details of contract concluded during the month of … filedetails of contract concluded during the...

46
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of publicatio n of NIT Types of bidding ( single /two bid system ) Last date of receipt of tender Nos. of tenders received Nos. and name of parties qualified after technical evaluation Nos. & names of parties not qualified after technical evaluation Whether contract awarded to lowest tenderer evaluated L1 Contract No. & date. Name of contractor. Value of contract Scheduled date of completion of supplies. Actual date of start of work Actual date of completion Remarks/ Reason for delay if any, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CE(C)I-JP Dy. CE/C/III-JP 1 AF/BKI/GC/JP/4R Construction strengthening and rebuilding minor bridges between Nadbai- Bharatpur Open tend er Two bid system 29.04.99 15 07 08 Yes CPM/JP/ KTT/CA/1 6 dated 15.02.200 0 M/s Jugendra Singh & Co., Etah. 2.98 crore 04.01.200 0 01.06.01 31/3/04 Work completed, case was investigated by vigilance final variation advice is awaited. Reminder sent. 2 AF/BKI/GC/ JP/68 Laying and linking BG track between BTE- AH section Open tend er 24..04.04 One bid system 27.09.04 5 1 4 Yes NWR/S& C/CA/51 dated 04.01.05 M/s RSV Construction Hyderabad 1.83 crore 01.03.05 5.11.04 31.5.05 Work completed. Final bill Under technical check 3 AF/BKI/GC/ JP/69 Laying and linking BG track between BTE- AH section Open tend er 24.04.04 One bid system 27.9.2004 5 1 4 Yes NWR/S& C/CA/49 dated24.1 2.04 M/s Engipress Rail Link, Gwalior 1.58 crore 25.02.05 28.10.04 30.11.05 Work is in dispute as money suit filed by contractor. 4 AF/BKI/GC/36 Welding of rail joints bet. BKI- KL section Open tend er - One packet system 09.06.03 3 1 2 Yes Dy. CE(C)JP/ CA/77 dated 07.10.03 M/s India Thermit Corp Ltd., Kanpur 1.02 Crore 08/3/04 12/10/03 30/06/04 Final bill is awaited from field office. 5 NWR-JP/RE yard/11 Const./Exten of station building at RE yard Open tend er 8.08.2008 One packet system 29.08.2008 01 - 01 Yes Dy CE/C- JP/CA/22 1 dt. 17.02.09 M/s New Everest Stone Curshing Co. Gurgaon 4.88 Crore 14/6/09 26/10/08 31/08/11 Work completed. Final bill awaited. 6 HIS- RE/Doubling/2 Const/ Extension of FOB&PF shelter shed bet. RE- HIS. Open tend er 24.07.2008 One packet system 25.08.2008 03 - 01 Yes Dy CE/C- JP/CA/22 4 dt. 19.03.09 M/S Sanjeev Brothers, Jaipur. 4.16 Lakhs 22/4/09 22/02/09 31/12/11 Work is in progress, further DOC extension is to be applied by agency. 7 AWR-HSI Doubling/5 Construction of Minor Bridge E/Work bet. HIS to Km.57 to AWR Open tend er 09.08.2007 One packet system 12.09.2007 02 01 01 Yes Dy.CE(C)/ JP/CA/21 3 dated 08.07.08 M/s Jugeundra Singh Co., Etah 5.80 Crore 09/01/09 08/05/08 31/3/11 Work completed final bill technically checked .Final variation will be submitted for adm. Approval of competent authority

Upload: others

Post on 12-Sep-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication of NIT

Types of bidding ( single /two bid system )

Last date of receipt

of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of work

Actual date of completion

Remarks/ Reason for delay if

any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE(C)I-JP

Dy. CE/C/III-JP

1

AF

/BK

I/G

C/J

P/4

R

Construction strengthening and rebuilding minor bridges between Nadbai- Bharatpur

Open tender

Two bid system

29.0

4.9

9

15 07 08 Yes CPM/JP/KTT/CA/16 dated 15.02.2000

M/s Jugendra Singh & Co., Etah.

2.98 crore 04.01.2000

01.06.01 31/3/04 Work completed, case was investigated by vigilance final variation advice is awaited. Reminder sent.

2

AF

/BK

I/G

C/

JP

/68

Laying and linking BG track between BTE- AH section

Open tender

24..0

4.0

4

One bid system

27.0

9.0

4

5 1 4 Yes NWR/S&C/CA/51 dated 04.01.05

M/s RSV Construction Hyderabad

1.83 crore 01.03.05 5.11.04 31.5.05 Work completed. Final bill Under technical check

3

AF

/BK

I/G

C/

JP

/69

Laying and linking BG track between BTE-AH section

Open tender

24.0

4.0

4

One bid system

27.9

.200

4 5 1 4 Yes NWR/S&

C/CA/49 dated24.12.04

M/s Engipress Rail Link, Gwalior

1.58 crore 25.02.05 28.10.04 30.11.05 Work is in dispute as money suit filed by contractor.

4

AF

/BK

I/G

C/3

6

Welding of rail joints bet. BKI- KL section

Open tender

- One packet system

09.0

6.0

3

3 1 2 Yes Dy. CE(C)JP/CA/77 dated 07.10.03

M/s India Thermit Corp Ltd., Kanpur

1.02 Crore

08/3/04 12/10/03 30/06/04 Final bill is awaited from field office.

5

NW

R-J

P/R

E

yard

/11

Const./Exten of station building at RE yard

Open tender

8.0

8.2

00

8

One packet system

29.0

8.2

008

01 - 01 Yes Dy CE/C-JP/CA/221 dt. 17.02.09

M/s New Everest Stone Curshing Co. Gurgaon

4.88 Crore 14/6/09 26/10/08 31/08/11 Work completed. Final bill awaited.

6

HIS

-

RE

/Do

ub

ling/2

Const/ Extension of FOB&PF shelter shed bet. RE-HIS.

Open tender

24.0

7.2

008

One packet system

25.0

8.2

008

03 - 01 Yes Dy CE/C-JP/CA/224 dt. 19.03.09

M/S Sanjeev Brothers, Jaipur.

4.16 Lakhs

22/4/09 22/02/09 31/12/11 Work is in progress, further DOC extension is to be applied by agency.

7

AW

R-H

SI

Doub

ling/5

Construction of Minor Bridge E/Work bet. HIS to Km.57 to AWR

Open tender

09.0

8.2

007

One packet system

12.0

9.2

007

02 01 01 Yes Dy.CE(C)/ JP/CA/213 dated 08.07.08

M/s Jugeundra Singh Co., Etah

5.80 Crore

09/01/09 08/05/08 31/3/11 Work completed final bill technically checked .Final variation will be submitted for adm. Approval of competent authority

Page 2: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

8

HS

I-R

E/D

ou

blin

g/1

Construction of Major Bridge minor bridge R/wall earth work station building ballast supply , track linking etc.

Open tender

2

1 &

2

2.0

7.2

008

One packet system

2

3.0

4.2

008

05 - 01 Yes NWR/S&C/CA/101 dated 23.10.08-

M/s ARSS- Triveni(JV) Bhubaneshwar

50.81 Crore

24/2/10 03/11/08 31/05/12 Work is in progress. Further extension of DOC is awaited from agency.

9

AW

R-

HS

I/D

oub

ling/6

Construction station building Misc. structure ballast supply track linking etc.

Open tender

21.0

2.2

008

One packet system

23.0

4.2

008

06 - 01 Yes NWR/S&C/CA/102 dated 23.10.08

M/s ARSS Infra structure project Ltd. Bhubaneshwar (Orissa)

21.24 Crore

02/07/09 27/10/08 31/05/12 Work is in progress. Further extension of DOC is awaited from agency.

10

NW

R/S

&C

/R

OB

/11

1/9

Const of ROB at LC No.111-C.

Open tender

02.1

0.2

008

One packet system

05.1

1.2

008

03 - 01 Yes Dy.CE(C)/ JP/CA/230 dated 13.10.10

M/S Bharat Spun Pipe & Const.Co. JP

6.52 Cr. 04/05/10 25/08/09 31/7/12 Work is in progress

11

NW

R/S

&C

/R

OB

/11

7/1

0

Const of ROB at LC No.117.

Open tender

29.1

.200

9

One packet system

04.0

3.2

009

04 - 01 Yes Dy.CE(C)/ JP/CA/229 dated 11.01.10

M/S Parul–Const.Co. MSH

2.35 Cr. 17/05/10 23/11/09 30/12/11 Work completed. Final variation is under administrative approval of competent authority.

12

NW

R/S

&C

/T/6

R

-4

Const. HQ Building at Jawahar nagar Jaipur.

Open tender

-

One bid system

21.9

.200

7

5 5 0 Yes NWR/S&C/CA/98 dtd. 04.03.08

M/s SAM India Built well Pvt. Ltd. Dehli

45.11 Crore 06.6.09 22.12.7 31.07.11. Final bill passed by accounts office .

13

WR

/S&

C/T

/13

Construction of 72 units Type-II, 108 units Type- III, 36 units Type-IV in Multistoried Towers & HEALTH Unit, shopping complex

Open tender

-

One bid system

15/0

4/2

009

04 04 0 Yes CE/S&C/CA/27 dtd. 8.9..2009

M/s Balaji Builders & Developers (JV) Jaipur

28.88 Crore

14.1.11 16.7.09 30.08.12 Work is in progress

Page 3: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

Dy. CE/C/GC-JP

Sr.

No.

T. No Item/Nature of work

Mod

e of

tend

er

Date of

publication of

NIT

Type of

bidding

(Single/T

wo bid

system)

Last date of

receipt of

tender

Nos of tenders

received

Nos &

Names of

parties not

qualified

after

technical

evaluation

Nos & names of

parties not qualified

after technical

evaluation

Weather

contract

awarded to

lowest

tenderer/eval

uated L-I

Contract no &

date

Name of

contractor

Value of

contract

Sch

edul

ed d

ate

of

com

plet

ion

of s

uppl

ies

Act

ual d

ate

of s

tart

of

wor

k

Act

ual d

ate

of

com

plet

ion

Rea

son

for

dela

y if

any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 NWR/S&C/JP

-SIKR-LHU &

SIKR-CUR

/GC/T/3R

Construction of minor bridges,

wing / return walls, earthwork

in formation, construction

including addition and

alteration of station buildings,

passenger platforms &

shelters, FOB etc

Ope

n te

nder

Single

Packet

system

NWR/S&C/

CA /108 dt.

28.06.2011

M/s Giriraj Civil

Developers Pvt.

Ltd., B-

15, Paras

Dersan Socity, S.

V. Road, Borivali

(East), Mumbai.

1955

3939

2.03

29.6.12

25.3.2011

2 DY.CE /C/GC/

NWR/ 2011/T-

5

Transportation of various type

of BG PSC sleepers from

sleeper factory such as Khatu,

Marwar Chapari, Degana,

Churu or any other sleeper

factory/place and P. way

materials

Ope

n te

nder

08.04.11 Single

Packet

system

12.5.11 04 - - yes 02

/NWR/Dy.

CE/C-

GC/JP

/2011-

12/JP-SIKR-

CUR &

SIKR-LHU

dt.

07.09.2011.

M/s Hanuman

Construction

Company,

Bhootra Niwas,

new market

Nokha. 3956

0390

.62

07.05.12 20.7.2011

3 DY.CE /C/GC/

NWR/ 2011/T-

3

Supplying and stacking 65mm

gauge stone ballast machine

crushed (hard stone)

conforming to RDSO

specifications

Ope

n te

nder

16.3.11 Single

Packet

system

21.4.11 08 01

M/s

CH

EV

RO

N M

INE

RA

LS A

sho

k

Kum

ar B

ansa

l & A

ssoc

iate

s, N

ew D

elhi

Not

aw

arde

d to

L1

03

/NWR/Dy.

CE/C-

GC/JP

/2011-

12/JP-SIKR-

CUR &

SIKR-LHU

dt.

23.09.2011.

M/s. Jai Mata

Construction Co.

House No.

14169, Stree No.

