details of contract concluded during the month of...

43
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF September, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of publicatio n of NIT Types of bidding ( single /two bid system ) Last date of receipt of tender Nos. of tenders received Nos. and name of parties qualified after technical evaluation Nos. & names of parties not qualified after technical evaluation Whether contract awarded to lowest tenderer evaluated L1 Contract No. & date. Name of contractor. Value of contract Scheduled date of completion of supplies. Actual date of start of work Actual date of completion Remarks/ Reason for delay if any, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CE(C)I-JP Dy. CE/C/III-JP Sr. No. T. No. Item/ Nature of work Mode of tender Date of public - catio n of NIT Type of bidd ing (single/ Two bid system) Last date of receipt of tender Nos of tenders receive d Nos. & names of parties qualified after technical evaluation Nos & names of parties not qualified after technical evaluati on Whether contract awarded to lowest tenderer/ Evaluated L1 Contract No. & date Name of contract-or Value of contract Scheduled date of completion of supplies Actual date of start of work Actual date of completi on Reason for delay if any 1 AF/BKI/GC/JP/4R Construction strengthening and rebuilding minor bridges between Nadbai- Bharatpur Open tender Two bid system 29.04.99 15 07 08 Yes CPM/JP/KTT/ CA/16 dated 15.02.2000 M/s Jugendra Singh & Co., Etah. 2.98 crore 04.01.2000 01.06.0 1 31/3/04 Work completed, case was investigated by vigilance final variation advice is awaited. Reminder sent. 2 AF/BKI/GC/ JP/68 Laying and linking BG track between BTE- AH section Open tender 24..04.04 One bid system 27.09.04 5 1 4 Yes NWR/S&C/CA /51 dated 04.01.05 M/s RSV Construction Hyderabad 1.83 crore 01.03.05 5.11.04 31.5.05 Work completed. Final bill Under technical check 3 AF/BKI/GC/ JP/69 Laying and linking BG track between BTE-AH section Open tender 24.04.04 One bid system 27.9.2004 5 1 4 Yes NWR/S&C/CA /49 dated24.12.04 M/s Engipress Rail Link, Gwalior 1.58 crore 25.02.05 28.10.0 4 30.11.05 Work is in dispute as money suit filed by contractor. 4 AF/BKI/GC/36 Welding of rail joints bet. BKI- KL section Open tender - One packet system 09.06.03 3 1 2 Yes Dy. CE(C)JP/CA/7 7 dated 07.10.03 M/s India Thermit Corp Ltd., Kanpur 1.02 Crore 08/3/04 12/10/0 3 30/06/04 Final bill is awaited from field office. 5 NWR-JP/RE yard/11 Const./Exten of station building at RE yard Open tender 8.08.2008 One packet system 29.08.2008 01 - 01 Yes Dy CE/C- JP/CA/221 dt. 17.02.09 M/s New Everest Stone Curshing Co. Gurgaon 4.88 Crore 14/6/09 26/10/0 8 31/08/11 Work completed. Final bill awaited.

Upload: others

Post on 12-Sep-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF September, 2012

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication of NIT

Types of bidding ( single /two bid system )

Last date of receipt

of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of work

Actual date of completion

Remarks/ Reason for delay if

any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE(C)I-JP

Dy. CE/C/III-JP

Sr.

No.

T.

No.

Item/

Nature

of work

Mode

of

tender

Date

of

public

-

catio

n

of

NIT

Type of

bidd

ing

(single/

Two bid

system)

Last

date of

receipt

of

tender

Nos of

tenders

receive

d

Nos. &

names of

parties

qualified

after

technical

evaluation

Nos &

names

of

parties

not

qualified

after

technical

evaluati

on

Whether

contract

awarded to

lowest

tenderer/

Evaluated

L1

Contract No.

& date

Name of

contract-or

Value of

contract

Scheduled

date of

completion

of supplies

Actual

date of

start of

work

Actual

date of

completi

on

Reason for delay

if any

1

AF

/BK

I/G

C/J

P/4

R Construction

strengthening and

rebuilding minor

bridges between

Nadbai- Bharatpur

Open

tender

Two bid

system

29.0

4.9

9

15 07 08 Yes CPM/JP/KTT/

CA/16 dated

15.02.2000

M/s Jugendra

Singh & Co.,

Etah.

2.98

crore

04.01.2000 01.06.0

1

31/3/04 Work completed,

case was

investigated by

vigilance final

variation advice is

awaited.

Reminder sent.

2

AF

/BK

I/G

C/

JP

/68

Laying and linking

BG track between

BTE- AH section

Open

tender

24..0

4.0

4 One bid

system

27.0

9.0

4

5 1 4 Yes NWR/S&C/CA

/51 dated

04.01.05

M/s RSV

Construction

Hyderabad

1.83

crore

01.03.05 5.11.04 31.5.05 Work completed.

Final bill Under

technical check

3

AF

/BK

I/G

C/

JP

/69

Laying and linking

BG track between

BTE-AH section

Open

tender

24.0

4.0

4 One bid

system

27.9

.200

4 5 1 4 Yes NWR/S&C/CA

/49

dated24.12.04

M/s Engipress

Rail Link,

Gwalior

1.58

crore

25.02.05 28.10.0

4

30.11.05 Work is in

dispute as money

suit filed by

contractor.

4

AF

/BK

I/G

C/3

6

Welding of rail

joints bet. BKI- KL

section

Open

tender

-

One

packet

system

09.0

6.0

3

3 1 2 Yes Dy.

CE(C)JP/CA/7

7 dated

07.10.03

M/s India

Thermit Corp

Ltd., Kanpur

1.02

Crore

08/3/04 12/10/0

3

30/06/04 Final bill is

awaited from field

office.

5

NW

R-J

P/R

E

yard

/11

Const./Exten of

station building at

RE yard

Open

tender

8.0

8.2

00

8 One

packet

system

29.0

8.2

008

01 - 01 Yes Dy CE/C-

JP/CA/221 dt.

17.02.09

M/s New

Everest Stone

Curshing Co.

Gurgaon

4.88

Crore

14/6/09 26/10/0

8

31/08/11 Work completed.

Final bill awaited.

6

HIS

-

RE

/Do

ub

ling/2

Const/ Extension of

FOB&PF shelter

shed bet. RE-HIS.

Open

tender

24.0

7.2

008

One

packet

system

25.0

8.2

008

03 - 01 Yes Dy CE/C-

JP/CA/224 dt.

19.03.09

M/S Sanjeev

Brothers,

Jaipur.

4.16

Lakhs

22/4/09 22/02/0

9

31/12/1

1

Work is in

progress, further

DOC is under

sanction

7

AW

R-H

SI D

ou

blin

g/5

Construction of

Minor Bridge

E/Work bet. HIS to

Km.57 to AWR

Open

tender

09.0

8.2

007

One

packet

system

12.0

9.2

007

02 01 01 Yes Dy.CE(C)/

JP/CA/213

dated

08.07.08

M/s Jugeundra

Singh Co., Etah

5.80

Crore

09/01/09 08/05/0

8

31/3/11 Work completed

final bill

technically

checked .Final

variation is to be

submitted for

adm. Approval of

competent

authority

8

HS

I-R

E/D

ou

blin

g/1

Construction of

Major Bridge minor

bridge R/wall earth

work station

building ballast

supply , track

linking etc.

Open

tender

21 &

22.0

7.2

008

One

packet

system

2

3.0

4.2

008

05 - 01 Yes NWR/S&C/CA

/101 dated

23.10.08-

M/s ARSS-

Triveni(JV)

Bhubaneshwar

50.81

Crore

24/2/10 03/11/0

8

31/05/1

2

Work is in

progress. Further

extension of DOC

is under for

sanction

competent

authority at H.Q.

9

AW

R-

HS

I/D

oub

ling/6

Construction

station building

Misc. structure

ballast supply track

linking etc.

Open

tender

21.0

2.2

008

One

packet

system

23.0

4.2

008

06 - 01 Yes NWR/S&C/CA

/102 dated

23.10.08

M/s ARSS Infra

structure project

Ltd.

Bhubaneshwar

(Orissa)

21.24

Crore

02/07/09 27/10/0

8

31/05/1

2

Work is in

progress. Further

extension of DOC

is awaited from

agency.

10

NW

R/S

&C

/R

OB

/11

1/9

Const of ROB at LC

No.111-C.

Open

tender

02.1

0.2

00

8

One

packet

system

05.1

1.2

008

03 - 01 Yes Dy.CE(C)/

JP/CA/230

dated

13.10.10

M/S Bharat

Spun Pipe &

Const.Co. JP

6.52 Cr. 04/05/10 25/08/0

9

31-12-

12

Work is in

progress.

11

NW

R/S

&C

/R

OB

/11

7/1

0

Const of ROB at LC

No.117.

Open

tender

29.1

.200

9 One

packet

system

04.0

3.2

009

04 - 01 Yes Dy.CE(C)/

JP/CA/229

dated

11.01.10

M/S Parul–

Const.Co.

MSH

2.35 Cr. 17/05/10 23/11/0

9

30/12/1

1

Negotiation for 3rd

& f/variation held

on 17-9-2012 and

TC to be held

12

WR

/S&

C/T

/13

Construction of 72

units Type-II, 108

units Type-

III, 36 units Type-IV

in Multistoried

Towers & HEALTH

Unit, shopping

complex

Open

tender

-

One bid

system

15/0

4/2

009

04 04 0 Yes CE/S&C/CA/2

7 dtd.

8.9..2009

M/s Balaji

Builders &

Developers (JV)

Jaipur

28.88

Crore

14.1.11 16.7.09 30.11.1

2

Work is in

progress

13

WR

/S&

C/T

/30

Residual complete

worked

Open

tender

One bid

system

06-0

3-1

2

06 1 5 yes NWR/S&C/CA

/117 dated 13-

07-12

M/s Infra

strictures Ltd.

New Delhi

27.25

Crore

07-11-13 7-11-13 Work not

completed due to

court stay.

Dy. CE/C/GC-JP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 NWR/S&C/JP-

SIKR-LHU & SIKR-

CUR /GC/T/3R

Construction of minor

bridges, wing / return

walls, earthwork in

formation, construction

including addition and

alteration of station

buildings, passenger

platforms & shelters,

FOB etc

Op

en t

end

er

Single

Packet

system

NWR/S&C/

CA /108 dt.

28.06.2011

M/s Giriraj Civil

Developers

Pvt. Ltd.,

B- 15, Paras

Dersan Socity,

S. V. Road,

Borivali (East),

Mumbai.

19

55

39

39

2.0

3

29.6.12

25.3.2011

Co

ntr

act

Term

inat

ed

.

2 DY.CE /C/GC/

NWR/ 2011/T-5

Transportation of

various type of BG PSC

sleepers from sleeper

factory such as Khatu,

Marwar Chapari,

Degana, Churu or any

other sleeper

factory/place and P.

way materials

Op

en t

end

er

08.04.11 Single

Packet

system

12.5.11 04 - - yes 02

/NWR/Dy.

CE/C-GC/JP

/2011-

12/JP-SIKR-

CUR & SIKR-

LHU dt.

07.09.2011.

M/s Hanuman

Construction

Company,

Bhootra Niwas,

new market

Nokha.

39

56

03

90

.62

07.05.12

Ext.

30.08.12

20.7.2011

3 DY.CE /C/GC/

NWR/ 2011/T-3

Supplying and stacking

65mm gauge stone ballast

machine crushed (hard

stone) conforming to

RDSO specifications

Op

en t

end

er

16.3.11 Single

Packet

system

21.4.11 08 01

M/s

CH

EV

RO

N M

INE

RA

LS

Ashok

Kum

ar

Bansal &

Associa

tes, N

ew

Delh

i

Not aw

ard

ed to L

1

03

/NWR/Dy.

