32: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Industries, Mumbai.

RVNL/Rail Proc/2/2006

20.4.06 Manufacture and supply of 7775 MT of 52 kg IRS rails (880) for different RVNL projects on Indian Railways.

1.12.06 M/s Steel Authority of India Ltd

- 30.36 Cr 30.36 Cr 30.11.07

RVNL/P-II/PSC Palwal Bhuteshwar

9.11.06 Manufacture & supply of 15000 Nos PSC sleepers for Palwal Bhuteshwar Project of RVNL.

27.11.06 M/s Hindustan Prefab Ltd., New Delhi.

1.29 Cr 1.29 Cr 1.29 Cr 26.5.07

Page 33: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DETAILS OF CONTRACTS BY PROJECTS OFFICE SECUNDERABAD PLACED DURING THE MONTH: JAN’ 2007

Tender Date of Description of item/work

Contract No. & date

Contractor’s Name

Quantity (for supply contract) estimated cost (for Engg. Elec. S&T/ Mech)

Rate (for supply contract Tendered cost (for Engg/ Elec/S&T/ Mech)

Value of Scheduled Comple-tion Number Opening Contract Date

RVNL/SC/GY-PMT/104 dated 18/10/05

29-12-2005

Earth work in formation, constn. Of bridges, service & residential bldgs., installation of track, remodelling of stn. yds. Elec. Wrks and other Misc. works along with testing and commissioning incl. supply of all materials except rails in connection with patch doubling of Gooty-Pullampet sec. of South Central Railway. (150.74 km.)

RVNL/SC/GY-PMT104 dated 12-10-06.

M/s. Sim-plex Infra-structures Limited, Mumbai

150.74 Route Kilometres

Engg. & Genl. Elec. Works Rs.157.33 Cr.

Rs.170.73 Cr.

06-04-2009

RVNL/2006/Elect/PMT-NRE/001 dated 13-03-06.

23-05-2006

Supply, Erection, Testing and commissioning of 25 Kv, 50 Hz, single phase, traction over head equipment switching station and other associated works in connection with patch doubling of Pullampet (Excl.), Nandalur (incl.) sec. of South Central Railway (29 Tkm)

RVNL/2006/Elect/PMT-NRE/001 dated 15-11-2006

M/s. Tata Projects Limited, Suryodaya Complex, Hyderabad.

Route Km. 21

Rs.5.99 Crores

Rs.8.40 Crores

17-09-2007.

Page 34: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DETAILS OF CONTRACTS AWARDED BY PROJECT OFFICE JAIPUR UPTO DECEMBER 2006

S. No.

Name of work and location

Est. cost of project

Tendered

Cost

% Above/ below SOR

Agreement No. Agency Date of start Time of Comp

Physical

Progress

Name of E in C with

Address (A) 189.43 Crs.

157.71* Crs (9.2%

below NIT Cost)

AL No. RVNL/Projects/RE-AJ/Contracts-

2005/02 Dated 17/11/2005

M/s IRCON Int. Limited, New Delhi

02/12/2005 21 Months

12% M/S Sowil-

Halcrow JV

Rewari-Ringus-Phulera-Ajmer Gauge

Conversion project (294.56

Km)

Rs.716.65 Crs. (B)

68.88 Crs.

63.75 Crs (7.4%

below NIT Cost)

AL No. RVNL/Projects/RE-AJ/Contracts-

2005/02 Date 11/11/2005

M/s RANI Construction Pvt. Ltd. in JV with M/s ERA Construction (India) Ltd.

26/11/2005 18 months

5% M/S Sowil-

Halcrow JV

(C) 10.33 Crs. As per

accepted rates of RB

contract

AL No. RVNL/Projects/RE-AJ/Contracts-

2005/03 (sleeper) Date 09/11/2005

M/S Donypolo Udhog limited,

Shamgarh

16.11.2006 12 months

64 % M/S Sowil-

Halcrow JV

10.65 Crs. As per

accepted rates of RB

contract

AL No. RVNL/Projects/RE-AJ/Contracts-

2005/03 (sleeper) Date 09/11/2005

Rural Engineering Co. Pvt. Ltd.

16.11.2006 12 months

66 % M/S Sowil-

Halcrow JV

1

10.74 Crs. As per

accepted rates of RB

contract

AL No. RVNL/Projects/RE-AJ/Contracts-

2005/03 (sleeper) Date 09/11/2005

Daya Engineering Works (SL) Ltd.

16.11.2006 12 months

65 % M/S Sowil-

Halcrow JV

Page 35: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

10.65 Crs. As per

accepted rates of RB

contract

AL No. RVNL/Projects/RE-AJ/Contracts-

2005/03 (sleeper) Date 09/11/2005

Arvind Construction Co.

Pvt. Ltd.

16.11.2006 12 months

70 % M/S Sowil-

Halcrow JV

6.80 Crs

5.75 Crs (15.44 %

below estimated

cost)

AL No. RVNL/JP/T &

Q/PMC/2006/002/Part III

Date 13/09/2006

Sowil Limited & Halcrow

Consulting India Ltd (JV)

26.09.2006 33 months

6 % Appointed as

Engineer (PMC)

(A) 52.58 Crs.

48.05 Crs (9.12 % below

estimated cost)

Agreement No.RVNL/PIII/B

LDI-SMR/GC/CA-3

of 2006

M/S ERA Construction

(India) Limited

01.08.06 18 months

1% NW Railway

(B) 43.13 Crs.

39.42 Crs (9.21 % below

estimated cost)

Agreement No.RVNL/PIII/B

LDI-SMR/GC/CA-2 of 2006 dated

30.06.06

M/S ERA Construction

(India) Limited

27.05.06 18 months

Nil NW Railway

2 SMR-BLDI Gauge

Conversion project

(223 Km)

244.27 Crs.

(C) 29.98 Crs.

29.99 Crs (At Par of estimated

cost)

Agreement No.RVNL/PIII/B

LDI-SMR/GC/CA-1 of 2006 dated

30.06.06

M/S ERA Construction

(India) Limited

27.05.06 15 months

Nil NW Railway

Page 36: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DETAILS OF CONTRACTS CONCLUDED BY PROJECT DEPTT., CORPORATE OFFICE DURING DEC' 20061 2 3 4 5 6 7 8 9

Tender Number Date of Opening

Description of Item/work Contract No.& date Contractors Name Quantity (for supply contract) Estimated Cost ( for Engg., Elect,S&T

Quantity (for supply contract) Tendered Cost ( for Engg., Elect,S&T

Value of Contract

Scheduled completion date

RVNL/NDLS/ALJ-GZB/2005/01 DT. 14.10.05

23.12.05 Construction of Roadbed, Bridges, Facilities, Installation of Track (excluding Supply of Rails, Thick Web Switches & Weldable CMS Crossings) & Electrical (Railway Electrification & General Electrification) in connection with Provision of 3rd Line on Aligarh-Ghaziabad Section (106 Kms) in the State of Uttar Pradesh (India)

2005/RVNL/P/I/ALJN-GZB/02 DT.08.06.06

M/s . IRCON GANNON DUNKERLY LTD.JV, New Delhi

188.03 Cr. 223.94 Cr. 223.45 Cr. 13.07.08

PMC/RVNL/NDLS/ALJ-GZB/2005/02 dt. 16.11.05

28.12.05 PMC of Construction of Roadbed, Bridges, Facilities, Installation of Track (excluding Supply of Rails, Thick Web Switches & Weldable CMS Crossings) & Electrical (Railway Electrification & General Electrification) in connection with Provision of 3rd Line on Aligarh-Ghaziabad Section (106 Kms) in the State of Uttar Pradesh (India)

C/PMC/ALJN-GZB/2005/06 dt. 10.07.06

M/s Lea Associates South Asia Pvt. Ltd,

4.46 Cr. 4.97 Cr. 4.90 Cr. 06.03.09

Page 37: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

2005/RVNL/P/CC/Civil Works

27.12.05 All Civil Engineering and connected General Electrical Works for Construction of Road bed facilities, Buildings, Box-pushing in existing 2 ROBs including Misc. works for Palwal-Bhuteshwar 3rd Line (81 Kms) on North Central Railway

2005/RVNL/P/CC/Civil Engg.dated 08.05.2006

M/s Era Construction India Ltd.

62.05 Cr. 62.05 Cr. 62.05 Cr. 07.11.07

2005/RVNL/P/CC/PMC(PB) dated 11.09.06

23.06.06 PMC of Construction of Palwal-Bhuteshwar 3rd Line Doubling (81 kms) in the State of Haryana and Uttar Pradesh (India) including Road bed facilities, Bridge works, Box Pushing, Flash Butt Welding, P.Way, Miscellaneous Civil works, Electrical works including OHE and Signalling and Interlocking Works on North Central Railway.

2005/RVNL/P/CC/PMC(PB)dated 27.09.06

M/s SCOTT WILSON Kirkpatric India Pvt.Ltd.

4.32 Cr. 4.28 Cr. 4.28 Cr. 26.12.08

Page 38: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl No

Tender Number

Date of Opening

Description of Item / Work Contract No & Date

Contractor's Name

Quantity (for supply contract )

Estimated Cost (for Engg/Elect./S & T

/Mech.)

Rate (for supply contract)Tendered

Cost (for Engg./Elect./S & T

/Mech.)

Value of Contract

Scheduledcomplection

date.

1 RFP/PMC/ Sub-projects Dt 05/03/2004

26/06/2004 Project Management Consultancy forSubprojects:i) Supply and Installation of Trackand Signalling: Keonjhar-Tomka Section(96.355km) of Banspani-Daitari New RailwayLine. ii) Construction of 2nd bridge across riverMahanadi (32 x 65.4m) on Cuttack-NergundiSection of East Coast Main Line.

RVNL/ Projects/ K-T&M-B /PMC/Package-1

M/s SOWiL-Halcrow JV - - 8,32,39,618/- 48 months

2

ADB/RAIL IMP PROJ/01

01/12/2004 Construction of 2nd BG over river Mahanadi inconnection to doubling of Talcher-Cuttack-paradeep section in Orissa,India

Contract No.ADB/RAIL IMPPROJ/01 Dt.29.4.2005

M/s BBJ-GAMMON JV Rs 109,45,00,000/- Rs 121,29,05,652/- Rs 121,29,05,652/- 36 months

3 RVNL/HDS-PRDP/BHUBANESHWAR/1/2005

27/06/2005 Construction of Br. No.134 over Mahanadi 22 x43.846m and Br. No.115 over Luna 13 x43.846m in connection with construction ofnew BG line between Haridaspur & Paradeep of East Coast

RVNL/BBSHDS-PRDP/MAHA-LUNA/SIMPLEX/14/13/2006/02 Dt30/01/2006

M/s Simplex Infrastructures Ltd.,502A, Poonam Chambers, 'A' Wing,5th Floor, Dr. A.B.Road, Worli,Mumbai - 400 018.

Rs 69,67,45,876/- Rs 67,51,46,754/- Rs 67,51,46,754/- 30 months

4

RFP/PMC/RVNL/BBS/HDS-PRDP/MAHA-LUNA/2005/1 Dtd.16.12.05

25/01/2006 Project management consultancy services forconstruction of Br.No.134 over Mahanadi 22 x43.846M & Br. No. 115 over LUNA 13 x43.846 M in connection with construction ofnew BG line between Haridaspur & Paradeep of East Coast Railway.

LOA-RVNL/BBS/TENDER/PMC-1-MAHA-LUNA/25/7/1332 Dt10/05/2006

M/s. SM Consultants,Plot No3489/6705, Near Kaling House , Po-RasulgarhBhubaneshwar

Rs 1,70,00,000/- Rs. 1,38,24,000/- Rs. 1,38,24,000/- 30 months

5 No.C/CPM/RVNL/BBS/LT/NIT/01, dtd.28/02/2006

31/03/2006 Providing consultancy services for DetailedEngineering Design of major bridges inconnection with Construction of new BG linebetween Haridaspur-Paradeep in East CoastRailway

RVNL/BBS/HDS-PRDP/14/ /15,dated

STUP Consultants P Ltd, P-11,DargaRoad,Park Circus,Kolkata-700017

Rs 45,00,000/- Rs 39,69,000/- Rs 39,69,000/- 3 months

Report for the period upto Mar 2007:

Details of Contract Awarded by AGM/Bhubaneshwar

Page 39: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DELHI PROJECT OFFICE (ELECTRICAL DEPARTMENT) Details of Contract awarded upto 30.04.2007

S No. Date of Opening

Description of item/work letter of Acceptance No. and date

Contractor's Name Qty. (for supply contract)tendered cost (for Elect/S &T/Mech)

Rate. (for supply contract)tendered cost (for

Value of Contract scheduled Completion/completion

1 23.5.2006

Supply, erection, Testing and commissioning of25 KV, 50 Hertz, Single phase OHE, SWS andother associated works in connection with patchdoubling of PMT-NRE section of SCR.

2006/Elect/PMT-NRE/001 Dated-18.9.2006

M/s Tata Projects Ltd. Hyderabad.

5.99 crore

8.40 crore 12 months from the dare of award

2 14.9.2006

Supply, installation, Testing and commissioningof Split/ multi split type of High wall mounted/cassette type of ceiling mounted airconditioners along with asociated electricaldistribution (LT panel and power wiring ) andother works for the new corporate officepremises of RVNL at 1st floor of August KrantiBhawan ( Hudco Building ), Bhikaji CamaPalace, New Delhi.

2006/Elect/NCO/AC/64 Dated-18.09.2006

M/s L G Electronics , India Pvt. Ltd.

69.31 lakhs

56.54 lakhs9 including AMC for 4 yrs after expiry of warranty period)

Phase-I-30 days Phase-II 90 days

3 09.02.2007

Detailed Design Engineering in connection with RE of Nandalur-Guntakal in South Central Railway

RVNL/SC/NRE-GTL/DDE, dated-24.04.2007

M/s Consulting Engineering Services (India)Pvt. Ltd.in JV with M/s Ntrust Technological Services Pvt. Ltd. , 41-A, Maker Tower , 'E'Cuffe Parade, Mumbai- 400005

1.3 crore

Rs. 81,02,200/-(Rupees Eighty one lakh, Two thousand two hundred only)

Six Month

Page 40: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

LIST OF CONTRACTS AWARDED BY CPM/JAIPUR UPTO JAN 2008 S. No. File No. Description of work Contract No.

& date Contractor’s

Name Estimated

Cost Tendered cost Value of

Contract Scheduled

Completion date

1.

RVNL/P-III/Bhildi-Samdari GC-1 dt. 28/11/05

All permanent way works including supply of ballast,p way material except rails and PSC sleepers from KM 121.41 to 223.44 between M. Bhinmal & Bhildi stations in c/w gauge conversion of existing MG railway line to BG line of BLDI-SMR section on NW Rly.

RVNL/PIII/B LDI-SMR/CA-2 OF 2006 DT. 30/6/06

M/S ERA Constructions (India) Limited

244.27crs.

39.42 crs. 39,422 crs. 18 months

2.

RVNL/PIII/Bhildi-Samdari GC-1 Dated 5/1/06

All permanent way works including supply of ballast, p way material except rails & Psc sleepers from KM 0.00 to 121.41 between Sandari & Bhinmal in c/w gauge conversion of existing MG Rly. Line to BG line of BLDI-SMR section on NW Rly.

RVNL/PIII/Bh ildi-Samdari GC/CA-3 of 2006 dt. 24.8.2006

M/S ERA Constructions

52.58 crs. 48.0548 18 months

3.

RVNL/PIII/ Bhildi-Samdari GC/1 dated 28.11.2005

All civil works for bridges & earthwork from Km 121.41 to 223.44 and buildings, FOBs, platforms, L-Xings & connected electrical works from Km 0.00 to 223.44 in c/w gauge conversion of existing MG railway line to BG line of Bhildi/Samdari section on NW Rly.

RVNL/PIII/B LDI-SMR/GC/CA-1 OF 2006 DT,. 30.6.2006

M/S ERA Constructions

29.99 crs. 29.9927 crs. 18 months

4.

RVNL/JP/T & Q Br. 3&54 Jacketing/2007/005 dt. 5/4/2007

Strengthening and modification of existing sub structure by way of jacketing, dowelling, raising of bed blocks, provision of additional piers, approach earth work, protection works on Br. No. 3 & 54 in c/w SMR-BLDI GC project

RVNL/JP/T &Q/Br.3&54 Jacketing/2007/005 dt. 6/8/2007

M/S Rachna Construction Coy.

8.40 crs. 8.50689 crs. 8.76406 crs. 09 months

5.

RVNL/JP/T&Q/Plate sGirder/2007/004 dt 5/4/2007

Fabrication, transportation and erection of welded plate girders of spans up to 818.3 m for various bridges including dismantling of existing MG girders in c/w gauge conversion of SMR—BLDI section on NW Railway.

RVNL/JP/T&Q/Plate Girder/2007/004 dt. 15/8/2007

M/S GPT-RAHEE (JV)

15.50crs. 14.072 crs. 13,6724 Crs. 8 months

6.

PMC

Project Management Consultancy for the track works, Civil Works, Ballast Supply, Signalling and Telecom, and Electrical works in connection with gauge conversion of Samdari-Bhildi Section (223 Km) over North Western Railway

RVNL/JP/T&Q/PMC/2007/008 dt. 1/12/2007

M/S Halcrow Consultant (I) Pvt. Ltd.

2,84,06,000 2.20cr 2,84,06,000 30 months

7.

SMR-Bagra

Misc.civil works including construction/modification of station buildings, S & T structures, platforms, level crossings Duty Huts, resting facilities for TMC staff and other connected works from SMR to Marwar Bagra (Including) on SMR-BLDI section

RVNL/JP/T&Q/Misc/2007/010 dt. 6/12/2007

M/S Kera Ram s/o Pusha Ram

4,81,20,717.30 4.50cr 4,81,20,717.30

12 Months

8.

Raniwara-BLDI

Misc. civil works including construction/modification of station buildings, S & T structures, platforms, level crossings Duty Huts, resting facilities for TMC staff and other connected works Rainwara (Excluding) to Bhildi on SMR-BLDI section.

RVNL/JP/T&Q/Misc/2007/012

M/s Bhinmal Contractors

4,23,45,804 4.03cr 4,23,45,804 12 Months

Page 41: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Detail of Contract awarded by Project Planning & Development Department, Corporate Office upto January 2008

S. No.

Tender No. Date of opening

Description of work/study

Contract No. & date

Contractor’s Name

Estimated cost of work

Tendered cost

Value of contract

Scheduled completion date

1 PP&D/HPT-VSG/2006

26.05.06 Traffic & Market study and Financial evaluation of doubling Hospet – Vasco section.

PP&D/HPT-VSG/2006 19.06.2006

M/s Feedback Ventures Pvt. Ltd. 

_ R

s. 7

,30,

000/

-

_

One Month from the date of award of Contract 18.07.2006

2 PP&D/BSPX-JKPR/RE/2006

16.10.06 Bankability study for Banspani – Jakhapura RE project. 

PP&D/BSPX-JKPR/RE/2006 09.11.2006

Infrastructure Development Corporation (Karnataka) Ltd. 

_ R

s. 4

,96,

157/

-   _ 

One Month from the date of award of Contract 08.12.2006

3 PP&D/DIGHI / Bankability Study/2006

06.11.06 Bankability study for New Line Indapur – Dighi Port (Agar Danda). 

PP&D / DIGHI / Bankability Study/200601.12.2006

M/s Ernst & Young Pvt. Ltd. 

_

R

s. 4

,40,

000/

-

  _ 

One Month from the date of award of Contract 31.12.2006

4 PP&D/BSPX – DTR/2007

09.03.07 Traffic & Market study and Financial evaluation of doubling of Banspani – Tomka – Jakhapura  section 

PP&D / BSPX – DTR/2007 10.04.2007

M/s Feedback Ventures Pvt. Ltd. 

_ R

s. 6

,94,

000/

-

   _ 

Two Months from the date of award of Contract 09.06.2007

Page 42: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

5 2007/PP&D/ DRFC/Pt-A / NSC/DLI -Chennai

02.04.07 Project Consultancy Services for Dedicated Freight Corridor, North – South  Corridor ( Delhi – Chennai) 

2007 / PP&D / DRFC / Pt.- A / NSC / DLI – Chennai 15.06.2007

M/s Wilbur Smith Pvt. Ltd. 

_

R

s. 4

9,43

,840

/-

   _ 

20 weeks from the date of award of Contract 01.11.2007

6 2007/PP&D/ DRFC Pt–B/EWC /KNM

02.04.07 Project Consultancy Services for Dedicated Freight Corridor, East – West Corridor (Kolkata –Nagpur – Mumbai) 

2007 / PP&D / DRFC / Pt.–B / EWC / KNM 03.07.2007

M/s Wilbur Smith Pvt. Ltd. 

_ R

s. 4

9,43

,840

/-    _ 

20 weeks from the date of award of Contract 19.11.2007

7 2007/PP&D/ DRFC/Pt-C/EC/ Kharagpur - Vijayawada

17.09.07 Project Consultancy Services for Dedicated Freight Corridor, East – Coast Corridor (Kharagpur – Vijayawada) 

2007 / PP&D / DRFC / Pt.-C / EC / Kharagpur – Vijayawada 29.10.2007

M/s Deloitte Touche Tohmatsu India pvt. Ltd. 

_ R

s. 4

1,56

,000

/-

_

20 weeks from the date of award of Contract 16.03.2008

8 2007/PP&D/ DRFC/Pt-D/SC/ Chennai - Goa

17.09.07 Project Consultancy Services for Dedicated Freight Corridor, Southern Corridor (Chennai – Goa) 

2007 / PP&D / DRFC / Pt.-D / SC / Chennai –Goa 02.11.2007

M/s Deloitte Touche Tohmatsu India pvt. Ltd. 

_

R

s. 4

1,56

,000

/-

_

20 weeks from the date of award of Contract 20.03.2008

 

Page 43: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contract awarded upto January 2008 by Electrical Department, Corporate Office, RVNL SN Tender

No. Date of

Opening Description of item/work Contract

No. and date

Contractor’s Name

Qty. (for supply

contract) Estimated Cost (for

Elect./S&T/Mech.

Rate (for supply

contract) Tendered Cost (for

Engg./ Elect./ S&T/ Mech.

Value of Con-tract

Scheduled Completion

Date

1 2006/ Elect/ PMT-NRE/ 001

23.05.06 Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Overhead Equipment, Switching Station and other associated works in connection with patch doubling of Pullampet (Excl) – Nandalur (Incl) section of Guntakal Division of S.C. Railway

2006/Elect/ PMT-NRE/ 001 Dated 18.09.2006

M/s Tata Projects Lmited “Suryodaya” 1-10-60/3, Begumpet Hyderabad – 500 016

Rs.5.99 crore - Rs.8.40 crore

12 months from the date of award

2 2006/ Elect/ NCO/ AC/ 64

14.09.06 Supply, Installation, Testing and Commissioning of Split/Multi-split type of High-wall mounted/Cassette type of Ceiling mounted Air Conditioners along with associated electrical distribution (LT panel and power wiring) and other works for the New Corporate Office Premises of Rail Vikas Nigam Limited at 1st Floor of August Kranti Bhawan, (HUDCO Building), Bhikaji Cama Place, New Delhi.

2006/Elect/ NCO/AC/ 64 Dated 18.09.06

M/s LG Electronics India Pvt. Ltd.

- - Rs.56.54 lakh (including AMC for 4 yrs after expiry of warranty period)

Phase-I: 30 days Phase-II: 90 days

3 RVNL/SC/ NRE-GTL/ DDE

09.02.2007 Detailed Design Engineering in connection with RE of Nandalur-Guntakal in South Central Railway.

RVNL/SC/ NRE-GTL/ DDE Dated 24.04.2007

M/s Consulting Engineering Services (India) Pvt. Ltd., in JV with M/s Ntrust Technological Services Pvt. Ltd., Cuffe Parade, Mumbai-05

Rs.1.3 crore - Rs.81.02 lakh

Six months

Page 44: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl No.