8A,

Ganesh Nagar,

Bhatinda

4135

4240

.00

15.08.12 17.08.2011

Page 4: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

4 DY.CE /C/GC/

NWR/ 2011/T-

2

Supplying and stacking 65mm

gauge stone ballast machine

crushed (hard stone)

conforming to RDSO

specifications

Ope

n te

nder

16.3.11 Single

Packet

system

21.4.11 06 01

M/s

CH

EV

RO

N M

INE

RA

LS A

sho

k K

umar

Ban

sal &

Ass

ocia

tes,

New

Del

hi

Not

aw

arde

d to

L1

04

/NWR/Dy.

CE/C-

GC/JP

/2011-

12/JP-SIKR-

CUR &

SIKR-LHU

dt.

24.10.2011.

M/s Devender

Singh

Contractor, 7,

pratap nagar,

Saket Colony,

Rajgarh Raod,

Hissar

3596

5760

.00

01.09.12 17.09.2011

5 DY.CE /C/GC/

NWR/ 2011/T-

10

Supplying and stacking 65mm

gauge stone ballast machine

crushed (hard stone)

conforming to RDSO

specifications between

Km.0.000 to Km. 30.2718 (L.

C. No. 29) on Sikar - Churu

section

Ope

n te

nder

09.8.11 Single

Packet

system

15.9.11 07 -

-

Yes.

09

/NWR/Dy.

CE/C-

GC/JP

/2011-

12/JP-SIKR-

CUR &

SIKR-LHU

dt.

05.05.2012.

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10, 3rd

Floor,

Satyanikertan,

New Delhi

2,32

,72,

500.

00

11.01.13. 14.02.2012

6 DY.CE /C/ GC/

NWR/ 2011/T-

11

Supplying and stacking 65mm

gauge stone ballast machine

crushed (hard stone)

conforming to RDSO

specifications between Km.

30.2718 to Km. 59.901 (L. C.

No. 51) on Sikar - Churu

section

Ope

n te

nder

09.8.11 Single

Packet

system

15.9.11 09 02

1.M

/s J

BG

Con

stru

ctio

n C

o.29

07,

GH

GT

roa

d, N

ear

Zila

paris

had,

Bha

tinda

2. M

/s S

anto

sh C

onst

. Co.

, Sad

ar B

azar

, New

Mar

ket,

Nok

ha

Not

aw

arde

d to

L1

10

/NWR/Dy.

CE/C-

GC/JP

/2011-

12/JP-SIKR-

CUR &

SIKR-LHU

dt.

05.05.2012.

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10, 3rd

Floor,

Satyanikertan,

New Delhi

2778

6500

.00

24.01.13 14.02.2012

Page 5: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

7 DY.CE /C/ GC/

NWR/ 2011/T-

15

Supplying and stacking 65mm

gauge stone ballast machine

crushed (hard stone)

conforming to RDSO

specifications at jhunjhunu

depot on-Sikar-Loharu section

Ope

n te

nder

23.9.11 Single

Packet

system

24.10.11 08 01

M/s

San

tosh

Con

st. C

o., S

adar

Baz

ar,

New

Mar

ket,

Nok

ha

Not

aw

arde

d to

L1

07

/NWR/Dy.

CE/C-

GC/JP

/2011-

12/JP-SIKR-

CUR &

SIKR-LHU

dt.

12.3.2012

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10, 3rd

Floor,

Satyanikertan,

New Delhi

2540

0000

.00

20.7.12 30.01.2012

8 DY.CE /C/ GC/

NWR/ 2011/T-

4R

Supplying and stacking 65mm

gauge stone ballast machine

crushed (hard stone)

conforming to RDSO

specifications between

Km.325.415 to Km. 360.900

(including Loharu station) on

Sikar - Loharu section Ope

n te

nder

28.9.11 Single

Packet

system

01.11.11 05 - - yes. 05

/NWR/Dy.

CE/C-

GC/JP

/2011-

12/JP-SIKR-

CUR &

SIKR-LHU

dt.

12.3.2012

M/s CHEVRON

MINERALS &

Mines Pvt. Ltd,

Flat No. 10, 3rd

Floor,

Satyanikertan,

New Delhi

2843

7200

.00

20.9.12 05.02.2012.

9 DY.CE /C/ GC/

NWR/ 2011/T-

14

Construction of New Major Bridge of span 12 X 6.10 m (Km. 319/6-7) and strengthening of Bridge no. 165 (3x6.10 M at Km. 268/5-6) and PSC Slabs as super-structure including earth work in approaches and other ancillary works in Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu Gauge conversion Project.

Ope

n te

nder

16.12.11 Single

Packet

system

25.01.12 06 - - Yes Contractor not

yet signed

agreement

M/s Surabhi

Maheshwar rao,

C-58, Road No.

1,

Film

Nagar,Jublee

Hills,

Hyderabad

2,76

,47,

151.

47

15.08.12

30.3.2012.

- -

10 DY.CE /C/ GC/

NWR/ 2011/T-

18

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-II (Km. 267.50 to Km. 314.00) including Dundlod Mukundgarh, Nua & Jhunjhunu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project

Ope

n te

nder

16.12.11 Single

Packet

system

20.01.12 02 - YES PG under

verified.

M/s Bharwal Lal

Bijarnia,

Villgae- Raipur,

Post- Prewari,

Distt. Nagour.

5,11

,16,

665.

77

06.03.13

Page 6: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

11 DY.CE /C/ GC/

NWR/ 2011/T-

19

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-III (Km. 314.00 to Km. 360.70) including Ratan Shahar, Chirawa, Surajgarh & Loharu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.

Ope

n te

nder

16.12.11 Single

Packet

system

18.01.12 05 - YES PG verified,

agreement

not yet

signed by

the

contractor.

M/s Laxyo

Energy Pvt. Ltd.,

113, Bakhatgarh

Tower, 10/A,

New Plasia,

Indore (MP)

4,73

,94,

338.

37

06.03.13

12 DY.CE /C/ GC/

NWR/ 2011/T-

17

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-I (Km. 237.50 to Km. 267.50) including Sikar & Nawalgarh yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.

Ope

n te

nder

16.12.11 Single

Packet

system

23.01.12 04 03 1. M/s Bhika ram Dev rath, VPO- Dhiarla, Distt. Churu.

2. M/s Goel Brothers Rail Infra PVT. Ltd., Bareilly.

3. Shri Nahar Const. Co., Jodhpur.

L-4 PG verified,

agreement

not yet

signed by

the

contractor.

M/s Shupal

Kumawat, Rly.

Contractor,

Village & Post.-

Badhal, Distt.-

Jaipur.

3,30

,96,

619.

97

04.04.13

13 Dy.CE/C/GC/

2012/T-23

Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations including loading, unloading and and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Ope

n te

nder

05.03.12 Single

Packet

system

09.04.12 04 - - Yes Under

preparation

as PG Not

submitted.

M/s Hanuman

Construction

Company,

Bhootra Niwas,

new market

Nokha.

5,36

,48,

955.

93

19.06.13

Page 7: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

Dy. CE/C/II-JP

Sr.No.

Tender No. Item / Nature of work.

Mode of tender

Date of Publication of NIT

Types of bidding (Single/ two bid system)

Last date of receipt of tender.

No. of tenders received

.

Nos. & Name of parties

qualified after technical

evaluation

Nos. & Name of parties

not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

contract No. and Date.

Name of contractor

Value of contract.

Schedule date

of completion of

supplies.

Actual date of start of work.

Actual date of

completion

Reason for delay if

any.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 JP-RGS/RUB/ Deposit/1RR

RUB in military cantt area

Open tender

- Single Packet System

31/8/07 4 M/s. P. J. Sood, BRC

3 NO Dy.CE(C)-II/JP/CA /13 dt. 27/12/07

M/s. P. J. Sood, BRC

355.269 24/9/08 12-04-2007

24/09/08 Extended upto 30/12/11

Phisically completed

2 NWR/S&C/KSG/ROB/28/1R-4

Constn. of ROB across Rly. track at LC No.28 in KSG yard at Km.266/8-9 on JP – AII section.

Open tender

Single Packet System

07-02-2008 3

Bharat Spun Pipe & Construction Co., Jaipur

2 YES Dy. CE(C)-II/JP/30 Dated 14/10/08

Bharat Spun Pipe& Const Co., JP

294.79 22/01/09

25/08/08

22/01/09 Extended upto 31/12/2011

Phisically completed

Dausa-Jaipur Doubling Project.

3 DO-JP/ Doubling/3R

Earth work & minor bridge

Open tender

- Single Packet System

30/3/07 M/s B. P. Modi Jaipur

YES DyCE(C)II/JP/CA/14dt. 29/12/07

M/s B. P. Modi Jaipur

762.91 17/12/08

20/11/07

17/12/08 extended upto 31/12/2010

Work completed & F/bill under tech. check.

4 DO-JP/ Doubling/4RR

Earth work & minor bridge

Open tender

- Single Packet System

21/09/07 1 M/s B. P. Modi Jaipur

0 YES DyCE(C)II/JP/CA/15dt. 29/12/07

M/s B. P. Modi Jaipur

749.56 02-01-2009

20/11/07

1/2/2009 extended upto 31/12/2010

Work completed & F/bill under tech. check.

5 JP-DO/ Doubling/8

Construction of FOB bet. DO-JP section

Open tender

- Single Packet System

29.11.06 2 M/s. Sanjeev Brothers Jaipur

1 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07

M/s. Sanjeev Brothers Jaipur

130.02 15.4.08 14.2.07 15/04/08 Extended upto 15/10/2010

Clearance required from Vig.

6 DO-JP/ Doubling/12RR

Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.

Open tender

- Single Packet System

30/11/07 2 M/s. B. M. Construction, GZB.

2 YES NWR/ S&C/ CA/100 dated 23/9/08

M/s. B. M. Construction, GZB.

846.08 27/04/2009

09-10-2008

27/04/2009 Exdtended upto 30/11/2010

Work completed & F/bill under tech. check.

7 DO-JP/ Doubling/14

Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.

Open tender

- Single Packet System

30.05.07 1 M/s. B. M. Construction, GZB.

0 YES NWR/ S&C/CA/99 dated 27/03/08

M/s. B. M. Construction, GZB.

1044.84 24.10.08

11-06-2007

24.10.08 extended upto 31/03/11.

Completed & final variation under techinical check

8 DO-JP-FL/ Doubling/16

Welding of 52Kg. /60Kg. Rails

Open tender

- Single Packet System

31/07/07 1 M/s. ITC, Kanpur.

0 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07

M/s. ITC, Kanpur.

341.22 18/02/09

20/06/09

18/02/09 Extended upto 30/04/2011

Physically completed.

Page 8: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

9 T. No. DO-JP/ Doubling/21

Dismantling of existing BG track, laying & linking in Zone-I DO (Excl.) to JT (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 1 M/s. B. S. Sangwan, Sonipat (Haryana)

0 YES Dy.CE(C)-II/JP/CA/34 dt. 20/06/09

M/s.B. S. Sangwan, Sonipat (Haryana)

206.44 22/09/09

04-10-

2009 22/09/09 Extended upto 15/07/10

Final bill under Tech. check.

10 T. No. DO-JP/ Doubling/22

Dismantling of existing BG track, laying & linking in Zone-II DO (Excl.) to JT (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 4 M/s. P. C. Sharma, Noida

3 YES Dy.CE(C)-II/JP/CA/33 dt. 05/06/09

M/s. P. C. Sharma, Noida

194.57 09-09-2009

04-01-

2009 9/9/2009 Extended upto 31/08/10

Final bill under process with SE/C/PW/JP

11 T. No. DO-JP/ Doubling/23

Dismantling of existing BG track, laying & linking in Zone-III BAI (Excl.) to KWP (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 3 M/s. P. C. Sharma, Noida

2 YES Dy.CE(C)-II/JP/CA/32 dt. 29/05/09

M/s. P. C. Sharma, Noida

187.06 09-09-2009

04-01-

2009 9/9/2009 Extended upto 31/01/11

Final bill under process with SE/C/PW/JP

12 T. No. DO-JP/ Doubling/24

Dismantling of existing BG track, laying & linking in Zone-IV KWP (Excl.) to JP (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 2 M/s. B. S. Sangwan, Sonipat (Haryana)

1 YES Dy.CE(C)-II/CA/35 dated 02/09/09

M/s.B. S. Sangwan, Sonipat (Haryana)

239.75 22/09/09

18/05/0

9 22/09/09 Extended upto 31/03/11

Finla bill under process

13 NWR/JP/C/2/ROB/DO-01 -

Construction of Road Over Bridge across the Railway track at Km.181/5-6 in between Dausa - Bhandana of Dausa-Jaipur section (Deposit work).