CE/C-GC/JP

/2011-

12/JP-SIKR-

CUR & SIKR-

LHU dt.

23.09.2011.

M/s. Jai Mata

Construction

Co.

House No.

14169, Stree

No. 8A,

Ganesh Nagar,

Bhatinda

413

542

40

.00

15.08.12 17.08.2011

4 DY.CE /C/GC/

NWR/ 2011/T-2

Supplying and stacking

65mm gauge stone ballast

machine crushed (hard

stone) conforming to

RDSO specifications

Op

en t

end

er

16.3.11 Single

Packet

system

21.4.11 06 01

M/s

CH

EV

RO

N M

INE

RA

LS

Ashok K

um

ar

Ba

nsal &

Associa

tes, N

ew

Delh

i

Not aw

ard

ed to L

1

04

/NWR/Dy.

CE/C-GC/JP

/2011-

12/JP-SIKR-

CUR & SIKR-

LHU dt.

24.10.2011.

M/s Devender

Singh

Contractor, 7,

pratap nagar,

Saket Colony,

Rajgarh Raod,

Hissar

35

96

57

60

.00

01.09.12 17.09.2011

5 DY.CE /C/GC/

NWR/ 2011/T-10

Supplying and stacking

65mm gauge stone ballast

machine crushed (hard

stone) conforming to

RDSO specifications

between Km.0.000 to Km.

30.2718 (L. C. No. 29) on

Sikar - Churu section

Op

en t

end

er

09.8.11 Single

Packet

system

15.9.11 07 -

-

Yes.

09

/NWR/Dy.

CE/C-GC/JP

/2011-

12/JP-SIKR-

CUR & SIKR-

LHU dt.

05.05.2012.

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10,

3rd Floor,

Satyanikertan,

New Delhi

2,3

2,7

2,5

00.0

0

11.01.13. 14.02.2012

6 DY.CE /C/ GC/

NWR/ 2011/T-11

Supplying and stacking

65mm gauge stone ballast

machine crushed (hard

stone) conforming to

RDSO specifications

between Km. 30.2718 to

Km. 59.901 (L. C. No. 51)

on Sikar - Churu section

Op

en t

end

er

09.8.11 Single

Packet

system

15.9.11 09 02

1.M

/s J

BG

Co

nst

ruct

ion

Co

.29

07

, GH

GT

road

, Nea

r Zi

la

par

ish

ad, B

hat

ind

a

2. M

/s S

anto

sh C

on

st. C

o.,

Sad

ar B

azar

, New

Mar

ket,

No

kha

Not aw

ard

ed to L

1

10

/NWR/Dy.

CE/C-GC/JP

/2011-

12/JP-SIKR-

CUR & SIKR-

LHU dt.

05.05.2012.

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10,

3rd Floor,

Satyanikertan,

New Delhi

27

78

65

00

.00

24.01.13 14.02.2012

7 DY.CE /C/ GC/

NWR/ 2011/T-15

Supplying and stacking

65mm gauge stone ballast

machine crushed (hard

stone) conforming to

RDSO specifications at

jhunjhunu depot on-Sikar-

Loharu section

Op

en t

end

er

23.9.11 Single

Packet

system

24.10.11 08 01

M/s

San

tosh

Co

nst

. Co

.,

Sad

ar B

azar

, New

Mar

ket,

No

kha

Not aw

ard

ed to L

1

07

/NWR/Dy.

CE/C-GC/JP

/2011-

12/JP-SIKR-

CUR & SIKR-

LHU dt.

12.3.2012

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10,

3rd Floor,

Satyanikertan,

New Delhi

25

40

00

00

.00

20.7.12 30.01.2012

8 DY.CE /C/ GC/

NWR/ 2011/T-4R

Supplying and stacking

65mm gauge stone ballast

machine crushed (hard

stone) conforming to

RDSO specifications

between Km.325.415 to

Km. 360.900 (including

Loharu station) on Sikar -

Loharu section

Op

en t

end

er

28.9.11 Single

Packet

system

01.11.11 05 - - yes. 05

/NWR/Dy.

CE/C-GC/JP

/2011-

12/JP-SIKR-

CUR & SIKR-

LHU dt.

12.3.2012

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10,

3rd Floor,

Satyanikertan,

New Delhi

284

37

20

0.0

0

20.9.12 05.02.2012.

9 DY.CE /C/ GC/

NWR/ 2011/T-14

Construction of New Major Bridge of span 12 X

6.10 m (Km. 319/6-7) and strengthening of Bridge no. 165 (3x6.10 M at Km.

268/5-6) and PSC Slabs as super-structure including earth work in approaches

and other ancillary works in Sikar- Loharu section in connection with Jaipur-

Sikar-Loharu & Sikar-Churu Gauge conversion Project.

Op

en t

end

er

16.12.11 Single

Packet

system

25.01.12 06 - - Yes Contractor

not yet

signed

agreement

M/s Surabhi

Maheshwar

rao,

C-58, Road

No. 1,

Film

Nagar,Jublee

Hills,

Hyderabad

2,7

6,4

7,1

51.4

7

15.08.12

30.3.2012. - -

10 DY.CE /C/ GC/

NWR/ 2011/T-18

Dismantling of existing

MG track, Laying and linking of Broad gauge main line, loop lines

including points and crossings in yards, spreading of ballast,

tamping of track, transportation of P. Way materials and other

ancillary works in Sikar -Loharu section Zone-II (Km. 267.50 to Km.

314.00) including Dundlod Mukundgarh, Nua & Jhunjhunu yards in

connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion

project

Op

en t

end

er

16.12.11 Single

Packet

system

20.01.12 02 - YES PG under

verified.

M/s Bharwal

Lal Bijarnia,

Villgae- Raipur,

Post- Prewari,

Distt. Nagour.

5,1

1,1

6,6

65.7

7

06.03.13

11 DY.CE /C/ GC/

NWR/ 2011/T-19

Dismantling of existing

MG track, Laying and linking of Broad gauge main line, loop lines

including points and crossings in yards, spreading of ballast,

tamping of track, transportation of P. Way materials and other

ancillary works in Sikar -Loharu section Zone-III (Km. 314.00 to Km.

360.70) including Ratan Shahar, Chirawa, Surajgarh & Loharu yards

in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion

project.

Op

en t

end

er

16.12.11 Single

Packet

system

18.01.12 05 - YES PG verified,

agreement

not yet

signed by

the

contractor.

M/s Laxyo

Energy Pvt.

Ltd.,

113,

Bakhatgarh

Tower, 10/A,

New Plasia,

Indore (MP)

4,7

3,9

4,3

38.3

7

06.03.13

12 DY.CE /C/ GC/

NWR/ 2011/T-17

Dismantling of existing MG track, Laying and linking of Broad gauge

main line, loop lines including points and crossings in yards,

spreading of ballast, tamping of track, transportation of P. Way

materials and other ancillary works in Sikar -Loharu section Zone-I (Km.

237.50 to Km. 267.50) including Sikar & Nawalgarh yards in

connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion

project.

Op

en t

end

er

16.12.11 Single

Packet

system

23.01.12 04 03 1. M/s Bhika ram Dev rath, VPO- Dhiarla, Distt. Churu.

2. M/s Goel Brothers Rail Infra PVT. Ltd., Bareilly.

3. Shri Nahar Const. Co., Jodhpur.

L-4 PG verified,

agreement

not yet

signed by

the

contractor.

M/s Shupal

Kumawat, Rly.

Contractor,

Village & Post.-

Badhal, Distt.-

Jaipur.

3,3

0,9

6,6

19.9

7

04.04.13

13 Dy.CE/C/GC/2012/T

-23

Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations including loading, unloading and and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Op

en t

end

er

05.03.12 Single

Packet

system

09.04.12 04 - - Yes Under

preparation

as PG

verification

from bank.

M/s Hanuman

Construction

Company,

Bhootra Niwas,

new market

Nokha.

5,3

6,4

8,9

55.9

3

19.06.13

14 Dy.CE/C/GC/2011/T

-12R

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between 59.901 (L. C. 51) to Km. 90.46 (Churu Station) on Sikar – Churu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Op

en t

end

er

04.4.12 Single

Packet

system

07.5.12 05 - - yes Under

preparation

as PG Not

submitted.

M/s

Kamakhaya

Trading Co.

House No. 32,

Patel Nagar,

Bhiwani.

3191

076

0.0

0

23.01.13

-

15 Dy. CE/C/ GC/2012/T-

24

Construction including fabrication of FOBs and platform shelters in SIKAR-LOHARU section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project.

Op

en t

end

er

25.05.12 Single

Packet

system

28.06.12 03 - - yes Contractor

refuse to

execute

work hence

work

terminated.

M/s. Bharat

Spun Pipe &

Construction

Co.,

43, Industrial

Area,

Jhotwara,

Jaipur

6266

464

6.0

0

07.01.13

- -

Co

ntr

act

Term

inat

ed

.

16 Dy. CE/C/ GC/2012/T-

23

Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations, including loading, unloading and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Op

en t

end

er

05.03.12 Single

Packet

system

09.04.12 03 - - yes 14/NWR/DY

CE/C-

GC/JP/2012-

13/JP-SIKR-

CUR&SIKR-

LHU

dt.16.08.12

M/s Hanuman

Construction

Co., Bhootra

Niwas, New

Market,

Nokha.

5364

895

5.9

3

19.06.13

15.07.12

- -

Dy. CE/C/II-JP

SrNo.

Tender No. Item / Nature of work.

Mode of tender

Date of Publication

of NIT

Types of bidding (Single/ two bid system)

Last date of receipt of tender.

No. of tenders

received.

Nos. & Name of parties

qualified after

technical evaluation

Nos. & Name of

parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer evaluate

d L1

Contract No. and Date.

Name of contractor

Value of contract.

Schedule date of

completion of supplies.

Actual date of start of

work.

Actual date of

completion

Reason for delay if any.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 JP-RGS/RUB/ Deposit/1RR

RUB in military cantt area

Open tender

- Single Packet System

31/8/07 4 M/s. P. J. Sood, BRC

3 NO Dy.CE(C)-II/JP/CA /13 dt. 27/12/07

M/s. P. J. Sood, BRC

355.269 24/9/08 12-04-2007

24/09/08 Extended upto 30/12/11

Final Variation under techinical check

3 NWR/S&C/KSG/ROB/28/1R-4

Constn. of ROB across Rly. track at LC No.28 in KSG yard at Km.266/8-9 on JP – AII section.

Open tender

Single Packet System

07-02-2008 3 Bharat Spun Pipe & Construction Co., Jaipur

YES Dy. CE(C)-II/JP/30 Dated 14/10/08

Bharat Spun Pipe& Const Co., JP

294.79 22/01/09 25/08/08 22/01/09 Extended upto 31/12/2011

Fiinal Bill Passed

Dausa-Jaipur Doubling Project.

4 DO-JP/ Doubling/3R

Earth work & minor bridge

Open tender

- Single Packet System

30/3/07 M/s B. P. Modi Jaipur

YES DyCE(C)II/JP/CA/14dt. 29/12/07

M/s B. P. Modi Jaipur

762.91 17/12/08 20/11/07 17/12/08 extended upto 31/12/2010

Work completed & F/bill under finance vetting

5 DO-JP/ Doubling/4RR

Earth work & minor bridge

Open tender

- Single Packet System

21/09/07 1 M/s B. P. Modi Jaipur

0 YES DyCE(C)II/JP/CA/15dt. 29/12/07

M/s B. P. Modi Jaipur

749.56 02-01-2009

20/11/07 1/2/2009 extended upto 31/12/2010

Work completed

6 JP-DO/ Doubling/8

Construction of FOB bet. DO-JP section

Open tender

- Single Packet System

29.11.06 2 M/s. Sanjeev Brothers Jaipur

1 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07

M/s. Sanjeev Brothers Jaipur

130.02 15.4.08 14.2.07 15/04/08 Extended upto 15/10/2010

Clearance required from Vig.