Tender Number

Date of Opening Description of Item /Work Contract

No. & Date Contractor's

Name

Quantity (for supply contract )

Estimated Cost (for Engg/Elect./S & T

/Mech.)

Rate (for supply contract)Tendered

Cost (for Engg./Elect./S & T

/Mech.)

Value of Contract

Scheduledcomplection date.

1 IRCON/CC/TN/RVNL/04/06

31/08/2004 Construction of Sub-Structure consisting of WellFoundations, Piers, Abutments and OtherAncillary Works of 2nd Railway Bridge No. 557at Km 414/544 over River Kuakhai with span of20 × 45.72 metres for RVNL's Railway doublingproject in Cuttack-Barang section of East CoastRailway.

IRCON/2032RVNL.CBRP/TRG. Kuakhai/33,dated 09/12/2004

Main Contractor : M/sIRCON International Ltd.Sub Contractor : M/s TRGIndustries Pvt. Ltd, E - 461,Greater Kailash - II, NewDelhi

Rs 29,08,59,088 Contracted Rs26,70,09,000Final Rs21,35,70,000

Contracted Rs26,70,09,000Final Rs21,35,70,000

(540 daysFrom the date of commencementof work)Original Date of Complection01/05/2006.Actual Complection Date30/04/2006

2 IRCON/CC/TN/RVNL/04/07.

31/08/2004 Construction of Sub-Structures consitsting ofWell/Open Foundations, Piers, Abutments andother Ancillary works of 2nd Railway Bridge No.22 at Km. 437/2-438/4 over river Mahanadi withspan of 1 × 30.50 + 6 × 89.30 + 5 × 76.20 metresfor RVNL's Railway Doubling Projects inRajatgarh - Barang Section of East Coast Railway.

IRCON/2031/CIVIL/RVNL/RBRP/Mahanadi/Gammon/34, dated 05/01/2005

Main Contractor : M/sIRCON International Ltd.Sub Contractor : M/sGAMMON India Ltd./NewBombay

Rs 24,38,57,411 Rs 26,72,67,722 Rs 26,72,67,722 (540 days From the date of commencementof work) Original Complection Date24/05/2006Extended upto 31/10/2007, workis still in progress.

3 IRCON/CC/TN/RVNL/04/11.

06/09/2004 Construction of Sub-Structures consitsting ofPile/Open Foundations, Piers, Abutments andother Ancillary works of 2nd Railway Bridge No.17(3 × 30.5mPSC), 18 ( 1 × 30.5m PSC), 19 ( 1 ×30.5mPSC), 32 ( 2 × 12.2mPSC + 1 × 63mG) and34 ( 3 ×7.35 ×3.7m RCC Box at Km 432/36-40,434/12-14434/26-28, 442/16-20 and 443/8-10 forRVNL's Railway Doubling Project in Rajatgarh-Barang Section of East Coast Railway.

IRCON/2031/RVNL.RBRP/Major Bridges.HSCL/33, dated16/01/2005.

Main Contractor : M/sIRCON International LtdSub Contractor : M/s. Hindustan Steel ConstructionLimited, Kolkata

Rs 96,794,412 Contracted Rs8,79,66,762Revised Rs 5, 94, 97, 000

Contracted Rs8,79,66,762Revised Rs 5, 94, 97, 000

(240 days From the date of commencementof work) Original Complection Date08/07/2005Actual Complection Date15/06/2006.

Details of contracts/award of tenders by RVNL Bhubaneshwar upto January 2008

1 of 5

Page 45: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl No.

Tender Number

Date of Opening Description of Item /Work Contract

No. & Date Contractor's

Name

Quantity (for supply contract )

Estimated Cost (for Engg/Elect./S & T

/Mech.)

Rate (for supply contract)Tendered

Cost (for Engg./Elect./S & T

/Mech.)

Value of Contract

Scheduledcomplection date.

4 RVNL/BBS/TOMKA-KOENJHAR/1 dtd 31/08/2005

24/10/2005 Supply and installation of Track, Signalling andYard Lighting works for construction of Keonjhar -Tomka new BG Railway Line in Orissa, India.

RVNL/BBS/TOMKA-KDJR/14/10/2006/01 Dt20/12/2005

M/s HCIL-Kalindee-ARSSJV, F-5, Gautam Nagar,Gulmohar Park Road, NewDelhi - 110 049

Rs 66,75,14,539 Rs 72,39,29,164 Rs 72,39,29,164 (12 months from the date ofcommencement ) Original Complection Date30/04/2007.Extension applied for 31/12/2007.Work in progress.

5 RVNL/Bhubaneswar/KEONJHAR-TOMKA/2 Dtd21/03/2006

17/04/2006 “Flash butt welding of 60 Kg Rails at site usingMobile Flash Butt Welding Plant in Constructionof Keonjhar – Tomka New BG Railway Line inthe State of Orissa, India”

RVNL/BBS/FBW/KT/FBW.JV/14/22/2006, dated 14/07/2007

M/s RAIL WELDERS JVCENTURY TOWERS 5thFloor, Shakespere Sarini,Kolkata - 700017

Rs 3,50,00,000 Rs 3,30,60,000 Rs 3,30,60,000 (6 months form the date ofcommencement of work)Original Complection Date28/11/2006.Extended and ActualComplection Date 15/03/2007.

6 RVNL/Bhubaneswar/KEONJHAR-TOMKA/2 Dtd21/03/2006

17/04/2006 Depot Supply of Stone ballast in connection withconstruction of Keonjhar-Tomka new BG RailwayLine in the state of Orissa, India."

RVNL/BBS/DEPOT-BALLAST/KT/ARSS/14/30/2006/04, dated02/09/2006

M/s ARSS InfrastructureProjects Limited.Sector - A, Zone - D,38, Mancheswar IndustrialEstate,Bhubaneswar - 10.

Rs2,50,00,000 Rs2,50,00,000 Rs2,20,20,000 ( 6 months form the date ofcommencement of work)Original and Actual ComplectionDate 25/02/2007.

7 RVNL/BBS/Limited TenderGoomty/4/25/19/18

08/09/2006 Proposal for execution of station GOOMTY withother allied works for station NKW,HCNR,CLDR, SGDP and TGRL of Keonjhar-Tomka new BG Rail Project of East CoastRailway.

RVNL/BBS/GOOMTY/TAMKA-KDJR/PKM/14/34/2006/05,dated 12/10/2006

Mr. P K Mohanty,At/Po.-Patalda,Via-Astaranga,Dist.-Puri.

Rs 14,10,753 Rs 14,10,753 (45 days form the date ofcommencement of work)Original and Actual Date26/11/2006.

8 RVNL/BBS/Keonjhar-Tomka/Ballast/SLT/LT /04/06

17/10/2006 Supply & leading of stone ballast by any suitablemeans in connection with construction of Keonjhar-Tomka new BG Railway line in the state ofOrissa.

RVNL/BBS/POB BALLAST/KT/ARSS/14/38/2007, dated06/01/2007

M/s ARSS InfrastructureProjects Limited.Sector - A, Zone - D,38, Mancheswar IndustrialEstate,Bhubaneswar - 10.

Rs 1,57,00,000 Rs 1,01,06,800 Rs 1,01,06,800 (2 months form the date ofcommencement of work withextension)Original Date of Complection17/02/2007.Actual Complection Date31/03/2007.

2 of 5

Page 46: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl No.

Tender Number

Date of Opening Description of Item /Work Contract

No. & Date Contractor's

Name

Quantity (for supply contract )

Estimated Cost (for Engg/Elect./S & T

/Mech.)

Rate (for supply contract)Tendered

Cost (for Engg./Elect./S & T

/Mech.)

Value of Contract

Scheduledcomplection date.

9 RVNL/Bhubaneswar/KOENJHAR-TOMKA / Turn outsleeper/ST/ 01/06,dated 01/12/2006.

12/11/2006 Manufacture and supply of 12 sets of 1 in 8 ½PSC turnout sleepers for Keonjhar – Tomka NewLine Project

LOA No.RVNL/BBS/Tenders/Turnout Sleeper Procurement/ 25/27/2842. 15/01/2007

M/s Calcutta Spring Limited,18, R. N. Mukherjee Road,Kolkata - 700 001.

Rs.23,82,900 Rs.23,82,900 (1 months form the date ofcommencement of work )Original and Actual ComplectioDate 14/02/2007.

10 RVNL/Bhubaneswar/Keonjhar-Tomka/Miscellaneous /LT/05/06, dated31/10/2006

15/11/2006 Execution of miscellaneous works between km58.0 to 155km. With other allied works ofKeonjhar-Tomka new BG Rail Project of EastCoast Railway.

RVNL/BBS/TAMKA-KDJR/14/41/2006, dated06/03/2007

M/s Ramakanta Jena,Railway & State Govt.Contractor, Plot No. : GA -228, " Bipin Niwas",

Rs 52,22,798 Rs 52,22,798 ( 3 months form the date ofcommencement of work withextension)Original Complection Date17/04/2007.Actual Complection Date31/07/2007.

11 RVNL/Bhubaneswar/KEONJHAR-TOMKA/ballast/OT/01/07, dated28.5.2007.

25/06/2007 Supply, leading and loading of machine crushedhard Stone ballast to any type of Rly. Wagon atBGPL. Station yard (Depot) in connection withConstruction of Keonjhar – Tomka new BGRailway Line in the State of Orissa, India.

LOA RVNL/BBS/Tender/Supply &Leading ofStone Ballast toBOYB (KT)/25/30/3867

M/s Sri Durga Condev (P)Ltd,At. Kairapari, P.O. Kotsahi(Tangi), District : Cuttack, Orissa , Pin - 754 022

Rs 266,63,000 Rs 266,63,000 ( 2 months from the date ofcomencement of work ) Original Complection Date8/9/2007.Extention Complection Date31/12/2007.

12 IFB-RVNL/BBS/Doubling-Third Line/2005/02-04 Dtd 16-10-2005

30/12/2005 “Construction of Roadbed (except Major bridges),Facilities and General Electrification for doublingof Railway line between Barang-Rajatgarh (25km), Cuttack – Barang (12 km) and 3rd linebetween Barang-Khurda Road (35 km) in thestate of Orissa, India”.

RVNL/BBS/ADB-Roadbed/14/24/2006, dated04/09/2006

M/s HCIL-ADHIKARYA-ARSS JV, 113-A, KamlaNagar New Delhi - 110 007

Rs 151,72,13,941 Rs 153,52,37,906 Rs 153,52,37,906 (24 months Form the date ofcommencement of work)Complection Date 06/09/2008.

3 of 5

Page 47: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl No.

Tender Number

Date of Opening Description of Item /Work Contract

No. & Date Contractor's

Name

Quantity (for supply contract )

Estimated Cost (for Engg/Elect./S & T

/Mech.)

Rate (for supply contract)Tendered

Cost (for Engg./Elect./S & T

/Mech.)

Value of Contract

Scheduledcomplection date.

13 IFB-RVNL/BBS/Doubling-Third Line/2005/02-04 Dtd 16-10-2005

30/12/2005 “Construction of Major Bridges in connection withdoubling of railway line between Barang-Rajatgarh (25 km), Cuttack – Barang (12 km) and3rd line between Barang-Khurda Road (35 km)in the state of Orissa, India”.

RVNL/BBS/ADB/Major Bridges/14/28/2006, dated04/09/2006

M/s HCIL-ADHIKARYA-ARSS JV, 113-A, KamlaNagar New Delhi - 110 007

Rs 123,61,04,234 Rs 131,02,94,667 Rs 131,02,94,667 (24 months Form the date ofcommencement of work)Complection Date 06/09/2008.

14 IFB-RVNL/BBS/Doubling-Third Line/2005/02-04 Dtd 16-10-2005

30/12/2005 Supply and installation of track (excluding supplyof rails, signaling and overhead equipment (OHE)& associated equipment for 25 kV, AC traction, inconnection with doubling of railway line betweenBarang-Rajatgarh (25 km), Cuttack – Barang (12km) and 3rd line between Barang-Khurda Road(35 km) in the state of Orissa, India".

RVNL/BBS/ADB/TRACK/14/29, dated09/10/2006

M/s HCIL-ADHIKARYA-ARSS JV, 113-A, KamlaNagar New Delhi - 110 007

Rs 138,32,28,297 Rs 130,85,85,026 Rs 130,85,85,026 (30 months Form the date ofcommencement of work)Complection Date 01/11/2008.

15 Bid Notice No.PMC/RVNL/BBS/ADB/DBL-Third Line/Major Bridges/2005/3 Dt.15/12/2005,

.27/01/2006 Project Management Consultancy Services forConstruction of Major Bridges in connection withdoubling of railway line between Barang-Rajatgarh (25 km), Cuttack – Barang (12 km) and3rd line between Barang-Khurda Road (35 km) inEast Coast Railway in the

RVNL/BBS/ADB/PMC-Major Br/Expert_SPA (JV)/14/25/2006, dated01/11/2006

EXPERT RESORTS &LAYOUTS PRIVATELIMITED , 16/1, BhavaniMansion Road, AmericanColony, Kumar Park East,Bangalore- 560001

Rs 3,00,00,000 Rs 2,61,88,500 Rs 2,61,88,500 (30 months Form the date ofcommencement of work)Complection Date 25/02/2009.

4 of 5

Page 48: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl No.

Tender Number

Date of Opening Description of Item /Work Contract

No. & Date Contractor's

Name

Quantity (for supply contract )

Estimated Cost (for Engg/Elect./S & T

/Mech.)

Rate (for supply contract)Tendered

Cost (for Engg./Elect./S & T

/Mech.)

Value of Contract

Scheduledcomplection date.

16 PMC/RVNL/BBS/ADB/DBL-Third Line/Road Bed/Track/2005/2 dated 15/12/2005.

27/01/2006 (a) Project Management Consultancy forConstruction of Roadbed (except Major bridges),Facilities and General Electrification for doublingof Railway line between Barang-Rajatgarh (25km), Cuttack – Barang (12 km) and 3rd linebetween Barang-Khurda Road (35 km) in thestate of Orissa, India.(b) Project ManagementConsultancy for Supply and installation of track(excluding supply of rails, signaling and overheadequipment (OHE) & associated equipment for 25kV, AC traction, in connection with doubling ofrailway line between Barang-Rajatgarh (25 km),Cuttack – Barang (12 km) and 3rd line betweenBarang-Khurda Road (35 km) in the state ofOrissa, India.

RVNL/BBS/ADB/PMC-Roadbed-Track/14/31/2006, dated29/11/2006

M/s Wilbur Smith AssociatesPvt Ltd/ Bangalore.75, 2nd Floor,14th Cross, R. T. Nagar, 1stBlock, Bangalore, Karnataka -560 032.

Rs 5,60,00,000 Rs 5,60,00,000 Rs6,09,66,085 (30 months Form the date ofcommencement of work)Complection Date 10/04/2009.

5 of 5

Page 49: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DETAILS OF CONTRACTS PLACED UPTO 31-01-2008 BY RVNL, SECUNDERABAD

Sl. No.

Tender Number Date of opening

Description of item/work

Contract No. & date

Contractor’s Name

Quantity (For supply contract) Estimted cost (for Engg., Elec.

S&T/Mech)

Rate (For supply

contract) Tendered cost (for Engg., Elec.

S&T/Mech)

Value of Contract

Scheduled completion date

.1 No.2006/ELECT/PMT-NRE/001 dated 13.3.2006

23-5-06 Supply, Erection, Testing and commissioning of 25 Kv OHE bet. Pullampet-Nandalur Sec. of Guntakal Divn. Of S.C. Railway

No.2006/Elec./PMT-NRE/001 dt. 15.11.06

M/s. Tata Projects Limited, Hyderabad. (TPL)

599.83 lakhs

599.83 lakhs

840.47 lakhs

12 months (02-(10-2007)

2 No.RVNL/SC/GY-PMT/104 dated 18-10-05

31/01/06 Gooty-Pullampet patch doubling

No.RVNL/SC/GY-PMT/Agt/104 dated 22-08-2006

M/s. Simplex Infrastructures Ltd., Mumbai

19223.74 Lakhs

19223.74 Lakhs

17074.07 Lakhs

30 + (6 Defect. Liability period) (06-04-2009)

3 No.RVNL/SC/GY-PMT/PMC/106 dated 02-12-05

27-03-06 Project Management Consultancy for Gooty-Pullampet patch doubling

No.RVNL/SC/GY-PMT/PMC/Agmt/106 dated 24.11.06

M/s. Aarvee Associates, Hyderabad

600.00 lakhs

600.00 lakhs

575.32 lakhs

30 + (6 Defect. Liability period (28-03-2009)

4 No.RVNL/SC/OBVP-KP/108 dated

01-09-2006

13-11-06 Venkatachalam to Krishnapatnam Phase I New BG Line

No.RVNL/SC/OBVP-KP/108 dated 27-06-2007

M/s.APR-VNR Joint Venture ,Hyderabad

4060.6 lakhs

4060.6 lakhs

4246.1 Lakhs

12 + (6 months defect liability period) (28-03-2008)

5 No.RVNL/SC/OBVP-KP/PMC/114 dated 25-05-06

09-07-07 Project Management Consultancy for Venkata-chalam to Krishnapa-tnam Phase I works

No.RVNL/SC/OBVP-KP/PMC/114 dated 05-11-07

M/s. Project Engineering Management Services-KITCO (JV), Tiruvananthapuram, Kerala

69.88 Lakhs

69.88 lakhs

84.66 lakhs

12 + (6 months defect liability period (09-09-08)

6 No.RVNL/SC/GTL-RC/112 dated

06-02-2007.

12-04-07 Guntakal-Raichur patch doubling .

No.RVNL/SC/GTL-RC/112 dated 15-10-07

M/s. APR-MVR Joint Venture, Hyderabad

9670.50 lakhs

9670.50 lakhs

9399.34 lakhs

18+6 (6 months defect liability period) dated 23-02-09

Page 50: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl. No.

Tender Number Date of opening

Description of item/work

Contract No. & date

Contractor’s Name

Quantity (For supply contract) Estimted cost (for Engg., Elec.

S&T/Mech)

Rate (For supply

contract) Tendered cost (for Engg., Elec.

S&T/Mech)

Value of Contract

Scheduled completion date

7 No.C/ADB/Gooty-Pullampet/ Signalling (Vol.III) dated 10-11-04

20-04-05 S & T Works in Guntakal-Raichur patch doublinhg

No.C/ADB/Gooty-Pullampet/ Signalling (Vol.III) dated 08-11-06

M/s. Leighton Emrail-Kalindee (JV)

10589 Lakhs

10589 Lakhs

9681.31 lakhs

36 months (29-06-09)

8 No.RVNL/SC/GTL-RC/112 dated

06-02-2007.

12-04-07 Guntakal-Raichur patch doubling .

No.RVNL/SC/GTL-RC/112 dated 15-10-07

M/s. APR-MVR Joint Venture, Hyderabad

9670.50 lakhs

9670.50 lakhs

9399.34 lakhs

18+6 (6 months defect liability period) dated 23-02-09

9 No.RVNL/SC/GTL-RC/ 113 dated

21.05.2007

10/07/07 Project Management Consultancy for Guntakal-Raichur patch doubling .

No.RVNL/SC/GTL-RC/ PMC /113/Contract dated 11.12.2007

M/s. SOWiL Limited, Goodwill Avenue, Office No.2, 1st floor, A Wing, Plot No.1, Sector 40, Nerul (West) Navi Mumbai – 400706

200.40 lakhs 200.40 lakhs 121.00 Lakhs

18+6 (6 months defect liability period) dated 23-02-09

Page 51: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contracts Awarded from 01/01/2004 to May, 2008 from the Corporate Office (S&T)

S.No Tender No./ Purchase Order

No.

Date of Opening

Descripton of Item/Work Contract No. & Date

Contractor's Name Quantity (for supply contract)

Estimated Cost (for Engg. Elect. S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg/Elect/S&T/ Mech.)

Value of Contract

Scheduled Completion Date

1 S&T/DEE-RW/BID dated 20.04.2005

16.06.2005 Supply & Installation of Signalling for replacement of existing signalling and Gauge Conversion of 2nd Meter Gauge line on Delhi Sarai Rohilla- Rewari Section (79 Km) of Northern Railway

S&T/DEE-RW/BID dated 21.10.2005

Consortium (Joint Venture) of M/s Bharat Rail Automation(P)Ltd, B-107 Mandpeshwar Ind.Estate, S.V.P. Road, Borivali(W), Mumbai-400092 and M/s Siemens Ltd, Pandurang Budhkar Marg, Worli, Mumbai-400018

39.00 Crores 39.00 Crores 35.14 Cores 30.04.2007 (20 Months from the date of issue of LOA)

2 RVNL/S&T/RE-AII/BID dated06.05.2006

12.07.2006 Supply & Installation of Signallingand Telecommunication equipmentin connection with MG to BGGauge Conversion on Rewari-Ringus-Phulera-Ajmer Section(294.57 km) of North WesternRailway.

RVNL/S&T/RE-AII/BID dated 13.10.2006

Kiran Infra Engineers Ltd. B-141, Road No.9-D, Vishwakarma Industrial Area, Jaipur-302 013(Joint Venture with M/s Mangla Ispat(Jaipur) Ltd. B-234, Road No.9, V.K.I Area, Jaipur-302013 & M/s Tirupati Plastomatics Pvt.Ltd, B-141, A-Road No. 9D, Vishkarma, Industrial Area, Jaipur-302013

66.00 Crores 66.00 Crores 72,30,66,612 18 Months from the date of issue of LOA(out of which the work in Rewari-Phulera section shall be completed in first 12 months time).

3 Purchase OrderNo. RVNL/S&T-01/2006 dated5.6.2007

16.01.2007 Supply of Signaling and QuadCable in connection with Samdari-Bhildi Section and Gaziabad-Aligarh J. Section

Work awarded vide Purchase Order No. RVNL/S&T-01/2006 dated 5.6.2007

1) M/s Tirupati Plastomatics Pvt. Ltd., B- 141(A), Road No. 9-D, Vishwakarma Industrial Area, Jaipur - 302013.

2) M/s Paramount Wires & Cables Ltd., C-125, Naraina Industrial Area, Phase-1, New Delhi - 110028.

1) 507 KM

2) 277 KM

____

____

1) 7,25,31,461/-

2) 5,28,05,215/- 4 months from the date of issue of Purchase Order

4 RVNL/S&T (shifting)/GZB-ALJN/BID dt.05.04.2007

17.04.2007 Shifting of Signaling field equipmentin connection with 3rd Line work inGhaziabad-Aligarh section of NorthCentral Railway

Work awarded vide Ltter of Acceptance No. RVNL/S&T(Shifting)/GZB-ALJN/BID dated 30.5.2007

M/s Ashok Engineering Works, 13-C, Daud Nagar, Naini, Allahabad, Uttar Pradesh

1,98,32,273.66 1,98,32,273.66 1,97,33,112 4 months from the date of issue of LOA

5 RVNL/S&T/SMR-BLDI/BID dated15.10.2007

20.11.2007 Laying Commissioning & Testing of6 quad Cable and associatedTelecommunication Circuits inconnection with MG to BG GaugeConversion on Samdari - Bhildi(223.44 km) of North WesternRailway

RVNL/S&T/SMR-BLDI dated 16.04.2008

M/s Alcon Builders and Engineers Pvt. Ltd. B-1/51, Malviya Nagar, New Delhi - 110017

3,34,39,747 3,34,39,747 4,69,88,536 9 months from the date of isue of LOA

Page 52: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S. No.