Open tender

_ Single Packet System

07-02-2008 Bharat Spun Pipe& Const Co., JP

YES Dy. CE(C)-CA/29 Dated 14/10/2008

Bharat Spun Pipe& Const Co., JP

547.26 02-10-2009

24/04/2008

Extended up to 15/03/2012

Completed Physically

Page 9: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

14 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/1 RR

Construction of minor bridges, wing/return walls , earthwork in formation ,construction including addition and altertation of station buildings, passanger platforms & shelters.FOB etc between Jaipur (incl) & Ringus (incl) stations of Jaipur -Ringus Section

Open tender

_ Single Packet System

18/01/2011 Giriraj Civil Developers Pvt Ltrd. BorivaliBombay

YES NWR/S&C/CA/110 Dated 16/08/2011

Giriraj Civil Developers Pvt Ltrd. BorivaliBombay

2141 08-10-2012

07/04/2011

_ contract terminated

15 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/5 RR

Construction of Minor Bridges , Wing /Return walls.E/work in formation construction including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR

Open tender

_ Single Packet System

16/09/2011 Modi Construction(JV) Jaipur

YES Modi Construction(JV) Jaipur

1724 26/04/2013

02.01.2012

Work in progress

16 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/ 01(geotech)

Staking out alignment , conducting geotechnical investigation design of the sun/super structure of minor & major bridges , prepration of GAD got minor &Major bridges etc

Open tender

Single Packet System

20.12.2011 M/S Surbhi Enterprises Jagatpura Jaipur.

YES M/S Surbhi Enterprises Jagatpura Jaipur.

9.46 Lakhs

01.09.2012

Work in progress

Page 10: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

17 TENDER NO. NWR/S&C/JP- SIKR/GC/T-3

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Ringus Km. 189.00 to SIKAR Km 238.70 on Ringus - SIKAR section in connection with Jaipur-Ringus-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Open tender

22.1.12 Single Packet System

24.2.12 7 M/s Rajsthan Mining Engineers Jaipur

NO M/s Rajsthan Mining Engineers Jaipur

4.66 crors

22.4.13

CE/C/II-JP

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication of NIT

Types of bidding ( single /two bid system )

Last date of receipt

of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of work

Actual date of completion

Remarks/ Reason for delay if

any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE(C)I-JP

Dy. CE/C/DO

1

DO

/GG

C/N

L/8

-

Construction of

minor bridges

from Chainage

00.00 to 30000

Between Dausa

and Lalsot in

connection with

DO-GGC new BG

Line

Op

en t

end

er

Single

Packet

system

07

/12

/20

05

Yes NWR/S&C/

CA/78

dated

27.06.06

M/s Jain

construction

Co.(JV) Ajmer

6.33 crore 20/05/07

Further

extension

granted

upto

31/12/2007

04/04/06 Contract

terminated.

Final bill is being

processed for keeping

in deposit..

Page 11: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

2

DO

/GG

C/N

L/9

Construction of

BG formation

from Chainage

1150 to 15000

between Dausa

Kala-Shekhpura in

connection with

DO-GGC new BG

line project.

O

pen

ten

der

Single

Packet

system

04

/01

/20

06

Yes NWR/S&C/

CA/81date

d 06.09..06

M/s Kewai

Construction (JV)

Jodhpur

6.45 crore 26/09/07

Further

extension

granted up

to

30/11/2011

12/07/06 - contract terminate on

24/11/12. Final

measurement under

process

3

DO

/GG

C/N

L/1

0

Construction of

BG formation

from Chainage

15000 to 28000

between Dausa

and Lalsot in

connection with

DO-GGC new BG

line project.

O

pen

ten

der

Single

Packet

system

16

/01

/20

06

Yes NWR/S&C/

CA/79

dated

30.06.06

M/s Parma Ram

Bhakar Jodhpur.

6.39 crore 17/07/07

extended

upto

30/11/2011

11/05/06 - contract terminate on

24/11/12. Final

measurement under

process

4

DO

/GG

C/N

L/1

4

Construction of

Major Bridges

with 1200mm dia

cast in situ board

piles & PSC girder

superstructure of

18.30 M between

DO-GGC in c/with

DO –GGC NLBG

Project

O

pen

ten

der

03

/10

/20

07

Single

Packet

system

14

/11

/20

07

Yes NWR/S&C/

CA/94

dated

18/02/200

8

M/s

Atlanta-ARSS

(JV) Bhubaneshwar

(Orissa).

41.63 crore 16/09/09

Extended

upto

31/12/2011

with token

penalty

20/02/08 - work completed

5

DO

/GG

C/N

L/1

5

Construction of

Minor Bridges

from chainage

30000.00 to

38500.00 &

Construction of

BG Formation

from chainage

28000.00 to

38500.00

between Dausa

and Lalsot in

connection with

DO-GGC New BG

line Project

O

pen

ten

der

0

3/1

0/2

00

7

Single

Packet

system

14

/11

/20

07

3 Yes Dy.

CE/C/I/JP/

CA/16

dated

29/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

(Orissa).

5.31Crores 09/06/09

Extended

upto

31/08/2011

24/01/08 - Work completed

Page 12: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

6

DO

/GG

C/N

L/1

8

Construction of

Broad Gauge

Formation &

Minor Bridges

from Chainage

41000.00 to

45000.00

between Dausa

and Lalsot in

connection with

Dausa- Gangapur

City New Broad

Gauge line

project.

Op

en t

end

er

Single

packet

system

14

/11

/20

07

Yes NWR/S&C/

CA/97

dated

03/03/200

8

M/s Atlanta-ARSS

(JV) Bhubneshwar

(Orissa)

17.95 Crore 30/07/09

extended

upto

30/06/12wit

h penalty

14/03/0/8 - Work in progress

7

DO

/GG

C/N

L/2

1

Construction of

BG formation and

Minor Bridge

from chanaige

45000 to 60000

bet. Lalsot and

Gangapur City in

connection with

DO-GGC New B G

line Project

O

pen

ten

der

24

/09

/20

07

Single

Packet

system

02

/11

/20

07

3 Yes NWR/S&C/

CA/95

dated

18/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

8.41

Crores

20/03/09

Extended

upto

31/05/12

with

penalty.

Further

extension

under

process.

15/03/08 - Work in progress

8

DO

/GG

C/N

L/2

2

Construction of

BG formation and

Minor Bridge

from chanaige

60000to 75000

bet. Lalsot and

Gangapur City in

connection with

DO-GGC New B G

line Project

O

pen

ten

der

2

4/0

9/2

00

7

Single

Packet

system

02

/11

/20

07

3 Yes Dy.

CE/C/I/JP/

CA/17

dated

29/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

6.71 Crores 10/03/09

Extended

upto

29/02/12.

Further

extension

under

process

10/03/08 - Work held up. 7 days

notice issued on

28/03/2012

9

DO

/GG

C/N

L/2

3

Construction of

BG formation and

Minor Bridge

from chanaige

75000 to 90000

bet. Lalsot and

Gangapur City in

connection with

DO-GGC New B G

line Project

O

pen

ten

der

2

4/0

9/2

00

7

Single

Packet

system

02

/11

/20

07

3 Yes NWR/S&C/

CA/96

dated

18/02/200

8

M/s. ARSS

Infrastructure

Projects Limited,

Bhubaneshwar

8.56

Crores

20/03/09

Extended

upto

31/01/12

with token

penalty.

Further

extension

under

process

15/03/08 -

Work held up. 7 days

noticed issued on

28/03/2012

Page 13: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

10

DO

/GG

C/N

L/8

(R&

C)

Construction of

Minor Bridges

from Chainage

00.00 to 30000.00

between Dausa

and Lalsot in

connection with

Dausa Gangapur

city new Broad

gauge line

project.

Op

en t

end

er

17

/01

/20

08

Single

packet

system

20

/02

/20

08

1 Yes Dy.

CE/C//DO/

CA/20

Dated23/0

6/2008

M/s Kewai

Construction Co.

(J/V), Jodhpur

5.98 Crore 01/01/09

Extended

upto

30/06/12

28/08/08 - Withdrawal of 48 hrs

notice under pcocess.

11

JP/C

/W/4

8R

R/R

OB

Dau

sa

Construction of

Road Over Bridge

across the

Railway track in

Dausa Yard at

Level Crossing No.

181-B at Km.

179/10-11 on

Jaipur Bandikui

section.

Op

en t

end

er

16

/12

/20

07

Single

packet

system

18

/01

/20

08

1 - Yes NWR/S&

C/CA/94

dated

18/02/200

8.

M/s Bharat Spun

Pipe & Construction

Co., Jaipur

3.82 Crore 15/07/09

Extended

upto

30/06/12

25/04/2009- - Work is on advance

stage of completion

12

DO

/GG

C/N

L/2

9

Construction of

platforms,

earthwork in

platform in

connection with

Dausa-

Gangapurcity new

BG line project.

Op

en t

end

er

27

/01

/20

09

Single

packet

system

02

/03

/20

09

9 - - Yes Dy.CE/C/D

O/CA/ 35

dated: 15

/10/2009

M/s Bharat- Kamal

(J/V), Jaipur

5.47 crore 04/08/10

Extended

upto

30/06/12

07/08/2009 - work in progress.

13

DO

/GG

C/N

L/3

6

Construction of

broad gauge

formation &

muior bridges

from Chainage

90000 to 92700

between Lalsot

and Gangapurcity

new Broad gauge

line project. Op

en t

end

er

22

/11

/20

09

Single

packet

system

28

/12

/20

09

2 - - yes Dy.

CE/C/DO/C

A/43 dated

07/04/201

0

M/s Mohan Singh

Jat, Gangapurcity

1.50 crore 05/12/2010

Extended

upto

6/12/11

further

extension

under

process

07/04/2010 - Work held up .

Page 14: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

14

DO

/GG

C/N

L/3

1

Construction of

ROBs across

Railway track at

chainage

37034,83925 &

37925 and

drainage over

pass at chainage

36960 & 37520

between

salempura to

Udaikalan station

inconnection with

Dausa-

Gangapurcity new

BG line project Op

en t

end

er

Single

packet

system

16

/02

/20

10

11 - - Yes NWR/S&C/

CA/105

dated

22/11/201

0

M/s Shree Ram

Kripa Construction

Jaipur

13.44 Crore 29/02/2012.

31/05/2012.

Further

extension

under

process

- - Work in progress

15

DO

/GG

C/N

L/3

2

Construction of

150unit type II, 7

units type-III staff

quarters & IOW

office and other

ancillary works

the water supply,

sewerage,

drinakge, roads,

parking, sanitary

and provision of

electrical//

communication

conduits & metal

boxes for NWR

residential colony

at various

stations between

Dausa-

Gangapurcity new

BG line project. Op

en t

end

er

Single

packet

system

05

/07

/20

1

02 - - Yes NWR/S&C/

CA/107

dated

28/03/201

1

M/s L.N. Agrawal-

MCD Pvt. Ltd., (J/V)

Jaipur

15.65 Crore 31/03/2012

further

extension

under

process

- - Work in progress.