7 DO-JP/ Doubling/12RR

Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.

Open tender

- Single Packet System

30/11/07 2 M/s. B. M. Construction, GZB.

2 YES NWR/ S&C/ CA/100 dated 23/9/08

M/s. B. M. Construction, GZB.

846.08 27/04/2009 09-10-2008

27/04/2009 Exdtended upto 30/11/2010

Work completed & F/bill under tech. check.

8 DO-JP/ Doubling/14

Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.

Open tender

- Single Packet System

30.05.07 1 M/s. B. M. Construction, GZB.

0 YES NWR/ S&C/CA/99 dated 27/03/08

M/s. B. M. Construction, GZB.

1044.84 24.10.08 11-06-2007

24.10.08 extended upto 31/03/11.

Completed & final variation under techinical check

9 DO-JP-FL/ Doubling/16

Welding of 52Kg. /60Kg. Rails

Open tender

- Single Packet System

31/07/07 1 M/s. ITC, Kanpur.

0 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07

M/s. ITC, Kanpur.

341.22 18/02/09 20/06/09 18/02/09 Extended upto 30/04/2011

Physically completed.

10 T. No. DO-JP/ Doubling/21

Dismantling of existing BG track, laying & linking in Zone-I DO (Excl.) to JT (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 1 M/s. B. S. Sangwan, Sonipat (Haryana)

0 YES Dy.CE(C)-II/JP/CA/34 dt. 20/06/09

M/s.B. S. Sangwan, Sonipat (Haryana)

206.44 22/09/09 04-10-2009 22/09/09 Extended upto 15/07/10

Final bill under Tech. check.

11 T. No. DO-JP/ Doubling/22

Dismantling of existing BG track, laying & linking in Zone-II DO (Excl.) to JT (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 4 M/s. P. C. Sharma, Noida

3 YES Dy.CE(C)-II/JP/CA/33 dt. 05/06/09

M/s. P. C. Sharma, Noida

194.57 09-09-2009

04-01-2009 9/9/2009 Extended upto 31/08/10

Final bill under process with SE/C/PW/JP

12 T. No. DO-JP/ Doubling/23

Dismantling of existing BG track, laying & linking in Zone-III BAI (Excl.) to KWP (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 3 M/s. P. C. Sharma, Noida

2 YES Dy.CE(C)-II/JP/CA/32 dt. 29/05/09

M/s. P. C. Sharma, Noida

187.06 09-09-2009

04-01-2009 9/9/2009 Extended upto 31/01/11

Final bill under process with SE/C/PW/JP

13 T. No. DO-JP/ Doubling/24

Dismantling of existing BG track, laying & linking in Zone-IV KWP (Excl.) to JP (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 2 M/s. B. S. Sangwan, Sonipat (Haryana)

1 YES Dy.CE(C)-II/CA/35 dated 02/09/09

M/s.B. S. Sangwan, Sonipat (Haryana)

239.75 22/09/09 18/05/09 22/09/09 Extended upto 31/03/11

Finla bill under process

14 NWR/JP/C/2/ROB/DO-01 -

Construction of Road Over Bridge across the Railway track at Km.181/5-6 in between Dausa - Bhandana of Dausa-Jaipur section (Deposit work).

Open tender

_ Single Packet System

07-02-2008

Bharat Spun Pipe& Const Co., JP

YES Dy. CE(C)-CA/29 Dated 14/10/2008

Bharat Spun Pipe& Const Co., JP

547.26 02-10-2009

24/04/2008 Extended up to 15/03/2012

Final Bill passed

15 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/1 RR

Construction of minor bridges, wing/return walls , earthwork in formation ,construction including addition and altertation of station buildings, passanger platforms & shelters.FOB etc between Jaipur (incl) & Ringus (incl) stations of Jaipur -Ringus Section

Open tender

_ Single Packet System

18/01/2011 Giriraj Civil Developers Pvt Ltrd. BorivaliBombay

YES NWR/S&C/CA/110 Dated 16/08/2011

Giriraj Civil Developers Pvt Ltrd. BorivaliBombay

2141 08-10-2012

07/04/2011

_ contract terminated final measurment in progress.

16 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/5 RR

Construction of Minor Bridges , Wing /Return walls.E/work in formation construction including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR

Open tender

_ Single Packet System

16/09/2011 Modi Construction(JV) Jaipur

YES NWR/S&C/CA/116 Dated 27/03/2012

Modi Construction(JV) Jaipur

1724 26/04/2013 02.01.2012 Work in progress

17 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/ 01(geotech)

Staking out alignment , conducting geotechnical investigation design of the sun/super structure of minor & major bridges , prepration of GAD got minor &Major bridges etc

Open tender

Single Packet System

20.12.2011 M/S Surbhi Enterprises Jagatpura Jaipur.

YES NWR/S&C/CA/118 Dated 25/07/12

M/S Surbhi Enterprises Jagatpura Jaipur.

946 Lakhs

01.09.2012 08-01-2012

Work in progress

18 TENDER NO. NWR/S&C/JP- SIKR/GC/T-3

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Ringus Km. 189.00 to SIKAR Km 238.70 on Ringus - SIKAR section in connection with Jaipur-Ringus-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Open tender

22.1.12 Single Packet System

24.2.12 7 M/s Rajsthan Mining Engineers Jaipur

NO M/s Rajsthan Mining Engineers Jaipur

4.66 crors

22.4.13 Work in progress

19 NWR/S&C/JP-SIKR/GC/T/2

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Jaipur Km.131.27 to Ringus Km. 189.00 on Jaipur - Ringus section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Open tender

Single Packet System

24/02/2012 M/S Jai Mata Construction Co, H. No. 14169, Street No 8A Ganesh Nagar Bhatinda

M/S Jai Mata Construction Co, H. No. 14169, Street No 8A Ganesh Nagar Bhatinda

7.90 Crores

09-06-2013

PG Not submitted contract terminated by forfiting E/Money

20 NWR/S&C/ROB/Design-Drg/T/1

Carrying out Geotechnical investigation and consultancy work for Road Over/Under Bridge (ROB/RUB) for Railway span including detail design (foundation, sub structure and super structure), preparation of GAD and working drawing as desired in scope of work of 3 ROBs on LC No.C-149 (at Phulera in Ringus – Phulera section), LC No.323/A (Jodhpur- Samdari- Barmer section), LC No.61-A (at Rewari in Rewari – Alwar section) and 2 RUBs on LC No.232 & 234 (in Jaipur – Phulera section).

Open tender

Single Packet System

17.02.12 6 C.S.Engineers & consulants Delhi 12

no 19.30 lacs

Work in proggress

CE/C/II-JP

Dy. CE/C/I-UDZ

Dy. CE/C/DNPR-BANSWARA

--------------------------------------------- N I L ------------------------------------------------------

T.No Item/Nature of work Mode of

tender

Date of

publication of

NIT

Type of

bidding

(Single/Two

bid system)

Last date of

receipt of

tender

Nos of tenders

received

Nos& Names

of parties

qualified after

technical

evaluation

Nos & names

of parties

not qualified

after

technical

evaluation

Weather

contract

awarded to

lowest

tenderer/ev

aluated LI

Contract no &

date

Name of

contractor

Value of

contract (In Rs.

Lacs)

Scheduled

date of

completion

of supplies

Actual date of

start of work

Actual date of

completion

Reason for delay if any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

T.NO.UDZ-

HMT/MB/T

/1

Construction of Major

bridges from DNRP-HMT in

connection with UDZ-HMT

section.

Open 19.11.10 Single 21.12.10 2 Yes NWR/S&C/

CA/111 dtd.

9.9.11

M/S Om

Prakash Goyal

& Co.,

Neemach

1568

29.11.12 10.08.11 Work in

Progress

T.NO.UDZ-

HMT/GC/

MB/T-2

Const., minor bridges from

Km. 160/0 to 187/0 in in

connection with UDZ-HMT

Section

Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/

CA/109 dtd.

16.8.11

M/s Braham

Prakash

ModiRavi

Constn.Co. (JV)

, Jaipur

1212.6

21.09.12 30.04.11 Work in

Progress

Extension application

is under consideration

T.NO.UDZ-

HMT/GC/E

W/T/3

Construction of Minor

bridges frm Km. 270/0 to

320/0 in connection with

UDZ-HMT section.

Open 08.12.10 Single 20.01.11 5 Yes NWR/S&C/

CA/112 dtd.

21.10.11

Amit-Mass (JV)

, Alkapuri,

VADODARA

1665.1

20.01.13 03.08.11 Work in

Progress

T.NO.UDZ-

HMT/GC/E

W/T/4

Construction of Minor

bridges frm Km. 207/0 to

250/0 in connection with

UDZ-HMT section.

Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/

CA/113 dtd.

21.10.11

M/s Rahee-

Triveni (J/V),

Kolkatta

3045.2

07.02.13 23.08.11 Work in

Progress

CE/C/III-JP

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication of NIT

Types of bidding ( single /two bid system )

Last date of receipt

of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of work

Actual date of completion

Remarks/ Reason for delay if

any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dy. CE/C/I-AII

1 Aii/Const/ Loco/Mo

d/T/1

Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of Loco Workshop at Ajmer.

Open 25.08.09 Single 28-10-09 07 Nos. - - Yes NWR/S&C/ CA/31 Dt. 17-06-10

M/s Bharat Span- GPT (JV) 43 Industrial Area, Jhotwara, Jaipur

3829.48 Lakhs 22-04-2012 & 06-11-2012

27-03-10 - Work is in progress.

2 Aii/Const/ C&W/Mo

d. /T/3/R1

Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of C&W Workshop at Ajmer.

Open 14.06.10 Single 07-07-2010

- - - Yes Under execution

M/s Prem Fabricators 301 Meera Manon Arcude, Near Krupa Petrol Pump, Parimal Garden, Ellis Bridge, Ahmedabad.

1524.97 Lakhs 05/12/2012 05-09-2011 - Work is in progress.

3 AII/BNGM-RAS/ NL/T/2

Construction of major bridge including earth work on the approaches between BNGM (Excl.)-RAS (incl.) section in c/with BNGM-RAS New B.G. Rail Line Project.

Open 11.03.10 Single 12-10-2010

07 Nos. - - Yes Under execution

M/s SB-SHC-MCDPL (JV) C-10, Vaishali Nagar, Jaipur.

Rs. 1592.08 Lakhs

18-07-2012 23.07.2011 - Work is in progress.

4 AII/BNGM-RAS/

NL/T/3(R)

Earthwork in bank/cutting and construction of minor bridges between Km. 0.00 to 10.50

Open 12.07.11 Single 03.08.11 07 Nos. - - Yes Under execution

M/s Jandu Construction Co. 305, Model Town Mandi, 5Adampur Hisar

Rs. 1060.43 Lakhs

30-10-2012 10.11.2011 - Work is in progress.

5 AII/BNGM-RAS/ NL/T/4

Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 10.50 to 20.50) section in c/with Bangurgram-RAS new BG Rail Link Project.

Open 16.12.10 Single 24.01.11 10 Nos. - - Yes Under execution

M/s Jai Mata Di Energy System (JV) VPO-Narodara, Tehsil - Laxmangarh Sikar (Raj.)

Rs. 1103.49 Lakhs

16/06/2012, 31/12/2012

29.06.2011 - Work is in progress.

6 AII/BNGM-RAS/ NL/T/5

Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 20.50 to 28.50) section in c/with Bangurgram-RAS new BG Rail Link Project.

Open 16.12.10 Single 24.01.11 08 Nos. - - Yes Under execution

M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar

Rs. 825.62 Lacs 16/06/2012, 31/12/2012

04.07.2011 - Work is in progress.

7 AII/BNGM-RAS/ NL/T/8

Supplying and Stacking machine crushed stone track Ballast in stacks as per Railways’ specifications between Km. 0.00 to 28.50 [Bangurgram to Ras] in connection with Bangurgram ¬- Ras new rail line project.