Tender/ICB No. Date of Opening

Description of Item/Work Letter of Award No. Letter of Award Date

Contractor’s Name Qty. (for supply contract)

Estimated Cost (for Engg./Elect./

S&T/Mech.)

Rate (for supply contract in Rs.) Contract Cost

(for Engg./Elect. /S&T/Mech. in

Lakh/Cr.)

Value of Contract

Scheduled Completion Date

6 PMC/RVNL/BBS/ADB/DBL-Third Line/Roadbed-Track/2005/2

27-01-06 PMC for (i) Contruction of Roadbed (exceptmajor bridges), facilities and generalelectrification in connection with doubling ofrailway line between Barang-Rajatgarh (25 Km),Cuttack-Barang (12 Km) and 3rd line betweenBarang-Khurda Road (35 Km) in the state ofOrissa; and (ii) Suplly and Installation of Track(excluding supply of rails), Signaling and OHE &associated equipment for 25 KV AC traction inconnection with doubling of railway line betweenBarang-Rajatgarh (25 Km), Cuttack-Barang (12Km) and 3rd line between Barang-Khurda Road(35 Km) in the state of Orissa.

PMC/RVNL/BBS/ADB/DBL-Third Line/Roadbed-Track/2005/2

13-09-06 M/s. Wilbur Smith Associates Pvt. Ltd., Bangalore.

-- 6.09 Cr. 6.09 Cr. 30 Months with defect liability period(From the date ofcommencement of work)

7 RVNL/JP/T&Q/PMC/002 22-08-06 Project Management Consultancy Services forGauge Conversion (MG to BG) of Railway Trackin Rewari-Ringus-Phulera-Ajmer (294.57 KM)Section including electrical works, supply andreplacement of existing signaling system of N. W.Railway

RVNL/JP/T&Q/PMC/2006/002/Part III

13-09-06 M/s. Sowil Ltd. & Halcrow Consulting Indig Ltd. (JV), Noida.

6.80 Cr. 5.75 Cr. 5.75 Cr. 33 Months with defect liability period(From the date ofcommencement of work)

8 RVNL/SC/GY-PMT/PMC/106

03-04-06 PMC for Patch Doubling of Track on Gooty-Pullampet Section of South Central Railway.

RVNL/SC/GY-PMT/ PMC/106

29-09-06 M/s. Aarvee Associates, Hyderabad.

6.00 Cr. 5.75 Cr. 5.75 Cr. 30 Months excluding defect liabilityperiod (From the date ofcommencement of work)

9 RVNL/Rail Procurement/1 of 2005

24-02-06 Manufacture & Supply of 69775 MT 60 Kg UIC Rails (Grade 880, Class A) conforming to IRS-T-12-96 for various railroad projects in different regions of India.

2005/RVNL/P/III/Rail Supply/01

09-02-07 M/s. SAIL, New Delhi.

69775 MT 35500 255.38 Cr. 18 Months (From the date ofcommencement of work)

10 RVNL/CPM/MAS/IPL-ICTT/01

29-08-06 Provision of Rail Connectivity from Idappalli to ICTT, Vallarpadam for works of elevated structures, major and minor bridges and earthwork in Trivendrum Division of SR.

RVNL/CPM/MAS/IPL-ICTT/01

21-02-07 M/s. Afcons Infrastructure Ltd., Mumbai.

171.24 Cr. 167.81 Cr. 167.81 Cr. 24 Months (From the date ofcommencement of work)

11 2005/RVNL/P/CC.P.Way (PB)

24-03-06 Construction of all P.Way Works including supply of ballast and P.Way materials (excluding rails and PSC line sleepers), signaling and OHE for Palway-Bhuteshwar 3rd Line (81 Km) on North Central Railway.

2005/RVNL/P/CC/P.Way (PB)

20-03-07 M/s. Kalindee_Cobra (JV), New Delhi.

88.59 Cr. 118.70 Cr. 118.70 Cr. 18 Months (From the dateof commencement of work)

Page 53: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S. No.

Tender/ICB No. Date of Opening

Description of Item/Work Letter of Award No. Letter of Award Date

Contractor’s Name Qty. (for supply contract)

Estimated Cost (for Engg./Elect./

S&T/Mech.)

Rate (for supply contract in Rs.) Contract Cost

(for Engg./Elect. /S&T/Mech. in

Lakh/Cr.)

Value of Contract

Scheduled Completion Date

12 RVNL/Bhubaneshwar/HDS-PRDP/5

12-10-06 Construction of Roadbed including Major and Minor Bridges, Facilities and General Electrification in connection with construction of New BG Line between Haridaspur and Paradeep in East Coast Railway, in the State of Orissa, India

RVNL/BBS/Tender/HDS-PRDP/Roadbed-Major Bridges/25/21

19-06-07 M/s. HCIl-Adhikarya(JV), Delhi.

223.04 Cr. 276.35 Cr. 276.35 Cr. 24 Months (From the date ofcommencement of work)

13 RVNL/PII/PSC Sleepers /1 of 2007

15-03-07 ICB 170107: Manufacture and supply of PSCMonoblock sleepers for Broad Gauge (1673) bysetting up new sleeper plants for various railroadprojects in different regions of Inda - Lot No.17010704

RVNL/PSC Sleepers/1 of 2007/165

06-07-07 M/s. RaghavendraRail InfrastructurePvt. Ltd.,Secunderabad

225000 No. 1126.50 25.34 Cr. 18 Months (From the dateof commencement of work)

14 RVNL/PII/PSC Sleepers /1 of 2007

15-03-07 ICB 170107: Manufacture and supply of PSCMonoblock sleepers for Broad Gauge (1673) bysetting up new sleeper plants for various railroadprojects in different regions of Inda - Lot No.17010701.

RVNL/PSC Sleepers/1 of 2007/185

27-07-07 M/s. VamanPrestressing Co.Ltd., Mumbai.

210000 No. 1268.83 26.64 Cr. 18 Months (From the dateof commencement of work)

15 RVNL/JP/T&Q/Bridges /2007/010

20-08-07 Rebuilding, strengthening of major bridges andreplacement of PSC slab of minor bridges inconnection with GC of meter gauge line to broadgauge on Rewari-Ajmer Section of NorthWestern Railway.

2007/RVNL/P/CC/Bridges/011

12-09-07 M/s. R. C. Kapoor-M.M. Shawl (JV), New Delhi.

15.51 Cr. 17.52 Cr. 17.52 Cr. 12 Months (From the dateof commencement of work)

16 RVNL/PII/PSC Sleepers /1 of 2007

15-03-07 ICB 170107: Manufacture and supply of PSCMonoblock sleepers for Broad Gauge (1673) bysetting up new sleeper plants for various railroadprojects in different regions of Inda - Lot No.17010705

RVNL/PSC Sleepers/1 of 2007/36

01-11-07 M/s. Prestress IndiaPvt. Ltd., NaviMumbai.

170000 No. 1477.60 Cr. 25.11 Cr. 18 Months (From the dateof commencement of work)

17 RVNL/Raipur/SA-KH-KHD-ANP/5

29-11-07 Const. of Roadbed, Major & Minor bridges, TrackLinking (excluding supply of rails, sleepers, thickweb switches and spl. Sleepers), S&T, and OHE& General Electrical work in c/w doublingbetween Salka Road-Khongsara (25.8 KM) andKhodri-Anuppur (61.6 KM) on Bilaspur Division ofSECR in Chattisgarh and MP states, India.

RVNL/Raipur/SA-KH-KHD-ANP/5

15-04-08 M/s. DS Const. Ltd.-BEST and CromptionEngrs. Ltd. (JV), NewDelhi.

170.12 Cr. 177.49 Cr. 177.49 Cr. 24 Months (From the date ofcommencement of work)

Page 54: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender Number Date of Opening

Description of Item/Work Contract No. & date of

award

Contractor's Name Quantity (for supply contract)

Estimated Cost (for Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tenderered Cost (for Engg./Elect./

S&T/Mech.)

Value of Contract

Scheduled completion

date

2005/RVNL/P/CC/PB dtd. 22.07.05

29.07.05 Design & Proof checking of Additional Openings in ROBs at Kosi Kalan and Bhuteshwar

03.08.05 M/s Unique Engineers 3.6 Lacs 3.33 Lacs 3.33 Lacs 23.08.05

2005/RVNL/CC/P/DEE/Palwal-Bhuteshwar dt.12.08.05

29.08.05 Detailed Design Engineering for Palwal - Bhuteshwar 3rd Line of NCR

12.09.05 M/s Scott Wilson Kirkpatrick India Pvt. Ltd.

53.01 Lacs 47.00 Lacs 47.00 Lacs 11.03.06

2005/RVNL/CC/P/2005/Jn.-Tkd dt.16.09.05

29.09.05 Detailed Design Engineering for Jn. Cabin - Palwal 4th Line (34 Km.) of NR

07.10.05 M/s Dalal Mott Macdonald 16.94 Lacs 19.61 Lacs 19.61 Lacs 06.01.2006

2005/RVNL/CC/P/PCDE/Palwal-Bhuteshwar

6.03.06 Proof Check of Detailed Design Engineering in connection with Palwal-Bhuteshwar

28.03.06 M/s Dalal Mott Macdonald - 8.20 lakh. 8.20 Lacs 28.03.2006

2005/RVNL/P/CC/Civil Works

27.12.05 All Civil Engineering and connected General Electrical Works for Construction of Road bed facilities, Buildings, Box-pushing in existing 2 ROBs including Misc. works for Palwal-Bhuteshwar 3rd Line (81 Kms) on North Central Railway

8.5.2006 M/s Era Consutrction India Ltd.

62.05 Cr. 62.05 Cr. 62.05 Cr. 8.5.2006

2005/RVNL/P/CC/PMC (PB) dated 11.09.06

23.06.06 PMC of construction of palwal-Bhuteshwar 3rd Line Doyubling (81 kms) in the State of Haryana and Uttar Pradesh (India) including Road bed facilities, Bridge works, Box Pushing, Flash Butt Welding, P.Way, miscellaneous Civil works, Electrical works including OHE and Signalling and Interlocking works on North Central Railway

27.09.06 M/s Scott Wilson kirkpatric India Pvt. Ltd.

4.32 Cr. 4.28 Cr. 4.28 Cr. 26.12.08

RVNL/NDLS/ALJN-GZB/2005/01 dated

14.10.05.

23.12.2005 Construction of Roadbed, Bridges, Facilities, Installation of Track (excluding Supply of Rails, Thick Web Switches & Weldable CMS Crossings) & Electrical (Railway Electrification & General Electrification) in connection with Provision of 3rd line on Aligarh - Ghaziabad Section (106 Kms.) in the State of Uttar Pradesh (India).

08.06.06 M/s IRCON - GANNON - Dunkerly - JV

188.00 Crore 223.94 Cr. 223.45 Cr. 13.07.08

Details of Contracts Awarded upto Mar 2009 in connection with Palwal-Bhuteshawar and Aligarh-Ghaziabad 3rd line CPM/DLI

CPM_DLI_2April2009.xls Contract Awarded upto March 09

Page 55: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender Number Date of Opening

Description of Item/Work Contract No. & date of

award

Contractor's Name Quantity (for supply contract)

Estimated Cost (for Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tenderered Cost (for Engg./Elect./

S&T/Mech.)

Value of Contract

Scheduled completion

date

RVNL/NDLS/ALJN-GZB/2005/02 dated 16.11.05.

28.12.05 PMC for the Construction of Roadbed, Bridges, Facilities, Installation of Track (Excluding Supply of Rails, Thick Web switches and weldable CMS crossings( & Electrical (Railway Electrification and General Electrification) in connection with provision of 3rd Line on Aligarh - Ghaziabad Section (106 Kms) in the state of Uttar Pradesh)

10.07.06 LASA-Wilbur Smith Associates-JV

4.46 Cr. 4.97 Cr. 4.90 crores 06.3.09

2005/RVNL/P/CC/P.Way(PB) dated 20.3.2007.

Construction of all P.Way Works including supply of Ballast and P.Way Materials (Excluding Rails and PSC sleepers), Signalling and OHE for Palwal-Bhuteshwar 3rd Line (81 kms.) on NC Railway.

M/s Kalindee- Cobra JV. 88.59 Cr. 118.7 Cr. 118.7 Cr. 19.11.08

CPM_DLI_2April2009.xls Contract Awarded upto March 09

Page 56: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender No. Date of Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract) Estimated Cost (for Engg./Elect./S&T/Mech.)

Rate (for supply contract) Tendered Cost (for Engg./Elect./S&T/Mech.)

Value of Contract

Scheduled Completion Date

RVNL/P-III/BIN-BPL/Composite Works Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track Linking (excluding supply of rails, thick web switches & sleepers), S&T and OHE & General Electrical work in connection with 3rd line between Habibganj & Bina (144.76 Km) on Bhopal Division of West Central Railway in the state of Madhya Pradesh (India) - Package No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No. RVNL/P-III/BIN-BPL/Composite Works Tender/Package-1 dated 31.08.2009 (Contract agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC Division,Post Box No. 979,Mount Poonamalle Road,Manakakkam, Chennai-600089.

-- --

141,87,83,852 March, 2012

RVNL/P-III/BIN-BPL/Composite Works Tender

31.01.2009 Construction of Road Bed, Major and MinorBridges, Track Linking (excluding supply ofrails, thick web switches & sleepers), S&Tand OHE & General Electrical work inconnection with 3rd line between Habibganj& Bina (144.76 Km) on Bhopal Division ofWest Central Railway in the state ofMadhya Pradesh (India) - Package No. 2between GanjBasoda (Excl) to Sanchi (Incl)chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No. RVNL/P-III/BIN-BPL/Composite Works Tender/Package-2 dated 31.08.2009 (Contract agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC Division,Post Box No. 979,Mount Poonamalle Road,Manakakkam, Chennai-600089.

-- ‐‐

150,04,89,048 March, 2012

RVNL/P-III/BIN-BPL/Composite Works Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track Linking (excluding supply of rails, thick web switches & sleepers), S&T and OHE & General Electrical work in connection with 3rd line between Habibganj & Bina (144.76 Km) on Bhopal Division of West Central Railway in the state of Madhya Pradesh (India) - Package No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage 879.750 to 830.850 (Km 48.9).

Notification of Award No. RVNL/P-III/BIN-BPL/Composite Works Tender/Package-3 dated 31.08.2009 (Contract agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV), C/o M/S Nagarjuna Construction Company Limited,4th Floor, Uma Enclave, Road No. 9, HYDERABAD-500034.

-- ‐‐

135,64,97,042 March, 2012

Details of Contracts Placed upto the month August, 2009 under GM/P‐III

Page 57: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

RAIL VIKAS NIGAM LIMITED / BHUBANESWAR

GM(Elect)/CO/RVNL FAX: (011)- 26738191 POSITION AS ON 04.10.2009

I. LIST OF TENDERS PENDING FOR FINALIZATION

S/N CV Date of Opening

Briefing Note

Preparation of comparative

statement

TC Minutes Finalized/ Accepted

Contract Value

(In Crores) 1. Design, Supply, Erection, Testing & Commissioning of SCADA(Supervisory Remote

Control and Data Acquisition) equipments along with Annual Maintenance Contract(AMC) for a period of Four Years after warranty period of Three years against the Railway Electrification work for Jakhapura-Tomka-Banspani section under Khurda Road Division of East Coast Railway, in the State of Orissa.

21.08.2009 Vetted on 16.09.09

(Technical)

-- BEC minutes (Technical) under

preparation.

1.13 Crs.

II. TENDERS UNDER INVITIATION

S/N Name of the work Date of Tender Notice

Date of Prebid meeting

Due date of Tender Opening

Estimated Tender Cost in Crores Remarks

NIL

III. CONTRACTS AWARDED

S/N Tender No.

Date of Opening Description of item/work

Letter of Acceptance No.

and date Contractor’s

Name

Qty. (for supply

contract) (for Elect/

S&T/Mech)

Rate. (for supply contract)

tendered cost (for Engg/Elect/

S &T/Mech)

Value of Contract (In Rs)

Scheduled Completion

period

1. 2007/ELECT/ BANSPANI/

OHE/82, dtd. 01.10.07

29.11.07 Supply, Erection, Testing and Commissioning of 25 kV AC 50 HZ single phase Traction Overhead Equipment and other associated works in connection with Railway Electrification of Tomka-Jaroli (144RKM/180 TKM) single line section of Khurda Road Division of East Coast Railway.

2007/Elect/ Banspani/

OHE/82/Gr.146 /6085,

dtd. 28.03.08

M/s. Cobra Instalaciones y Servicios, S.A., New Delhi.

-- Rs. 46,48,70,937/- 49,78,14,263/- 24 months i.e.

27.03.2010

2. RVNL/BBS/ HDS-PRDP/G/

HT-LT/OT/ 01/2008,

dtd. 08.01.08

15.02.08 Modification of 33 & 11 kV HT/LT Power Supply Line crossings over HDS-PRDP section of new railway track through UG, (XLPE) cable under the jurisdiction of KUR Division of East Coast Railway.

RVNL/BBS/ HDS-PRDP/G/ HT-LT/OT/01/

2008/6225, dtd. 31.05.08

M/s. Sarala Engineering Works, Kendrapada, Orissa.

-- Rs. 4,79,02,658/- 4,42,14,154/- 12 months i.e.

30.05.2009

1st Ext. up to 31.10.2009

3. RVNL/BBS/ Tomka-Jaroli/ GPS/AT-CLS/ OT/05/2008, dtd. 08.04.08

16.05.08 Supply, erection, testing and commissioning of XLPE armoured cables and its accessories for the commissioning of 10 KVA, 25/0.240 KV outdoor type auxiliary transformer and CLS works at 14 stations in Tomka-Jaroli section under Khurda Road Division of East Coast Railway in the state of Orissa.

RVNL/BBS/ Tomka-Jaroli/

GPS/AT-CLS/OT/ 05/2008/6480, dtd. 10.09.08.

M/s. AAYBEE Electrical & Construction, A-55, Saheed Nagar, Bhubaneswar-01

-- Rs. 89,03,258/- 80,04,029/- 12 months i.e.

09.09.2009

1st Ext. up to 31.03.2010

4. RVNL/BBS/ Tomka-Jaroli/

PSI/OT/07/ 2008,

dtd. 15.05.08

27.06.08 Design, supply, erection, testing & commissioning of 132/25 kV, 2 x 21.6 MVA, Traction-sub-Station, feeding post, shunt capacitor Bank and with other associated works at Keonjhar & Tomka, along with 9 nos. of Switching Stations in Tomka-Jaroli section under Khurda Road Division of East Coast Railway, in the State of Orissa.

RVNL/BBS/ Tomka - Jaroli/PSI/

OT/07/2008/6506, dtd. 22.09.08

M/s. GET Power Pvt. Ltd., 5th Floor, Apex Plaza, Nungambakkam High Road, Nungambakkam Chennai-34

-- Rs. 14,53,81,079/- 14,64,89,316/- 18 months i.e.

21.03.2010

(Cont…….P/2)

Page 58: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

--2--

S/N Tender No.

Date of Opening Description of item/work

Letter of Acceptance No.

and date Contractor’s

Name

Qty. (for supply

contract) (for Elect/ S&T/

Mech)

Rate. (for supply contract)

tendered cost (for Engg/Elect/

S &T/Mech)

Value of Contract (In Rs)

Scheduled Completion

period

5. RVNL/BBS/3rd Line/Doubling/ GPS/AT-CLS/ OT/ 04/2008, dtd. 04.04.08

30.05.08 Supply, erection, testing and commissioning of 25 kV /240 V, 25 KVA oil filled outdoor type auxiliary transformers, XLPE cable, CLS panels and their accessories for the section of KUR-BRAG-RJGR/CTC in connection with 3rd line/doubling work under Khurda Road Division of East Coast Railway in the state of Orissa.

RVNL/BBS/3rd Line/Doubling/ GPS/AT-CLS/

OT/04/2008/6518, dtd. 26.09.08

M/s. Akshaya Kumar Das, Plot No. 502, Das Nivas, Nayapalli, Bhubaneswar-12

-- Rs. 87,51,472/- 87,84,931/- 12 months i.e.

25.09.2009 1st Ext. up to 31.03.2010

6. RVNL/BBS/Elect/Doubling-

3rd line/ ADB/ HT.MOD/OT/10/

2008, dtd. 22.10.2008.

28.11.08 Modification of 33kV & 11kV HT Power Line Railway track crossings of M/s. CESCO through underground (XLPE) cable between KUR-BRAG-RJGR/CTC section under Doubling/3rd line work in Khurda Road Division of East Coast Railway, in the State of Orissa.

RVNL/BBS/ Elect/ Doubling-3rd line/

ADB/HT. MOD/OT /10/2008/6806, dtd. 23.12.08

M/s. Kalinga Engineering & Architecture Works, 214, Gajapati Nagar, Bhubaneswar-05

-- Rs. 28,86,275/- 30,16,157/- Original 3 months

up to 22.03.09

4th Ext. up to 22.11.09

7. RVNL/BBS/ JKPR-HDS/PSI/ OT/08/2008, dtd.

03.09.2008

14.10.08 Design, supply, erection, testing & commissioning of additional 132/25 kV, 21.6 MVA, power transformer with associated equipments at Jakhapura Traction-Sub-Station, under Khurda Road Division of East Coast Railway, in the State of Orissa.

RVNL/BBS/ JKPR-HDS/PSI/OT/08/

2008, dtd. 05.02.09

M/s. Siddhartha Engineering Ltd. Plot No. 1389, Gandamunda Near Netaji Subhas Chandra Bose Park Bhubaneswar-30

-- Rs. 3,02,43,061/- 3,21,92,111/- 12 months i.e.

04.02.2010

8. RVNL/BBS/Elect(G)/Doubling-3rd line/ADB/Lift for MS/OT/09/2008, dtd. 10.10.2008.

27.11.08 Supply erection, and commissioning of 04 Nos. of service elevators (lifts) for 02 Nos. (G+8) Multistoried buildings at Bhubaneswar station area under the jurisdiction of Khurda Road division of East Coast Railway, in the State of Orissa.

RVNL/BBS/Elect. (G)/Doubling-3rd line /ADB/Lift for MS/ OT/09/2008/

7163, dtd. 29.04.09

M/s. OMEGA Elevators, 5/c, Archana Industrial Estate, Opp. Ajit Mills, Rakhial, Ahmedabad -23.

-- Rs. 78,83,920/- 65,52,000/- 06 months i.e.

28.10.2009

9. RVNL/BBS/ Tomka-

Jaroli/PSI/ OT/12/2008, dtd.

01.12.2008

22.01.09 Design, supply, erection, testing & commissioning of 132 kV single circuit two phase line on DC Tower from Keonjhar-TSS to Harichandanpur-TSS including 132/25 kV, 2 x 21.6 MVA, Traction-Sub-Station at Harichandanpur and their associate equipments in Tomka-Jaroli section under Khurda Road Division of East Coast Railway, in the State of Orissa.

RVNL/BBS/ Tomka -Jaroli/ PSI/OT/12/

2008/7271, dtd. 03.06.09.

M/s. Cobra-NMTPL(JV), B-324, New Friends Colony, New Delhi – 65

-- Rs. 17,94,71,272/- 18,44,90,426/- 18 months i.e.

02.12.2010

(S.K.Das)

GM(Elect)/RVNL/BBS

Page 59: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract) Estimated Cost (for Engg./Elect./S&T/Mech.)

Rate (for supply contract) Tendered Cost (for Engg./Elect./S&T/Mech.)