Page 15: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

16

DO

/GG

C/N

L/3

0

Construction of

single line 13

standard straight

alignment tunnel

in soil and rock

including cut and

cover portion

between

chainage 38/720

to 40/840

including side

drain and other

approaches of

tunnel between

Didwana- Lalsot

Railway station in

connection with

Dausa-

Gangapurcity new

BG line project. Op

en t

end

er

Single

packet

system

27

/07

/20

09

12 - - Yes NWR/S&C/

CA/106

dated

29/12/10

M/s Valecha-

Transtonelstroey

(J/V) Mumbai

53.02 Crore 27/09/2012 - - Work in progress

17

DO

/GG

C/N

L/2

6

DO/GGC/NL/26-

Supplying and

stacking 50mm

gauge machine

crushed stone

track ballast in

stacks as per

Railway’s

specification

between Km. 1.00

to 41.00 (Dausa-

Lalsot) section in

connection with

Dausa-

Gangapurcity new

BG line project. Op

en t

end

er

Single

packet

system

07

/01

/20

11

6 Yes

Dy.CE/C/D

O/CA/54

dated

22/07/11

M/s R.K. Infra (J/V),

Jaipur

7.74 Crore 05/04/2012

Extended

upto

05/04/2013

Work in progress

Page 16: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

18

DO

/GG

C/N

L/2

8

Construction of

Broad gauge

formation in

cutting,

construction of

rail side drain,

catch water drain

& slope

protection work

from chainage

36000 to 38500

between Dausa

and Lalsot in

connection with

Dausa-

Gangapurcity new

BG line project Op

en t

end

er

15

/03

/20

11

Single

packet

system

21

/04

/20

11

3 - - Yes

Dy.CE/C/D

O/CA/57

dated

30/11/201

1

M/s Jagdish Prasad

Agrawal, Alwar

6.03 Crore 31/12/2012 17/10/11 work in progress

19

DO

/GG

C/N

L/4

0

Laying and

linking of BG track

and

transportation of

P.Way material,

PSC sleepers etc

between Dausa-

Deedwana

section in

connection with

Dausa-

Gangapurcity new

BG line project. Op

en t

end

er

28

/03

/20

11

Single

packet

system

18

/05

/20

11

6 - - Yes

Dy.CE/C/D

O/CA/56

dated

18/10/11

M/s Goel Brothers

Rail Infra Pvt. Ltd.,

Bareilly.

5.66 Crore 01/08/2012 13/09/11 Work in progress

20

DO

/GG

C/N

L/4

3

Construction of

duty bunk

miscellaneous

structures and

road work etc.

between Dausa

Gangapurcity

section in

connection with

Dausa

Gangapurcity

new BG line

project.

Op

en T

end

er

21

/05

/20

11

Single

packet

system

27

/06

/20

11

4 - - Yes - M/s Bharat –Kamal

(J/V), Udaipur

5.31 Crore 18/10/12 - - Contract proposed to

be closed vide letter

dated 19/03/2012

Page 17: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

21

DO

/GG

C/N

L/3

9R

R

Construction of

station

buildings,

signaling

structures and

miscellaneous

structures etc.

at various

stations

between Dausa

(excl.) to

Gangapurcity

(excl.) in

connection with

Dausa

Gangapurcity

new BG line

project.

Op

en T

end

er

28

/06

/20

11

Single

packet

system

05

/08

/20

11

3 - - Yes NWR/S&C/

CA/115

dated

21/03/201

2

M/s Bharat-Kamal

(J/V), Udaipur

8.25 Crore 28/02/13 - - work in progress

22

DO

/GG

C/N

L/9

(R

&C

)

Construction of

Broad Gauge

Formation from

chainage 1150.00

to 15000.00

between Dausa

Kala and

Shekhpura

Villages in

connection with

Dausa-Gangapur

City New Broad

Gauge line

Project(Risk &

Cost tender).

Op

en t

end

er

25

/11

/20

11

Single

packet

system

28

/12

/20

11

7 - - Yes Dy.CE/C/D

O/CA/58

dated

21/02/201

12

M/s Jai Salasar

Balaji Construction

Co. (J/V) Jaipur

4.60 04/05/12

Extended

upto

04/09/2012

21/01/12 - Withdrawal of 48 hrs.

notice is under

process.

Page 18: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

23

DO

/GG

C/N

L/1

0 (

R&

C)

Construction of

Broad Gauge

Formation from

chainage

15000.00 to

28000.00

between Dausa

and Lalsot in

connection with

Dausa-Gangapur

City New Broad

Gauge line

Project(Risk &

Cost tender).

Op

en t

end

er

25

/11

/20

11

Single

packet

system

28

/12

/20

11

7 - - Yes Dy.CE/C/D

O/CA/59

dated

21/02/201

12

M/s Jai Salasar

Balaji Construction

Co. (J/V) Jaipur

2.95 04/05/12

Extended

upto

04/09/2012

21/01/12 - Withdrawal of 48 hrs

notice is under process

Page 19: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

DY. CE/C/I-UDZ

Sr.

No.

T.No Item/Nature

of work

Mode of

tender

Date of

publication

of NIT

Type of

bidding

(Single/Two

bid system)

Last date

of receipt

of tender

Nos of

tenders

received

Nos&

Names of

parties

qualified

after

technical

evaluation

Nos &

names of

parties not

qualified

after

technical

evaluation

Weather

contract

awarded

to lowest

tenderer/

evaluate

d LI

Contract no

& date

Name of

contractor

Value of

contract (In

Rs. Lacs)

Schedule

d date of

completio

n of

supplies

Actual

date of

start of

work

Actual

date of

completio

n

Reason for

delay if any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 T.NO.UDZ-

HMT/GC/M

B/T-2

Const.,

minor

bridges from

Km. 160/0 to

187/0 in in

connection

with UDZ-

HMT Section

Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/

CA/109 dtd.

16.8.11

M/s

Braham

Prakash

ModiRavi

Constn.Co

. (JV) ,

Jaipur

1212.6

21.09.12 30.04.11 Work in

Progress

2 T.NO.UDZ-

HMT/MB/T/

1

Construction

of Major

bridges from

DNRP-HMT

in connection

with UDZ-

HMT section.

Open 19.11.10 Single 21.12.10 2 Yes NWR/S&C/

CA/111 dtd.

9.9.11

M/S Om

Prakash

Goyal &

Co.,

Neemach

1568

29.11.12 10.08.11 Work in

Progress

3 T.NO.UDZ-

HMT/GC/E

W/T/3

Construction

of Minor

bridges frm

Km. 270/0 to

320/0 in

connection

with UDZ-

HMT section.

Open 08.12.10 Single 20.01.11 5 Yes NWR/S&C/

CA/112 dtd.

21.10.11

Amit-Mass

(JV) ,

Alkapuri,

VADODAR

A

1665.1

20.01.13 03.08.11 Work in

Progress

4 T.NO.UDZ-

HMT/GC/E

W/T/4

Construction

of Minor

bridges frm

Km. 207/0 to

250/0 in

connection

with UDZ-

HMT section.

Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/

CA/113 dtd.

21.10.11

M/s

Rahee-

Triveni

(J/V),

Kolkatta

3045.2

07.02.13 23.08.11 Work in

Progress

Page 20: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

Dy. CE/C/DNPR-BANSWARA

Sr.

No.

T.No Item/Nature of work Mode

of

tender

Date of

publication of

NIT

Type of

bidding

(Single/

Two bid

system)

Last date

of receipt

of tender

Nos of

tenders

received

Nos &

Names of

parties

not

qualified

after

technical

evaluation

Nos &

names of

parties not

qualified

after

technical

evaluation

Weather

contract

awarded

to lowest

tenderer/e

valuated

LI

Contract no

& date

Name of

contracor

Value of

contract

Schedule

d date of

completio

n of

supplies

Actual date

of start of

work

Actual date

of

completion

Reason for

delay if

any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 Dy.CE/C/

UDZ/DN

RP-

RTM/FLS

/2011/T/1

Carrying out final

location of survey &

….other preliminary

activities in

connection with

new BG line

between DNRP-

RTM via Banswara

Open 1/6/11 &

30/6/11 (NIT

& First

cirrugbdum)

Single 1/7/11 10 Dy.CE/C/U

DZ/DNRP-

RTM/FLS/2

011/T/1

M/s

S.M.Consult

ants,Bhubne

swar

4.99 Cr 12/11/12 28/11/11 14/11/12 Work in

progress

Page 21: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication of NIT

Types of bidding ( single /two bid system )

Last date of receipt

of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of work

Actual date of completion

Remarks/ Reason for delay if

any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE(C)III-JP

Dy. CE/C/I-AII

1

AM

P/N

L /

T/1

4R

Const. of station building at Pushkar station & construction of various types of quarters bet. Ajmer-Pushkar in c/with Ajmer-Pushkar New BG Line.

Open 20.10.08

Single 25-11-08

2 Nos. - - Yes AII/AMP/NL/CA/9 Dt. 29-05-09

M/s Omprakash Goyal & Co. Neemuch

548.60 lakhs 24-01-10 Extended upto 28-02-2012

03-11-2009 - Work completed

2

AM

P/N

L/T

/19

Linking of B.G. track in main line, loop lines, sidings including points & crossing, transportation of P. way material & other miscellaneous works between stations Madar (including) to Pushkar (including) in connection with Madar-Pushkar new BG Line Project.

Open 03.10.10

Single 26-04-10

07 Nos.

- - Yes AII/AMP/NL/ CA/14 Dt 09-12-10

M/s Bhanwar Lal Bijarnia, Village Rajpura, Post Parevadi, Tehsil Nawa, Distt. Nagaur

526.50 Lakhs 16-12-2010 Extended upto 15-01-2012

23-06-10 - Work completed

3

Aii/

Co

nst/ L

oco/M

od/T

/1

Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of Loco Workshop at Ajmer.

Open 25.08.09

Single 28-10-09

07 Nos.

- - Yes NWR/S&C/ CA/31 Dt. 17-06-10

M/s Bharat Span- GPT (JV) 43 Industrial Area, Jhotwara, Jaipur

3829.48 Lakhs

22-04-2012 & 06-11-2012

27-03-10 - Work is in progress.

Page 22: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

4

Aii/

Co

nst/ C

&W

/Mod

. /T

/3/R

Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of C&W Workshop at Ajmer.

Open 14.06.10

Single 07-07-2010

- - - Yes Under execution

M/s Prem Fabricators 301 Meera Manon Arcude, Near Krupa Petrol Pump, Parimal Garden, Ellis Bridge, Ahmedabad.

1524.97 Lakhs

05-12-2012

05-09-2011 - Work is in progress.

5

AII/B

NG

M-R

AS

/ N

L/T

/2 Construction of

major bridge including earth work on the approaches between BNGM (Excl.)-RAS (incl.) section in c/with BNGM-RAS New B.G. Rail Line Project.

Open 11.03.10

Single 12-10-2010

07 Nos.

- - Yes Under execution

M/s SB-SHC-MCDPL (JV) C-10, Vaishali Nagar, Jaipur.

Rs. 1592.08 Lakhs

18-07-2012

23.07.2011 - Work is in progress.

6

AII/B

NG

M-R

AS

/

NL/T

/3(R

)

Earthwork in bank/cutting and construction of minor bridges between Km. 0.00 to 10.50

Open 12.07.11

Single 03.08.11

07 Nos.

- - Yes Under execution

M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar

Rs. 1060.43 Lakhs

30-10-2012

10.11.2011 - Work is in progress.

7

AII/B

NG

M-R

AS

/ N

L/T

/4

Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 10.50 to 20.50) section in c/with Bangurgram-RAS new BG Rail Link Project.

Open 16.12.10

Single 24.01.11

10 Nos.

- - Yes Under execution

M/s Jai Mata Di Energy System (JV) VPO-Narodara, Tehsil - Laxmangarh Sikar (Raj.)

Rs. 1103.49 Lakhs

16-06-2012

29.06.2011 - Work is in progress.

Page 23: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

8

AII/B

NG

M-R

AS

/ N

L/T

/5

Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 20.50 to 28.50) section in c/with Bangurgram-RAS new BG Rail Link Project.

Open 16.12.10

Single 24.01.11

08 Nos.

- - Yes Under execution

M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar

Rs. 825.62 Lacs

19-06-2012

04.07.2011 - Work is in progress.

9

AII/B

NG

M-R

AS

/ N

L/T

/8

Supplying and Stacking machine crushed stone track Ballast in stacks as per Railways’ specifications between Km. 0.00 to 28.50 [Bangurgram to Ras] in connection with Bangurgram - Ras new rail line project.

Open 19.08.11

Single 27.09.11

4 Nos. - - Yes Under execution

M/s Rajesh Kumar Gupta, 54, Nehru Nagar, Kush Marg, Alwar(Raj.)