Open 19.08.11 Single 27.09.11 4 Nos. - - Yes Under execution

M/s Rajesh Kumar Gupta, 54, Nehru Nagar, Kush Marg, Alwar(Raj.)

Rs. 406.50 Lacs 25-12-2012 08.02.2012 - Work is in progress.

Dy. CE/C/II-AII

S.No

Tender No. Item/Nature of work Mode of

Tender Inquiry

Dt. of Publica tion of NIT

Types of

bidding (single/ two-bid system)

Last date of receipt of tender

Nos. of tenders receive

d

Nos. & Name of Parties qualified after technical evaluation

Nos. & Name of Parties not qualified after technical evaluation

Whether tender

awarded to lowest

tenderer/ Evaluated

L1

Agreement No. & Date.

Name of Contractor Value of Contract

Scheduled date of completion of supplies

Actual Date of start of work

Actual date of completion

Reason for delay if any

1 T.No.AII/KVJ-KRJD/I/BG Doubling/T/3:

Earthwork in bank/cutting for formation between Keshavganj (incl.) – Swarupganj (Excl.) section in connection with Keshavganj– Swarupganj Patch Doubling Project.

Open 24.09.10 Single 01.11.10 14 Nos. Ist Lowest M/S

Varaha Infra Ltd., Umesh Smriti-6

Jalam Vilas Scheme, Poata B.

Road, Jodhpur

NIL Yes NWR/S&C/CA/32 Dt. 21.07.11

M/S Varaha Infra Ltd., Umesh Smriti-6 Jalam Vilas Scheme, Poata

B. Road, Jodhpur

`896.90 Lacs. 17.11.2011, 31.03.2012,

30.06.2012 & 30.11.2012

01.02.11 17.11.11 Work under progress

2 T.No.AII/KVJ-KRJD/I/BGD/T/2R

: Construction/Extension of Major/minor bridges including earthwork on the approaches between Keshavganj (incl.) – Swarupganj (Excl.) section with Railway’s design & drawing and construction of ORH at Abu Road in connection with Keshavganj-Swarupganj Patch Doubling Project.

Open 04.02.11 Single 03.03.11 04 Nos. Ist Lowest

M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17,

Vijaya Building,

Barakhamba Road,

Connaught Place, New

Delhi.

NIL Yes NWR/S&C/CA/33 Dt. 30.08.11

M/s Tantia-YSCC-IV BPL (JV), 1304, 13th

Floor, 17, Vijaya Building, Barakhamba

Road, Connaught Place, New Delhi.

`1095.38 Lacs. 20.02.2012, 30.06.2012 & 30.11.2012

-- 20.02.12 Work under progress

3 T.No.AII/KVJ-KRJD/I/BG Doubling/T/6–

Supplying and stacking 50mm machine crushed stone track ballast confirming to Railway specifications in stacks on cess along the track and in yards at various stations between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project

Open 04.04.2011 Single 10.05.11 05 Nos. Ist Lowest M/s

Bhaniyana Constructio

n, 28, Kanishka Resort,By

Pass Road, PAL,Distt. Jodhpur(R

aj.)

NIL Yes Dy.CE(C)AII/KVJ-

SRPJ/BGD/CA/69 Dtd. 16.11.2011

Ist Lowest M/s Bhaniyana

Construction, 28, Kanishka Resort,By

Pass Road, PAL,Distt. Jodhpur(Raj.)

`371.12 Lacs. 17.05.2012 & 17.11.2012

-- 17.05.12 Work under progress

4 T.No.AII/KVJ-KRJD/I/BG Doubling/T/8-R:

Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with

Open 27.07.11 Single 02.09.11 6 Nos. Ist Lowest

M/s Laxyo Energy Pvt. Ltd., 46/1, TIT Road,

Ratlam (M.P.)

NIL Yes Dy.CE(C)AII/KVJ-

SRPJ/BGD/CA/71 Dtd. 05.12.2011

Ist Lowest M/s Laxyo

Energy Pvt. Ltd., 46/1, TIT Road, Ratlam

(M.P.)

`371.12 Lacs. 14.04.2012 & 30.09.2012

-- 14.04.12 Work under progress

Keshavganj– Swarupganj BG Patch Doubling Project.

Dy. CE/C/Jodhpur

S N Tender No. Item/ Nature of

work

Mode of

tender

enquiry

Date of

publication of

NIT

Types of

bidding

(Single /

Two bid

system).

Last date of

receipt of

tender

No. of

tender

recei-ved.

Nos. & name of

parties qualified

after technical

evaluation

Nos. & name of

parties not qualified

after technical

evaluat-ion

Whether

contract

awarded to

lowest tender

/ evaluated

L.I.

Contract No. &

date

Name of

Contractor

Value of

contract (Rs)

Fig. in lacs. of

Rs.

Schedule date

of completion

Actual date of

start of work

Actual date

of complet-

ion

Reasons for

delays, if any.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1. JU/Const.-1/

19/2008-09,

Zone-I - Laying &

linking of BG track.

Open

Tender

24.03.09 Single 28.04.09 3 1 (M/s P.C.

Sharma, A-87,

Noida [UP])

1

(M/s Bhanwar Lal

Bijarnia)

Yes Dy.CE/C-I/JU

/16/2009-10

dtd.06.09.09

M/s P.C. Sharma,

A-87, Distt.

Gautam Budh

Nagar [UP]

236.35 212.22 05.11.09

31.03.10

15.02.10

31.03.10

30.04.10

23.07.09 30.04.10 Negotiation for

the items

executed

beyond 125%

of agreement

quantity held

on 23.08.12 &

now final

variation

sanction.

2. JU/Const.-1/

25/2008-09,

Depot supply of

Stone ballast

Open

Tender

06.05.09 Single 10.06.09 3 1 (M/s Vinayak

Const. Co.,

Jaswantgarh)

1 (M/s J.K. Const.

Co., Nokha)

Yes Dy.CE/C-I/JU

/21/2009-10

dtd.26.11.09

M/s Vinayak

Const. Co.,

Jaswantgarh

143.68 173.88 28.12.09

31.01.10

31.03.10

15.05.10

15.06.10

28.12.09 - Contractor has

been

instructed to

remove

rejected ballast

from Railway

Land & case is

also with Vig.

Branch.

3. T.No.JU/ Const.-

I/30 / 2009-10

AT Welding of rail

joint

Open

Tender

19.09.09 Single 22.10.09 1 1 (The India

Thermit Corp.

Kanpur)

- Yes Dy.CE/C

JU /22/2009-10

dt.29.3.10

The India

Thermit Corp.

Kanpur

103.63 77.31 22.04.10

31.08.10

15.11.10

31.03.11

30.05.11

28.11.09 - Final C&A

sanctioned &

final bill under

finalisation

4. JU/C/04/04-05

Bridge work No.

31 & 72 SMR-

BLDI

Open

tender

6.6.04 Single 6.7.04 08 Nos M/S Rachna Const.

Company

N/A L I NWR/S&C/CA/5

3 Dt. 20.1.05

M/S Rachna

Const. Comp.,.

TAL- Ankleshwar

Distt Bharuch

394.31 465.25

403.15

23.11.05 15.3.05 31.07.09

Final variation

will be

prepared after

sanction of NS

items which is

under

preparatio.

5. JU/C/08/04-05 Bridge work 30,56 Open Single 29.12.04 NWR/S&C/CA/ M/S Rachna 373.42 318.74 11.06.06 7.10.05 30.11.09 Final variation

vetted by HQ

S N Tender No. Item/ Nature of

work

Mode of

tender

enquiry

Date of

publication of

NIT

Types of

bidding

(Single /

Two bid

system).

Last date of

receipt of

tender

No. of

tender

recei-ved.

Nos. & name of

parties qualified

after technical

evaluation

Nos. & name of

parties not qualified

after technical

evaluat-ion

Whether

contract

awarded to

lowest tender

/ evaluated

L.I.

Contract No. &

date

Name of

Contractor

Value of

contract (Rs)

Fig. in lacs. of

Rs.

Schedule date

of completion

Actual date of

start of work

Actual date

of complet-

ion

Reasons for

delays, if any.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dt.19.

11.04

& 76 SMR- BLDI tender 64 dt .14.9.05 Const. Company 254.22

finance &

sanctioned by

CA. Now, Final

bill under

preparation

6. JU/C-II/01/09-10 Const. of ROB at

LC 36-C( At MKN)

& 63-C (At NGO)

Open single 14.7,09 05 M/S Rachana

Const Co.

N/A L-I DyCE/C-

II/JU/29/2009-10

Dated 25.2.2010

M/S Rachana

Const Co.

Unjha

546.95 09.07.10

30.10.11

31.01.12

20.02..12

30.04.12

30.09.12

24.8.09 Work in

progress

7. JUConst-/

03/2010-11 E/work in cutting

in filling PLC – Bye

pas

Open

tender

02.07.2010 Single 03.08.10 01 M/S Bhanwar Lal

Bijarnia

N/A L-1 DyCE/C-

II/JU/30/2010-11

Dated

02.02.20110

M/S Bhanwar Lal 106.04 13.07.11

30.08.11

15.11.11

31.12.11

28.10.10 Work

completed.

-

8. JU/Const-6/10-11 Const of ROB at

L.C. No. C-325 at

(BME)

Open

tender

15.10.2010 Single 16.09.10 06 M/S Rachana

const. comp.

N/A L-1 Dy CE/C

/JU/34/2011-12

dt. 21.10.11

M/S Rachana

const. comp.

380.99 07.11.11

31.07.12

30.11.12

28.06.11 Work in

progress

-

9. JUConst-/

08/2010-11 Extension of Bay

No.4 inside Diesal

Shad BGKT

Open

temder

22.09.2010 Single 25.10.10 02 M/s Anil Trading

co. Sikar

M/S Jai Bala Ji

Const. co. Sri-

Gananagar

L-1 Dy CE/C

/JU/35/2011-12

dt. 21.10.11

M/s Anil Trading

co. Sikar

242.85 16.11.11

30.07.12

15.10.12

15.03.11 Work in

progress

-

10. JUConst-/

09.R/2010-11 MKN-BIDD

E/Work in cutting

& filling Const.of

ROB insted of LC

etc.

Open

temder

21.02.11 Single 07.06.11 01 M/s Bhanwar Lal

Briainiya Vill.

Rajpura Distt. NGO

- L-1 - M/s Bhanwar Lal

Briainiya

289.66 29.09.12 10.10.11 Work in

progress

-

11. T.NO.JU/CONST/

T-01/2012-13

(ROB)

Accepted on

10.09.12

Construction of

ROB at LC No.

C-323-A (at

Barmer),

Open 05.07.12 Single 07.08.12 02 Parul Construction

Co.,

Mehsana

M/s Vishnu Prakash

R Pungalia, Jodhpur.

L-1 - Parul

Construction

Co.,

Mehsana

329.43 09.07.13

12. T.No. JU/

CONST/ 15/2011-

12 Accepted on–

17.09.12

Work of

remodeling of

Jodhpur yard

Open 25.03.12 Single 26.04.12 04 Sh.Girdhari Ram

S/o Sh. Sajjan Ram,

M/s P.C. Sharma,

Noida (U.P.)

L-1 - Sh.Girdhari Ram

S/o Sh. Sajjan

132.02 16.06.12

S N Tender No. Item/ Nature of

work

Mode of

tender

enquiry

Date of

publication of

NIT

Types of

bidding

(Single /

Two bid

system).

Last date of

receipt of

tender

No. of

tender

recei-ved.

Nos. & name of

parties qualified

after technical

evaluation

Nos. & name of

parties not qualified

after technical

evaluat-ion

Whether

contract

awarded to

lowest tender

/ evaluated

L.I.