Scheduled Completion Date

1 RVNL/P-III/BIN-BPL/Composite Works Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track Linking (excluding supply of rails, thick web switches & sleepers), S&T and OHE & General Electrical work in connection with 3rd line between Habibganj & Bina (144.76 Km) on Bhopal Division of West Central Railway in the state of Madhya Pradesh (India) - Package No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No. RVNL/P-III/BIN-BPL/Composite Works Tender/Package-1 dated 31.08.2009 (Contract agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC Division,Post Box No. 979,Mount Poonamalle Road,Manakakkam, Chennai-600089.

--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-BPL/Composite Works Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,Track Linking (excluding supply of rails, thick webswitches & sleepers), S&T and OHE & General Electricalwork in connection with 3rd line between Habibganj & Bina(144.76 Km) on Bhopal Division of West Central Railwayin the state of Madhya Pradesh (India) - Package No. 2between GanjBasoda (Excl) to Sanchi (Incl) chainage928.500 to 879.750 (Km 48.75).

Notification of Award No. RVNL/P-III/BIN-BPL/Composite Works Tender/Package-2 dated 31.08.2009 (Contract agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC Division,Post Box No. 979,Mount Poonamalle Road,Manakakkam, Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-BPL/Composite Works Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track Linking (excluding supply of rails, thick web switches & sleepers), S&T and OHE & General Electrical work in connection with 3rd line between Habibganj & Bina (144.76 Km) on Bhopal Division of West Central Railway in the state of Madhya Pradesh (India) - Package No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage 879.750 to 830.850 (Km 48.9).

Notification of Award No. RVNL/P-III/BIN-BPL/Composite Works Tender/Package-3 dated 31.08.2009 (Contract agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV), C/o M/S Nagarjuna Construction Company Limited,4th Floor, Uma Enclave, Road No. 9, HYDERABAD-500034.

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way items/Guntakul-Raichur/1 of 2009/Switches; Lot No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm) for patch doubling of Guntakul-Raichur Section under CPM/RVNL/SC

RVNL/P-III/P.way items/Guntakul-Raichur/1 of 2009/Switches dated 30.03.2009

M/s VAE VKN Industries Pvt. Ltd., 24/5 Sriram Road, Civil Lines, Delhi-110054.

Manufacture ans Supply: Rs 1.02 Lakh for 60 kg 1 in 12 Switches and Rs 0.74 Lakh for 60 kg 1 in 8 1/2 Switches. Transportation: Rs 25.00 Th for 60 kg 1 in 12 Switches and Rs 22.50 Th for 60 kg 1 in 8 1/2 Switches.

Rs 1.77 Cr 30.09.2009

5 RVNL/P-III/P.way items/Guntakul-Raichur/1 of 2009/CMS Xing; Lot No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm) for patch doubling of Guntakul-Raichur Section under CPM/RVNL/SC

RVNL/P-III/P.way items/Guntakul-Raichur/1 of 2009/CMS Xing dated 30.03.2009

M/s VAE VKN Industries Pvt. Ltd., 24/5 Sriram Road, Civil Lines, Delhi-110054.

Manufacture ans Supply: Rs 2.04 Lakh for 60 kg 1 in 12 CMS Crossing and Rs 1.75 Lakh for 60 kg 1 in 8 1/2 CMS Crossing. Transportation: Rs 3.00 Th for 60 kg 1 in 12 CMS Crossing and Rs 2.40 Th for 60 kg 1 in 8 1/2 CMS Crossing.

Rs 3.02 Cr 30.09.2009

6 2006/RVNL/Mumbai/Bina-Bhopal/2006 dated 30.08.2006

30.06.2006 Coducting Final Location Surey(FSL) from the center line of the final alignment & detailed design Engg (DDE) Between Bina- Bhopal (138 Km) in WC Rly.

2006/RVNL/Mumbai/Bina- Bhopal/2006 dated 23.02.2006

M/s March Services & contractors Sagam Road, Pune-30

--- Rs 1.23 Cr 20.08.2007

Details of Contracts Placed upto the month September, 2009 under GM/P‐III

Page 60: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 1 of 14

Quarterly Progress Report of RVNL Works at Bhubaneswar From July’09 to Sept’09

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

1.RAJATHGARH-BARANG, CUTTACK-BARANG DOUBLING & KHURDA ROAD-BARANG THIRD LINE

a “Construction of Roadbed (except Major bridges), Facilities and General Electrification for doubling of Railway line between Barang-Rajatgarh (25 km), Cuttack – Barang (12 km) and 3rd line between Barang-Khurda Road (35 km) in the state of Orissa, India”.

RVNL/BBS/ADB-Roadbed/14/24/2006 Dt 04/09/2006

M/s HCIL-ADHIKARYA-ARSS JV, 113-A, Kamla Nagar New Delhi - 110 007

7/9/2006 24 to 36 months (Revised)

62%

CPM-I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 61: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 2 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

Civil Engineering works Electrification works Total

Rs 14816 Lakh Rs 356 Lakh Rs 15172 Lakh

Rs 14851 Lakh Rs 501 Lakh Rs 15352 Lakh

0.60% below 75.84% above 1.19 above

b “Construction of Major Bridges in connection with doubling of railway line between Barang-Rajatgarh (25 km), Cuttack – Barang (12 km) and 3rd line between Barang-Khurda Road (35 km) in the state of Orissa, India”.

Rs 12361 Lakh

Rs 13102 Lakh

(+) 6% RVNL/BBS/ADB-Major Bridges/14/28/06 Dt.04/09/2006

M/s HCIL-ADHIKARYA-ARSS JV, 113-A, Kamala Nagar New D0elhi - 110 007

7/9/2006 24 to 36 months (Revised)

73% CPM-I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 62: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 3 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

C Project Management Consultancy Services for Construction of Major Bridges in connection with doubling of railway line between Barang-Rajatgarh (25 km), Cuttack – Barang (12 km) and 3rd line between Barang-Khurda Road (35 km) in East Coast Railway in the State of Orissa.

Rs 300 Lakh

Rs 261 Lakh

(-) 13% LOA-RVNL/BBS/Contract/Expert Resort-SPA(PMC-Major Bridges) 14/25/1517 Dt 23/06/2006

EXPERT RESORTS & LAYOUTS PRIVATE LIMITED , 16/1, Bhavani Mansion Road, American Colony, Kumar Park East, Bangalore- 560001

29/8/2006 30 months 42 months (Revised)

82 % CPM-I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 63: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 4 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

d Supply & Installation of Track (excluding supply of rails), Signaling and Overhead Equipment (OHE) & associated equipment for 25 KV, AC traction in connection with doubling of Railway line between Barang Rajatgarh (25 Km), Cuttack – Barang (12 Km) and 3rd line between Barang – Khurda Road (35 Km) in the state of Orissa, India Civil Engineering Works

Rs 8087 Lakh

Rs 7088 Lakh

12.35% Below

RVNL/BBS/ADB-Track/14/29/2006, Dt 09/10/06

M/s HCIL-ADHIKARYA-ARSS JV, 113-A, Kamla Nagar New Delhi - 110 007

2/11/2006 30 months 36 Months (Revised)

43%

CPM-I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 64: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 5 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

S & T Works Electrical Works Total

Rs 3638 Lakh Rs 2107 Lakh Rs 13832 Lakh

Rs 3298 Lakh Rs 2700 Lakh Rs 13086 Lakh

9.34% Below 28.14% above (-) 5.4% Below

32% 21% 36 %

E a) Project Management Consultancy for Construction of Roadbed (except Major bridges), Facilities and General Electrification for doubling of Railway line between Barang-Rajatgarh (25 km), Cuttack – Barang (12 km) and 3rd line

Rs 700 Lakh

Rs 609 Lakh

(-) 13 %

RVNL/BBS/ADB/PMC-Roadbed-Track/14/31/2006

M/s Wilbur Smith Associates Pvt Ltd/ Bangalore.

11/10/06 30 Months 42 Months (Revised)

73% CPM-I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 65: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 6 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

between Barang-Khurda Road (35 km) in the state of Orissa, India. b) Project Management Consultancy for Supply and installation of track (excluding supply of rails, signaling and overhead equipment (OHE) & associated equipment for 25 kV, AC traction, in connection with doubling of railway line between Barang-Rajatgarh (25 km), Cuttack –

Page 66: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 7 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

Barang (12 km) and 3rd line between Barang-Khurda Road (35 km) in the state of Orissa, India

2. ANGUL-BUDHAPANK-SUKINDA ROAD/BAGHUAPAL IN EAST COAST RAILWAY

a “Conducting Confirmatory Final Location Survey & marking of center line of final alignment on ground, and preparation of land plan & schedule for carrying out land acquisition for proposed new

Rs 96 Lakh

Rs 72 Lakh

(-) 25 %

RVNL/BBS/CFLS/ANGL-SKND.RD/PS/14/47/2007/01, dated 23/11/2007

M/s Pioneer Surveyors, Swagat Garden Block – C, Ground floor Deshbandhu Nagar, Baguiati, Kolkata – 700 059.

23/10/07 12 Months 100% CFLS And 40 % Land Acquisition

CPM-II /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 67: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 8 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

BG line between Angul - Budhapank – Sukinda Road/Baghuapal in East Coast Railway.”.

3. Construction of Third line in Jakhapura – Haridaspur section on Howrah Chennai main line of Khurda Road Division of ECoR. a Construction of

Br No. 449 over river Brahmani ( 29 x 45.7m) in connection with 3rd line between Jakhapura and Haridaspur on Howrah – Chennai Main Line in East Coast Railway, in Orissa”.

Rs 9626 Lakh

Rs 9212 Lakh

(-) 4.3%

RVNL/BBS/HDS-JKPR/BRIDGE 449 ( BRAHMANI)/OT/14/51/2008/04, dated 08/08/2008

M/s BEB – DDS – RKD Joint Venture. 72/A, Mancheswar Industrial Estate. Bhubaneswar – 751 010.

09/08/08 08/08/10 22% CPM-II /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 68: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 9 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

b Construction of Roadbed, major and Minor Bridges and Track Linking (Excluding supply of rails and sleepers, turn out sleepers and thick web switches ) including S &T and OHE & General Electrical works in connection with third line between Jakhapura – Haridaspur ( 25.0 Km) on Khurda road Division of East Coast Railway in Orissa State, India”.

Rs 9128 Lakh

Rs 9693 Lakh

(+) 6.19%

RVNL/BBS/Tenders/HDS-JKPR/(Road Bed)/14/52/MCML-ECI JV/2008/05, dated 16/12/2008.

M/s McML Systems Pvt Ltd. – ECI Engineering & Construction Co. Ltd. # C9, Industrial Estate, Yelahanka, Bangalore – 560 064,

08/12/2008

18 months from the date of commencement.

16% CPM-II /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 69: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 10 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

7. PMC(Keonjhar-Tomka & 2nd Railway Bridge over river Mahanadi(Br. No.544)

Project Management Consultancy for Sub projects) Keonjhar-Tomka New BG line (96.355km) of Banspani-Daitari New Railway Line. ii) Construction of 2nd bridge across river Mahanadi (32 x 65.4m) near Cuttack of East Coast Main Line.

Rs. 832 Lakh

RVNL/ Projects/ K-T & M-B/ PMC/ Package 1 Dtd. 08/08/2005.

M/s. SOWiL-Halcrow JV Plot No-8, Near Satyakali Mandir, Satyanagar, Bhubaneswar-751007

20.04.2005 48 Months

99 %

CPM –II /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

8. Const. of Br N0.134 over Mahanadi and 115 over Luna -(HDS-PRDP)

Construction of Br. No.134 over Mahanadi 22 x 43.846m and Br. No.115 over Luna 13 x 43.846m in connection with construction of new BG line between Haridaspur &

Rs. 6967 Lakh

Rs 6751 Lakh

(-) 3.20%

RVNL/BBSHDS-PRDP/ MAHA-LUNA/SIMPLEX/14/13/2006/02 Dt 30/01/2006

M/s Simplex Infrastructures Ltd., 502A, Poonam Chambers, 'A' Wing, 5th Floor, Dr. A.B.Road, Worli,

09.12.2005 30 Months

60% CPM –I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 70: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 11 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

Paradeep of East Coast

Mumbai - 400 018.

9. Project Management Consultancy Const. of Br N0.134 over Mahanadi and 115 over Luna -(HDS-PRDP) Project management

consultancy services for construction of Br.No.134 over Mahanadi 22 x 43.846M & Br. No. 115 over LUNA 13 x 43.846 M in connection with construction of new BG line between Haridaspur & Paradeep of East Coast Railway.

Rs. 170 Lakh

Rs. 138 Lakh

(-) 18.68%

RVNL/BBS/Contracts/HDS-PRDP/MAHA-LUNA/PMC/14/21/2006

M/s. SM Consultants, Plot No 3489/6705, Near Kalinga House , Po- Rasulgarh Bhubaneswar

10.05.2006 30 Months 62% CPM – I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

10. Construction of Roadbed and Major Bridges in HDS-PRDP new BG Line.

Construction of Roadbed including Major & Minor Bridges, Facilities and General

(+) 23.90%

RVNL/BBS/HDS-PRDP/ ROADBED/14/45/2007 DT.24.08.20

HCIL-ADHIKARYA (JV)113-A, Kamla Nagar, New Delhi-

19.06.2007 24 Months 14% CPM – I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur,

Page 71: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 12 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

Electrification in connection with construction of New BG line between Haridaspur & Paradeep in East Coast Railway in the State of Orissa, India

1. Civil Engineering Works

2. General

Electrification work

Total Cost

Rs 22009 Lakh Rs. 295 lakh Rs. 22304 Lakh

Rs 27346 Lakh Rs 289 Lakh Rs. 27635 Lakh

07 110007 Bhubaneswar (Orissa) 751 023.

11. PMC for Roadbed HDS-PRDP

Project Management Consultancy for “Construction of Roadbed including Major and Minor Bridges, Facilities, General Electrification and Ballast Supply in connection with Construction of New BG Line between

Rs. 370 Lakh

Rs. 267 Lakh

(-) 38.27%

RVNL/BBS/PMC/HDS-PRDP/Rd&MBr/14/49/2007 dt. 31.12.2007.

M/s SMC-SMSS (JV), Plot No. 3489/6705, Near Kalinga House, Palasuni., P.O - Rasulgarh, Bhubaneswar

01.12.2007 30 Months

15% CPM – I /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 72: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 13 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

Haridaspur & Paradeep (82 Km) in East Coast Railway, in the State of Orissa, India.”

- 751010

12. RE S &T works of Jaroli – Tomka Section.

“Supply execution of Signaling and Telecommunication works in connection with Railway Electrification of Jaroli – Tomka Section in Jakhapura – Daitari – Bansapani Branch Line under Khurda Road Division of East Coast Railway in the State of Orissa”.

Rs 264 Lakh

Rs 327 Lakh

(+) 24% LAO No. RVNL/BBS/Tender/RE/S &T Works/Jaroli – Tomka/25/42/7622, dated 17.03.2009.

M/s Benzfab Tecnologies Pvt Ltd & National Engineering JV, A-19, Ground Floor, Sahid Nagar, Bhubaneswar – 751 007.

20.03.09 18 months + 6 months defect liability period.

22% General Manager (Elect) /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

Page 73: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 14 of 14

Sl No

Name of work and Location Est.Cost Tendered

Cost % above & below

SOR Agmt. No Agency Date of

Start Time of Comp

Physical

Progress

Name of E in C with address R

ema-

rks

13. DKB RE related works

Construction of type –I, II, III & IV quarters, tower wagon shed, PSI depot, AEE office, height gauge, arrangement for OHE mast on bridges and other ancillary works in connection with Jaroli – Tomka section ( 146.0 Km) on Khurda road division of East Coast Railway in Orissa State, India”.

Rs 112 Lakh

LOA No. RVNL/BBS/Tenders/JAROLI-TOMKA-OHE Related Civil Engineering Works/14/54/7226, dated 13/01/2008

M/s Chita Ranjan Swain, 128, Dharam Vihar, Jagamara, Khandagiri, Bhubaneswar

13.02.09 18 months 16% CPM – II /RVNL/BBS ‘B’ Block (West Wing), Ground Floor & 1st Floor, Rail Vihar, Chandrasekharpur, Bhubaneswar (Orissa) 751 023.

It is certified that “ All the works / Purchase/Consultancy contracts and other contracts in progress, as per the prescribed monetary limit have been reported in this QPR’s”

Page 74: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of contracts placed by PIU, Bangalore during the month 31st August 2009

Tender Number Date of Opening

Descrip- tion of Item/ Work

Contract No. & Date

Contractor’s Name

Quantity (for supply contract) Estimated Cost (for Engg./ Elect. S & T Mech.)

Rate (for supply contract) Tendered Cost (for Engg./ Elect./S &T Mech.)

Value of Contract

Scheduled Completion date

Rupees Rupees Rupees 2007RVNL/ Mumbai/HPT – TNGT Dated: 5.3.2000

16.5.2008

FLS/HPT-TNGT (245km) on SWR

RVNL/Mumbai/ FLS/HPT-TNGT/2008 Dated:2.7.2008

M/s.Hydroneum Systems, “Raghuvansh”, C.T.S.No.755/80, Plot No.78, 2nd floor, Mayur Colony, Kothrud, Pune – 411 038 M.S. (INDIA)

1,32,91,500

1,32,91,500

1,19,62,350

1.10.2010

Details of contracts placed by PIU, Bangalore during the month 30th

September 2009

NIL NIL NIL NIL NIL NIL NIL NIL NIL CPM/RVNL/Bangalore

Page 75: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India) - Package No. 1

between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India) - Package No. 2

between GanjBasoda (Excl) to Sanchi (Incl) chainage

928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India) - Package No. 3

between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. -

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.04.2010

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.04.2010

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bin

a- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 30.11.2009

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

Details of Contracts Placed upto the month March' 2010 under GM/P-III

Page 76: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 12.05.2010

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot No.

11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand, 3rd

& 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation: Rs

20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch 60

Kg.

Rs 3.92 Cr 16.05.2010

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 17.05.2010

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 17.05.2010

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

Page 77: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender Number Date of Opening Description of Item/WorkContract No. &

date of awardContractors Name

Quantity (for

supply contract)

Estimated cost (for

Engg./Elect. /S&T/

Mech.

Rate ( for supply

contract)

Tendered cost (for

Engg./Elect./

S&T/Mech

Value of

contract

Scheduled

completion date

NIL NIL NIL NIL NIL NIL NIL NIL NIL

Details of Contracts Awarded during February 2010 by PIU Mumbai

Page 78: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 1 of 4

Sl. No Tender Number Date of

opening

Description of item/work Contract No. & date Contractor’s Name Estima-ted cost Tendered cost Value of Contract Scheduled completion

date

(A)

1 No.RVNL/SC/GY-

PMT/104 dated 18-10-

05

31.01.06 Gooty-Pullampet patch

doubling

No.RVNL/SC/GY-

PMT/Agt/104 dated 22-08-

2006

M/s. Simplex Infrastructures

Ltd., Mumbai

19223.74 lakhs 19223.74 lakhs 17074.07 lakhs 30 + (6 Defect. Liability

period) (06-04-2009)

2 No.RVNL/SC/GY-

PMT/PMC/106 dated

02-12-05

27.03.06 Project Management

Consultancy for Gooty-

Pullampet patch doubling

No.RVNL/SC/GY-

PMT/PMC/Agmt/106 dated

24.11.06

M/s. Aarvee Associates,

Hyderabad

600 lakhs 600 lakhs 575.32 lakhs 30 + (6 Defect. Liability

period (28-03-2009)

3 No.RVNL/SC/OBVP-

KP/108 dated 01-09-

2006

13.11.06 Venkatachalam to

Krishnapatnam Phase I New

BG Line

No.RVNL/SC/OBVP-KP/108

dated 27-06-2007

M/s.APR-VNR Joint Venture

,Hyderabad

4060.6 lakhs 4060.6 lakhs 4246.1 lakhs 12 + (6 months defect

liability period) (28-03-

2008)

4 No.RVNL/SC/OBVP-

KP/PMC/114 dated 25-

05-06

09.07.07 Project Management

Consultancy for Venkata-

chalam to Krishnapa-tnam

Phase I works

No.RVNL/SC/OBVP-

KP/PMC/114 dated 5.11.07

M/s. Project Engineering

Management Services-KITCO

(JV), Tiruvananthapuram,

Kerala

69.88 lakhs 69.88 lakhs 84.66 lakhs 12 + (6 months defect

liability period (09-09-

08)

5 No.RVNL/SC/GTL-

RC/112 dated 06-02-

2007.

12.04.07 Guntakal-Raichur patch

doubling .

No.RVNL/SC/GTL-RC/112

dated 15.10.07

M/s. APR-MVR Joint Venture,

Hyderabad

9670.5 lakhs 9670.5 lakhs 9399.34 lakhs 18+6 (6 months defect

liability period) dated 23-

02-09

6 No.RVNL/SC/GTL-RC/

113 dated 21.05.2007

10.07.07 Project Management

Consultancy for Guntakal-

Raichur patch doubling .

No.RVNL/SC/GTL-RC/ PMC

/113/Contract dated

11.12.2007

M/s. SOWiL Limited, Navi

Mumbai – 400706

200.40 lakhs 200.40 lakhs 121.00 Lakhs 18+6 (6 months defect

liability period) dated 23-

02-09.

7 No:RVNL/SC/NRE-

GTL/RE/Civil/128

dt:13.04.09

21.05.09 Construction of Quarters and

Service Bldgs etc in connection

with Civil & Elecl works of RE

bet. Nandalur - Kondapauram

RVNL/SC/NRE-

GTL/RE/Civil/128 dt:13.04.09

M/s. Inter Continental (I) Ltd,

Hyderabad.

8.21 Crs 8.21 Crs 9.51 Crs 12 + 3 months

8 No:RVNL/SC/NRE-

GTL/RE/Civil/129

dt:13.04.09

21.05.09 Construction of Quarters and

Service Bldgs etc in connection

with Civil & Elecl works of RE

bet. Kondapuram - Guntakal.

RVNL/SC/NRE-

GTL/RE/Civil/129 dt:13.04.09

M/s. Inter Continental (I) Ltd,

Hyderabad.

9.95 Crs 9.95 Crs 12.09 Crs 12 + 3 months

9 No:RVNL/SC/NRE-

GTL/RE/Civil/130

dt:13.04.09

21.05.09 Construction of Tower wagon

shed, Loco trip shed etc in

connection with RE works bet.

Nandalur - Guntakal.

No:RVNL/SC/NRE-

GTL/RE/Civil/130 dt:13.04.09

M/s. Vishnu Constructions &

Company, Hyderabad.

3.88 Crs 3.38 Crs 4.94 Crs 12 + 3 months

DETAILS OF CONTRACTS AWARDED BY PIU/RVNL/SC UPTO 31.03.2010.

CIVIL

Page 79: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 2 of 4

Sl. No Tender Number Date of

opening

Description of item/work Contract No. & date Contractor’s Name Estima-ted cost Tendered cost Value of Contract Scheduled completion

date

DETAILS OF CONTRACTS AWARDED BY PIU/RVNL/SC UPTO 31.03.2010.

10 RVNL/SC/OBVP-

KP/Track

Maintenance/135

12.05.09 Obulavaripalli - Krishnapatnam

New BG line - Proposed

maintennce of newly

commissioned BG track

betgween Venkatachalam -

Krishnapatnam stations

including points, X-ings,

looplines etc, on Vijayawada

Divion of South Central

Railway

RVNL/SC/OBVP-KP/Track

Maintenance/135 dt:22.10.09

Sri D.Srinivas, Secunderabad 28.34 lakhs 28.34 lakhs 24.95 lakhs 21.10. 2010.