Rs. 406.50 Lacs

25-12-2012

08.02.2012 - Work is in progress.

Dy. CE/C/II-AII

S.No.

Tender No. , Item/Nature of work Mode of Tender Inquiry

Dt. of Publica- tion of NIT

Types of bidding (single/ two-bid system)

Last date of receipt of

tender

Nos. of tenders received

Nos. & Name of Parties qualified after technical evaluation

Nos. & Name of Parties not qualified after technical evaluation

Whether tender

awarded to lowest

tenderer/ Evaluated

L1

Agreement No. & Date.

Name of Contractor

Value of Contract

Scheduled date of completion of supplies

Actual Date of start of work

Actual date of completion

Reason for delay if any

1 T.No.AII/KVJ-KRJD/I/BG Doubling/T/3: Earthwork in bank/cutting for formation between Keshavganj (incl.) – Swarupganj (Excl.) section in connection with Keshavganj– Swarupganj Patch Doubling Project.

Open 24.09.10 Single 01.11.10 14 Nos. Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6

Jalam Vilas Scheme, Poata B.

Road, Jodhpur

NIL Yes NWR/S&C/CA/32 Dt. 21.07.11

M/S Varaha Infra Ltd., Umesh Smriti-6

Jalam Vilas Scheme, Poata B.

Road, Jodhpur

`896.90

Lacs.

17.11.2011, 31.03.2012 & 30.06.2012

01.02.11 17.11.11 Work under progress

Page 24: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

2 T.No.AII/KVJ-KRJD/I/BGD/T/2R: Construction/Extension of Major/minor bridges including earthwork on the approaches between Keshavganj (incl.) – Swarupganj (Excl.) section with Railway’s design & drawing and construction of ORH at Abu Road in connection with Keshavganj-Swarupganj Patch Doubling Project.

Open 04.02.11 Single 03.03.11 04 Nos. Ist Lowest M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17,

Vijaya Building,

Barakhamba Road,

Connaught Place, New

Delhi.

NIL Yes NWR/S&C/CA/33 Dt. 30.08.11

M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17,

Vijaya Building,

Barakhamba Road,

Connaught Place, New

Delhi.

`1095.38

Lacs.

20.02.2012 & 30.06.2012

-- 20.02.12 Work under progress

3 T.No.AII/KVJ-KRJD/I/BG Doubling/T/6– Supplying and stacking 50mm machine crushed stone track ballast confirming to Railway specifications in stacks on cess along the track and in yards at various stations between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project

Open 04.04.2011 Single 10.05.11 05 Nos. Ist Lowest M/s

Bhaniyana Construction

, 28, Kanishka Resort,By

Pass Road, PAL,Distt.

Jodhpur(Raj.)

NIL Yes Dy.CE(C)AII/KVJ-

SRPJ/BGD/CA/69 Dtd. 16.11.2011

Ist Lowest M/s

Bhaniyana Construction

, 28, Kanishka Resort,By

Pass Road, PAL,Distt.

Jodhpur(Raj.)

`371.12

Lacs.

17.05.2012 -- 17.05.12 Work under progress

4 T.No.AII/KVJ-KRJD/I/BG Doubling/T/8-R:Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project.

Open 27.07.11 Single 02.09.11 6 Nos. Ist Lowest M/s Laxyo

Energy Pvt. Ltd., 46/1, TIT Road,

Ratlam (M.P.)

NIL Yes Dy.CE(C)AII/KVJ-

SRPJ/BGD/CA/71 Dtd. 05.12.2011

Ist Lowest M/s Laxyo

Energy Pvt. Ltd., 46/1, TIT Road,

Ratlam (M.P.)

`371.12

Lacs.

14.04.2012 & 30.09.2012

-- 14.04.12 Work under progress

Dy. CE/C/Jodhpur

S N Tender No. Item/ Nature of work

Mode of tender enquiry

Date of publication

of NIT

Types of bidding (Single / Two bid system).

Last date of receipt of tender

No. of tender recei-ved.

Nos. & name of parties

qualified after technical

evaluation

Nos. & name of parties not qualified after

technical evaluat-ion

Whether contract

awarded to lowest tender

/ evaluated L.I.

Contract No. & date

Name of Contractor Value of contract

(Rs) Fig. in lacs.

of Rs.

Schedule date of completion

Actual date of start of

work

Actual date of complet-

ion

Reasons for delays, if any.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1. 1 JU/Const.-1/ 19/2008-09,

Zone-I - Laying & linking of BG track.

Open Tender

24.03.09 Single 28.04.09 3 1 (M/s P.C. Sharma, A-87,

Noida [UP])

1 (M/s Bhanwar

Lal Bijarnia)

Yes Dy.CE/C-I/JU /16/2009-10 dtd.06.09.09

M/s P.C. Sharma, A-87, Distt. Gautam Budh Nagar [UP]

236.35 212.22

05.11.09 31.03.10 15.02.10 31.03.10 30.04.10

23.07.09 30.04.10 Final C&A has been vetted by AFA/C/JU on 14.11.11 & sent to HQ office for Sanction and now vetted by Finance.

2. 2 JU/Const.-1/ 25/2008-09,

Depot supply of Stone ballast

Open Tender

06.05.09 Single 10.06.09 3 1 (M/s Vinayak

Const. Co., Jaswantgarh)

1 (M/s J.K. Const. Co.,

Nokha)

Yes Dy.CE/C-I/JU /21/2009-10 dtd.26.11.09

M/s Vinayak Const. Co., Jaswantgarh

143.68 173.88

28.12.09 31.01.10 31.03.10 15.05.10 15.06.10

28.12.09 - Contractor has been instructed to remove rejected ballast from

Railway Land & case is also with Vig. Branch.

Page 25: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

S N Tender No. Item/ Nature of work

Mode of tender enquiry

Date of publication

of NIT

Types of bidding (Single / Two bid system).

Last date of receipt of tender

No. of tender recei-ved.

Nos. & name of parties

qualified after technical

evaluation

Nos. & name of parties not qualified after

technical evaluat-ion

Whether contract

awarded to lowest tender

/ evaluated L.I.

Contract No. & date

Name of Contractor Value of contract

(Rs) Fig. in lacs.

of Rs.

Schedule date of completion

Actual date of start of

work

Actual date of complet-

ion

Reasons for delays, if any.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

3. 3 T.No.JU/ Const.-I/30 /

2009-10

AT Welding of rail joint

Open Tender

19.09.09 Single 22.10.09 1 1 (The India Thermit Corp.

Kanpur)

- Yes Dy.CE/C JU /22/2009-10

dt.29.3.10

The India Thermit Corp. Kanpur

103.63 77.31

22.04.10 31.08.10 15.11.10 31.03.11 30.05.11

28.11.09 - Final C&A sanctioned & final bill under finalisation

4. 4 JU/C/04/04-05

Bridge work No. 31 & 72 SMR- BLDI

Open tender

6.6.04 Single 6.7.04 08 Nos M/S Rachna Const. Company

N/A L I NWR/S&C/CA/53 Dt. 20.1.05

M/S Rachna Const. Comp.,. TAL- Ankleshwar Distt Bharuch

394.31 465.25 403.15

23.11.05 15.3.05 31.07.09

Final variation will be prepared after sanction of NS items which is under preparatio.

5. 5 JU/C/02/04-05

Civil work KM. 0.00 to 60 SMR-BLDI GC.

Open tender

6.6.04 Single 6.7.04 4 Nos M/S Rachna Const. Company

N/A L I NWR/S&C/CA/56 Dt. 07.03.05

“DO” 703.07 253.85

19.12.05 1.3.05 31.8.09 Work completed. Final bill passed by Accounts on 09.05.12.

6. 6 JU/C/08/04-05 Dt.19. 11.04

Bridge work 30,56 & 76 SMR- BLDI

Open tender

Single 29.12.04 NWR/S&C/CA/ 64 dt .14.9.05

M/S Rachna Const. Company

373.42 318.74 254.22

11.06.06 7.10.05 30.11.09 Final C&A sanctioned by C.A. (CAO/C) vide letter, dtd. 26.6.12.

7. 7 JU/C-

II/01/09-10 Const. of ROB at LC

36-C( At MKN) & 63-C (At NGO)

Open single 14.7,09 05 M/S Rachana Const Co.

N/A L-I DyCE/C-II/JU/29/2009-10 Dated 25.2.2010

M/S Rachana Const Co. Unjha

546.95 09.07.10 30.10.11 31.01.12 20.02..12 30.04.12

24.8.09 Work in progress

8. 8 JUConst-/

03/2010-11 Earth work in

cutting in filling …. PLC – Bye pas

Open tender

02.07.2010 Single 03.08.10 01 M/S Bhanwar Lal Bijarnia

N/A L-1 DyCE/C-II/JU/30/2010-11 Dated 02.02.20110

M/S Bhanwar Lal 106.04 13.07.11 30.08.11 15.11.11 31.12.11

28.10.10 Work completed.

-

9. 9 JU/Const-

6/10-11 Const of ROB at L.C. No. C-325 at

(BME)

Open tender

15.10.2010 Single 16.09.10 06 M/S Rachana const. comp.

N/A L-1 Dy CE/C /JU/34/2011-12 dt. 21.10.11

M/S Rachana const. comp.

380.99 07.11.11 31.07.12

28.06.11 Work in progress

-

10. 10 JUConst-/

08/2010-11 Extension of Bay

No.4 inside Diesal Shad BGKT

Open temder

22.09.2010 Single 25.10.10 02 M/s Anil Trading co.

Sikar

M/S Jai Bala Ji Const. co. Sri-

Gananagar

L-1 Dy CE/C /JU/35/2011-12

dt. 21.10.11

M/s Anil Trading co. Sikar

242.85 16.11.11 30.07.12

15.03.11 Work in progress

-

11. 11 JUConst-/

09.R/2010-

11

E/Work in cutting & filling for foundation,

Const.of ROB insted of level crossing etc.

Open temder

21.02.11 Single 07.06.11 01 M/s Bhanwar Lal Briainiya Vill. Rajpura Distt. NGO

- L-1 - M/s Bhanwar Lal Briainiya

289.66 29.09.12 10.10.11 Work in progress

-

Page 26: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

CE/C/IV-JP

Dy. CE/C/II-BKN

SN Tender No

Item/Nature of work Mode of tender inquiry

Dt.of publication NIT

Type of bidding (Single/two bid system

Last date of receipt of tender

Nos.of tenders received

Nos & names of parties qualified after technical evaluation

Nos & names of parties not qualified after technical evaluation.

Contract No. & dt.

Name of contractor

Value of contract

Scheduled date date of completion of supplies

Actual date of start of work

Actual date of completion/extended date of completion

Remarks/Reason for delay if any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 Const/BKN/42/2009-10

Construction of RRI Building & Sick line office complex and construction & modification of station building, platforms, platform shelters, conversion of MG sick line shed into Track machine shelter and dismantling of MG AC maintenance shed, FOB landing and other miscellaneous works at Bikaner in connection with Sadulpur - Bikaner Gauge conversion project

open tender

29.03.09 single 29.04.09

08 Nos

Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

150-NWR/Dy CE/C-I/BKN Dt 24.12.09

M/S Govind Gupta, 5/99, Chopra Patti Narwana Distt Jind ( Haryana)

Rs 377.44 lakhs

02.09.09 21.09.09 15.03.12 Work is almost completed.Minor works in progress.

2 Const/BKN/02/2010-11

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-10 (Ch 435500 to Ch 462100 including Gadhwala, Bikaner Eaast and Bikaner station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project

Open tender

06.05.10 single 10.06.10

05 Nos

Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

161-NWR/Dy CE/C-I/BKn Dt 06.09.2010

M/S Shree Shyam Engineering Co., Poonia Colony Churu ( Raj)

Rs171.59 lakhs

07.03.11 08.07.10 31.12.11 Work completed & final variation in process.

Page 27: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

3 Const/BKN/04/2010-11dated 19.06.2010

Construction of BG Rail level P/F at Belasar, Painting & colour washing on various stations, Brick on edge flooring on P/F and miscellaneous, residual protection & safety related works between Km 325 to 462 in Ratangarh Bikaner section in connection with Sadulpur- Bikaner gauge conversion project.