Contract No. &

date

Name of

Contractor

Value of

contract (Rs)

Fig. in lacs. of

Rs.

Schedule date

of completion

Actual date of

start of work

Actual date

of complet-

ion

Reasons for

delays, if any.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

including all work

related to P. way,

AT welding

JODHPUR

Ram,

JODHPUR

CE/C/IV-JP

Dy. CE/C/BKN

SN Tender No Item/Nature of work Mode of tender inquiry

Dt.of publication NIT

Type of bidding (Single/two bid system

Last date of receipt of tender

Nos.of tenders received

Nos & names of parties qualified after technical evaluation

Nos & names of parties not qualified after technical evaluation.

Contract No. & dt.

Name of contractor

Value of contract

Scheduled date of completion of supplies

Actual date of start of work

Actual date of completion/extended date of completion

Remarks/Reason for delay if any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 Const/BKN/42/2009-10

Construction of RRI Building & Sick line office complex and construction & modification of station building, platforms, platform shelters, conversion of MG sick line shed into Track machine shelter and dismantling of MG AC maintenance shed, FOB landing and other miscellaneous works at Bikaner in connection with Sadulpur - Bikaner Gauge conversion project

open tender

29.03.09 single 29.04.09

08 Nos

Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

150-NWR/Dy CE/C-I/BKN Dt 24.12.09

M/S Govind Gupta, 5/99, Chopra Patti Narwana Distt Jind ( Haryana)

Rs 377.44 lakhs

02.09.09

21.09.09

15.03.12 Work since completed.

2 Const/BKN/02/2010-11

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-10 (Ch 435500 to Ch 462100 including Gadhwala, Bikaner Eaast and Bikaner station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project

Open tender

06.05.10 single 10.06.10

05 Nos

Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

161-NWR/Dy CE/C-I/BKn Dt 06.09.2010

M/S Shree Shyam Engineering Co., Poonia Colony Churu ( Raj)

Rs171.59 lakhs

07.03.11

08.07.10

31.12.11 Final bill passed.

3 Const/BKN/03/2010-11dated 19.06.2010

Const. of twenty four coach length BG washing line after dismantling of existing MG washing line and oher related miscellaneous works at Bikaner in connection with BKN-SDLP GC

Open tender

11.06.10 single 14.07.10

09 Nos

Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

163-NWR/Dy CE/C-I/BKN Dt 14.12.2010

M/S Jitender Singh , V&PO- Kakoda Distt. Jhujhunu

Rs 279.82 lakhs

16.10.10

12.11.10

31.03.12 Work since completed.

4 Const/BKN/18/2009-10/RE-HSR/Std-II dated 18.02.2010

Const. of Station biliding and other service buildimnngs etc. between Rewari ( excluiding ) to Hansi in c/with RE-HSR Std-II panel interlocking.

Open tender

18.02.10 single 26.03.10

05 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

102-NWR/Dy CE/C-II/BKN Dt 19.10.2010

M/S V.K.Const. Co. 2-D-37, Jawahar Nagar Sri Ganganagar

Rs 416.38 lakhs

15.05.11

15.06.10

30.10.12 Work is in progress

5 Const/BKN/08/HSR - RE/2010-11 dated 04.09.2010

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Manheru, Bawani Khera, Jitakheri and Hansi on Rewari - Hisar section.

Open tender

04.09.10 single 13.10.10

03 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

106-NWR/Dy CE/C-II/BKN/2010-11 Dt 03.02.11

M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)

Rs216.41 lakhs

08.09.11

26.12.10

08.09.11 Contract closed on administrative grounds and final variation in process.

6 Const/BKN/07/HSR - RE/2010-11 dated 04.09.2010

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Kishangarh Balawas, Jausana, Kosli, Jharli & Charkhi Dadari on Rewari - Hisar section.

Open tender

04.09.10 single 13.10.10

04 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

107-NWR/Dy CE/C-II/BKN/2010-11 Dt 04.02.11

M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)

Rs 230.69 lakhs

27.09.11

18.01.11

30.06.12 Work is in progress.Kishangarh Balawas,Jatusana,Kosli stations have been commissioned on 30.03.2012, 10.04.2012 & 10.06.2012.At Jharli, Pre NI work completed and the station is planned to be commissioned in the end of this month.

7 Const/BKN/09 ( R) /HSR - RE/2010-11 dated 24.12.2010

Supplying and stacking 47600 cum 65mm gauge stone ballast machine crushed ( hard stone) conforming to RDSO specificationsin connection with Std-III and MACL Signaling work in HSR-RE section.

Open tender

24.12.10 single 02.02.11

03 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

111-NWR/Dy CE/C-II/BKN/2011-12 Dt 04.05.11

Sh Devender Singh , H.No.7, Pratap Nagar , Saket Colony , Rajgarh Road , Hisar.

Rs 342.72 lakhs

14.12.11

21.03.11

14.12.11 Contract closed on administrative grounds and final variation in process.

8 Const/ BKN/02(R)/ SDRA/ 2010-11 Dated 05.06.10

Construction of station building , passenger platforms, staff quarters , duty huts for L-Xing, earthwork in embankment etc. in connection with Provision of B class station at Sudhrana .

Open tender

11.06.10 Single 14.07.10

09 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

103/NWR/Dy CE/C-II/BKN Dt 13.12.2010

M/S Jitender Singh , VPO- Kakoda Distt Jhunjhnu

RS 366.52 lakhs

18.10.11

01.11.10

30.09.12 Work is in progress.

9 Const/BKN/25/007-08

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe wall/retaining wall, stone pitching etc. I bet Km.323.50 to Km. 388.00 on BKN-SDLP section

Open tender

12.07.07 single 13.08.07

1 Nos. Tender awarded to evaluated L-1 further offers not discussed by TC

Tender awarded to lowest valid and eligible tenderer

91-NWR/DY CE/C-I/BKN /2007-08 dated 07.07.08

M/S Bharon Singh Rathore & Co. Survodya Basti near Narsingh Sagar Talab, Bikaner

2.40 Crores 24.12.08

30.01.08

31.03.11 Final bill under passing

10 Const/BKN/26(R )/2007-08

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc, from Km.388.00 to Km 455.00 on BKN-SDLP section

open tender

18.12.07 single 23.01.08

1 Nos. Tender awarded to evaluated L-1 further offers not discuss

Yes, tender awarded to lowest valid and eligible tenderer

120 NWR/DY CE/C-I/BKN/ 2008-09 dt 16.02.09

M/S Bheron Singh Rathore & Co. Sarvoday Basti, Bikaner (Raj)

3.08 Crores 15.03.09

28.08.08

31.03.11 Final variation under preparation.

ed by TC

11 Const/BKN/26(R ) /2008-09

Earthwork (including Blanketing material) in formation in bank & cutting with mechanical compaction, construction of 2 Nos RUBs having spans 2x10.50m & 1 No. RUB having spans of 1x6.10m and 5 Nos RUBs cum balancing culverts of spans 1x 3.66m ( all RCC boxes) including other ancillary works for construction of Ratangarh Bye Pass in connection with Bikaner-Ratangarh-Sadulpur gauge conversion project

open tender

18.02.09 single 23.03.09

10 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

CE/S&C/CA/28 dated 12.10.09

M/S Maya Const. Co. Pvt. Ltd., A-20, Shyam Darshan Society, Harivila Road, New Naroda, Ahmedabad-382346.

Rs 829.25 lakhs

13.08.09

27.08.09

15.05.11 Final variation submitted to HQ for HQ finance vetting & sanction by competent authority.

12 Const/BKN/10 (R )/2009-10

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-6 (Ch 325500 to Ch 351500 including Rajaldesar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.

open tender

07.08.09 single 07.09.09

05 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

162-NWR/Dy CE/C-I/BKN Dt 17.09.10

M/S Bhanwar Lal Bijarniya, Bhaiya Hotel, Bombay Motor Chouraha

Rs 139.06 lakhs

05.10.09

07.10.09

31.07.11 Final variation under finance vetting.

13 Const/BKN/11 (R )/2009-10

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-7 (Ch 351500to Ch 375500 including Persneu & Bigga station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.

open tender

07.08.09 single 07.09.09

07 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

158-NWR/Dy CE/C-I/BKN Dt 29.07.10

M/S Shree Nahar Agencies, A-328, Shastri Nagar Jodhpur

Rs 136.30 lakhs

05.10.09

07.10.09

31.05.11 Final bill under passing

14 Const/BKN/01/2010-11

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-09 (Ch 398500 to Ch 435500 including Benisar, Sudsar and Napasar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.

Open tender

06.05.10 single 10.06.10

04 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

160-NWR/Dy CE/C-I/BKN dt 06.09.10

M/S P.C.Sharma, A-87, Sector- 49, Noida (UP)

Rs 208.29 lakhs

18.03.11

19.07.10

30.07.11 Final bill under passing

15 Const/BKN/04/2011-12/BKN-SDLP-RTGH-SRDR

Supplying and stacking 55000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

14.09.11 single 14.10.11

08 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

172-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S Jai Mata Const.Co. H.No.14169 Street no.8A Ganesh Nagar Bhatinda( Pb)

Rs 305.25 lakhs

25.05.12

10.01.12

31.12.12 Work is in progress. 40400 cum supplied.

16 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR

Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.

Open tender

17.09.311

single 17.10.11

2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

173-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat

Rs 534.82 lakhs

01.06.12

05.01.12

01.12.12. Work is in progress.

17 Const/BKN/05/2011-12/BKN-SDLP-RTGH-SRDR

Supplying and stacking 60000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between km 19 to Sardarshahar on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.

Open tender

14.09.11 single 14.10.11

07 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

174-NWR/Dy CE/C-I/BKN Dt 31.03.2012.

M/S Chevron Minerals & Mines Pvt Ltd.Flat No.10, 3rd Floor Satya Niketan , Opposite Venkateshaware College , Near Dhaula Kuan , New Delhi- 110021

Rs 364.20 lakhs

17.07.12

29.01.12

30.09.12 Work is in progress. 59000 cum supplied.

18 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project

Open tender

20.01.12 single 22.02.12

2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

PG submitted.

M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003

Rs 531.61 lakhs

25.12.12

24.05.12

25.12.2012 Work in progress.

19 Const/BKN/20 /2009-10

Construction and modification of station building, CC Apron,RRI building, platform, raising/shifting of existing platform shelter, providing & fixing AC sheet roof, linking of BG track on CC Apron, dismantling of MG tracks and points & crossings,etc. and other misc. works at Suratgarh station in connection with Sarupsar-Srigangar gauge project

Open tender

02.07.09 single 06.08.09

07 Nos

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

147-NWR/Dy CE/C-I/BKN Dt 16.11.09

M/S Inderjeet Chhouda Contractor ,8-A-17, Jawahar Nagar Sri Ganganagar

Rs 396.99 lakhs

01.08.10

24.10.09

29.02.12 Work completed.Final variation in process.

20 Const/BKN/02/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-02 (Km. 50.00 to 81.00 including Rai Singhnagar & Gajsinghpur station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10

01 no. Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

3-NWR/Dy CE/C-III/BKN Dt 14.12.10

M/S Jhawar Sales Corporation, Rani Bazar Bikaner

Rs 194.62 lakhs

26.06.11

15.12.10

31.03.12 Work completed. Final bill is to be recorded by SSE/C/P.Way/SOG

21 Const/BKN/03/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-03 ( Km.81.00 to 115.00 including Sri Karanpur & Keasri Singhpur station yard) on Suratgarh –Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10

03 Nos.

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

9-NWR/Dy CE/C-III/BKN Dt 09.03.2011.