11 RVNL/SC/GY-

PMT/Bridge works/139

22.12.2010 Construction of Bridge No:601,

743 & 744

RVNL/SC/GY-PMT/Bridge

works/139 dt:23.11.2009

M/s.MEC-CC (JV)/Hyderabad 9.92 Crs 9.92 Crs 11.45 Crs 6 Months + 180 days

DLP

12 RVNL/SC/GY-

PMT/Fabrication

works/140

22.12.2010 Construction of FOBs and

COPs between GY-PMT

RVNL/SC/GY-

PMT/Fabrication works/140

dt:23.11.2009

M/s. Vishnu Constructions &

Company, Hyderabad.

7.75 Crs 7.75 Crs 8.91 Crs 6 Months + 180 days

DLP

(B)

13 No.2006/ELECT/PMT-

NRE/001 dated 13.3.06

23-5-06 Supply, Erection, Testing and

commissioning of 25 Kv OHE

bet. Pullampet-Nandalur Sec.

of Guntakal Divn. of S.C. Rly

No.2006/Elec./PMT-

NRE/001 dt. 15.11.06

M/s. Tata Projects Limited,

Hyderabad. (TPL)

599.83 lakhs 599.83 lakhs 840.47 lakhs 12 months (02-10-

2007). Extended up to

30-09-2009.

14 RVNL/SC/OBVP-

KP/OHE/120

31.08.07 Design, Supply, Erection,

Testing & Commissioning of 25

KV, 50HZ, Single Phase,

Traction Over-head

Equipment, etc Ph. I work

between Venkatachalam Road

Jn. to Krishnapatnam in

connection with laying of new

BG line between

Obulavaripalle -

Krishnapatnam section of

South Central Railway.

RVNL/SC/OBVP-

KP/OHE/120 dt:12-03-2008

M/s. Cobra Instalaciones y.

Servicios, S.A., NDLS

NA NA Rs.15.11 Crs. 11.03.2009. Extended

up to 15-10-2009

ELECTRICAL

Page 80: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 3 of 4

Sl. No Tender Number Date of

opening

Description of item/work Contract No. & date Contractor’s Name Estima-ted cost Tendered cost Value of Contract Scheduled completion

date

DETAILS OF CONTRACTS AWARDED BY PIU/RVNL/SC UPTO 31.03.2010.

15 RVNL/SC/NRE-

KDP/RE/121

27.01.08 Design, Supply, Erection,

Testing & Commissioning of 25

KV, 50HZ, Single Phase,

Traction Over-head Equipment

etc., between Nandalur (Excl)

and Kondapuram (Incl)

stations and S&T works of

Guntakal Division of South

Central Rly.

RVNL/SC/NRE-

KDP/RE/121/Agt.

Dated 21-07-08

M/s.Larsen & Toubro Limited,

Chennai

NA NA Rs.103.47 Crs 20-01-2010

16 RVNL/SC/GTL-

WADI/DDE/122

27.03.08 Detailed Design Engineering

(Electrical, Civil) for Railway

Electrification of –

Guntakal(excl)-Raichur-

Wadi(excl) and Wadi(excl) –

Gulbarga(incl) (265RKM)

(including patch doubling line

section) in Guntakal Division

on S.C. Rly and Solapur Divn

of Central Railway

RVNL/SC/GTL-WADI-

GR/DDE/Agt/122 Dt:18-07-

2008.

M/s. Balaji Rail Road Systems

Limited, Secunderabad.

NA NA Rs.58.41 lakhs 17.01.2009. Extended

up to 31.03.2010.

17 RVNL/SC/KDP-

GTL/RE/127

04.06.08 Design, Supply, Erection,

Testing & Commissioning of 25

KV, 50HZ, Single Phase,

Traction Over-head Equipment

etc.,for RE between

Kondapuram(Excl) – Guntakal

(Incl) Section of GTL Divn of

SC Rly.

RVNL/SC/KDP-GTL//RE/127

dt:17-11-2008

M/s.TATA Projects Limited,

Hyderabad

NA NA Rs.101.18 Crs 16.05.2010.

18 RVNL/SC/NRE-

GTL/TSS/119

08.07.08 Design, Supply, Erection,

Testing & Commissioning of

132/25 KV and 220/25 KV,

TSS at Kadapa, Muddanur,

Tadipatri and Gooty Nandalur -

Guntakal Section of Guntakal

Division of SC RLY.

RVNL/SC/NRE-

GTL/TSS/119, dt:04.12.2008

M/s. G.E.T. Power Pvt Limited,

Chennai

NA NA Rs.28.20 Crs 03.06.2010

Page 81: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Page 4 of 4

Sl. No Tender Number Date of

opening

Description of item/work Contract No. & date Contractor’s Name Estima-ted cost Tendered cost Value of Contract Scheduled completion

date

DETAILS OF CONTRACTS AWARDED BY PIU/RVNL/SC UPTO 31.03.2010.

19 RVNL/SC/VKT-

KP/SCADA/131

25.05.09 Design, Supply, Erection,

Testing & Commissioning of

Supervisory Remote Control &

Data Acquisition (SCADA)

equipment on section between

Venkatachalam RD JN and

Krishnapatnam on Vijayawada

Divn of SC Rly.

RVNL/SC/VKT-

KP/SCADA/131 dt.11.9.09

M/s Nelco, Navi Mumbai 11.05 lakhs 11.05 lakhs Rs.13.26 lakhs 3 months

20 RVNL/SC/NRE-

GTL/PMC/124

dt:17.12.09

14.05.09 Project Management

consultancy for erection,

Testing & Commissioning of

25 KV AC single phase 50 Hz

Traction OHE, Switching stns,

TSSs, SCADA, S&T works and

other associated civil works in

NRE (Excl) – GTL (Incl)

section of GTL Divn of SC

Railway

LOA No: RVNL/SC/NRE-

GTL/PMC/124 dt:17.12.09

M/s. United Rail Road

Consultants Ltd, Hyderabad

250.74 lakhs 250.74 lakhs 274.65 lakhs 36 months

( c)

21 No.C/ADB/Gooty-

Pullampet/ Signalling

(Vol.III) dated 10-11-04

20.04.05 S & T Works in Guntakal-

Raichur patch doublinhg

No.C/ADB/Gooty-Pullampet/

Signalling (Vol.III) dated 08-

11-06

M/s. Leighton Emrail-Kalindee

(JV)

10589 lakhs 10589 lakhs 9681.31 lakhs 36 months (29.6.09)

22 RVNL/S&T/Venk-

Krish/Bid dt:31.10.07

04.12.07 S&T works in five stations in

connection with new BG line

between Venkatachalm -

Krishnapatnam

RVNL/S&T/Venk-Krish/Bid

dt:15.07.08

M/s . VNR Infrastructures Ltd,

Hyderabad.

8.70 8.70 10.82 12 months.

23 RVNL/S&T/GTL -

RC/Bid dt:20.06.08

31.07.08 S&T works of Guntakal -

Raichur Patch doubling

No:RVNL/SC/GTL-RC/VNR-

1/09 dt:31.03.09

M/s. VNR Infrastructures

Limited, Hyderabad

14.18 14.18 15.29 12 months.

24 No.RVNL/

SC/NRE-KDP/RE/121

S&T works at 12 stations and

misc works in connection with

doubling of Raichur – Guntakal

section.

No.RVNL/

SC/NRE-KDP/RE/Agt/121 dt.

12.8.08

M/s. L&T Limited, ECC Divn.

Chennai

1587.3 1587.3 2090.47 18 months

Signal & Telecom

Page 82: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl. No. Tender No. Date of Opening

description of Item/Work Contract No. & Date

Contractor's Name Quantity (for supply contract) Estimate Cost (for Engg./Elect./S&T/Mech.)

Rate (for supply contract) Tender Cost (For Engg./Elect./S&T/Mech.)

Scheduled Completion Date

1

RVNL/KOL/PKU-KGP/PSI/OT/09/01/ Dt. 04.06.2009

23.07.2009 Design, Supply, Erection, Testing & Commissioning Of 132/27 Kv, 2 X 30/42 MVA, Traction-Sub-Station , with an additional bay and replacement of one existing 13/20MVA capacity, modification of 132KV incomming and out going 25KV Power Supply, TSS feeding post, with other associated works at Balichak Sub-Station, along with modification of opposite gantry in connection with 3rd line between Panskura-Kharagpur under Kharagpur Division Of South Eastern Railway in the State of West Bengal.

Contract Agreement No. RVNL/KOL/EL/PSI/OT/09/01/Vol-II dated 16/04/2010

M/s.PSC Engineers Pvt. Ltd. IT Building(3rd floor),Benfish,31,G.N.Block, Sector -V, Salt Lake City, Kolkata 700091.

Rs. 7,94,23,187/- Rs. 7,49,54,437/- 08-11-11

Details Contracts Placed upto the month March' 2010 under GM/P-III

Page 83: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Krs.d.vig. stat.

Details of Contracts/award of tenders by PIU/Chennai for the period from 01.01.2010 to

31.03.2010.

Sn

Ten

der

no.

Dat

e o

f o

pen

ing

Des

cri

pti

on o

f

item

/Wo

rk

Co

ntr

act

/LO

A n

o.

& d

ate

.

Co

ntr

acto

r’s

nam

e

Qty

. [f

or

sup

ply

co

ntr

act]

Est

imat

ed

Co

st [

for

En

gg

./E

lect

/S &

T

/Mec

h]

Rat

e [f

or

sup

ply

co

ntr

act]

Ten

der

ed

Co

st [

for

En

gg.

/

Ele

ct/S

& T

/Mec

h]

in R

s.

Val

ue

of

Co

ntr

act

in R

s.

Sch

edu

led

com

ple

tio

n d

ate.

NIL

CPM/Chennai

Page 84: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

List of Contracts awarded by CPM/Jaipur for SMR-BLDI GC Project upto May 2010

S. No. Description of work Contract No. & date Contractor’s Name

Value of Contract

Completion date

1.

Misc. civil works including construction/modification of station buildings, S & T structures, platforms, level crossings Duty Huts, resting facilities for TMC staff and other connected works Marwar Bagra (Ex) to Rainwara (Including) on SMR-BLDI section.

RVNL/JP/T&Q/Misc/2007/013

M/s Kaluram Contractors (JV)

4.38 Crs

12 Months

2 Construction of 43 Staff Quarters at RAKHI, BALWARA, LADERMER, BAKRA ROAD, JAGAN NATH JI etc. Stations of Samdari-Bhildi Section of North Western Railway

RVNL/JP/T & Q / Quarters / 2008/01 dt 20.3.09

Kera Ram s/o Pusha Ram

2.62 Crs. 15 Months 1.7.10

Page 85: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 1 between Bina (Incl) to Ganj Basoda (Incl)

chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 2 between GanjBasoda (Excl) to Sanchi

(Incl) chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 3 between Sanchi (Excl) to Habibganj (Incl)

chainage 879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. -

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.04.2010

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.06.2010.

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bin

a- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 15.08.2010

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

Details of Contracts Placed upto the month May' 2010 under GM/P-III

Page 86: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60

kg 1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.09.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot No.

11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 16.08.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 31.07.2010

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 16.08.2010

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Page 87: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contracts Awarded from Dec.'06 to April, 2010 from the Corporate Office (S&T)

S.No Tender No./

Purchase Order

No.

Date of

Opening

Descripton of Item/Work Contract No. &

Date

Contractor's Name Quantity (for

supply contract)

Estimated Cost (for

Engg. Elect.

S&T/Mech.)

Rate (for supply

contract)

Tendered Cost

(for

Engg/Elect/S&T/

Mech.)

Value of

Contract

Scheduled Completion

Date

(2)

RVNL/S&T/RRPA/

Solar/REL/2008

Dtd.25.06.08 for

Qty.378 Panels.

(2) M/s Rajasthan Electronics &

Instruments Ltd. Jaipur

Rs.50 lacs

(Approx.)

(3)

RVNL/S&T/RRPA/

Solar/CEL/2008

Dtd.09.07.08 for

Qty.210 Panels

(3) M/s Central Electronics Ltd. Sahibabad

(UP)

Rs.33 lacs

(Approx)

2

TENDER

NO.RVNL/S&T/D

G/2008 Dated

25.03.2008

28.04.2008

Supply & Installation of DG sets of 15

KVA in connection with MG to BG

conversion on Rewari -Ringus-Ajmer

Section of NWR

P.O. no.

RVNL/S&T/DG/SE

E/2008 dt.

30.07.2008

M/s Shekhawati Electrical Engg. Jaipur 128 lacs 128 lacs Rs.108 lacs One (1) month from the

issue of P. Order

3

RVNL/S&T/SMR-

BLDI/BID dated

02.11.2007

20.12.2007

"Supply, Installation, Testing &

Commissioning of Signallling

Equipment with Route Setting Panle

Interlocking at 21 Stations in

Connection with MG to BG Gauge

Conversion on Samdari - Bhildi (223.44

KM) of North Western Railway"

C.A.

No.RVNL/S&T/SM

R-BLDI/ dtd.

17.07.08

JV of M/s Kiran Infra Engineers Ltd. & M/s

ELIOP, Spain

1881 lacs (approx.) 1881 lacs

(approx.)

2162 lacs

(Approx.)

12 months from the date

of issue of LOA

4

RVNL/S&T/VENK-

KRISH/BID dated

31.10.2007

04.12.2007

"Supply, Installation, Testing &

Commissioning of Signalling & Telecom

Equipment in connection with Route

Setting Panel Interlocking at 5 Stations

in connection with new BG Line in

Venkatachalam to Krishnapatnam of

South Central Railway".

C.A. No.

RVNL/S&T/VENK -

KRISH/BID dated

15.07.08

M/s VNR Infrastructures Ltd. #8-2-310/17,

Road NO. 14 Banjara Hills Hyderabad -34

870 lacs (Approx) 870 lacs

(Approx)

1082 lacs

(Approx)

12 months from the date

of issue of LOA

RVNL/

S&T/Solar/2008

dt.18.02.2008

24.03.2008

(1) M/s Tata BP Solar India Ltd. NDLS -1.

Three (3) P.Orders

placed :-

(1)

P.O. NO. RVNL/

S&T/RRPA/Solar/T

BP Dtd.25.06.08

for Qty.1764

panels.

1

Supply of Solar Panel based charging

system in connection with MG to BG

conversion on Rewari -Ringus -Phulera

-Ajmer Section of NWR

Rs.393 lacs

Rs.244 lacs

(approx)

Rs.393 lacs

Two (2 ) months from the

date of issue of P.

Orders

1 of 3

Page 88: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No./

Purchase Order

No.

Date of

Opening

Descripton of Item/Work Contract No. &

Date

Contractor's Name Quantity (for

supply contract)

Estimated Cost (for

Engg. Elect.

S&T/Mech.)

Rate (for supply

contract)

Tendered Cost

(for

Engg/Elect/S&T/

Mech.)

Value of

Contract

Scheduled Completion

Date

5

RVNL/S&T/GTL-

RC/BID dated

20.06.2008

31.07.2008

“Design, Supply, Installation, Testing &

Commissioning of Signalling &

Telecommunication Equipment with

Panel Interlocking (Route Setting type)

at 12 (TWELVE) stations and alteration

in Raichur Station in connection with

Doubling work in Raichur-Guntukal

Section of South Central Railway

C.A. No.

RVNL/S&T/GTL-

RC/BID dated

14.05.09

M/s VNR Infrastructures Ltd. #8-2-310/17,

Road NO. 14 Banjara Hills Hyderabad -34

1418 lacs (Approx) 1418 lacs (Approx) 1529.5 lacs

(Approx)

12 months from the date

of issue of LOA

6

Two (2) Purcahse

Orders placed:- (1)

No. RVNL/S&T/

Cables/Sriram/09-

10 dt.20.08.09

M/s Sriram Cables Pvt. Ltd. Flat No. 102,

A -8A, Rama Road, Adarsh Nagar, Delhi -

33

581 lacs

(Approx.)

7

(2)

No. RVNL/S&T/

Cables/Elkay/09-

10 dt.21.08.09

M/s Elkay Telelinks Ltd. Opposite Ranhera

Khera, Ballabgarh, Opposite Plot No. 84,

Sector -25, Faridabad - 05, Haryana

295.5 lacs

(Approx.)

8

RVNL/S&T/SolarP

anel/SMR-

BLDI/2009 dt,

29.06.2009

28.07.09

Supply of Solar Panel Based Charging

System in connection with MG to BG

conversion on Samdhari – Bhildi

Section of NWR.

RVNL/S&T/SolarP

anel/SMR-

BLDI/TATA/09-10

Dtd.10.12.09

M/s Tata BP Solar India Ltd. # 78, Phase -

1, Electronic City, Hosur Road, Bangalore,

- 560 100

251.6 lacs (Approx.)251.6 lacs

(Approx.)

224.3 lacs

(Approx.)

Two (2 ) months from the

date of issue of P.

Orders

9

RVNL/S&T/OFC/

GHH-FRK/BID

Dated

26/08/09

30.09.09

“Supply, Installation, Testing and

Commissioning of Telecommunication

Equipment in connection with GC work

in Garhi Harsaru - Farukhnagar section

(length 11.27 Km) of Northern Railway”

C.A. No.

RVNL/S&T/OFC/G

HH-FRK/Karan/09-

10 Dtd.05.02.10

M/s Karan Singh & Sons, #84/22, Anand

Vihar, Baghambari Road, Bharadajpuram,

Allahabad 211-006 (UP)

45.9 lacs (Approx.) 45.9 lacs (Approx.)49.6 lacs

(Approx)

45 days from the date of

issue of LOA

10

RVNL/S&T/SMR-

BLDI/OFC/BID

Dated

25/08/09

30.09.09

“Supply, Installation, Testing and

Commissioning of MUX Equipment and

Supply and Laying of Optical Fiber

Cable at Samdhari –Bhildi Section (224

KM) of North Western Railway”

C.A. No:

RVNL/S&T/OFC/S

MR-

BLDI/M.V.Omni/09-

10 Dtd.10.05.10

M/s M.V. Omni Projects (India) Ltd. #74,

New York Tower -A, S.G. Highway, Thaltej

Cross Road, Ahmedabad - 380054

313.98 lacs

(Approx.)

313.98 lacs

(Approx.)

359.20 lacs

(Approx.)

6 Months from the date

of issue of LOA

Procurement of various type/size

Signalling/ Power/ Quad Cables for

Raichur - Guntakul

704.4 lacs (Approx) 704.4 lacs (Approx)

Two (2 ) months from the

date of issue of P.

Orders

RVNL/S&T/Cable

s/Bid dated

08.04.09

11.05.2009

2 of 3

Page 89: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No./

Purchase Order

No.

Date of

Opening

Descripton of Item/Work Contract No. &

Date

Contractor's Name Quantity (for

supply contract)

Estimated Cost (for

Engg. Elect.

S&T/Mech.)

Rate (for supply

contract)

Tendered Cost

(for

Engg/Elect/S&T/

Mech.)

Value of

Contract

Scheduled Completion

Date

11

RVNL/S&T/19LC

G/2008 dated

05.08.08

12.08.08

Supply of Electrically Operated Lifting

barrier assembly complete in

connection with MG to BG conversion

on Rewari - Ringus- Phulera Section of

North Western Railway.

Work awarded vide

P.O. No.

RVNL/S&T/19/LCG

/2008 dated

25.08.2008

M/s Global Devices, #C-8/5, Ardee City,

Gurgoan, Haryana - 122 00319 sets -

54.67 lacs

(Approx.)

completed within 30

days of placement of

order

12

2005/RVNL/P/CC/

P.way(PW) dt.

12.01.2006

28.02.06

Construction of P.way works including

supply of ballast and P.way materials

(excluding rails, line, sleepers),

signalling and overhead power supply

works for Palwal - Bhuteshwar 3rd Line

(81 kms) on North Central Railway

2005/RVNL/P/CC/

P.way(PW) dt.

05.11.2007

M/s Kalindee - Cobra JV

(M/s Kalindee Rail Nirman (Engineers)

Ltd. & Cobra Instalaciones 4 Servicios

S.A.)

8859.28 lacs approx.8859.28 lacs

approx.

11870.70 lacs

(Approx.)

Extended upto

31.12.2010

13

2007/RVNL/S&T/

F.

Equipment/PWL-

BTSR/NCR/BID

dt. 03.10.2007

15.11.2007

Laying of HDP Pipe 120/200 mm dia

under Railway Track for laying

signalling/Telecom Cable in connection

with 3rd line work on Palwal -

Bhuteshwar Section on North Central

Railway.

No.

2007/RVNL/S&T/F.

Equip/PWL-

BTSR/NCR/Bid

dated 09.02.2008

M/s Creative Enterpreneurs, A-3/332,

Sector -8, Rohini, Delhi - 110085

140.71 lacs

(Approx)

140.71 lacs

(Approx)

76.03 lacs

(Approx.)

Completed within 3

months from the date of

issue of LOA.

14

No.2007/RVNL/S

&T/PMC(PB) dt.

01.11.2007

10.12.2007

Project Management Consultancy of

Signalling and Interlocking Works in

Construction of Palwal - Bhuteshwar

3rd Line Doubling (81 km) in the state

of Haryana and Uttar Pradesh (India)

on North Central Railway

No.

2007/RVNL/S&T/P

MC(PB) dated

23.06.2008

M/s Sai Consulting Engineers Pvt. Ltd. 4,

Kuldip Soceity, Near Ishwar Bhuban,

Navarangpura, Ahmedabad - 380009

90.42 lacs

(Approx).

18 months excluding

defect liability period

3 of 3

Page 90: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 1 between Bina (Incl) to Ganj Basoda (Incl)

chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 2 between GanjBasoda (Excl) to Sanchi

(Incl) chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 3 between Sanchi (Excl) to Habibganj (Incl)

chainage 879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. -

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.09.2010*

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.06.2010.

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bin

a- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 15.08.2010

Details of Contracts Placed upto the month June' 2010 under GM/P-III

Page 91: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8* RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60

kg 1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.09.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot No.

11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 16.08.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 31.07.2010

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

Page 92: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 16.08.2010

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Note: * Delivery Period Extended upto 30.09.2010.

Page 93: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl. No Tender Number Date of

opening

Description of item/work Contract No. & date Contractor’s Name Estima-ted cost Tendered cost Value of

Contract

Scheduled

completion date

(A)

1 No.RVNL/SC/GY-

PMT/104 dated 18-10-

05

31.01.06 Gooty-Pullampet patch

doubling

No.RVNL/SC/GY-

PMT/Agt/104 dated 22-08-

2006

M/s. Simplex Infrastructures

Ltd., Mumbai

19223.74 lakhs 19223.74 lakhs 17074.07 lakhs 30 + (6 Defect. Liability

period) (06-04-2009)

2 No.RVNL/SC/GY-

PMT/PMC/106 dated

02-12-05

27.03.06 Project Management

Consultancy for Gooty-

Pullampet patch doubling

No.RVNL/SC/GY-

PMT/PMC/Agmt/106 dated

24.11.06

M/s. Aarvee Associates,

Hyderabad.

600 lakhs 600 lakhs 575.32 lakhs 30 + (6 Defect. Liability

period (28-03-2009)

3 No.RVNL/SC/OBVP-

KP/108 dated 01-09-

2006

13.11.06 Venkatachalam to

Krishnapatnam Phase I New

BG Line

No.RVNL/SC/OBVP-KP/108

dated 27-06-2007

M/s.APR-VNR Joint Venture

,Hyderabad

4060.6 lakhs 4060.6 lakhs 4246.1 lakhs 12 + (6 months defect

liability period) (28-03-

2008)4 No.RVNL/SC/OBVP-

KP/PMC/114 dated 25-

05-06

09.07.07 Project Management

Consultancy for Venkata-

chalam to Krishnapa-tnam

Phase I works

No.RVNL/SC/OBVP-

KP/PMC/114 dated 5.11.07

M/s. Project Engineering

Management Services-KITCO

(JV), Tiruvananthapuram,

Kerala

69.88 lakhs 69.88 lakhs 84.66 lakhs 12 + (6 months defect

liability period (09-09-

08)

5 No.RVNL/SC/GTL-

RC/112 dated 06-02-

2007.