Open tender

22.06.10 single 23.07.10

04 Nos

Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

165-NWR/Dy CE/C-I/BKN Dt 28.12.2010

M/S Payre Lal Dhaka Const. Company. B-63, Sanik Basti Churu

Rs 185.98 lakhs

21.09.11 08.10.10 31.12.11 Final bill passed.

4 Const/BKN/03/2010-11dated 19.06.2010

Const. of twenty four coach length BG washing line after dismantling of existing MG washing line and oher related miscellaneous works at Bikaner in connection with BKN-SDLP GC

Open tender

11.06.10 single 14.07.10

09 Nos

Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

163-NWR/Dy CE/C-I/BKN Dt 14.12.2010

M/S Jitender Singh , V&PO- Kakoda Distt. Jhujhunu

Rs 279.82 lakhs

16.10.10 12.11.10 31.03.12 Washing line completed & commissioned and work of under ground water tank is in progress.

5 Const/BKN/18/2009-10/RE-HSR/Std-II dated 18.02.2010

Const. of Station biliding and other service buildimnngs etc. between Rewari ( excluiding ) to Hansi in c/with RE-HSR Std-II panel interlocking.

Open tender

18.02.10 single 26.03.10

05 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

102-NWR/Dy CE/C-II/BKN Dt 19.10.2010

M/S V.K.Const. Co. 2-D-37, Jawahar Nagar Sri Ganganagar

Rs 416.38 lakhs

15.05.11 15.06.10 30.10.12 Buildings at Jatusana, Kosli, Jharli, Manheru, Charkhi Dadri and Bhawani Khera handed over to S&T deptt. Roof casted at Jitakheri & Hansi and finishing work is pending. Circulating area work at Jatusana and Kosli is in progress.

Page 28: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

6 Const/BKN/08/HSR - RE/2010-11 dated 04.09.2010

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Manheru, Bawani Khera, Jitakheri and Hansi on Rewari - Hisar section.

Open tender

04.09.10 single 13.10.10

03 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

106-NWR/Dy CE/C-II/BKN/2010-11 Dt 03.02.11

M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)

Rs216.41 lakhs

08.09.11 26.12.10 08.09.11 All ordinary sleeper & 33 sets turnout sleeper out of 36 reached at site. Contractor has requested for closing of contract on administrative grounds due to non availability of P.way material & funds constraints with Railways. Matter is in process.

7 Const/BKN/07/HSR - RE/2010-11 dated 04.09.2010

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Kishangarh Balawas, Jausana, Kosli, Jharli & Charkhi Dadari on Rewari - Hisar section.

Open tender

04.09.10 single 13.10.10

04 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

107-NWR/Dy CE/C-II/BKN/2010-11 Dt 04.02.11

M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)

Rs 230.69 lakhs

27.09.11 18.01.11 30.06.12 All ordinary sleepers and turnout sleepers have been transported at site. 52kg Rails (New) has been transported to stations KGBS, JTS, and KSI & JRL. Pre NI work has been completed at KGBS & JTS stations and is in progress at KSI. Interim connection of JTS siding has been done on 11.11.2011.Kishangarh Balawas & Jatusana stations have been commissioned on 30.03.2012 & 10.04.2012.Kosli station has also been commissioned on 10.06.2012.

Page 29: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

8 Const/BKN/09 ( R) /HSR - RE/2010-11 dated 24.12.2010

Supplying and stacking 47600 cum 65mm gauge stone ballast machine crushed ( hard stone) conforming to RDSO specificationsin connection with Std-III and MACL Signaling work in HSR-RE section.

Open tender

24.12.10 single 02.02.11

03 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

111-NWR/Dy CE/C-II/BKN/2011-12 Dt 04.05.11

Sh Devender Singh , H.No.7, Pratap Nagar , Saket Colony , Rajgarh Road , Hisar.

Rs 342.72 lakhs

14.12.11 21.03.11 14.12.11 Ballast supply was in progress at Jharli when the work was held up due to want of funds. Cumulative progress so far is 11031 cum. The Contractor has been instructed to restart the work and apply for currency of the contract which has expired on 14th Dec 2011.The Contractor has requested to closure of contract on admn. grounds.

9 Const/ BKN/02(R)/ SDRA/ 2010-11 Dated 05.06.10

Construction of station building , passenger platforms, staff quarters , duty huts for L-Xing, earthwork in embankment etc. in connection with Provision of B class station at Sudhrana .

Open tender

11.06.10 Single 14.07.10

09 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

103/NWR/Dy CE/C-II/BKN Dt 13.12.2010

M/S Jitender Singh , VPO- Kakoda Distt Jhunjhnu

RS 366.52 lakhs

18.10.11 01.11.10 30.09.12 Work is in progress.

10 Const/BKN/25/007-08

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe wall/retaining wall, stone pitching etc. I bet Km.323.50 to Km. 388.00 on BKN-SDLP section

Open tender

12.07.07 single 13.08.07

1 Nos. Tender awarded to evaluated L-1 further offers not discussed by TC

Tender awarded to lowest valid and eligible tenderer

91-NWR/DY CE/C-I/BKN /2007-08 dated 07.07.08

M/S Bharon Singh Rathore & Co. Survodya Basti near Narsingh Sagar Talab, Bikaner

2.40 Crores

24.12.08 30.01.08 31.03.11 Final variation under finance vetting.

11 Const/BKN/26(R )/2007-08

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc, from Km.388.00 to Km 455.00 on BKN-SDLP section

open tender

18.12.07 single 23.01.08

1 Nos. Tender awarded to evaluated L-1 further offers not discussed by TC

Yes, tender awarded to lowest valid and eligible tenderer

120 NWR/DY CE/C-I/BKN/ 2008-09 dt 16.02.09

M/S Bheron Singh Rathore & Co. Sarvoday Basti, Bikaner (Raj)

3.08 Crores

15.03.09 28.08.08 31.03.11 Cross section of earthwork for 67 km under technical checking.

Page 30: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

12 Const/BKN/26(R ) /2008-09

Earthwork (including Blanketing material) in formation in bank & cutting with mechanical compaction, construction of 2 Nos RUBs having spans 2x10.50m & 1 No. RUB having spans of 1x6.10m and 5 Nos RUBs cum balancing culverts of spans 1x 3.66m ( all RCC boxes) including other ancillary works for construction of Ratangarh Bye Pass in connection with Bikaner-Ratangarh-Sadulpur gauge conversion project

open tender

18.02.09 single 23.03.09

10 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

CE/S&C/CA/28 dated 12.10.09

M/S Maya Const. Co. Pvt. Ltd., A-20, Shyam Darshan Society, Harivila Road, New Naroda, Ahmedabad-382346.

Rs 829.25 lakhs

13.08.09 27.08.09 15.05.11 Final variation in process.

13 Const/BKN/12/2009-10

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-8 (Ch 375500 to Ch 398500 including Sri Dungargarh station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.

open tender

20.05.09 single 24.06.09

01 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

152-NWR/Dy CE/C-I/BKN Dt 04.01.10

M/S Karnani Constructions, New Lane Gangasahar Bikaner

Rs 129.74 lakhs

17.08.09 01.10.09 15.10.11 Final bill under passing.

14 Const/BKN/10 (R )/2009-10

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-6 (Ch 325500 to Ch 351500 including Rajaldesar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.

open tender

07.08.09 single 07.09.09

05 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

162-NWR/Dy CE/C-I/BKN Dt 17.09.10

M/S Bhanwar Lal Bijarniya, Bhaiya Hotel, Bombay Motor Chouraha

Rs 139.06 lakhs

05.10.09 07.10.09 31.07.11 Final variation under preparation.

Page 31: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

15 Const/BKN/11 (R )/2009-10

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-7 (Ch 351500to Ch 375500 including Persneu & Bigga station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.

open tender

07.08.09 single 07.09.09

07 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

158-NWR/Dy CE/C-I/BKN Dt 29.07.10

M/S Shree Nahar Agencies, A-328, Shastri Nagar Jodhpur

Rs 136.30 lakhs

05.10.09 07.10.09 31.05.11 Final variation under preparation.

16 Const/BKN/01/2010-11

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-09 (Ch 398500 to Ch 435500 including Benisar, Sudsar and Napasar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.

Open tender

06.05.10 single 10.06.10

04 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

160-NWR/Dy CE/C-I/BKN dt 06.09.10

M/S P.C.Sharma, A-87, Sector- 49, Noida (UP)

Rs 208.29 lakhs

18.03.11 19.07.10 30.07.11 Final variation is in process.

17 Const/BKN/23 ( R-2) /2007-08 dated 06.06.08

Earthwork in banks and cutting for formation including side drain , trolley refuses etc. including supply of cement in Sadulpur -Churu section from km 224 to 282 on BKN-SDLP GC project

Open tender

10.06.08 single 11.07.08

01 Nos

Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

118-NWR/Dy CE/C-I/BKN Dt 29.01.09

The Birhi Kalan L/C Co.OP. Society Ltd. Birhi Kalan, Tehsil - Charkhi Dadri Distt. Bhiwani

Rs 348.83 lakhs

03.09.09 25.11.08 31.05.10 Final variation under finance vetting

18 Const/BKN/04/2011-12/BKN-SDLP-RTGH-SRDR

Supplying and stacking 55000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

14.09.11 single 14.10.11

08 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

172-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S Jai Mata Const.Co. H.No.14169 Street no.8A Ganesh Nagar Bhatinda( Pb)

Rs 305.25 lakhs

25.05.12 10.01.12 31.07.12 Work is in progress. 32150 cum supplied.

Page 32: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

19 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR

Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.

Open tender

17.09.311

single 17.10.11

2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

173-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat

Rs 534.82 lakhs

01.06.12 05.01.12 01.12.12. Work is in progress.

20 Const/BKN/05/2011-12/BKN-SDLP-RTGH-SRDR

Supplying and stacking 60000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between km 19 to Sardarshahar on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.

Open tender

14.09.11 single 14.10.11

07 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

174-NWR/Dy CE/C-I/BKN Dt 31.03.2012.

M/S Chevron Minerals & Mines Pvt Ltd.Flat No.10, 3rd Floor Satya Niketan , Opposite Venkateshaware College , Near Dhaula Kuan , New Delhi- 110021

Rs 364.20 lakhs

17.07.12 29.01.12 17.07.12 Work is in progress. 25060 cum supplied.

21 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project

Open tender

20.01.12 single 22.02.12

2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

PG submitted.

M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003

Rs 531.61 lakhs

25.12.12 24.05.12 25.12.2012 Work in progress.

Page 33: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

22 Const/BKN/52/2007-08 (R )

Supplying and stacking 36200 cum 65mm gauge stone ballast machine crushed ( hard stone ) confirming to RDSO specifications between Km. 57 to 77 on Sarupsar-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

open tender

25.04.08 single 09.06.08

2 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 further offers not discussed by TC

109-NWR/Dy CE/C-I/BKN Dt 19.12.08

M/S J.K.Const. Co., New Market Nokha Distt. Bikaner (Rajasthan)

Rs 3.57 Crores

07.04.09 18.08.08 30.01.12 Final bill under passing.

23 Const/BKN/53/2007-08 (R )

Supplying and stacking 33800 cum 65mm gauge stone ballast machine crushed ( hard stone ) confirming to RDSO specifications between Km. 77 to 97 on Sarupsar-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project.

open tender

25.04.08 single 09.06.08

3 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 further offers not discussed by TC

110-NWR/Dy CE/C-I/BKN Dt 24.12.08

M/S J.K.Const. Co., New Market Nokha Distt. Bikaner (Rajasthan)

Rs 3.52 Crores

29.04.09 09.09.08 30.04.12 Final bill under preparation.

24 Const/BKN/37/ 2008-09

Construction and Modification of station building, RRI Building,TTM Rest Shelter, earthwork in filling for buildings, Raising /shifting of existing platform shelter, providing & fixing A.C. Sheet roofing & other misc. works at station Sri Ganganagar in connection with Sarupsar- Sri Ganganagar G.C. project

Open tender

26.11.08 single 27.12.08

02 Nos

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

139-NWR/Dy CE/C-I/BKN Dt 22.09.09

M/S V.K. Construction Co.2-D-37A Jawahar Nagar Sri Ganganagar)

Rs 190.57 lakhs

28.03.10 08.08.09 31.05.12 Work completed.