M/S Bhanwar Lal Bijarnia Village-Rajpura Post-Parewadi Tehsil-Nawa Distt: Nagaur (Raj)

Rs 178.57lakhs

31.05.11

15.12.10

30.06.12 Work completed. Final bill is to be recorded by SSE/C/P.Way/SOG

22 Const/BKN/04/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-04 (Km. 115.00 to 138.00 including Prithvirajpur & Sri Gangashahar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10

03 Nos.

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

7-NWR/Dy CE/C-III/BKN Dt 25.01.11

M/S Karnani Construction New Line Gangashahar, Bikaner(Raj)

Rs 138.34 lakhs

05.06.11

15.12.10

30.08.12 Work is in progress.

23 Const/BKN/01 (R)/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-01 (Km. 20.500 to 50.00 including Bhagwansar, Sarupsar & Mohansar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

07.10.10 single 08.11.10

02 Nos.

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

6-NWR/Dy CE/C-III/BKN Dt 19.01.11.

M/S P.C.Sharma, A-87, Sector-49, Nodia, Gautam Budh Nagar ( UP)

Rs 174.99 lakhs

21.07.11

15.12.10

31.07.12 work is in progress.

24 Const/BKN/12/2010-11/SGNR-HMH-SURP

Construction, Strengthening/extension of existing Minor bridges and placement of PSC slabs with RCC ballast retainers of span upto 6.10m including earthwork in approaches of bridges and other ancillary works in Diplana (excluding) to Suratpura (including) section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

09.10.10 single 10.11.10

04 nos Tender awarded to evaluated L-1 .

02 Nos (i) M/S Vikas Const. Co. Bhagina Road Near Water Works Pilani (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh

132-NWR/Dy CE/C-II/BKN dt 07.03.12

M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar

Rs 165.50 lakhs

23.02.12

05.10.11

30.12.12 work is in progress.

25 Const/BKN/10/2010-11/SGNR-HMH-SURP

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall etc, including supply of cement between Diplana (excluding) to Suratpura (including) to section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

09.10.10 single 10.11.10

06 nos Tender awarded to evaluated L-1 .

03 Nos (i) M/S Rajender Singh Contractor, 817, Sector-15A, Hisar (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh (iii) M/S Devender Singh Naveen (JV),7 Pratap Nagar , Saket Colony Rajgarh Road Hisar.

122-NWR/Dy CE/C-II/BKN dt 26.11.2011.

The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani

Rs 510.15 lakhs

23.03.12

26.07.11

30.12.12 work is in progress.

26 Const/BKN/23/2010-11/SGNR-HMH-SURP

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 88.00 to 132.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

11.12.10 single 12.01.11

04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

14-NWR/Dy CE/C-2/BKN Dt 15.09.2011

M/S Gawar Const. Ltd. DDS 378, Sector 16-17, Hisar

Rs 653.23lakhs

06.05.12

01.07.11

31.10.12 Work is in progress

27 Const/BKN/11 ( R) /2009-10

Construction of Road Over Bridge in lieu of Level crossing No. 53-C at Km 82/13-14 on Delhi- Rewari – Bhatinda Railway Line Xing Bhiwani – Tosham Road at RD 85.04 in Bhiwani District.

Open tender

27.11.09 single 30.12.09

01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No.99-NWR/Dy CE/C-II/BKN dated 03.06.2010.

Shree Gautam Construction Co. Ltd, A.T.Road, Opposite Pan Bazar , Over Bridge , Paltan Bazar Guwahati ( Assam)

Rs 653.23lakhs

31.01.12

05.08.10

31.07.12 Work completed.

28 Const/BKN/ 19/2008-09/SOG-BTI

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of existing turnouts, leading of P.way material and other miscellaneous works at all stations in connection with Standard–III and MACL signaling work at Birangkhera, Mandi Dabwali, Bagwali, Sangat, Gurusar Sahnewala and Bhatinda A & B Cabins on Suratgarh-Bathinda section

Open tender

27.02.09 single 01.04.09

01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No.78-NWR/Dy CE/C-II/BKN dated 17.08.2009

M/s Ganpati Const. Co., H.No. 430-B-1 Shant Nagar, Bathinda (Pb)

Rs174.63lakhs

31.08.11

24.07.09

31.12.11 Contract closed on administrative grounds and final variation in process.

29 Const/BKN/ 20/2008-09/SOG-BTI

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of and other miscellaneous works at all stations in c/w Standard–III and MACL signaling work at Rangmahal, Pilibanga, Dabli Rathan, Maneksar, Sangaria and Dhaban stations on Suratgarh-Bathinda section.

Open tender

27.02.09 single 01.04.09

01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No- 78-NWR/Dy CE/C-II/BKN dated 17.08.2009

M/s Karnani Const. New Line, Ganga Shahar, Bikaner

Rs 202.39 lakhs

14.06.11

12.06.09

31.03.12 Contract closed on administrative grounds and final variation in process.

30 Const/BKN/62/2007-08

Supplying and stacking 21900 cum 65mm gauge stone ballast machine between Suratgarh & Bathinda Railway stations in c/w Standard-III & MACL signaling work on Suratgarh-Bathinda section.

Open tender

17.12.07 single 18.01.08

02 nos Tender awarded to evaluated L-1 .

01 nos (i) M/S Ganpati Construction Co. H.No.430-B,/1 (22333) Shanti Nagar, Bhatinda

Agmt No 63/NWR/Dy CE/C-II/BKN dated 31.10.2008

M/s T.C. Const. Co, (JV), Nokha

Rs 211.38 lakhs

30.10.10

30.07.08

30.10.10 Contract closed on administrative grounds and final variation in process.

31 Const/BKN/ 13/2010-11

Supply of 52 kg /90 UTS SKV welding portions to the Railways for welding of rail joints from km 20.500 to 138.00 between Sarupsar (including) to Sri Ganganagar (including) in connection with Sarupsar to Sri Ganganagar Gauge conversion project.

Open tender

20.01.10 single 29.01.12

02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No17/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 28.02.2012

M/S India Thermit Corporation Ltd. 84/22, Fazal Ganj, Kanpur

Rs181.73 lakhs

29.01.12

28.08.11

30.06.12 Work in progress

32 Const/BKN/03 /2011-12/SRPR-SGNR

Widening & extension of High level platform No 3,4 & 5,providing hydrants for coach filling , Dismantling of old FOB, Shifting of PF shelters, Dismantling of MG washing line & goods platform, construction of road approach for BG goods platform at Suratgarh , Construction of type -II & III quarter at Sarupsar, Construction of duty hut & gate lodge at Suratgarh , Brick pitching for slope protection and other misc. work at Suratgarh and on Suratgarh -Sri Ganganagar ( excluding) section in connection with Sarupsar - Sri Ganaganagar gauge conversion project

Open tender

18.09.11 single 31.10.11

03 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No16/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 17.01.12

M/S Aditya Traders 38, Gurudawara Gali, Hanumangarh Jn

Rs 458.32 lakhs

28.08.12

12.12.11

28.08.12 Work in progress

33 Const/BKN/03/2011-12/SURP-HMH-SGNR Dt. 19.05.2011

Construction / modification of station building & structures i.e. S&T buildings, platforms, PF shelters , duty bunk and other ancillary works between Tehsil Bhadra ( excluding) to Sidhmukh (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project

Open tender

26.05.11 single 29.06.11

03 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

126-NWR/Dy CE/C-II/BKN dated 11.01.12

M/S Agarwal Const Co. Dudhwa Khara , Churu

Rs 418.60 lakhs

10.10.12

11.11.11

10.10.12 work in progress

34 Const/BKN/27®/2010-11/SGNR-HMH-SURP dated 28.06.2011

Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory / place including unloading and stacking /spreading at site from km 88.000 to 178.580 ( including Suratpura yard ) in connection with Sri Ganganagar – Hanumangarh – Suratpura gauge conversion project

Open tender

02.07.11 single 03.08.11

05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Contract Agmt No. 124/11-12 dated 19.12.2011. of /Dy CE/C-II/BKN

M/S Har Har Const. Co. Surender Nagar ).

Rs 192.38 lakhs

02.10.12

07.11.11

02.10.12 work in progress

35 Const/BKN/02/SURP-HMH-SGNR/11-12

Construction / modification of station building & structures i.e. S&T buildings, platforms, duty bunk and other ancillary works between Sidhmukh ( excluding) to Suratpura Jn. (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project

Open tender

26.05.11 single 29.06.11

05 nos Tender awarded to evaluated L-1 .

(i) M/S Ridhi Sidhi Construction Co. Sujangarh Road , Nokha , Bikaner ( Raj) (ii) M/S Sangam Construction Company C/O Nasar Latif S/O Abdul Khan Moh. Nardiyan Ward No.17, Rajgarh , Sadulpur ( Churu)

129-NWR/Dy CE/C-II/BKN Dt 02.02.12.

M/S Pyare Lal Dhaka Copnst. Co. Churu)

Rs 315.48 lakhs

04.11.12

23.11.11

04.11.12 work in progress

36 Const/BKN/09(R)/2011-12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.

Construction and modification of station buildings, platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

20.01.12 single 28.03.12

04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG submitted.

M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)

Rs 647.31 lakhs

03.03.13

Work is in progress

03.03.13 Work is in progress

37 Const/BKN/32(R)/2011-12/SURP-HMH-SGNR Dated 29.05.2012

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 132.00 to 175.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

01.06.12 single 09.07.12

2 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG since submitted.

M/S Jai Mata Const. Co, 14169, Street no.8-A, Ganesh Nagar , Bathinda

Rs 726.00 lakhs

03.04.13

Work is in progress

03.04.13 Work is in progress

38 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012

Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project

Open tender

26.05.12 single 27.06.12

05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG yet to be submitted.

M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur

Rs137.94 lakhs

28.12.12

Work is in progress

28.12.12 Work is in progress

39 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2013

Dismantling & reconstruction of parcel office, extension of waiting hall, construction of platform shelters, improvement of platform surfacing of Island platform and other ancillary works at Sri Gangsanagar in connection with Sarupsar -Sriganganagar Gauge Conversion Project.

Open tender

08.08.12 single 08.08.12

02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG yet to be submitted.

M/S V.K.Const Co, 2-D-37,Jawaharnagar Sri Ganganagar

Rs131.75 lakhs

06.05.13

Work is in progress

06.05.13 Work under mobilisation

Dy. CE/C/HMH

S. No

Tender No Item/ Nature of work

Mode of tender inquiry

Date of publication of NIT

Types of bidding (Single/ Two-old System)

Last date of receipt of tender

Nos. of tender received

Nos & name of parties qualified after technical evaluation

Nos & names of parties not qualified after technical evaluation

Whether contract awarded to lowest tenderer/ evaluated L-1

Contract No & date

Name of contractor

Value of contract

Schedule date of completion of supply

Actual date of start of work

Actual date of completion

Reason for delay if any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 Const/ BKN/11/10-11/ SGNR-HMH-SURP dt. 04.10.10

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc between Hanumangarh Jn (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

09.10.10 One packet system

10.11.10 7 1 6 Yes, L-1

Const/ BKN/ 11/10-11/ SGNR-HMH-SURP Dt: - 13.01.11

The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani

660.84 12.01.12 04.03.11

12.01.12 30.11.12

Work is in progress.

2 Const/ BKN/ SURP-HMH-SGNR/ 13/

2010-11 Dt. 04.10.10

Rebuilding, Construction, Strengthening/ extension of existing Minor bridges and upto 6.10m including earthwork in in Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

09.10.10 One packet system

10.11.10 4 1 3 Yes, L-1

Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt: - 05.02.11

M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar

425.56 04.02.12 24.11.11

04.02.12 30.09.12

Work is in progress.

3 Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 02.12. 2010

Construction/modification of station buildings & structures i.e. S&T buildings, Platforms, P.F. Shelters/ FOB, between Sadul Shahar (excluding) to Hanumangarh Jn. (excluding) section in c/w SURP-HMH-SGNR GC project.

Open Tender

05.12.10 One packet system

12.01.11 8 1 7 Yes, L-1

Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 17.02.11

M/s Jai Matadi Energy System, VPO-Narodara, Tehsil-Laxmangarh, Distt-Sikar.)