12.04.07 Guntakal-Raichur patch

doubling .

No.RVNL/SC/GTL-RC/112

dated 15.10.07

M/s. APR-MVR Joint Venture,

Hyderabad

9670.5 lakhs 9670.5 lakhs 9399.34 lakhs 18+6 (6 months defect

liability period) dated 23-

02-096 No.RVNL/SC/GTL-RC/

113 dated 21.05.2007

10.07.07 Project Management

Consultancy for Guntakal-

Raichur patch doubling .

No.RVNL/SC/GTL-RC/ PMC

/113/Contract dated

11.12.2007

M/s. SOWiL Limited, Navi

Mumbai – 400706

200.40 lakhs 200.40 lakhs 121.00 Lakhs 18+6 (6 months defect

liability period) dated 23-

02-09.7 No:RVNL/SC/NRE-

GTL/RE/Civil/128

dt:13.04.09

21.05.09 Construction of Quarters and

Service Bldgs etc in

connection with Civil & Elecl

works of RE bet. Nandalur -

Kondapauram

RVNL/SC/NRE-

GTL/RE/Civil/128

dt:13.04.09

M/s. Inter Continental (I) Ltd,

Hyderabad.

8.21 Crs 8.21 Crs 9.51 Crs 12 + 3 months

8 No:RVNL/SC/NRE-

GTL/RE/Civil/129

dt:13.04.09

21.05.09 Construction of Quarters and

Service Bldgs etc in

connection with Civil & Elecl

works of RE bet. Kondapuram -

Guntakal.

RVNL/SC/NRE-

GTL/RE/Civil/129

dt:13.04.09

M/s. Inter Continental (I) Ltd,

Hyderabad.

9.95 Crs 9.95 Crs 12.09 Crs 12 + 3 months

9 No:RVNL/SC/NRE-

GTL/RE/Civil/130

dt:13.04.09

21.05.09 Construction of Tower wagon

shed, Loco trip shed etc in

connection with RE works bet.

Nandalur - Guntakal.

No:RVNL/SC/NRE-

GTL/RE/Civil/130

dt:13.04.09

M/s. Vishnu Constructions &

Company, Hyderabad.

3.88 Crs 3.38 Crs 4.94 Crs 12 + 3 months

DETAILS OF CONTRACTS AWARDED BY PIU/RVNL/SC UPTO 30.06.2010.

CIVIL

Page 94: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

10 RVNL/SC/OBVP-

KP/Track

Maintenance/135

12.05.09 Obulavaripalli -

Krishnapatnam New BG line -

Proposed maintennce of

newly commissioned BG track

betgween Venkatachalam -

Krishnapatnam stations

including points, X-ings,

looplines etc, on Vijayawada

Divion of South Central

Railway

RVNL/SC/OBVP-KP/Track

Maintenance/135

dt:22.10.09

Sri D.Srinivas, Secunderabad 28.34 lakhs 28.34 lakhs 24.95 lakhs 21.10. 2010.

11 RVNL/SC/GY-

PMT/Bridge works/139

22.12.2010 Construction of Bridge

No:601, 743 & 744

RVNL/SC/GY-PMT/Bridge

works/139 dt:23.11.2009

M/s.MEC-CC (JV)/Hyderabad 9.92 Crs 9.92 Crs 11.45 Crs 6 Months + 180 days

DLP

12 RVNL/SC/GY-

PMT/Fabrication

works/140

22.12.2010 Construction of FOBs and

COPs between GY-PMT

RVNL/SC/GY-

PMT/Fabrication works/140

dt:23.11.2009

M/s. Vishnu Constructions &

Company, Hyderabad.

7.75 Crs 7.75 Crs 8.91 Crs 6 Months + 180 days

DLP

(B)

13 No.2006/ELECT/PMT-

NRE/001 dated

13.3.06

23-5-06 Supply, Erection, Testing and

commissioning of 25 Kv OHE

bet. Pullampet-Nandalur Sec.

of Guntakal Divn. of S.C. Rly

No.2006/Elec./PMT-

NRE/001 dt. 15.11.06

M/s. Tata Projects Limited,

Hyderabad. (TPL)

599.83 lakhs 599.83 lakhs 840.47 lakhs 12 months (02-10-

2007). Extended up to

30-09-2009.

14 RVNL/SC/OBVP-

KP/OHE/120

31.08.07 Design, Supply, Erection,

Testing & Commissioning of

25 KV, 50HZ, Single Phase,

Traction Over-head

Equipment, etc Ph. I work

between Venkatachalam

Road Jn. to Krishnapatnam in

connection with laying of new

BG line between

Obulavaripalle -

Krishnapatnam section of

South Central Railway.

RVNL/SC/OBVP-

KP/OHE/120 dt:12-03-2008

M/s. Cobra Instalaciones y.

Servicios, S.A., NDLS

NA NA Rs.15.11 Crs. 11.03.2009. Extended

up to 15-10-2009

15 RVNL/SC/NRE-

KDP/RE/121

27.01.08 Design, Supply, Erection,

Testing & Commissioning of

25 KV, 50HZ, Single Phase,

Traction Over-head

Equipment etc., between

Nandalur (Excl) and

Kondapuram (Incl) stations

and S&T works of Guntakal

Division of South Central Rly.

RVNL/SC/NRE-

KDP/RE/121/Agt.

Dated 21-07-08

M/s.Larsen & Toubro Limited,

Chennai

NA NA Rs.103.47 Crs 20-01-2010

ELECTRICAL

Page 95: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

16 RVNL/SC/GTL-

WADI/DDE/122

27.03.08 Detailed Design Engineering

(Electrical, Civil) for Railway

Electrification of –

Guntakal(excl)-Raichur-

Wadi(excl) and Wadi(excl) –

Gulbarga(incl) (265RKM)

(including patch doubling line

section) in Guntakal Division

on S.C. Rly and Solapur Divn

of Central Railway

RVNL/SC/GTL-WADI-

GR/DDE/Agt/122 Dt:18-07-

2008.

M/s. Balaji Rail Road Systems

Limited, Secunderabad.

NA NA Rs.58.41 lakhs 17.01.2009. Extended

up to 31.03.2010.

17 RVNL/SC/KDP-

GTL/RE/127

04.06.08 Design, Supply, Erection,

Testing & Commissioning of

25 KV, 50HZ, Single Phase,

Traction Over-head

Equipment etc.,for RE

between Kondapuram(Excl) –

Guntakal (Incl) Section of

GTL Divn of SC Rly.

RVNL/SC/KDP-

GTL//RE/127 dt:17-11-2008

M/s.TATA Projects Limited,

Hyderabad

NA NA Rs.101.18 Crs 16.05.2010.

18 RVNL/SC/NRE-

GTL/TSS/119

08.07.08 Design, Supply, Erection,

Testing & Commissioning of

132/25 KV and 220/25 KV,

TSS at Kadapa, Muddanur,

Tadipatri and Gooty Nandalur

- Guntakal Section of Guntakal

Division of SC RLY.

RVNL/SC/NRE-

GTL/TSS/119,

dt:04.12.2008

M/s. G.E.T. Power Pvt

Limited, Chennai

NA NA Rs.28.20 Crs 03.06.2010

19 RVNL/SC/VKT-

KP/SCADA/131

25.05.09 Design, Supply, Erection,

Testing & Commissioning of

Supervisory Remote Control &

Data Acquisition (SCADA)

equipment on section between

Venkatachalam RD JN and

Krishnapatnam on Vijayawada

Divn of SC Rly.

RVNL/SC/VKT-

KP/SCADA/131 dt.11.9.09

M/s Nelco, Navi Mumbai 11.05 lakhs 11.05 lakhs Rs.13.26 lakhs 3 months

20 RVNL/SC/NRE-

GTL/PMC/124

dt:17.12.09

14.05.09 Project Management

consultancy for erection,

Testing & Commissioning of

25 KV AC single phase 50 Hz

Traction OHE, Switching stns,

TSSs, SCADA, S&T works

and other associated civil

works in NRE (Excl) – GTL

(Incl) section of GTL Divn of

SC Railway

LOA No: RVNL/SC/NRE-

GTL/PMC/124 dt:17.12.09

M/s. United Rail Road

Consultants Ltd, Hyderabad

250.74 lakhs 250.74 lakhs 274.65 lakhs 36 months

Page 96: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

21 RVNL/SC/NRE-

GTL/RE/SCADA/136

05.03.2010 Design, Supply, Erection and

Testing and commissiong of

SCADA bet. Nandalur and

GTL

LOA No:RVNL/SC/NRE-

GTL/RE/SCADA/136

dt:04.06.2010.

M/s. CMC Limited,

Hyderabad.

138.00 lkhs 138.00 lakhs 113.75 lakhs 12 months excluding 6

months defect liability

( c)

22 No.C/ADB/Gooty-

Pullampet/ Signalling

(Vol.III) dated 10-11-04

20.04.05 S & T Works in Guntakal-

Raichur patch doublinhg

No.C/ADB/Gooty-Pullampet/

Signalling (Vol.III) dated 08-

11-06

M/s. Leighton Emrail-Kalindee

(JV)

10589 lakhs 10589 lakhs 9681.31 lakhs 36 months (29.6.09)

23 RVNL/S&T/Venk-

Krish/Bid dt:31.10.07

04.12.07 S&T works in five stations in

connection with new BG line

between Venkatachalm -

Krishnapatnam

RVNL/S&T/Venk-Krish/Bid

dt:15.07.08

M/s . VNR Infrastructures Ltd,

Hyderabad.

8.70 8.70 10.82 12 months.

24 RVNL/S&T/GTL -

RC/Bid dt:20.06.08

31.07.08 S&T works of Guntakal -

Raichur Patch doubling

No:RVNL/SC/GTL-RC/VNR-

1/09 dt:31.03.09

M/s. VNR Infrastructures

Limited, Hyderabad

14.18 14.18 15.29 12 months.

25 No.RVNL/

SC/NRE-KDP/RE/121

S&T works at 12 stations and

misc works in connection with

doubling of Raichur –

Guntakal section.

No.RVNL/

SC/NRE-KDP/RE/Agt/121

dt. 12.8.08

M/s. L&T Limited, ECC Divn.

Chennai

1587.3 1587.3 2090.47 18 months

Signal & Telecom

Page 97: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Tender Number Date of Opening Description of Item/WorkContract No. &

date of awardContractors Name

Quantity (for

supply contract)

Estimated cost (for

Engg./Elect. /S&T/

Mech.

Rate ( for supply

contract)

Tendered cost (for

Engg./Elect./

S&T/Mech

Value of

contract

Scheduled

completion date

NIL NIL NIL NIL NIL NIL NIL NIL NIL

Details of Contracts Awarded during JUNE 2010 by PIU Mumbai

Page 98: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Sl. No Tender Number Date of

opening

Description of item/work Contract No. & date Contractor’s Name Estima-ted cost Tendered cost Value of Contract Scheduled completion

date

(A)

1 No.RVNL/SC/GY-

PMT/104 dated 18-10-

05

31.01.06 Gooty-Pullampet patch

doubling

No.RVNL/SC/GY-

PMT/Agt/104 dated 22-08-

2006

M/s. Simplex Infrastructures

Ltd., Mumbai

19223.74 lakhs 19223.74 lakhs 17074.07 lakhs 30 + (6 Defect. Liability

period) (06-04-2009)

2 No.RVNL/SC/GY-

PMT/PMC/106 dated

02-12-05

27.03.06 Project Management

Consultancy for Gooty-

Pullampet patch doubling

No.RVNL/SC/GY-

PMT/PMC/Agmt/106 dated

24.11.06

M/s. Aarvee Associates,

Hyderabad.

600 lakhs 600 lakhs 575.32 lakhs 30 + (6 Defect. Liability

period (28-03-2009)

3 No.RVNL/SC/OBVP-

KP/108 dated 01-09-

2006

13.11.06 Venkatachalam to

Krishnapatnam Phase I New

BG Line

No.RVNL/SC/OBVP-KP/108

dated 27-06-2007

M/s.APR-VNR Joint Venture

,Hyderabad

4060.6 lakhs 4060.6 lakhs 4246.1 lakhs 12 + (6 months defect

liability period) (28-03-

2008)4 No.RVNL/SC/OBVP-

KP/PMC/114 dated 25-

05-06

09.07.07 Project Management

Consultancy for Venkata-

chalam to Krishnapa-tnam

Phase I works

No.RVNL/SC/OBVP-

KP/PMC/114 dated 5.11.07

M/s. Project Engineering

Management Services-KITCO

(JV), Tiruvananthapuram,

Kerala

69.88 lakhs 69.88 lakhs 84.66 lakhs 12 + (6 months defect

liability period (09-09-

08)

5 No.RVNL/SC/GTL-

RC/112 dated 06-02-

2007.

12.04.07 Guntakal-Raichur patch

doubling .

No.RVNL/SC/GTL-RC/112

dated 15.10.07

M/s. APR-MVR Joint Venture,

Hyderabad

9670.5 lakhs 9670.5 lakhs 9399.34 lakhs 18+6 (6 months defect

liability period) dated 23-

02-096 No.RVNL/SC/GTL-RC/

113 dated 21.05.2007

10.07.07 Project Management

Consultancy for Guntakal-

Raichur patch doubling .

No.RVNL/SC/GTL-RC/ PMC

/113/Contract dated

11.12.2007

M/s. SOWiL Limited, Navi

Mumbai – 400706

200.40 lakhs 200.40 lakhs 121.00 Lakhs 18+6 (6 months defect

liability period) dated 23-

02-09.7 No:RVNL/SC/NRE-

GTL/RE/Civil/128

dt:13.04.09

21.05.09 Construction of Quarters and

Service Bldgs etc in

connection with Civil & Elecl

works of RE bet. Nandalur -

Kondapauram

RVNL/SC/NRE-

GTL/RE/Civil/128

dt:13.04.09

M/s. Inter Continental (I) Ltd,

Hyderabad.

8.21 Crs 8.21 Crs 9.51 Crs 12 + 3 months

8 No:RVNL/SC/NRE-

GTL/RE/Civil/129

dt:13.04.09

21.05.09 Construction of Quarters and

Service Bldgs etc in

connection with Civil & Elecl

works of RE bet. Kondapuram -

Guntakal.

RVNL/SC/NRE-

GTL/RE/Civil/129

dt:13.04.09

M/s. Inter Continental (I) Ltd,

Hyderabad.

9.95 Crs 9.95 Crs 12.09 Crs 12 + 3 months

9 No:RVNL/SC/NRE-

GTL/RE/Civil/130

dt:13.04.09

21.05.09 Construction of Tower wagon

shed, Loco trip shed etc in

connection with RE works bet.

Nandalur - Guntakal.

No:RVNL/SC/NRE-

GTL/RE/Civil/130

dt:13.04.09

M/s. Vishnu Constructions &

Company, Hyderabad.

3.88 Crs 3.38 Crs 4.94 Crs 12 + 3 months

DETAILS OF CONTRACTS AWARDED BY PIU/RVNL/SC BY THE END OF JULY 2010

CIVIL

Page 99: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

10 RVNL/SC/OBVP-

KP/Track

Maintenance/135

12.05.09 Obulavaripalli - Krishnapatnam

New BG line - Proposed

maintennce of newly

commissioned BG track

betgween Venkatachalam -

Krishnapatnam stations

including points, X-ings,

looplines etc, on Vijayawada

Divion of South Central

Railway

RVNL/SC/OBVP-KP/Track

Maintenance/135

dt:22.10.09

Sri D.Srinivas, Secunderabad 28.34 lakhs 28.34 lakhs 24.95 lakhs 21.10. 2010.

11 RVNL/SC/GY-

PMT/Bridge works/139

22.12.2010 Construction of Bridge No:601,

743 & 744

RVNL/SC/GY-PMT/Bridge

works/139 dt:23.11.2009

M/s.MEC-CC (JV)/Hyderabad 9.92 Crs 9.92 Crs 11.45 Crs 6 Months + 180 days

DLP

12 RVNL/SC/GY-

PMT/Fabrication

works/140

22.12.2010 Construction of FOBs and

COPs between GY-PMT

RVNL/SC/GY-

PMT/Fabrication works/140

dt:23.11.2009

M/s. Vishnu Constructions &

Company, Hyderabad.

7.75 Crs 7.75 Crs 8.91 Crs 6 Months + 180 days

DLP

(B)

13 No.2006/ELECT/PMT-

NRE/001 dated 13.3.06

23-5-06 Supply, Erection, Testing and

commissioning of 25 Kv OHE

bet. Pullampet-Nandalur Sec.

of Guntakal Divn. of S.C. Rly

No.2006/Elec./PMT-

NRE/001 dt. 15.11.06

M/s. Tata Projects Limited,

Hyderabad. (TPL)

599.83 lakhs 599.83 lakhs 840.47 lakhs 12 months (02-10-

2007). Extended up to

30-09-2009.

14 RVNL/SC/OBVP-

KP/OHE/120

31.08.07 Design, Supply, Erection,

Testing & Commissioning of

25 KV, 50HZ, Single Phase,

Traction Over-head

Equipment, etc Ph. I work

between Venkatachalam Road

Jn. to Krishnapatnam in

connection with laying of new

BG line between

Obulavaripalle -

Krishnapatnam section of

South Central Railway.

RVNL/SC/OBVP-

KP/OHE/120 dt:12-03-2008

M/s. Cobra Instalaciones y.

Servicios, S.A., NDLS

NA NA Rs.15.11 Crs. 11.03.2009. Extended

up to 15-10-2009

15 RVNL/SC/NRE-

KDP/RE/121

27.01.08 Design, Supply, Erection,

Testing & Commissioning of

25 KV, 50HZ, Single Phase,

Traction Over-head Equipment

etc., between Nandalur (Excl)

and Kondapuram (Incl)

stations and S&T works of

Guntakal Division of South

Central Rly.

RVNL/SC/NRE-

KDP/RE/121/Agt.

Dated 21-07-08

M/s.Larsen & Toubro Limited,

Chennai

NA NA Rs.103.47 Crs 20-01-2010

ELECTRICAL

Page 100: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

16 RVNL/SC/GTL-

WADI/DDE/122

27.03.08 Detailed Design Engineering

(Electrical, Civil) for Railway

Electrification of –

Guntakal(excl)-Raichur-

Wadi(excl) and Wadi(excl) –

Gulbarga(incl) (265RKM)

(including patch doubling line

section) in Guntakal Division

on S.C. Rly and Solapur Divn

of Central Railway

RVNL/SC/GTL-WADI-

GR/DDE/Agt/122 Dt:18-07-

2008.

M/s. Balaji Rail Road Systems

Limited, Secunderabad.

NA NA Rs.58.41 lakhs 17.01.2009. Extended

up to 31.03.2010 with

LD.

17 RVNL/SC/KDP-

GTL/RE/127

04.06.08 Design, Supply, Erection,

Testing & Commissioning of

25 KV, 50HZ, Single Phase,

Traction Over-head Equipment

etc.,for RE between

Kondapuram(Excl) – Guntakal

(Incl) Section of GTL Divn of

SC Rly.

RVNL/SC/KDP-GTL//RE/127

dt:17-11-2008

M/s.TATA Projects Limited,

Hyderabad

NA NA Rs.101.18 Crs 16.05.2010.

18 RVNL/SC/NRE-

GTL/TSS/119

08.07.08 Design, Supply, Erection,

Testing & Commissioning of

132/25 KV and 220/25 KV,

TSS at Kadapa, Muddanur,

Tadipatri and Gooty Nandalur -

Guntakal Section of Guntakal

Division of SC RLY.

RVNL/SC/NRE-

GTL/TSS/119, dt:04.12.2008

M/s. G.E.T. Power Pvt

Limited, Chennai

NA NA Rs.28.20 Crs 03.06.2010

19 RVNL/SC/VKT-

KP/SCADA/131

25.05.09 Design, Supply, Erection,

Testing & Commissioning of

Supervisory Remote Control &

Data Acquisition (SCADA)

equipment on section between

Venkatachalam RD JN and

Krishnapatnam on Vijayawada

Divn of SC Rly.

RVNL/SC/VKT-

KP/SCADA/131 dt.11.9.09

M/s Nelco, Navi Mumbai 11.05 lakhs 11.05 lakhs Rs.13.26 lakhs 3 months. Extended

up to 31.08.10.

20 RVNL/SC/NRE-

GTL/PMC/124

dt:17.12.09

14.05.09 Project Management

consultancy for erection,

Testing & Commissioning of

25 KV AC single phase 50 Hz

Traction OHE, Switching stns,

TSSs, SCADA, S&T works and

other associated civil works in

NRE (Excl) – GTL (Incl)

section of GTL Divn of SC

Railway

LOA No: RVNL/SC/NRE-

GTL/PMC/124 dt:17.12.09

M/s. United Rail Road

Consultants Ltd, Hyderabad

250.74 lakhs 250.74 lakhs 274.65 lakhs 36 months.

Page 101: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

21 RVNL/SC/NRE-

GTL/RE/SCADA/136

05.03.2010 Design, Supply, Erection and

Testing and commissiong of

SCADA bet. Nandalur and

GTL

LOA No:RVNL/SC/NRE-

GTL/RE/SCADA/136

dt:04.06.2010.

M/s. CMC Limited, Hyderabad. 138.00 lkhs 138.00 lakhs 113.75 lakhs 12 months excluding 6

months defect liability

( c)

22 No.C/ADB/Gooty-

Pullampet/ Signalling

(Vol.III) dated 10-11-04

20.04.05 S & T Works in Gooty -

Pullampeta patch doublinhg

No.C/ADB/Gooty-Pullampet/

Signalling (Vol.III) dated 08-

11-06

M/s. Leighton Emrail-Kalindee

(JV)

10589 lakhs 10589 lakhs 9681.31 lakhs 36 months (29.6.09)

23 RVNL/S&T/Venk-

Krish/Bid dt:31.10.07

04.12.07 S&T works in five stations in

connection with new BG line

between Venkatachalm -

Krishnapatnam

RVNL/S&T/Venk-Krish/Bid

dt:15.07.08

M/s . VNR Infrastructures Ltd,

Hyderabad.

8.70 8.70 10.82 12 months.

24 RVNL/S&T/GTL -

RC/Bid dt:20.06.08

31.07.08 S&T works at 12 stations and

misc works in connection with

doubling of Raichur – Guntakal

section.

No:RVNL/SC/GTL-RC/VNR-

1/09 dt:31.03.09

M/s. VNR Infrastructures

Limited, Hyderabad

14.18 14.18 15.29 12 months.

25 No.RVNL/

SC/NRE-KDP/RE/121

S&T works at 7 stations in

Nandaluru - Kondapur patch

;doubling.

No.RVNL/

SC/NRE-KDP/RE/Agt/121

dt. 12.8.08

M/s. L&T Limited, ECC Divn.

Chennai

1587.3 1587.3 2090.47 18 months

Signal & Telecom

Page 102: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 1 between Bina (Incl) to Ganj Basoda (Incl)

chainage 975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 2 between GanjBasoda (Excl) to Sanchi

(Incl) chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) -

Package No. 3 between Sanchi (Excl) to Habibganj (Incl)

chainage 879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.09.2010*

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010**

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bin

a- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 15.08.2010

Details of Contracts Placed upto the month July' 2010 under GM/P-III

Page 103: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-

500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60

kg 1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.09.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot No.