25 Const/BKN/20 /2009-10

Construction and modification of station building, CC Apron,RRI building, platform, raising/shifting of existing platform shelter, providing & fixing AC sheet roof, linking of BG track on CC Apron, dismantling of MG tracks and points & crossings,etc. and other misc. works at Suratgarh station in connection with Sarupsar-Srigangar gauge project

Open tender

02.07.09 single 06.08.09

07 Nos

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

147-NWR/Dy CE/C-I/BKN Dt 16.11.09

M/S Inderjeet Chhouda Contractor ,8-A-17, Jawahar Nagar Sri Ganganagar

Rs 396.99 lakhs

01.08.10 24.10.09 29.02.12 Work completed.Final bill under preparation.

Page 34: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

26 Const/BKN/02/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-02 (Km. 50.00 to 81.00 including Rai Singhnagar & Gajsinghpur station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10

01 no. Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

3-NWR/Dy CE/C-III/BKN Dt 14.12.10

M/S Jhawar Sales Corporation, Rani Bazar Bikaner

Rs 194.62 lakhs

26.06.11 15.12.10 31.03.12 Work completed.Final bill is to be recorded by SE/C/PW/SOG

27 Const/BKN/03/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-03 ( Km.81.00 to 115.00 including Sri Karanpur & Keasri Singhpur station yard) on Suratgarh –Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10

03 Nos.

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

9-NWR/Dy CE/C-III/BKN Dt 09.03.2011.

M/S Bhanwar Lal Bijarnia Village-Rajpura Post-Parewadi Tehsil-Nawa Distt: Nagaur (Raj)

Rs 178.57lakhs

31.05.11 15.12.10 30.03.12 Work completed.Final bill is to be recorded by SE/C/PW/SOG

28 Const/BKN/04/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-04 (Km. 115.00 to 138.00 including Prithvirajpur & Sri Gangashahar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10

03 Nos.

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

7-NWR/Dy CE/C-III/BKN Dt 25.01.11

M/S Karnani Construction New Line Gangashahar, Bikaner(Raj)

Rs 138.34 lakhs

05.06.11 15.12.10 30.08.12 Work is in progress.

Page 35: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

29 Const/BKN/01 (R)/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-01 (Km. 20.500 to 50.00 including Bhagwansar, Sarupsar & Mohansar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

07.10.10 single 08.11.10

02 Nos.

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

6-NWR/Dy CE/C-III/BKN Dt 19.01.11.

M/S P.C.Sharma, A-87, Sector-49, Nodia, Gautam Budh Nagar ( UP)

Rs 174.99 lakhs

21.07.11 15.12.10 31.07.12 work is in progress.

30 Const/BKN/09/2010-11/SGNR-SRPR

Supplying and fixing of Hectometer post, kilometer post, gradient post, fouling mark, benches and construction of duty huts , trolley refuges & other ancillary work between Km. 81.00 to 138.00 between Sarupsar-Sri Ganganagar section in connection with Sarupsar -Sriganganagar Gauge conversion project

Open tender

25.09.10 single 27.10.10

05 Nos.

Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

11-NWR/Dy CE/C-III/BKN Dt 21.04.11

M/S Shree Jaswant Const. Co. Kanta Khutria Colony, Bikaner

Rs 129.54lakhs

26.08.11 03.01.11 31.03.12 Work completed. Final bill is to be recorded by SSE/C/Works/SGNR

31 Const/BKN/08/2010-11/SGNR-SRPR

Supplying and fixing of Hectometer Post, Kilometer Post, Gradient Post, Fouling Mark, Benches and Const of trolley refuses and other ancillary works between Km.20.00 to Km.81.00 and Supplying & fixing of Lifting Barrier between Sarupsar -Sri ganganagar Section in Connection with Sarupsar -Sri ganganagar Gauge Conversion Project.

Open tender

25.09.10 single 27.10.10

07 Nos.

Tender awarded to evaluated L-1 .

M/S Attscon India II 18969 St.No. 15 Guruteg Bahadur Nagar , Bhatinda

10-NWR/Dy CE/C-III/BKN Dt 08.04.11

M/S Shree Jee Builders, Jail Well Bikaner

Rs 131.57lakhs

09.09.11 10.01.11 30.04.12 Final variation under finance vetting.

Page 36: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

32 Const/BKN/12/2010-11/SGNR-HMH-SURP

Construction, Strengthening/extension of existing Minor bridges and placement of PSC slabs with RCC ballast retainers of span upto 6.10m including earthwork in approaches of bridges and other ancillary works in Diplana (excluding) to Suratpura (including) section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

09.10.10 single 10.11.10

04 nos Tender awarded to evaluated L-1 .

02 Nos (i) M/S Vikas Const. Co. Bhagina Road Near Water Works Pilani (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh

132-NWR/Dy CE/C-II/BKN dt 07.03.12

M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar

Rs 165.50 lakhs

23.02.12 05.10.11 15.05.12 work is in progress.

33 Const/BKN/10/2010-11/SGNR-HMH-SURP

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall etc, including supply of cement between Diplana (excluding) to Suratpura (including) to section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

09.10.10 single 10.11.10

06 nos Tender awarded to evaluated L-1 .

03 Nos (i) M/S Rajender Singh Contractor, 817, Sector-15A, Hisar (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh (iii) M/S Devender Singh Naveen (JV),7 Pratap Nagar , Saket Colony Rajgarh Road Hisar.

122-NWR/Dy CE/C-II/BKN dt 26.11.2011.

The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani

Rs 510.15 lakhs

23.03.12 26.07.11 23.07.12 work is in progress.

Page 37: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

34 Const/BKN/23/2010-11/SGNR-HMH-SURP

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 88.00 to 132.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

11.12.10 single 12.01.11

04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

14-NWR/Dy CE/C-2/BKN Dt 15.09.2011

M/S Gawar Const. Ltd. DDS 378, Sector 16-17, Hisar

Rs 653.23lakhs

06.05.12 01.07.11 31.10.12 Work is in progress

35 Const/BKN/11 ( R) /2009-10

Construction of Road Over Bridge in lieu of Level crossing No. 53-C at Km 82/13-14 on Delhi- Rewari – Bhatinda Railway Line Xing Bhiwani – Tosham Road at RD 85.04 in Bhiwani District.

Open tender

27.11.09 single 30.12.09

01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No.99-NWR/Dy CE/C-II/BKN dated 03.06.2010.

Shree Gautam Construction Co. Ltd, A.T.Road, Opposite Pan Bazar , Over Bridge , Paltan Bazar Guwahati ( Assam)

Rs 653.23lakhs

31.01.12 05.08.10 31.07.12 Work is in progress.

36 Const/BKN/ 19/2008-09/SOG-BTI

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of existing turnouts, leading of P.way material and other miscellaneous works at all stations in connection with Standard–III and MACL signaling work at Birangkhera, Mandi Dabwali, Bagwali, Sangat, Gurusar Sahnewala and Bhatinda A & B Cabins on Suratgarh-Bathinda section

Open tender

27.02.09 single 01.04.09

01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No.78-NWR/Dy CE/C-II/BKN dated 17.08.2009

M/s Ganpati Const. Co., H.No. 430-B-1 Shant Nagar, Bathinda (Pb)

Rs174.63lakhs

31.08.11 24.07.09 31.12.11 Contract is being processed for short closure on administrative grounds.

37 Const/BKN/ 20/2008-09/SOG-BTI

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of and other miscellaneous works at all stations in c/w Standard–III and MACL signaling work at Rangmahal, Pilibanga, Dabli Rathan, Maneksar, Sangaria and Dhaban stations on Suratgarh-Bathinda section.

Open tender

27.02.09 single 01.04.09

01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No- 78-NWR/Dy CE/C-II/BKN dated 17.08.2009

M/s Karnani Const. New Line, Ganga Shahar, Bikaner

Rs 202.39 lakhs

14.06.11 12.06.09 31.03.12 Contract is being processed for short closure on administrative grounds.

Page 38: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

38 Const/BKN/ 62/2007-08

Supplying and stacking 21900 cum 65mm gauge stone ballast machine between Suratgarh & Bathinda Railway stations in c/w Standard-III & MACL signaling work on Suratgarh-Bathinda section.

Open tender

17.12.07 single 18.01.08

02 nos Tender awarded to evaluated L-1 .

01 nos (i) M/S Ganpati Construction Co. H.No.430-B,/1 (22333) Shanti Nagar, Bhatinda

Agmt No 63/NWR/Dy CE/C-II/BKN dated 31.10.2008

M/s T.C. Const. Co, (JV), Nokha

Rs 211.38 lakhs

30.10.10 30.07.08 30.10.10 Contract is being processed for short closure on administrative grounds.

39 Const/BKN/ 13/2010-11

Supply of 52 kg /90 UTS SKV welding portions to the Railways for welding of rail joints from km 20.500 to 138.00 between Sarupsar (including) to Sri Ganganagar (including) in connection with Sarupsar to Sri Ganganagar Gauge conversion project.

Open tender

20.01.10 single 29.01.12

02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No17/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 28.02.2012

M/S India Thermit Corporation Ltd. 84/22, Fazal Ganj, Kanpur

Rs181.73 lakhs

29.01.12 28.08.11 30.06.12 work in progress

40 Const/BKN/03 /2011-12/SRPR-SGNR

Widening & extension of High level platform No 3,4 & 5,providing hydrants for coach filling , Dismantling of old FOB, Shifting of PF shelters, Dismantling of MG washing line & goods platform, construction of road approach for BG goods platform at Suratgarh , Construction of type -II & III quarter at Sarupsar, Construction of duty hut & gate lodge at Suratgarh , Brick pitching for slope protection and other misc. work at Suratgarh and on Suratgarh -Sri Ganganagar ( excluding) section in connection with Sarupsar - Sri Ganaganagar gauge conversion project

Open tender

18.09.11 single 31.10.11

03 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No16/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 17.01.12

M/S Aditya Traders 38, Gurudawara Gali, Hanumangarh Jn

Rs 458.32 lakhs

28.08.12 12.12.11 28.08.12 Work in progress

41 Const/BKN/03/2011-12/SURP-HMH-SGNR Dt. 19.05.2011

Construction / modification of station building & structures i.e. S&T buildings, platforms, PF shelters , duty bunk and other ancillary works between Tehsil Bhadra ( excluding) to Sidhmukh (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project

Open tender

26.05.11 single 29.06.11

03 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

126-NWR/Dy CE/C-II/BKN dated 11.01.12

M/S Agarwal Const Co. Dudhwa Khara , Churu

Rs 418.60 lakhs

10.10.12 11.11.11 10.10.12 work in progress

Page 39: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

42 Const/BKN/27®/2010-11/SGNR-HMH-SURP dated 28.06.2011

Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory / place including unloading and stacking /spreading at site from km 88.000 to 178.580 ( including Suratpura yard ) in connection with Sri Ganganagar – Hanumangarh – Suratpura gauge conversion project

Open tender

02.07.11 single 03.08.11

05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Contract Agmt No. 124/11-12 dated 19.12.2011. of /Dy CE/C-II/BKN

M/S Har Har Const. Co. Surender Nagar ).

Rs 192.38 lakhs

02.10.12 07.11.11 02.10.12 work in progress

43 Const/BKN/02/SURP-HMH-SGNR/11-12

Construction / modification of station building & structures i.e. S&T buildings, platforms, duty bunk and other ancillary works between Sidhmukh ( excluding) to Suratpura Jn. (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project

Open tender

26.05.11 single 29.06.11

05 nos Tender awarded to evaluated L-1 .

(i) M/S Ridhi Sidhi Construction Co. Sujangarh Road , Nokha , Bikaner ( Raj) (ii) M/S Sangam Construction Company C/O Nasar Latif S/O Abdul Khan Moh. Nardiyan Ward No.17, Rajgarh , Sadulpur ( Churu)

129-NWR/Dy CE/C-II/BKN Dt 02.02.12.