402.09 16.02.12 30.03.11

16.02.12 31.10.12

Work is in progress.

4 Const/ BKN/ 21/2010-11 Dated 04.12.2010

Supplying and stacking 75000 cum 65mm gauge stone ballast between Km. 0.00 to 44.00 on Hanumangarh-Suratpura in c/w SURP-HMH-SGNR GC project.

Open Tender

11.12.10 One packet system

12.01.11 6 1 5 Yes, L-1

Const/ BKN/ 21/2010-11 Dated 17.02.11

Sh. Devender Singh, 7, Pratap Nagar, Saket Colony, Rajgarh Road, Hisar

617.25 16.02.12 10.05.11

16.02.12 31.08.12

Work is in progress.

5 Const/ BKN/15/10-11/ SGNR-HMH-SURP dt. 02.12.10

“Rebuilding, Construction, Strengthening/extension of existing Minor bridges PSC slabs with RCC ballast retainers of span upto 6.10m in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

05.12.10 One packet system

12.01.11 3 1 2 Yes, L-1

Const/ BKN/15/ 10-11/ SGNR-HMH-SURP dt. 25.03.11

M/s G.K. Contractor, House No. 157, Sector No. 9, Extension, Hanumangarh Jn.

273.28 24.03.12 10.07.11

24.03.12 31.08.12

Work is in progress

6 Const/ BKN/ 22/2010-11 Dated 04.12.10

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 44.00 to 88.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open Tender

11.12.10 One packet system

12.01.11 6 1 5 Yes, L-1

Const/ BKN/ 22/2010-11 Dated 07.05.11

M/s Jai Mata Const. Co. H.No. 14169 Street No. 8A, Bathinda

686.25 07.05.11 25.07.11

07.05.12 31.10.12

Work is in progress.

7 Const/BKN/ 22/2010-11 Dated 04.12.10

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc, including supply of cement between Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

01.01.11 One packet system

12.01.11 7 1 6 Yes, L-1

Const/BKN/ 14/2010-11 Dated 07.05.11

M/s Jaimatadi Energy Systems (JV),VPO Narodara,Teh. Laxmangarh, Dist. Sikar

416.61 06.05.12 01.07.11

31.10.12 Work is in progress.

8 Const/BKN/16/ 2010-11/ SGNR-HMH-SURP dt. 02.12.10

Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, PF shelters / FOB, duty bunk and other ancillary works between Sri Ganganagar (excluding) to Sadul Sahar (including) section c/w SURP-HMH-SGNR GC project.

Open Tender

01.01.11 One packet system

12.01.11 6 1 5 Yes, L-1

Const/ BKN/16/ 2010-11/SGNR-HMH-SURP 07.05.11

M/s Surender Kumar Bansal, 59 P Block, Shri Ganga Nagar

547 17.05.12 27.05.11

30.9.12 Work is in progress.

9 Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 19.02.11

Construction/Rebuilding of substructure of Bridge No. 40 (1 x 45.70 m Open Web Girder) at km 141.515 on Gang Canal, Bridge No. 2-A (2 x 61.0 m Open Web Girder) at km 2.347 on Ghaggar River, Bridge No. 14-B (2 x 61.0 m Open Web Girder) at km 18.345 on Ghaggar River and Bridge No. 21-A (1 x 76.20 m Open Web Girder) at km 28.638 on Indira Gandhi Main Canal including other ancillary works in c/w SURP-HMH-SGNR GC project.

Open Tender

24.02.11 One packet system

30.03.11 5 1 4 Yes, L-1

Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 15.07.11

M/s Jaimatadi Energy System, JV, VPO Narodara, Teh. Laxmangarh, Dist. Sikar

13.34 Cr. 14.07.12 01.02.12

14.7.13 Work is in progress.

10 Const/ BKN/ 26 (R)/ 2010-11/ SGNR-HMH-SURP dt. 28.06.11

Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory/place including unloading and stacking/ spreading at site from km. 0.000 to 88.000 (Excluding Hanumangarh Yard) in connection with Sri Ganganagar-Hanumangarh-Suratpura Gauge Conversion Project.”

Open Tender

02.07.11 One packet system

03.08.11 6 1 5 Yes, L-1

CConst/ BKN/ 26 (R)/ 2010-11/SGNR-HMH-SURP Dated: - 03.10.11

M/s Har Har Company, Doshi Chambers, Mehta Market, Surenderanagar. (Guj)

152.19 lakh

02.10.12 11.11.11

02.10.12 Work is in progress.

11 Const/ BKN/ 16/2011-12/ SURP-HMH-SGNR Dated–16.08.2011

Construction of Foot Over Bridge and Platform Shelter at Hanumangarh Junction, Hanumangarh Town, Ellenabad and Nohar station in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.””

Open Tender

28.08.11 One packet system

28.09..11 2 1 1 Yes, L-1

Const/BKN/16/2011-12/SURP-HMH-SGNR Dated: - 16.12.2011

M/s Sajneev Brothers, C-10, Vaishali Nagar, Jaipur

302.87 Lakh

15.12.12 20.03.12

15.12.12 work is in progress

12 Const/BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 10.10.2011

Supplying and stacking 40000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Banwali, Fateh Singhwala, Budh Singhwala & between Km.201.00 to 202.00 Depot on Sri Ganganagar–Diplana

Open Tender

14.10.11 One packet system

18.11.2011

4 1 3 Yes, L-1

Const/ BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 14.12.2011

M/s Jai Mata Const. Co., House No. 14169, Street No. 8A, Ganesh Nagar, Bathinda

439.70 LAKH

13.06.12 17.12.11

31.07.12 Work is in progress

section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.

13 Const/BKN/SURP-HMH-SGNR/19(R-1)/ 2010-11 dt.19. 10.11

Supplying and stacking 65000 cum 65mm gauge stone ballast between Km.137.250 to 171.00 (including Sri Ganganagar) on Sri Ganganagar–Hanumangarh section in c/w SURP-HMH-SGNR GC project..

Open Tender

25.10.11 One packet system

30.11.11 4 1 3 Yes, L-1

Const/BKN/SURP-HMH-SGNR/19(R-1)/ 2010-11 dt.14.12.11

M/S J.K.Const. Co. New Market, Nokha

719.90 LAKH

13.08.12 23.12.11

13.08.12 Work is in progress.

14 Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 05.12.2011

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in section & at LC’s of Zone-1 (Ch. 138.000 to 204.130) on Sri Ganganagar-Hanumangarh section c/w SURP-HMH-SGNR GC project.

Open Tender

10.12.11 One packet system

11.01.12 3 1 2 Yes, L-1

Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 22.01.12

M/s RAVI INFRABUILD PROJECTS PVT. LTD., 95, Hiran Magri Sector-11, Udaipur

904.54 21.01.13 01.02.12

21.01.13 Work is in progress

15 Const/HMH/ 20(R-2)/ SURP-HMH-SGNR/2010-11 Dated 22.12.2011

Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km.171.00 to 204.130 (including Hanumangarh) on Sri Ganganagar–Hanumangarh section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.

Open Tender

25.12.11 One packet system

25.01.12 5 1 4 Yes, L-1

Const/HMH/20(R-2)/SURP-HMH-SGNR/2010-11 Dated 24.02.12

M/s Sura Const. Co., Sector-13, 1323/1133, Hisar.

687.05 23.10.12 25.02.12

23.10.12 Work is in progress

16 Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12

Supplying and stacking 90000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications in various Depots i.e. near Hanumangarh Junction, Talwara Jhil, Ellenabad, Nohar, Diplana & any other location on Hanumangarh-Diplana section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.

Open Tender

13.01.12 One packet system

13.03.12 5 1 4 Yes, L-1

Const/HMH/25/SURP-HMH-SGNR/2011-12 Dated–09.05.12

(Sh. Devender Singh, 7, Pratap Nagar,Saket Colony, Rajgarh Road, Hisar).

874.71 08.05.13 01.06.12

08.05.13 work is in progress

17 Const/HMH/7/ 12-13/SURP-HMH-SGNR Dated 09.7.2012,

Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Talwara Jhil (excluding) to Khinaniyan (including) section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project (M/s P.S. Infrabuild PVT. LTD 15. Jaat Dharmshala Complex G.T. Road Fatehabad ( Haryana)

Open Tender

11.7.12 One packet system

13.8.12 4 1 3 Yes, L-1

Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12

M/S P.S.Infra Build Pvt.Lited 15 jaat Dharmshala G.T.Road Fatehabad

779.3 12.7.13 - 12.7.13 Work yet to be started

18 Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,

Transportation, Assembling, Erection, Cambering, Riveting (with contractor’s rivets) painting and launching (as per contractor’s approved scheme) of open web through steel girders on Bridge No. 2-A (2 x 61.00m) at km. 2.347 on Ghaggar River, Bridge No. 14-B (2 x61.00m) at km. 18.345 on Ghaggar River and Bridge No. 21-A (1x 76.20m) at Km. 28.638 on Indira Gandhi Main Canal (Girder components will be supplied by Railway) with supplying & fixing of bearings and supplying, fabricating & fixing of galvanized steel channel sleepers along with matching fittings at site, on newly constructed top of pier/abutment to perfect level & alignment and other ancillary works in c/with SURP-HMH-SGNR GC project. (M/s Kiran Infra Engineers Ltd, Jaipur.

Open Tender

13.01.12 One packet system

30.7.12 4 1 3 Yes, L-1

Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,

M/S Kiran Infra engg.Lted B-141 Road no 9D VKI area JP

495.56 16.9.13 - 16.8.13 Work yet to be started

19 Const/HMH/ 03/2012-

13/SGNR-HMH-

SURP dt. 23.06.12

“Balance work of Rebuilding of existing Major & Minor bridges with RCC BOX of span upto 6.0 m including earthwork in approaches of bridges and other ancillary works in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.t.(

Open Tender

28.6.12 One packet system

30.7.12 5 1 4 Yes, L-1

Const/HMH/ 03/2012-13/SGNR-

HMH-SURP dt.

23.06.12

M/s. Shree Karni Traders, C-171, Kanta kathuria Colony,Bikaner

168.78 7.12.12 14.8.12 7.12.12 Work is in progress.

CE/C/V-JP

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication of NIT

Types of bidding ( single /two bid system )

Last date of receipt

of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of work

Actual date of completion

Remarks/ Reason for delay if

any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dy. CE/C/DO

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 DO/GG

C/NL/8

-

Construction of

minor bridges

from Chainage

00.00 to 30000

Between Dausa

and Lalsot in

connection with

DO-GGC new BG

Line

Op

en t

end

er

Single

Packet

system

07

/12

/20

05

Yes NWR/S&C/

CA/78

dated

27.06.06

M/s Jain

construction

Co.(JV) Ajmer

6.33 crore 20/05/07

Further

extension

granted

upto

31/12/2007

04/04/06 Contract

terminated.

Final bill is being

processed for keeping

in deposit.

2 DO/GG

C/NL/9

Construction of

BG formation

from Chainage

1150 to 15000

between Dausa

Kala-Shekhpura in

connection with

DO-GGC new BG

line project.

Op

en t

end

er

Single

Packet

system

04

/01

/20

06

Yes NWR/S&C/

CA/81date

d 06.09..06

M/s Kewai

Construction (JV)

Jodhpur

6.45 crore 26/09/07

Further

extension

granted up

to

30/11/2011

12/07/06 - contract terminate on

24/11/12. Final

measurements have

been recorded by

XEN/C/DO

3 DO/GG

C/NL/1

0

Construction of

BG formation

from Chainage

15000 to 28000

between Dausa

and Lalsot in

connection with

DO-GGC new BG

line project.

Op

en t

end

er

Single

Packet

system

16

/01

/20

06

Yes NWR/S&C/

CA/79

dated

30.06.06

M/s Parma Ram

Bhakar Jodhpur.