11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 16.08.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 31.08.2010***

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

Page 104: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 16.08.2010

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Note: * Delivery Period Extended upto 30.09.2010.

** Delivery Period Extended upto 30.08.2010.

*** Delivery Period Extended upto 31.08.2010.

Page 105: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India) - Package No. 1

between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India) - Package No. 2

between GanjBasoda (Excl) to Sanchi (Incl) chainage

928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India) - Package No. 3

between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot No.

31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt. Ltd.,

24/5 Sriram Road, Civil Lines,

Delhi-110054.

Manufacture and Supply: Rs 1.25

Cr for 60 kg 1 in 12 Switches and

Rs 16.97 Lakh for 60 kg 1 in 8 1/2

Switches & Rs 4.24 Lakh for 52 kg

1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.09.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt. Ltd.,

24/5 Sriram Road, Civil Lines,

Delhi-110054.

Manufacture and Supply: Rs 2.47

Cr for 60 kg 1 in 12 CMS Crossing

and Rs 0.5 Cr for 60 kg 1 in 8 1/2

CMS Crossing. Transportation:

Rs 3.18 Lac for 60 kg 1 in 12 CMS

Crossing and Rs 0.6 Lac for 60 kg

1 in 8 1/2 CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 15.08.2010

Details of Contracts Placed upto the month AUG' 2010 under GM/P-III

Page 106: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7 RVNL/BPL/S&T/HBJ-BPL-

BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor 6-

3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs 3.22

Cr. for PSC Turnout Sleeper Set

for 1 in 12, 60 kg and Rs 52.63

Lakh for PSC Turnout Sleeper Set

1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.09.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand, 3rd

& 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs 3.34

Cr. for PSC Turnout Sleeper Set

for 1 in 12, and Rs 25.26 Lac for

PSC T/out Sleeper Set 1 in 8 1/2

60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation: Rs

20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch 60

Kg.

Rs 3.92 Cr 16.08.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs 5.70

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 5.10 Lac for 1 in

81/2 Derailing Switches 52Kg.

Transportation: Rs 1.31 Lac for 1

in 8 1/2 52Kg Curved Switches and

Rs 1.08 Lac for 1 in 8 1/2 Derailing

Switches

Rs 13.19 Lac 31.08.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09 Cr

for Maintenance Tools, Rs 0.35 Cr

for Site Facilities & Rs 2.65 Cr for

Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs 2.33

Cr for 60 Kg CMS Crossing 1 in

12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

Page 107: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr for

staff & Provision & maintenance

of Office for- Rs 2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road projects

in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Note: * Delivery Period Extended upto 30.09.2010.

** Delivery Period Extended upto 30.08.2010.

*** Delivery Period Extended upto 31.10.2010.

**** Delivery Period Extended upto 31.08.2010.

Page 108: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 2 between GanjBasoda (Excl) to Sanchi (Incl)

chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 15.08.2010

Details of Contracts Placed upto the month of Sept' 2010 under GM/P-III

Page 109: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 31.12.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

Page 110: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Page 111: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

1

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

1 RVNL/CPM/ATU-SA/Chennai/

22.9.2005 GC work between SA - ATU section [including Civil Engg., Electrical and S & T works]

LOA No.RVNL/CPM/ATU-SA/Chennai/01 dt.31.102005

Agreement no. RVNL/Attur-Salem/01 dated 25.1.2006.

M/S D.S. Construction Ltd., C-66, South Extension II, New Delhi. 110 049.

56.69 Cr 0 614690485.96 18.11.2006./Extd Up to

31.12.2007+ 12 months Defect

Liability period.

2

RVNL/CPM/ATU-SA/Chennai/02

20.9.2005 Project Management Consultancy for GC between SA - ATU GC work.

LOA no. RVNL/CPM/ATU-SA/Chennai/02 dated 14.11.2005 Agreement no. RVNL/Chennai/PMC/02 dated3.4.2006

M/S Aarvee Associates, Ravula Residency, Srinagar colony, Hyderabad. 82.

-- 0 10118500.00

+

Service tax.

12 months + 12 months defects

liability period [31.12.2007 +

DLP]

3 RVNL/CPM/MAS/VM-MV/01.

02.01.2006 Gauge conversion of MG to BG between Villupuram and Mayiladuthurai section in Southern Railway.

-LOA no. RVNL/CPM/MAS/VM-MV/01 dt. 17.4.2006.Agreement no. RVNL/CPM/MAS/VM-MV/01 dated 21.7.2006

M/S Tata -Kalindi-Unity Infra Projects Ltd., [JV]

Suryodaya, 1-10-60/3, Begum pet, Hyderabad -16.

186 Cr. 0 1822269941.00 16.1.2008./ Extn. 15.11.2008/

Extn. 30.9.2009 30.12.2009.

Page 112: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

2

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

4 RVNL/TRL-AJJ/01

22.2.2006 Project Management Consultancy for construction of 3 rd line between Tiruvallur and Arakkonam in Southern Railway.

LOA no. RVNL/TRL-AJJ/01 dt. 27.6.2006 Agreement no. RVNL/TRL-AJJ/02/PMC dt. 21.8.2006

M/S Expert _SPA [JV]

C/o Expert Resorts & Layout G-2, Pride Elite, No. 10, Museum Road, Bangalore. 25

-- 0 15893000.00 +

Service tax.

21 Months + 12 months DLP

15.11.2008 + DLP] Extd. 31.7.2010

5 RVNL/TRL-AJJ/01

02.01.2006 Construction of Roadbed, Bridges, Facilities, installation of Track [excluding supply of Rails, Thick web switches & weldable CMS Crossings] & Electrical [Rly. electrification and Genl. Electrification] Signalling and Telecommunication works in connection with provision of 3rd line between

LOA no. RVNL/TRL-AJJ/01 dt. 29.6.2006

Agreement no. RVNL/CPM/TRL-AJJ/Chennai/01 dt. 28.8.2006

M/S Larsen & Toubro Limited, Chennai. 89.

580123304 0 589425046.00 28.6.2007 / Extn.

Up to 31.7.2009

+ 180 days DLP

Page 113: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

3

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

Tiruvallur and Arakkonam in S.Railway.

6 RVNL/VM-MV/Chennai/02

16.5.2006 Project Management Consultancy services for GC of MG to BG Rly. Line of VM - MV section in southern Railway. - 122 KMs

LOA no. RVNL/VM-MV/Chennai/02 dated 12.7.2006 Agreement no. RVNL/VM-MV/Chennai/02/PMC dt. 2.9.2006

M/S Expert_SPA [JV], Bangalore -25.

---- 0 37961020

+

Service Tax

March 2008 including DLP.

[31.8.2008 + DP]

7 RVNL/CPM/MAS/VM-MV/Minor Br.LT/03

18.12.2006 Construction of minor bridges with precast RCC box of various sizes between Villupuram and Mayiladuturai – Reach III

Agreement No. RVNL/CPM/MAS/VM-MV/Minor Br.LT/03 dated 28/03/2007

M/s. K.Rajan No. 4, 5th Cross Canara Bank Colony, Srinivasa Nagar Tiruchchirappalli – 620 017

16804835.00 0 17561052 30.10.2007/ Extd. Up to 31.10.2009/

31.3.2010

8 RVNL/CPM/MAS/IPL-ICTT/01

15.11.2006 Provision of rail connectivity from Idappalli to ICTT, Vallarpadam for works of elevated structures, major and minor bridges and earthwork in

LOA No. RVNL/CPM/MAS/IPL-ICTT/01 dated 21/02/2007

M/s. Afcons Infrastructure Ltd. Afcons House, 16 Shah Industrial Estate Andheri (W), Mumbai – 400 053

1678135436 0 1712431635 30.11.2008

Extd. Up to 21.2.2010

Page 114: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

4

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

Trivandrum Division of Southern Railway

9 RVNL/CPM/MAS/TRL-AJJ/Pipe Culvert/LT - 2

24.3.2007 Extension of Pipe Culverts, Construction of Platform wall, Passenger amenities, Circulation area etc., in TRL - AJJ section.

RVNL/CPM/MAS/TRL-AJJ/Pipe Culvert/LT - 2

dt. 15.5.2007

M/S Harsha constructions, 70, Hunters Road,, Vasupujya, Vepery, Chennai - 600 112.

1.78 Crore 0 20339036 14.2.2008 Extd. Up to 30.9..2009

/30.4.2010

10 RVNL/CPM/MAS/VM-MV/Retaining Wall/LT -10

27.3.2007 Construction of retaining wall between KM 253/800 - 284/000 - Vallampadugai - Mayiladuthurai Reach V in VM - MV Section

RVNL/CPM/MAS/VM-MV/Retaining Wall/LT -10 dt.25.5.2007

Mr. L. Narasimha Reddy, 37/18, Dr. Gurusamy Road,Chetpet, Chennai - 600 031.

1.72 Crore 0 17249765 24.10.2007 Extd. Up to 30.10.2009

/10.6.2010

11 RVNL/CPM/MAS/VM-MV/Station Bldg.,/LT- 12

16.6.2007 Construction of Station Building at Thiruthuraiyur, Melpattambakkam and Tiruppadiripuliyur and Service Buildings

RVNL/CPM/MAS/VM-MV/Station Bldg.,/LT- 12 dated 7.7.2007

M/S Harsha constructions, 70, Hunters Road,, Vasupujya, Vepery, Chennai - 600

1.77 Crore 0 21821118 6.1.2008 Extd. Up to 30.10.2009/

31.3.2010 /30.6.2010

Page 115: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

5

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

at Tiruppadiripuliyur in VM - MV Section.

112.

12 RVNL/CPM/MAS/VM-MV/Station Bldg.,/LT - 13

16.6.2007 Construction of Station Building at Kille, Chidambaram and Vaithiswaran Koil and Service Building at Chidambaram in VM-MV Section..

RVNL/CPM/MAS/VM-MV/Station Bldg.,/LT - 13 dated 7.7.2007

M/S Simhadri Constructions, 31/2, Welcome Colony, Anna Nagar West, Chennai - 600 101.

1.86 Crore 0 22861552 6.1.2008 Extd. Up to

30.8.2009/31.12.2009

13 RVNL/CPM/MAS/IPL-ICTT/LT -2

16.8.2007 Linking, Supply of Ballast and supply of Permanent way materials for the yard arrangements at Idapalli Yard.

LOA no. RVNL/CPM/MAS/IPL-ICTT/LT -2 dated 1.10.2007

Mr. Anil Kumar, Railway Contractor, Kodath House, Neduvannoor, Chowara PO, Alwaye - 683 571.

3.21 Crores 0 53914140 30.4.2008

Extd. Up to 31.12.2009 31.3.2010/ 30.6.2010.

Page 116: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

6

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

14 RVNL/CPM/MAS/IPL-ICTT/LT-3

22.8.2007 Overhead Electrification and modification works at Idapalli Yard including provision of switching post in Trivandrum Division.

LO No. RVNL/CPM/MAS/IPL-ICTT/LT-3 dt. 20.12.2007

M/S Tirumurthi Hightech Co., Pvt./, Ltd., 54/25, GF - 2nd Street, Padi Pudunagar, Chennai - 600 101.

2.23 Cr. 0 23199802 19.6.2008 Extd. Up to 30.11.2009/

30.6.2010/ 31.8.2010

15 RVNL/CPM/MAS/VM-MV/OT-2

27.3.2008 Paving of Rail Level Goods Platform at Sirkazhi Yard, Improvements to LC Gates, Water Pipe line works for Coach watering at Mayiladuturai and Track Drainage arrangement at Sirkashi, Vaitheeswarankoil, Anadandavapuram and Mayiladuthurai junction in Villupuram - Mayiladuturai section.

RVNL/CPM/MAS/VM-MV/OT-2 dt.12.6.2008

Mr. R. Venkatakrishna Reddy, HO 9-53, New Dilsukh Nagar, Hyederabad. 500 060

3.5 Crore 0 35998144 11.12.2008 Extd. Up to

30.11.2009/ 31.3.2010

/15.10.2010.

Page 117: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

16 RVNL/CPM/MAS/IPL-ICTT/S & T/OT-2

20.3.2008 Signaling arrangements at Idapalli Yard [Remodeling work] in connection with provision of Rail connectivity from Idapalli to International Container Transshipment

RVNL/CPM/MAS/IPL-ICTT/S & T/OT-2 dt. 10.5.2008

Mr. R.V. Abdul Majeed, Railway Contractor, P.Box No. 12, Chavakad, Trichur District, Kerala.

1.95 Crore 0 35134549 9.11.2008 Extd. Up to

30.11.2009/ 31.3.2010./

31.5.2010

17 RVNL/CPM/MAS/VM-MV/OT-5

19.5.2008 Additional works such as earth work in Platform, regarding of LC approach roads, laying of bituminous concrete in LCs, Gate lodge buildings, formation of approach roads to Goods Platforms, protection of embankment at vulnerable locations, painting of PSC

LOA No. RVNL/CPM/MAS/

VM-MV/OT-5 dated 21.7.2008.

M/S Eagle Earthmovers, 14, SCS Complex, South Car Street, Tiruchendur - 637211.

84551735 0 107977171 20.1.2009 Extd. Up to

30.11.2009/ 31.3.2010

/31.8.2010

Page 118: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

8

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

girders, etc. between Villupuram and Cuddalore Port Junction. [including]

18 RVNL/CPM/MAS/VM-MV/OT -4

13.5.2008 Conversion of free/two 90 R & 60 KG Rail joints into short welded panels/long welded panels on loop & main lines in station yards in VM - MV section.

LOA no. RVNL/CPM/MAS/VM-MV/OT -4 dated 14.8.2008

M/S Sagar Thermit Corporation Ltd., B -67, APIE, Balanagar, Hyderabad - 500037.

7358600 0 10890728 13.2.2009 Extd. Up to 30.6.2009/

31.12.2009

19 RVNL/CPM/MAS/TRL-AJJ/OT-2

03.7.2008 Paving of Platform with GC, provision of pre-cast CC drain, Provision of Inspection Steps, Mini shelters on Platform & other Misc. works in TRL - AJJ Section.

LOA No.

RVNL/CPM/MAS/TRL-AJJ/OT-2 dated 20.8.2008

M/S Harsha Constructions, 51, Hunters road, Vasupujya apartment, Vepery, Chennai- 600112.

1.9382394 0 20936932 19.11.2008

Extd. Up to 30.9.2009/ 30.4.2010

Page 119: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

9

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

20 RVNL/CPM/MAS/VM-MV/OT - 7

03.7.2008 Ballasting by Rail lorry and Hopper wagons, packing of tracks and other track works between Villupuram and Mayiladuturai.

LOA no. RVNL/CPM/MAS/VM-MV/OT - 7 dated 22.10.2008

M/S M. Mohandass, Railway Contractor, No. 91, PJN 2nd Street, Sholingur Road, Arakkonam - 631 101.

26866001 0 28047314 21.07.2009 Extd. Up to 30.10.2009

/31.3.2010/ 31.5.2010

21 . RVNL/CPM/MAS/VM-MV/OT-10

11.7.2008 Proposed improvements to LCs, earthwork in filling for Platforms and bridge back filling, painting of PSC girders, paving of goods platforms and other works between Parangipettai & Sirkazhi.

LOA No. RVNL/CPM/MAS/VM-MV/OT-10 dt. 22.10.2008

Mr. R. Venkatakrishna Reddy, HO 9-53, New Dilsukh Nagar, Hyederabad. 500 060

85892744 0 103303578 21.04.2008 Extd. Up to

30.10.2009/ 30.4.2010/ 30.6.2010/ 30.9.2010

Page 120: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

10

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

22 RVNL/CPM/MAS/VM-MV/OT-09

11.7.2008 Proposed improvements to LCs, earthwork in filling for Platforms and bridge back filling, painting of PSC girders, paving of goods platforms and other works between Cuddalore Port Junction and Parangipettai.

LOA No. RVNL/CPM/MAS/VM-MV/OT-09 dt. 6.11.2008

M/S Kalindee Rail Nirman (E) Ltd., 2nd Floor, Building no. 9A, Cyber city, DLF Phase III, Guraon - 122002

60642004 0 76649581 05.05.2008

Extd. Up to 15.10.2009/

31.3.2010./

23 RVNL/CPM/MAS/IPL-ICTT/OT -3

29.12.2008 Supply of 50 mm size hard machine crushed stone ballast as per latest RDSO specification [IRS - GE-1 of June 2004] and stacking the same at places along side the track and yard as per the directions of the

LOA no. RVNL/CPM/MAS/IPL-ICTT/OT -3 dated 9.2.2009

M/S Vallamattam Stone Aggregates {P} Ltd. Pandappilly Post, Muvattupuzha, Ernakulam, Kerala - 686 672.

21216000 0 19497504 08.10.2009/

31.5.2010/ 31.8.2010.

Page 121: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

11

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

24 RVNL/CPM/MAS/IPL-ICTT/OT-5

06.2.2009 1. Manufacture & supply of prestressed pretensioned concrete sleeper for Bridges with arrangements for fixing 60 Kg/52 Kg [UIC] and 52 Kg/90 R Guard Rail for Bridges as per RDSO drg. No. 4088 Alt. 3 including loading into Road Lorries.

2. Manufacture and supply of pre-stressed, pretensioned concrete sleepers for fixing 60 KG [UIC]/52 Kg running and 52 KG/90 R Guard Rail for bridge approaches as per

LOA no. RVNL/CPM/MAS/IPL-ICTT/OT-5 dated 9.3.2009

M/S Concrete Products & Construction Company, No. 398, [Old no. 766], Poonamallee High Road, Chennai. 600 010.

14091786 0 17626497 08.9.2009/

30.4.2010/ 31.7.2010.

Page 122: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

12

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

RDSO Drg. No. 4089 to 4097 Alt.4 including loading into Road Lorries in the factory premises.

25 RVNL/CPM/MAS/IPL-ICTT/OHE/OT-4

06.3.2009 Design, Supply, erection and commissioning of traction Overhead equipment, auxiliary transformer stations including modification to existing OHEs between Idappalli and Vallarpadam in Trivandrum division of Southern Railway in the State of Kerala.

LOA no. RVNL/CPM/MAS/IPL-ICTT/OHE/OT-4 dated 6.5.2009

M/S Tirumurthi Hitech Co., PVT., Ltd., 54/55, Ground floor, Second Street, Padi Pudunagar, Chennai. 600 101.

45184014 0 48565428 05.02.2010/ 30.6.2010.

Page 123: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

13

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

26 RVNL/CPM/MAS/VM-MV/OT-11

18.2.2009 Construction of Service Building, Passenger amenities, General electrical work and other works between Parangipettai and Mayiladuthurai in Southern Railway.

LOA no. RVNL/CPM/MAS/VM-MV/OT-11 dated 25.5.2009

M/S Malathy Constructions, Nellore

35819945 0 42298452 24.11.2009/

31.1.2010/ 31.7.2010

31.10.2010.

27 RVNL/CPM/MAS/VM-MV/OT – 13

09.5.2009 Additional Civil & Electrical works between Villupuram and Mayiladuthurai in Southern Railway.

LOA no. RVNL/CPM/MAS/VM-MV/OT – 13 dt. 16.6.2009

M/S JPC—SRC [JV], No. 21-7-12, Madina Street, Salipetaq, Kakinada – 533 001.

52314592 0 59036022 15.2.2010/ 31.8.2010/ 31.10.2010

28 RVNL/CPM/MAS/ATU-SA/OT-3

25.5.2009

Residual S & T works between Attur and Salem in Southern Railway.

RVNL/CPM/MAS/ATU-SA/OT-3 dated 29.6.2009

Mr. R.V. Abdul Latheef, Railway Contractor, Guruvayr, Kerala.

2495877 0 3868609 28.9.2009/ 31.1.2010/ 31.8.2010.

29 . RVNL/CPM/MAS/OBVP – VKT/OT-3

12.9.2009 Earth work, Bridges and site facilities between new Manubolu station and Venkatachalam Road Junction in SC

LOA no. RVNL/CPM/MAS/OBVP – VKT/OT-3 dated 19.9.2009

M/S Railone – RSV –AVR [JV], H.No. 8-3-833/44 Plot no. 44, Phase I, Kamalapuri

140990079 0 129583753 18.5.2010/ 31.7.2010

Page 124: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

14

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

Railway. Colony, Hyderabad – 500 073.

30 RVNL/CPM/MAS/IPL-ICTT/OT-6.

16.6.2009 Provision of Signalling and telecommunication arrangements at Vallarpadam Goods terminal yard, Southern Railway, in Kerala State.

LOA no. RVNL/CPM/MAS/IPL-ICTT/OT-6 dated 1.8.2009.

M/S Abdul Majeed, PB no. 12, Kalpaka, Arakkal Building, PO, Chavakkad, Tiruchur District, Kerala, 680056

18831467 0 24926269 31.1.2010/ 31.5.2010

31 RVNL/CPM/MAS/IPL-ICTT/OT -7

21.7.2009 Linking of Track between Idapalli and Vallarpadam [excluding Idappalli yard and including yard arrangements at Vallarpadam] in Trivandrum division of Southern Railway.

RVNL/CPM/MAS/IPL-ICTT/OT -7 dt.1.8.2009

M/S K.V. AniklKumar & K.V. Baiju [JV] Kodath House, Neduvannoor, Chowara PO, Always. 683 571.

53058301 0 61980207 30.4.2010/ 30.6.2010/ 30.9.2010

Page 125: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

15

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

32 RVNL/CPM/MAS/OBVP – VKT/OT-2

25.8.2009 Supply of track materials, linking of track, collection and dumping of ballast, station building [including general electrical works] and Platform works between New Manubolu Station and Venkatachalam Road Junction in South Central Railway.

LOA no. RVNL/CPM/MAS/OBVP – VKT/OT-2 dated 25.9.2009

M/S Mohandoss –K. Dhanasekar [JV], 91, PJN II street, Sholingur road, Arakkonam – 631 001.

65327602 0 71632535 24.5.2010/ 31.8.2010/ 15.10.2010

33 RVNL/CPM/MAS/OBVP – VKT/OT-5

29.8.2009 Design, Supply, erection, testing and commissioning of traction over head equipment, auxiliary transformer stations including modifications to existing OHEs between New Manubolu Station and Venkatachalam

LOA no. RVNL/CPM/MAS/OBVP – VKT/OT-5 dated 29.9.2009

M/S MCML Electrical Systems Pvt., Ltd. – ECI Engineering & Construction Co., Ltd., [JV] 12 SM, KSSIDC Industrical Area, Yelahanka New Town, Bangalore – 560

37724147 0 33790256 28.6.2010

Page 126: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

16

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

Road Junction in South Central Railway.

064

34 RFP/PMC/Tunnel/OBVP-VKT/2009.

21.12.2009 Carrying out site investivation, Detailed design and supervision for construction of Road bed including two tunnels [Chainages 18.481 - 19.712 KM and 23.284 - 30.26 KM] Bridges, P.Way, Electrifi9cation of track and S & T works, between chainages 17.1 KM to Chainage 356.00 KM from Nethavaripalli [excl.] to Vellikalluy [excl] section of

LOA no. RFP/PMC/Tunnel/OBVP-VKT/2009 dated 31.5.2010.

M/S AYESA India - Wilbur Smith Associates Inc. [JV] 502, 5

th Floor,

Time Tower, M.G. Road, Gurgaon - 122 001.

-- --0 32 12 01 750

Page 127: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

17

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

Obulavaripalle - Venkatachalam new line on South Central Railway in Kadappa/Nellore Districts in the State of Andhra Pradesh [India]

35 RVNL/CPM/MAS/TRL - AJJ/4

th

Line/OT 1

18.6.2010 Construction of Roadbed, Bridges, Supply of ballast, installation of track [excluding supply of Rails and thick web switches], Electrical [Rly. Electrification and General Electrification] Signalling and Telecommunication works in S.Rly, Tamil Nadu.