M/S Pyare Lal Dhaka Copnst. Co. Churu)

Rs 315.48 lakhs

04.11.12 23.11.11 04.11.12 work in progress

44 Const/BKN/01/SURP-HMH-SGNR/11-12

Supplying and stacking 50000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specification at Narwasi, Gogameri & sidhmukh depots in c/w SURP-HMH-SGNR GC project.

Open tender

25.08.11 single 26.09.11

08 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

135-NWR/Dy CE/C-II/BKN Dt 01.05.2012

M/S Chevron Minerals & Mines Pvt Ltd Flat No. 10, 3rd Floor, Staya Niketan, Opposite Venkteshware College Near, Dhualan Kuan, New Delhi-110021).

Rs362.90 lakhs

18.11.12 08.02.12 18.11.12 work in progress

Page 40: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

45 Const/BKN/ 33/2011-12/SURP-HMH-SGNR dt. 15.03.2012

Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Paharsar Halt, Hansiawas Halt, Anupsahar & any other suitable location between Km. 132.00 to 175.00 on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

19.03.12 single 20.04.12

5 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG not submitted.

M/S Jai Mata Const. Co.Bathinda

Rs 532.35 lakhs

17.05.12 work under mobilisation

16.03.13 Due to non commencement and non submission of work by the contractor, contract has been terminated and being re-invited.

46 Const/BKN/09(R)/2011-12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.

Construction and modification of station buildings, platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

20.01.12 single 28.03.12

04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG not submitted.

M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)

Rs 647.31 lakhs

03.03.13 work under mobilisation

03.03.13 Work under mobilisation.

Dy. CE/C/HMH

S. No

Tender No Item/ Nature of work

Mode of tender inquiry

Date of publication of NIT

Types of bidding (Single/ Two-old System)

Last date of receipt of tender

Nos. of tender received

Nos & name of parties qualified after technical evaluation

Nos & names of parties not qualified after technical evaluation

Whether contract awarded to lowest tenderer/ evaluated L-1

Contract No & date

Name of contractor

Value of contract

Schedule date of completion of supply

Actual date of start of work

Actual date of completion

Reason for delay if any

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 Const/ BKN/11/10-11/ SGNR-HMH-SURP dt. 04.10.10

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc between Hanumangarh Jn (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

09.10.2010 One packet system

10.11.10 7 1 6 Yes, L-1

Const/ BKN/ 11/10-11/ SGNR-HMH-SURP Dt: - 13.01.11

The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani

660.84 12.01.12 04.03.11 12.01.12 31.05.12

Work is in progress.

Page 41: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

2 Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt. 04.10.10

Rebuilding, Construction, Strengthening/ extension of existing Minor bridges and upto 6.10m including earthwork in in Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

09.10.2010 One packet system

10.11.10 4 1 3 Yes, L-1

Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt: - 05.02.11

M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar

425.56 04.02.12 24.11.11 04.02.12 30.09.12

Work is in progress.

3 Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 02.12. 2010

Construction/modification of station buildings & structures i.e. S&T buildings, Platforms, P.F. Shelters/ FOB, between Sadul Shahar (excluding) to Hanumangarh Jn. (excluding) section in c/w SURP-HMH-SGNR GC project.

Open Tender

05.12.2010 One packet system

12.01.11 8 1 7 Yes, L-1

Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 17.02.11

M/s Jai Matadi Energy System, VPO-Narodara, Tehsil-Laxmangarh, Distt-Sikar.)

402.09 16.02.12 30.03.11 16.02.12 30.06.12

Work is in progress.

4 Const/ BKN/ 21/2010-11 Dated 04.12.2010

Supplying and stacking 75000 cum 65mm gauge stone ballast between Km. 0.00 to 44.00 on Hanumangarh-Suratpura in c/w SURP-HMH-SGNR GC project.

Open Tender

11.12.2010 One packet system

12.01.11 6 1 5 Yes, L-1

Const/ BKN/ 21/2010-11 Dated 17.02.11

Sh. Devender Singh, 7, Pratap Nagar, Saket Colony, Rajgarh Road, Hisar

617.25 16.02.12 10.05.11 16.02.12 31.08.12

Work is in progress.

5 Const/ BKN/15/10-11/ SGNR-HMH-SURP dt. 02.12.10

“Rebuilding, Construction, Strengthening/extension of existing Minor bridges PSC slabs with RCC ballast retainers of span upto 6.10m in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

05.12.2010 One packet system

12.01.11 3 1 2 Yes, L-1

Const/ BKN/15/ 10-11/ SGNR-HMH-SURP dt. 25.03.11

M/s G.K. Contractor, House No. 157, Sector No. 9, Extension, Hanumangarh Jn.

273.28 24.03.12 10.07.11 24.03.12 31.08.12

Work is in progress

6 Const/ BKN/ 22/2010-11 Dated 04.12.10

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 44.00 to 88.00 on Hanumangarh–Suratpura section in

Open Tender

11.12.2010 One packet system

12.01.11 6 1 5 Yes, L-1

Const/ BKN/ 22/2010-11 Dated 07.05.11

M/s Jai Mata Const. Co. H.No. 14169 Street No. 8A, Bathinda

686.25 07.05.11 25.07.11 07.05.12 31.10.12

Work is in progress.

Page 42: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

7 Const/ BKN/ 22/2010-11 Dated 04.12.10

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc, including supply of cement between Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

01.01.2011 One packet system

12.01.11 7 1 6 Yes, L-1

Const/ BKN/ 14/2010-11 Dated 07.05.11

M/s Jaimatadi Energy Systems (JV), VPO Narodara, Teh. Laxmangarh, Dist. Sikar

416.61 06.05.12 01.07.11 06.05.12 Work is in progress.

8 Const/BKN/16/ 2010-11/ SGNR-HMH-SURP dt. 02.12.10

Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, PF shelters / FOB, duty bunk and other ancillary works between Sri Ganganagar (excluding) to Sadul Sahar (including) section c/w SURP-HMH-SGNR GC project.

Open Tender

01.01.2011 One packet system

12.01.11 6 1 5 Yes, L-1

Const/BKN/16/2010-11/SGNR-HMH-SURP 07.05.11

M/s Surender Kumar Bansal,59 P Block, Shri Ganga Nagar

547 17.05.12 27.05.11 17.05.12 Work is in progress.

9 Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 19.02.11

Construction/Rebuilding of substructure of Bridge No. 40 (1 x 45.70 m Open Web Girder) at km 141.515 on Gang Canal, Bridge No. 2-A (2 x 61.0 m Open Web Girder) at km 2.347 on Ghaggar River, Bridge No. 14-B (2 x 61.0 m Open Web Girder) at km 18.345 on Ghaggar River and Bridge No. 21-A (1 x 76.20 m Open Web Girder) at km 28.638 on Indira Gandhi Main Canal including other ancillary works in c/w SURP-HMH-SGNR

Open Tender

24.02.2011 One packet system

30.03.11 5 1 4 Yes, L-1

Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 15.07.11

M/s Jaimatadi Energy System, JV, VPO Narodara, Teh. Laxmangarh, Dist. Sikar

13.34 Cr.

14.07.12 01.02.12 14.07.12 Work is in progress.

Page 43: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

GC project.

10 Const/ BKN/ 26 (R)/ 2010-11/ SGNR-HMH-SURP dt. 28.06.11

Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory/place including unloading and stacking/ spreading at site from km. 0.000 to 88.000 (Excluding Hanumangarh Yard) in connection with Sri Ganganagar-Hanumangarh-Suratpura Gauge Conversion Project.”

Open Tender

02.07.2011 One packet system

03.08.2011

6 1 5 Yes, L-1

CConst/ BKN/ 26 (R)/ 2010-11/SGNR-HMH-SURP Dated: - 03.10.11

M/s Har Har Company, Doshi Chambers, Mehta Market, Surenderanagar. (Guj)

152.19 lakh

02.10.12 11.11.11 02.10.12 Work is in progress.

11 Const/ BKN/ 16/2011-12/ SURP-HMH-SGNR Dated–16.08.2011

Construction of Foot Over Bridge and Platform Shelter at Hanumangarh Junction, Hanumangarh Town, Ellenabad and Nohar station in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.””

Open Tender

28.08.2011 One packet system

28.09..2011

2 1 1 Yes, L-1

Const/BKN/16/2011-12/SURP-HMH-SGNR Dated: - 16.12.2011

M/s Sajneev Brothers, C-10, Vaishali Nagar, Jaipur

302.87 Lakh

15.12.12 20.03.12 15.12.12 work is in progress

12 Const/BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 10.10.2011

Supplying and stacking 40000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Banwali, Fateh Singhwala, Budh Singhwala & between Km.201.00 to 202.00 Depot on Sri Ganganagar–Diplana section in connection with Suratpura-

Open Tender

14.10.2011 One packet system

18.11.2011

4 1 3 Yes, L-1

Const/ BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 14.12.2011

M/s Jai Mata Const. Co., House No. 14169, Street No. 8A, Ganesh Nagar, Bathinda

439.70 LAKH

13.06.12 17.12.11 13.06.12 Work is in progress

Page 44: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

Hanumangarh-Sri Ganganagar Gauge Conversion project.

13 Const/BKN/20)/SURP-HMH-SGNR/ 2011-12 Dated – 19.10.11

Rebuilding of existing Major & Minor bridges with RCC BOX of span upto 6.0 m including earthwork in approaches of bridges and other ancillary works in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project..

Open Tender

25.10.2011 One packet system

30.11.2011

2 1 3 Yes, L-1

Const/BKN/20)/SURP-HMH-SGNR/ 2011-12 Dated – 16.12.11

M/s Sanjeev Brothers. C-10, Vaishali Nagar, Jaipur

450.87 LAKH

15.06.12 19.12.11 15.06.12 Work terminated

14 Const/BKN/SURP-HMH-SGNR/ 19(R-1)/ 2010-11 dt. 19. 10.11

Supplying and stacking 65000 cum 65mm gauge stone ballast between Km.137.250 to 171.00 (including Sri Ganganagar) on Sri Ganganagar–Hanumangarh section in c/w SURP-HMH-SGNR GC project..

Open Tender

25.10.2011 One packet system

30.11.2011

4 1 3 Yes, L-1

Const/BKN/SURP-HMH-SGNR/ 19(R-1)/ 2010-11 dt. 14.12.11

M/S J.K.Const. Co. New Market, Nokha

719.90 LAKH

13.08.12 23.12.11 13.08.12 Work is in progress.

Page 45: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of

15 Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 05.12.2011

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in section & at LC’s of Zone-1 (Ch. 138.000 to 204.130) on Sri Ganganagar-Hanumangarh section c/w SURP-HMH-SGNR GC project.

Open Tender

10.12.11 One packet system

11.01.12 3 1 2 Yes, L-1

Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 22.01.12

M/s RAVI INFRABUILD PROJECTS PVT. LTD., 95, Hiran Magri Sector-11, Udaipur

904.54 21.01.13 01.02.12 21.01.13 Work is in progress

16 Const/HMH/ 20(R-2)/ SURP-HMH-SGNR/2010-11 Dated 22.12.2011

Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km.171.00 to 204.130 (including Hanumangarh) on Sri Ganganagar–Hanumangarh section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.

Open Tender

25.12.11 One packet system

25.01.12 5 1 4 Yes, L-1

Const/HMH/20(R-2)/SURP-HMH-SGNR/2010-11 Dated 24.02.12

M/s Sura Const. Co., Sector-13, 1323/1133, Hisar.

687.05 23.10.12 25.02.12 23.10.12 Work is in progress

17 Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12

Supplying and stacking 90000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications in various Depots i.e. near Hanumangarh Junction, Talwara Jhil, Ellenabad, Nohar, Diplana & any other location on Hanumangarh-Diplana section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.

Open Tender

13.01.12 One packet system

13.03.12 5 1 4 Yes, L-1

Const/HMH/25/SURP-HMH-SGNR/2011-12 Dated–09.05.12

(Sh. Devender Singh, 7, Pratap Nagar,Saket Colony, Rajgarh Road, Hisar).

874.71 08.05.13 - 08.05.13 Work is yet to be started

For CAO/C/JP

Page 46: DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF … fileDETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012 Sr. No Tender No. Item /nature of work Mode of tender Dt. of