6.39 crore 17/07/07

extended

upto

30/11/2011

11/05/06 - Contract terminate on

24/11/12. Final

measurements have

been recorded

4 DO/GG

C/NL/1

4

Construction of

Major Bridges

with 1200mm dia

cast in situ board

piles & PSC girder

superstructure of

18.30 M between

DO-GGC in c/with

DO –GGC NLBG

Project

Op

en t

end

er

03

/10

/20

07

Single

Packet

system

14

/11

/20

07

Yes NWR/S&C/

CA/94

dated

18/02/200

8

M/s

Atlanta-ARSS

(JV) Bhubaneshwar

(Orissa).

41.63 crore 16/09/09

Extended

upto

31/10/2012

20/02/08 - work completed

5 DO/GG

C/NL/1

5

Construction of

Minor Bridges

from chainage

30000.00 to

38500.00 &

Construction of

BG Formation

from chainage

28000.00 to

38500.00

between Dausa

and Lalsot in

connection with

DO-GGC New BG

line Project

Op

en t

end

er

0

3/1

0/2

00

7

Single

Packet

system

14

/11

/20

07

3 Yes Dy.

CE/C/I/JP/

CA/16

dated

29/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

(Orissa).

5.31Crores 09/06/09

Extended

upto

31/08/2011

24/01/08 - Work completed

6 DO/GG

C/NL/1

8

Construction of

Broad Gauge

Formation &

Minor Bridges

from Chainage

41000.00 to

45000.00

between Dausa

and Lalsot in

connection with

Dausa- Gangapur

City New Broad

Gauge line

project.

Op

en t

end

er

Single

packet

system

14

/11

/20

07

Yes NWR/S&C/

CA/97

dated

03/03/200

8

M/s Atlanta-ARSS

(JV) Bhubneshwar

(Orissa)

17.95 Crore 30/07/09

extended

upto

31/12/2012

14/03/0/8 - Work in progress

7 DO/GG

C/NL/2

1

Construction of

BG formation and

Minor Bridge

from chanaige

45000 to 60000

bet. Lalsot and

Gangapur City in

connection with

DO-GGC New B G

line Project

Op

en t

end

er

24

/09

/20

07

Single

Packet

system

02

/11

/20

07

3 Yes NWR/S&C/

CA/95

dated

18/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

8.41

Crores

20/03/09

Extended

upto

31/03/2013

15/03/08 - Work in progress

8 DO/GG

C/NL/2

2

Construction of

BG formation and

Minor Bridge

from chanaige

60000to 75000

bet. Lalsot and

Gangapur City in

connection with

DO-GGC New B G

line Project

Op

en t

end

er

2

4/0

9/2

00

7

Single

Packet

system

02

/11

/20

07

3 Yes Dy.

CE/C/I/JP/

CA/17

dated

29/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

6.71 Crores 10/03/09

Extended

upto

31/03/2013

10/03/08 - Work held up. 7 days

notice issued on

28/03/2012

9 DO/GG

C/NL/2

3

Construction of

BG formation and

Minor Bridge

from chanaige

75000 to 90000

bet. Lalsot and

Gangapur City in

connection with

DO-GGC New B G

line Project

Op

en t

end

er

2

4/0

9/2

00

7

Single

Packet

system

02

/11

/20

07

3 Yes NWR/S&C/

CA/96

dated

18/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

8.56

Crores

20/03/09

Extended

upto

30/06/2013

15/03/08 -

Work held up. 7 days

noticed issued on

28/03/2012

10 DO/GG

C/NL/8

(R&C)

Construction of

Minor Bridges

from Chainage

00.00 to 30000.00

between Dausa

and Lalsot in

connection with

Dausa Gangapur

city new Broad

gauge line

project.

Op

en t

end

er

17

/01

/20

08

Single

packet

system

20

/02

/20

08

1 Yes Dy.

CE/C//DO/

CA/20

Dated23/0

6/2008

M/s Kewai

Construction Co.

(J/V), Jodhpur

5.98 Crore 01/01/09

Extended

upto

31/08/2012

28/08/08 - Work has been

terminate on 12/07/12.

11 JP/C/W

/48RR/

ROB

Dausa

Construction of

Road Over Bridge

across the

Railway track in

Dausa Yard at

Level Crossing No.

181-B at Km.

179/10-11 on

Jaipur Bandikui

section.

Op

en t

end

er

16

/12

/20

07

Single

packet

system

18

/01

/20

08

1 - Yes NWR/S&

C/CA/94

dated

18/02/200

8.

M/s Bharat Spun

Pipe & Construction

Co., Jaipur

3.82 Crore 15/07/09

Extended

upto

15/10/2012

25/04/2009- - Work is on advance

stage of completion

12 DO/GG

C/NL/2

9

Construction of

platforms,

earthwork in

platform in

connection with

Dausa-

Gangapurcity new

BG line project.

Op

en t

end

er

27

/01

/20

09

Single

packet

system

02

/03

/20

09

9 - - Yes Dy.CE/C/D

O/CA/ 35

dated: 15

/10/2009

M/s Bharat- Kamal

(J/V), Jaipur

5.47 crore 04/08/10

Extended

upto

30/10/12

07/08/2009 - work in progress.

13 DO/GGC

/NL/36

Construction of

broad gauge

formation &

muior bridges

from Chainage

90000 to 92700

between Lalsot

and Gangapurcity

new Broad gauge

line project.

Op

en t

end

er

22

/11

/20

09

Single

packet

system

28

/12

/20

09

2 - - yes Dy.

CE/C/DO/C

A/43 dated

07/04/201

0

M/s Mohan Singh

Jat, Gangapurcity

1.50 crore 05/12/2010

Extended

upto

6/12/11

further

extension

under

process

07/04/2010 - Work held up.

Contractor has filed suit

in the court.

14 DO/GGC

/NL/31

Construction of

ROBs across

Railway track at

chainage

37034,83925 &

37925 and

drainage over

pass at chainage

36960 & 37520

between

salempura to

Udaikalan station

inconnection with

Dausa-

Gangapurcity new

BG line project

Op

en t

end

er

Single

packet

system

16

/02

/20

10

11 - - Yes NWR/S&C/

CA/105

dated

22/11/201

0

M/s Shree Ram

Kripa Construction

Jaipur

13.44 Crore 29/02/2012.

Extended up

to

15/11/2012

- - Work in progress

15 DO/GGC

/NL/32

Construction of

150unit type II, 7

units type-III staff

quarters & IOW

office and other

ancillary works

the water supply,

sewerage,

drinakge, roads,

parking, sanitary

and provision of

electrical//

communication

conduits & metal

boxes for NWR

residential colony

at various

stations between

Dausa-

Gangapurcity new

BG line project.

Op

en t

end

er

Single

packet

system

05

/07

/20

1

02 - - Yes NWR/S&C/

CA/107

dated

28/03/201

1

M/s L.N. Agrawal-

MCD Pvt. Ltd., (J/V)

Jaipur

15.65 Crore 31/03/2012.

Extended

upto

31/03/13

- - Work in progress.

16 DO/GGC

/NL/30

Construction of

single line 13

standard straight

alignment tunnel

in soil and rock

including cut and

cover portion

between

chainage 38/720

to 40/840

including side

drain and other

approaches of

tunnel between

Didwana- Lalsot

Railway station in

connection with

Dausa-

Gangapurcity new

BG line project.

Op

en t

end

er

Single

packet

system

27

/07

/20

09

12 - - Yes NWR/S&C/

CA/106

dated

29/12/10

M/s Valecha-

Transtonelstroey

(J/V) Mumbai

53.02 Crore 27/09/2012.

Further

extension

under

process.

- - Work in progress

17 DO/GGC

/NL/26

DO/GGC/NL/26-

Supplying and

stacking 50mm

gauge machine

crushed stone

track ballast in

stacks as per

Railway’s

specification

between Km. 1.00

to 41.00 (Dausa-

Lalsot) section in

connection with

Dausa-

Gangapurcity new

BG line project.

Op

en t

end

er

Single

packet

system

07

/01

/20

11

6 Yes

Dy.CE/C/D

O/CA/54

dated

22/07/11

M/s R.K. Infra (J/V),

Jaipur

7.74 Crore 05/04/2012

Extended

upto

05/04/2013

Work in progress

18 DO/GGC

/NL/28

Construction of

Broad gauge

formation in

cutting,

construction of

rail side drain,

catch water drain

& slope

protection work

from chainage

36000 to 38500

between Dausa

and Lalsot in

connection with

Dausa-

Gangapurcity new

BG line project

Op

en t

end

er

15

/03

/20

11

Single

packet

system

21

/04

/20

11

3 - - Yes

Dy.CE/C/D

O/CA/57

dated

30/11/201

1

M/s Jagdish Prasad

Agrawal, Alwar

6.03 Crore 26/04/12

Extended

upto

31/12/2012

17/10/11 work in progress

19 DO/GGC

/NL/40

Laying and

linking of BG track

and

transportation of

P.Way material,

PSC sleepers etc

between Dausa-

Deedwana

section in

connection with

Dausa-

Gangapurcity new

BG line project.

Op

en t

end

er

28

/03

/20

11

Single

packet

system

18

/05

/20

11

6 - - Yes

Dy.CE/C/D

O/CA/56

dated

18/10/11

M/s Goel Brothers

Rail Infra Pvt. Ltd.,

Bareilly.

5.66 Crore 01/08/2012.

Extended

upto

15/12/2012

13/09/11 Work in progress

20 DO/GGC

/NL/43 Construction of

duty bunk

miscellaneous

structures and

road work etc.

between Dausa

Gangapurcity

section in

connection with

Dausa

Gangapurcity

new BG line

project.

Op

en T

end

er

21

/05

/20

11

Single

packet

system

27

/06

/20

11

4 - - Yes - M/s Bharat –Kamal

(J/V), Udaipur

5.31 Crore 18/10/12 - - Contract proposed to

be closed vide letter

dated 19/03/2012

21 DO/GGC

/NL/39R

R

Construction of

station

buildings,

signaling

structures and

miscellaneous

structures etc.

at various

stations

between Dausa

(excl.) to

Gangapurcity

(excl.) in

connection with

Dausa

Gangapurcity

new BG line

project.

Op

en T

end

er

28

/06

/20

11

Single

packet

system

05

/08

/20

11

3 - - Yes NWR/S&C/

CA/115

dated

21/03/201

2

M/s Bharat-Kamal

(J/V), Udaipur

8.25 Crore 28/02/13 - - work in progress

For CAO/C/JP

22 DO/GGC

/NL/9

(R&C)

Construction of

Broad Gauge

Formation from

chainage 1150.00

to 15000.00

between Dausa

Kala and

Shekhpura

Villages in

connection with

Dausa-Gangapur

City New Broad

Gauge line

Project(Risk &

Cost tender).

Op

en t

end

er

25

/11

/20

11

Single

packet

system

28

/12

/20

11

7 - - Yes Dy.CE/C/D

O/CA/58

dated

21/02/201

12

M/s Jai Salasar

Balaji Construction

Co. (J/V) Jaipur

4.60 04/05/12

Extended

upto

04/09/2012

21/01/12 - Work terminate on

09/07/12.

23 DO/GGC

/NL/10

(R&C)

Construction of

Broad Gauge

Formation from

chainage

15000.00 to

28000.00

between Dausa

and Lalsot in

connection with

Dausa-Gangapur

City New Broad

Gauge line

Project(Risk &

Cost tender).

Op

en t

end

er

25

/11

/20

11

Single

packet

system

28

/12

/20

11

7 - - Yes Dy.CE/C/D

O/CA/59

dated

21/02/201

12

M/s Jai Salasar

Balaji Construction

Co. (J/V) Jaipur

2.95 04/05/12

Extended

upto

04/09/2012

21/01/12 - work terminated on

09/07/12