LOA no. RVNL/CPM/MAS/TRL - AJJ/4

th Line/OT 1 dated

23.7.2010

M/S IVRCL Infrastructures & Projects Limited, MIHIR H no. 8-2-350/5/A/24/1B, Road no. 2, Banjara Hills, Hyderabad - 500 034.

717210381 0 650300055 01.9.2013

Page 128: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

18

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

36 RVNL/CPM/MAS/OBVP-VKT/OT-6

06.8.2010 Execution of earthwork information, Bridges, Road under Bridges, Station Buildings, Staff quarters, General electrical works including power line crossings from KM 00 to KM 17 between Obulavaripalle to Nethavaripalle in South Central Railway in Andhra Pradesh.

LOA no. RVNL/CPM/MAS/OBVP-VKT/OT-6 dated 30.8.2010.

M/S BVSR - KVR [JV], 5-8-51/1, Fathe Sultan Lane, Nsampallyt, Hyderabad - 500

787884327 0 598792084 30.8.2012

37 RVNL/Chennai/TRL-AJJ/4th line/PMC

18.8.2010 Project Management consultancy for Construction of Roadbed, Bridges, Supply of ballast, installation of track [excluding supply of Rails and thick web switches], Electrical [Rly. Electrification

LOA no. RVNL/Chennai/TRL-AJJ/4th line/PMC dated 31.8.2010

M/S Theme Engineering Services Pvt.,Ltd. No. 203, Daedu Marg, Barakat Nasgar, Jaipur 302015

-- 0 23560000 31.8.2013

Page 129: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

19

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

and General Electrification] Signalling and Telecommunication works in S.Rly, Tamil Nadu.

38 RVNL/CPM/OBVP/NET/PMC.

18.8.2010 Project Management Consultancy for new BG line between Obuluvaripalle and Venkatachalam - Execution of earthwork information, Bridges, Road under Bridges, Station Buildings, Staff quarters, General electrical works including power line crossings from KM 00 to KM 17 between Obulavaripalle to Nethavaripalle in South Central

RVNL/CPM/OBVP/NET/PMC dt. 31.8.2010.

M/S Data Technosys [Engg] Pvt. Ltd. TF-II, Asha Apartments, 19, Rana Mohan Rai Marg, Lucknow - 1.

-- 0 11280000 30.8.2012

Page 130: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

20

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

Railway in Andhra Pradesh.

39 RVNL/CPM/MAS/IPL - ICTT/OT-8

29.6.2010 Construction of Inspection platform with hand rails for the elevated structure, provision of guide piles for the navigational channel and pile built up for the future piles in Trivandrum division of Southern Railway -

RVNL/CPM/MAS/IPL - ICTT/OT-8 dt. 14.7.2010

Mr. Anil Kumar, Railway Contractor, Kodath House, Neduvannoor, Chowara PO, Alwaye - 683 571

66448138 0 76415359

Page 131: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

21

Details of Contracts/award of tenders by PIU Chennai for the period from 01.10.2005 to 30.10.2010.

Sl.

N

o.

Tender no. Date of

Opening.

Description of

item/work

Contract No. & date.

Contractor’s

name

Qty. [for supply

contract]

Estimated cost

[for

Engg./Elect/S &

T [Mech]

Rate[ for supply

Contract]

Tendered Cost for

Engineering/Elect/

S & T/Mech] in `

Value of

Contract in ` Scheduled

completion date.

40 RVNL/CPM/MAS/DG-VM/Bridges/OT-1

02.09.2010 Execution of major and precast minor Bridges from Villupuram to Ariyalur and form Valadi to Dindigul in Tiruchirapalli Division of Southern Railway.

RVNL/CPM/MAS/DG-VM/Bridges/OT-1 dt. 04.10.2010.

M/S Simplex Infrastructuures Limited, Simplex House, No. 27, Shakespeare Sarani, Kolkatta -700017.

1914797530 0 1683298983 30 months. [3.4.2013]

CPM/RVNL/Chennai

Page 132: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Detail of Contract awarded upto October, 2010 of Project Planning & Development Department

S. No.

Tender No. Date of opening

Description of work/study

Contract No. & date (LOA)

Contractor’s Name

Estimated cost of work

Tendered cost

Value of contract

Scheduled completion date

1 PP&D/RVNL/ HX-SBC/2010

23.08.10 Bankability study for Cuddapah-Bangalore New Line project.

PP&D/RVNL/ HX-SBC/2010 24/09/2010

M/s PricewaterhouseCoopers Pvt. Ltd.

12,89,340/-

Rs. 14,5

0,1

00/-

_

8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010

2 PP&D/RVNL/ KUR-BOLANGIR/2010

21.09.10 Bankability study for Khurda Road-Bolangir New Line project.

PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010

M/S Deloitte Touche Tohmatsu India Pvt. Ltd.

15,00,000/-

R

s.9

,65,1

25/-

_

10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)

3. RVNL/PP&D/Babkability/Buramara-Chakulia/10

25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.

RVNL/PP&D/Babkability/Buramara-Chakulia/10 30/04/2010

M/S Feedback Ventures Pvt. Ltd.

15,00,000/-

Rs.1

3,1

8,0

85/-

_ 3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)

4. RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10

09/04/10 Bankability study of electrification of Nallapadu-Guntakal section

RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010

M/s PricewaterhouseCoopers Pvt. Ltd

15,00,000/-

R

s.9

,91,5

14/-

_

3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)

5. PP&D/RFP/BOT/CONSULT/2009/Pt. II

21.08.10 Project Consultancy services for development of PPP model in Railway projects.

PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010

M/s. RITES Ltd.

R

s. 15,0

0,0

00/-

_

26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)

ED/PP&D/RVNL

Page 133: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 2 between GanjBasoda (Excl) to Sanchi (Incl)

chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 15.08.2010

Details of Contracts Placed upto the month of Oct' 2010 under GM/P-III

Page 134: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 31.12.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

Page 135: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Page 136: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

S.No Tender No. Date of

Opening

Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)

Estimated Cost (for

Engg./Elect./S&T/Mech.)

Rate (for supply contract)

Tendered Cost (for

Engg./Elect./S&T/Mech.)

Scheduled Completion

Date

1 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage

975.16 to 928.500 (Km 46.66).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-1 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.--

Rs 141.88 Cr March, 2012

2 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 2 between GanjBasoda (Excl) to Sanchi (Incl)

chainage 928.500 to 879.750 (Km 48.75).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-2 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. Larsen & Toubro Ltd,ECC

Division,Post Box No. 979,Mount

Poonamalle Road,Manakakkam,

Chennai-600089.

--

Rs. 150.05 Cr March, 2012

3 RVNL/P-III/BIN-

BPL/Composite Works

Tender

31.01.2009 Construction of Road Bed, Major and Minor Bridges,

Track Linking (excluding supply of rails, thick web

switches & sleepers), S&T and OHE & General Electrical

work in connection with 3rd

line between Habibganj &

Bina (144.76 Km) on Bhopal Division of West Central

Railway in the state of Madhya Pradesh (India) - Package

No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage

879.750 to 830.850 (Km 48.9).

Notification of Award No.

RVNL/P-III/BIN-

BPL/Composite Works

Tender/Package-3 dated

31.08.2009 (Contract

agreement yet to be

done)

M/s. NCCL-ECIECCL-ARPL (JV),

C/o M/S Nagarjuna Construction

Company Limited,4th Floor, Uma

Enclave, Road No. 9,

HYDERABAD-500034. --

Rs 135.65 Cr March, 2012

4 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches; Lot

No. 31030801

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/Switches dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

1.25 Cr for 60 kg 1 in 12 Switches

and Rs 16.97 Lakh for 60 kg 1 in 8

1/2 Switches & Rs 4.24 Lakh for

52 kg 1 in 8 1/2 Switches.

Transportation: Rs 26.50 Lac for

60 kg 1 in 12 Switches and Rs

4.50 Lac for 52 kg 1 in 8 1/2

Switches & Rs 1.12 Lakh for 60 kg

1 in 8 1/2 Switches.

Rs 1.77 Cr 30.11.2010

(extended)

5 RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing; Lot

No. 31030802

27.06.2008 Manufacture and supply of P.way items for BG (1673mm)

for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/P.way

items/Guntakul-Raichur/1

of 2009/CMS Xing dated

30.03.2009

M/s VAE VKN Industries Pvt.

Ltd., 24/5 Sriram Road, Civil

Lines, Delhi-110054.

Manufacture and Supply: Rs

2.47 Cr for 60 kg 1 in 12 CMS

Crossing and Rs 0.5 Cr for 60 kg 1

in 8 1/2 CMS Crossing.

Transportation: Rs 3.18 Lac for

60 kg 1 in 12 CMS Crossing and

Rs 0.6 Lac for 60 kg 1 in 8 1/2

CMS Crossing.

Rs 3.02 Cr 30.08.2010

(extended)

6 RVNL/Mumbai/Bina-

BPL/ 2006 dated

30.08.2006

30.08.2006 Conducting Final Location Survey (FLS) marking the

center line of the final alignment on the ground and

Detailed Design Engg (DDE) for BG third line between

Bina-Bhopal (138.423 Km) in WC Rly.

RVNL/Mumb/RPS/FLS(Bi

na- BPL)/ 2006 dated

11.12.2006

M/s Monarch Services &

Contractors, Sinhagad Road,

Pune-411030

--- Rs 1.23 Cr 15.08.2010

Details of Contracts Placed upto the month of Nov' 2010 under GM/P-III

Page 137: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

7 RVNL/BPL/S&T/HBJ-

BPL-BIN/2

09.06.2009 Supply, installing, modification, testing &commissing of

electronic interlocking system alongwith modification, in

relay based indoor signaling arrangement at PI/RRI/LC

gates, IBH etc. alongwith yard remodeling in connection

with the work of 3rd line between Habibganj & Bina

(144.76 Km) on Bhopal Division of West Central Railway

in the state of Madhya Pradesh (India)

No: RVNL/BPL/S&T/HBJ-

BPL-BIN/2 dated

23.10.2009

M/s Bharat Rail Automations (P)

Ltd. B-107, Mandpeshwar

Industrial Estate, SVP ROAD,

Borivali (W), Mumbai-400092

Signaling & Telecommuction - Rs

23,32,40,706/-

Rs 23.32 Cr 22.10.2011

8 RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for for patch doubling of Guntakul-Raichur Section under

CPM/RVNL/SC

RVNL/P-III/PSC Turnout

Sleeper Set/Guntakul-

Raichur/2009; Lot No.

5030901 dated

13.11.2009.

M/s Patil Rail Infrastructure Pvt

Ltd., The Grand, 3rd & 4th Floor

6-3-1090/B-4 Raj Bhawan Road,

Somaji guda, Hyderabad-500082.

Manufacture and Supply: Rs

3.22 Cr. for PSC Turnout Sleeper

Set for 1 in 12, 60 kg and Rs

52.63 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg .

Transportation: Rs 32.86 Lac for

PSC Turnout Sleeper Set for 60 kg

1 in 12 and Rs 6 Lakh for PSC

Turnout Sleeper Set 1 in 8 1/2 for

60 kg.

Rs 4.14 Cr 30.11.2010.

9 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803

04.09.2009. Manufacture and supply of P.way items for BG (1673mm)

for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120803 dated

17.11.2009

M/s Rayalaseema Concrete

Sleepers Pvt Ltd., The Grand,

3rd & 4th Floor 6-3-1090/B-4 Raj

Bhawan Road, Somaji guda,

Hyderabad-500082.

Manufacture and Supply: Rs

3.34 Cr. for PSC Turnout Sleeper

Set for 1 in 12, and Rs 25.26 Lac

for PSC T/out Sleeper Set 1 in 8

1/2 60 kg & Rs 10.9 lac for PSC

Turnout Sleeper Set for Derailing

Switch 60 Kg, Transportation:

Rs 20.90 Lac for PSC Turnout

Sleeper Set for 60 kg 1 in 12 and

Rs 1.68 Lakh for PSC Turnout

Sleeper Set 1 in 8 1/2 for 60 kg &

Rs 0.84 lac for PSC Turnout

Sleeper Set for Derailing Switch

60 Kg.

Rs 3.92 Cr 31.12.2010.

10 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120801

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120801 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

5.70 Lac for 1 in 8 1/2 52Kg

Curved Switches and Rs 5.10 Lac

for 1 in 81/2 Derailing Switches

52Kg. Transportation: Rs 1.31

Lac for 1 in 8 1/2 52Kg Curved

Switches and Rs 1.08 Lac for 1 in

8 1/2 Derailing Switches

Rs 13.19 Lac 10.09.2010

(extended)

11 RVNL/BPL/Elect/HBJ-

BIN/TSS

23.07.2009 Design, Supply, Erection, Testing & commissioning of

132/25 KV Traction Sub-station, Feeding Post, Fixed

Capacitor, bank System & other associated works at

BARETH & SANCHI, TRACTION SUB STATIONS,

Augmentation & replacement of traction transformers AT

BINA TSS, by providing 3rd bay & modification in existing

Feeding Posts at Sukhisewania, Gulabganj in connection

with Electrification of 3rd line on BINA- BHOPAL section

of BHOPAL DIVISION of WCR.

RVNL/BPL/Elect/HBJ-

BIN/TSS

dated18/19.01.2010

M/s S. L. Enterprises 41-A,

Phase-II, Mayapuri Industrial

State, Delhi-110064

Electrical Items-Rs 3.89 Cr for

CORE SOR Items, Rs 11.36 Cr for

Traction Transformer, Rs 0.12 Cr

for Maintenance spares,Rs 0.09

Cr for Maintenance Tools, Rs 0.35

Cr for Site Facilities & Rs 2.65 Cr

for Misc. Items,etc.

Rs 18.47 Cr 18.01.2012

12 RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No. 11120802

04.09.2009. Manufacture and supply of P.way items for BG

(1673mm)for Salka Road- Anuppur Section under

CPM/RVNL/Bilaspur.

RVNL/P-III/P.way

items/Salka Road-

Anuppur/2 of 2009; Lot

No.11120802 dated

18.11.2009

M/s Hindustan Engg. & Industries

Ltd., Mody Building, 27, Sir RN

Mukherji Marg, Kolkata-700001.

Manufacture and Supply: Rs

2.33 Cr for 60 Kg CMS Crossing 1

in 12, and Rs 17.75 Lac for 52 Kg

CMS Crossing 1 in 81/2

Transportation: Rs 2.53 Lac for

60 Kg CMS Crossing 1 in 12, and

Rs 0.24 Lac for 52 Kg CMS

Crossing 1 in 81/2.

Rs 2.53 Cr 31.10.2010

(extended)

Page 138: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

13 RVNL/New Delhi/B-B-

H/PMC/Pt-II

15.10.2009 Project Management Consultancy forConstruction of

Road Bed, Major and Minor Bridges, Track Linking

(excluding supply of rails, thick web switches & sleepers),

S&T and OHE & General Electrical work in connection

with 3rd line between Habibganj & Bina (144.76 Km) on

Bhopal Division of West Central Railway in the state of

Madhya Pradesh (India)

Notification of Award No

RVNL/New Delhi/B-B-

H/PMC/Pt-II dated

23.03.2010

M/s Aarvee Associates

Architects, Engineers &

Consultants Pvt Ltd, Ravula

Residancy, Srinagar Colony,

Hyderabad-82.

Renumerations for -Rs 6.57 Cr

for staff & Provision &

maintenance of Office for- Rs

2.70 Lacs.

Rs 6.60 Cr 22.10.2012

14 No. RVNL/P-

III/TWS/2009/Pt I

25.02.2010 Manufacture and Supply of Curved Switches with ZU-

1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880

Grade) Stock Rail conforming to Indian Railway

Specifications IRS-T-10-2000 for various rail road

projects in different regions of India.

Notification of Award No

No. RVNL/P-

III/TWS/2009/Pt I

Dated 26.05.2010

M/s VAE VKN RTT (JV),

Century Towers,

5th Floor,

45 Shakespeare Sarani,

Kolkata. - 700 017

Manufacture and Supply: Rs

17.79 Cr for 60 kg 1 in 12 TWS

Transportation: Rs 36.84 Lac for

60 kg 1 in 12 TWS.

Rs 18.16 Cr 25.05.2011

Page 139: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

Details of Contracts awarded with respect to RVNL/PIU/Bilaspur as on 31.12.2010

Tender

Number

Date of

Opening

Description of Item/Work Contract No

& date of

award

Contractor’s

Name

Quantity (for

supply

contract)

Estimated

Cost (for

Engg./Elect./

S&T/ Mech.)

Rate (for supply

contract)

Tendered Cost

(for Engg./Elect./

S&T/ Mech.)

Value of

Contract

Scheduled

Completion

date

RVNL/Raipu

r/SA -KH-

KHD-

ANP/5

Dt. 6/10/07

29.11.07 Construction of Road bed, Major & Minor

Bridges and Track linking (excluding supply of

Rails and Sleepers, Thick Web Switches and

special Sleepers) S&T and OHE & General

Electrical Work in connection with Doubling

between Salka Road- Khongsara (25.8 Km)

and Khodri-Anuppur (61.6 Km) on Bilaspur

Division of South East Central Railway in

Chhattisgarh and MP State, India.

RVNL/Raipur/

SA -KH-KHD-

ANP/ 5

Dt. 15/04/08

M/s DS

Constructions

Ltd, Best &

Crompton

Engineers Ltd.

(JV), C-66,

South

Extension-11,

New Delhi –

110049.

170.12 Cr. 177.498 Cr 177.498 Cr 30.05.2010

Extended

up to

30.06.2011

2008/RVNL/

Bilaspur/DR

Z-RGH

Dt.30.06.08

12.08.08 Conducting Final Location Survey, marking

centre line for Final Alignment on ground,

Design detailed Engineering, preparation of

Drawings and approval from RVNL/Railway for

doubling of Dallirajhara-Rowghat New Rail

link (95.00 Km) on Raipur Division of

S.E.C.Railway.

CPM/RVNL/BS

P/DRZ-

RGH/FLS/01

Dt.23.09.08

M/s Balaji Rail

Road Systems

Ltd, Plot No. 3,

Sitaram Nagar,

Staff Road,

Near Diamond

Point,

Secunderabad

500009

0.9022 Cr. 0.9497Cr 0.9497Cr 15.02.2009

extended up

to 31.12.10

Page 140: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

2009/RVNL/

Bilaspur/DR

Z-ROW/02

Dt.12.03.09

16.06.09 Construction of Road bed, supply of ballast,

major & minor bridges, Residential and

service buildings & general electrical work etc.

, for Dallirajhara-Keoti section( 42 Kms) in

connection with a new rail link between

Dallirajhara and Rowghat in Raipur Division of

S.E.C.Railway in the state of Chhattisgarh

( India).

CPM/RVNL/BS

P/DRZ-

Keoti/SMS/73

6 Dt.20.10.09

M/s SMS

Infrastructure

Limited- 267

Ganesh

Phadnavis

Bhavan, Near

Triangular

Park,

Dharampeth,

Nagpur

440010

115.629 Cr 97.815 Cr. 97.81Cr. 09.06.2012

(30 months

including

Defect

Liability

Period of 6

Months)

RVNL/Raipu

r/SA-KH-

KHD-ANP/

PMC-2

dtd.19.11.0

7

21.12.07 Project Management Consultancy (PMC) for

Construction of Roadbed, Major and Minor

Bridges, Track Linking (excluding supply of

rails, sleepers, thick web switches & special

sleepers), S&T, and OHE and General

Electrical work in connection with doubling

between Salka Road- Khongsara ( 25.8 Km)

and Khodri- Anuppur (61.6 Km) on Bilaspur

Division of South East Central Railway in

Chhattisgarh & M.P. State ( India).

RVNL/Raipur/

SA-KH-KHD-

ANP/ PMC-2

dtd.29.04.08

M/s S.N.Bhobe

& Associates

Pvt.

Ltd,Banking

Complex No. II

Unit

No.10,Plot No.

9 & 10, Sector-

19A,Vashi,

Navi Mumbai-

400 705

NIL 3.34 Cr. 3.34 Cr. 23.12.2010

(30 months

including

Defect

Liability

Period of 6

Months)

Extended up

to

Dt.30.06.11.

RVNL/Bilasp

ur/DRZ-

ROW/PMC-

2/ dt. 21-

09-09

01.12.09 Project Management Consultancy (PMC)

tender for “CONSTRUCTION OF ROADBED,

SUPPLY OF BALLAST, P-WAY, MAJOR &

MINOR BRIDGES, RESIDENTIAL AND SERVICE

BUILDINGS, SIGNAL AND TELECOM &

ELECTRICAL WORK ETC., FOR DALLIRAJHARA –

ROWGHAT NEW RAIL LINK PROJECT IN

RAIPUR DIVISION OF SOUTH EAST CENTRAL

RAILWAY IN THE STATE OF CHHATTISGARH,

INDIA”

CPM/RVNL/BS

P/DRZ-

ROW/PMC(Te

nder)/1529

Dt.28.07.10

M/S Lion

Engineering

Consultant &

M/S

Consulting

Engineers

Group Ltd (JV),

Home No.14,

Deepak

Society,

Chhunna

NIL 3.0285 Cr 3.0285 Cr 13.09.2013

(36 months

including

Defect

Liability

Period of 6

Months)

Page 141: Details of Contracts Awarded upto January, 2006 from the …rvnl.org/admin/uploaded1/contracts/20110620180231_Upto_Dec_10.pdf · Details of Contracts Awarded in April, 2006 from the

DGM/P-I/RVNL/BSP

Bhatti, Kolar

Road, Bhopal

(MP)

2006/RVNL/

Raipur/Anu

ppur-

Bilaspur/3

Dt.22.11.06

04.01.07 Conducting Detailed Designing Engineering (

Civil, P.Way and Electrical Engineering), Yard

Drawings, Preparation of LOP Assistance in

land acquisition and forest clearances,

Detailed Construction Estimate and BOQ for

Doubling between Khodri-Anuppur (61.6Km)

and Salka Road-Khongsara (25.8KM) on

Bilaspur Division of South East Central

Railway.

CPM/RVNL/

Raipur/ Salka

Road-Annupur

Dt.16.01.07

M/S Monarch

Surveyors &

Contractor

Pvt. Ltd. Of 67,

Rujeta Appt.

Panmala,

Pune-30.

Rs.

57,30,000/-

Rs. 52,14,300/- Rs.

52,14,300/-

16.05.2007

Extended up

to 30.09.10

grant of

extension

under

process

upto

31.03.11

2006/RVNL/

Mumbai/

Bilaspur

Yard/ Fly

Over/04

Dt.23.11.06

04.01.07 Conducting Confirmatory Final Location

Survey (FLS) of Fly Over at Bilaspur yard and

making the centre line of final alignment on

the ground for BG double line conforming to

the standards of a Group A on FLYOVER and

at its approaches in connection with doubling

of Bilaspur-Anuppur section along with

Detailed Designing of (Civil, P.Way, and

Electrical Engineering) aspects, preparation of

Bill of Quantities including land acquisition on

SEC Railway.

CPM/RVNL/

Raipur/Salka

road-Anuppur

Dt.16.01.07

M/S Monarch

Surveyors &

Contractor

Pvt. Ltd. Of 67,

Rujeta Appt.

Panmala,

Pune-30.

Rs.

19,48,400/-

Rs. 18,12,012/- Rs.

18,12,012/-

30.03.07

Extended up

to 30.09.10

grant of

extension

under

process

upto

31.03.11