DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF July, 2012
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication of NIT
Types of bidding ( single /two bid system )
Last date of receipt
of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of work
Actual date of completion
Remarks/ Reason for delay if
any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
CE(C)I-JP
Dy. CE/C/III-JP
1
AF
/BK
I/G
C/J
P/4
R
Construction strengthening and rebuilding minor bridges between Nadbai- Bharatpur
Open tender
Two bid system
29.0
4.9
9
15 07 08 Yes CPM/JP/KTT/CA/16 dated 15.02.2000
M/s Jugendra Singh & Co., Etah.
2.98 crore 04.01.2000
01.06.01 31/3/04 Work completed, case was investigated by vigilance final variation advice is awaited. Reminder sent.
2
AF
/BK
I/G
C/
JP
/68
Laying and linking BG track between BTE- AH section
Open tender
24..0
4.0
4
One bid system
27.0
9.0
4
5 1 4 Yes NWR/S&C/CA/51 dated 04.01.05
M/s RSV Construction Hyderabad
1.83 crore 01.03.05 5.11.04 31.5.05 Work completed. Final bill Under technical check
3
AF
/BK
I/G
C/
JP
/69
Laying and linking BG track between BTE-AH section
Open tender
24.0
4.0
4
One bid system
27.9
.200
4 5 1 4 Yes NWR/S&
C/CA/49 dated24.12.04
M/s Engipress Rail Link, Gwalior
1.58 crore 25.02.05 28.10.04 30.11.05 Work is in dispute as money suit filed by contractor.
4
AF
/BK
I/G
C/3
6
Welding of rail joints bet. BKI- KL section
Open tender
- One packet system
09.0
6.0
3
3 1 2 Yes Dy. CE(C)JP/CA/77 dated 07.10.03
M/s India Thermit Corp Ltd., Kanpur
1.02 Crore
08/3/04 12/10/03 30/06/04 Final bill is awaited from field office.
5
NW
R-J
P/R
E
yard
/11
Const./Exten of station building at RE yard
Open tender
8.0
8.2
00
8
One packet system
29.0
8.2
008
01 - 01 Yes Dy CE/C-JP/CA/221 dt. 17.02.09
M/s New Everest Stone Curshing Co. Gurgaon
4.88 Crore 14/6/09 26/10/08 31/08/11 Work completed. Final bill awaited.
6
HIS
-
RE
/Do
ub
ling/2
Const/ Extension of FOB&PF shelter shed bet. RE-HIS.
Open tender
24.0
7.2
008
One packet system
25.0
8.2
008
03 - 01 Yes Dy CE/C-JP/CA/224 dt. 19.03.09
M/S Sanjeev Brothers, Jaipur.
4.16 Lakhs
22/4/09 22/02/09 31/12/11 Work is in progress, further DOC extension is to be applied by agency.
7
AW
R-H
SI
Doub
ling/5
Construction of Minor Bridge E/Work bet. HIS to Km.57 to AWR
Open tender
09.0
8.2
007
One packet system
12.0
9.2
007
02 01 01 Yes Dy.CE(C)/ JP/CA/213 dated 08.07.08
M/s Jugeundra Singh Co., Etah
5.80 Crore
09/01/09 08/05/08 31/3/11 Work completed final bill technically checked .Final variation will be submitted for adm. Approval of competent authority
8
HS
I-R
E/D
ou
blin
g/1
Construction of Major Bridge minor bridge R/wall earth work station building ballast supply , track linking etc.
Open tender
2
1 &
2
2.0
7.2
008
One packet system
2
3.0
4.2
008
05 - 01 Yes NWR/S&C/CA/101 dated 23.10.08-
M/s ARSS- Triveni(JV) Bhubaneshwar
50.81 Crore
24/2/10 03/11/08 31/05/12 Work is in progress. Further extension of DOC is awaited from agency.
9
AW
R-
HS
I/D
oub
ling/6
Construction station building Misc. structure ballast supply track linking etc.
Open tender
21.0
2.2
008
One packet system
23.0
4.2
008
06 - 01 Yes NWR/S&C/CA/102 dated 23.10.08
M/s ARSS Infra structure project Ltd. Bhubaneshwar (Orissa)
21.24 Crore
02/07/09 27/10/08 31/05/12 Work is in progress. Further extension of DOC is awaited from agency.
10
NW
R/S
&C
/R
OB
/11
1/9
Const of ROB at LC No.111-C.
Open tender
02.1
0.2
008
One packet system
05.1
1.2
008
03 - 01 Yes Dy.CE(C)/ JP/CA/230 dated 13.10.10
M/S Bharat Spun Pipe & Const.Co. JP
6.52 Cr. 04/05/10 25/08/09 31/7/12 Work is in progress
11
NW
R/S
&C
/R
OB
/11
7/1
0
Const of ROB at LC No.117.
Open tender
29.1
.200
9
One packet system
04.0
3.2
009
04 - 01 Yes Dy.CE(C)/ JP/CA/229 dated 11.01.10
M/S Parul–Const.Co. MSH
2.35 Cr. 17/05/10 23/11/09 30/12/11 Work completed. Final variation is under administrative approval of competent authority.
12
NW
R/S
&C
/T/6
R
-4
Const. HQ Building at Jawahar nagar Jaipur.
Open tender
-
One bid system
21.9
.200
7
5 5 0 Yes NWR/S&C/CA/98 dtd. 04.03.08
M/s SAM India Built well Pvt. Ltd. Dehli
45.11 Crore 06.6.09 22.12.7 31.07.11. Final bill passed by accounts office .
13
WR
/S&
C/T
/13
Construction of 72 units Type-II, 108 units Type- III, 36 units Type-IV in Multistoried Towers & HEALTH Unit, shopping complex
Open tender
-
One bid system
15/0
4/2
009
04 04 0 Yes CE/S&C/CA/27 dtd. 8.9..2009
M/s Balaji Builders & Developers (JV) Jaipur
28.88 Crore
14.1.11 16.7.09 30.08.12 Work is in progress
Dy. CE/C/GC-JP
Sr.
No.
T. No Item/Nature of work
Mod
e of
tend
er
Date of
publication of
NIT
Type of
bidding
(Single/T
wo bid
system)
Last date of
receipt of
tender
Nos of tenders
received
Nos &
Names of
parties not
qualified
after
technical
evaluation
Nos & names of
parties not qualified
after technical
evaluation
Weather
contract
awarded to
lowest
tenderer/eval
uated L-I
Contract no &
date
Name of
contractor
Value of
contract
Sch
edul
ed d
ate
of
com
plet
ion
of s
uppl
ies
Act
ual d
ate
of s
tart
of
wor
k
Act
ual d
ate
of
com
plet
ion
Rea
son
for
dela
y if
any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 NWR/S&C/JP
-SIKR-LHU &
SIKR-CUR
/GC/T/3R
Construction of minor bridges,
wing / return walls, earthwork
in formation, construction
including addition and
alteration of station buildings,
passenger platforms &
shelters, FOB etc
Ope
n te
nder
Single
Packet
system
NWR/S&C/
CA /108 dt.
28.06.2011
M/s Giriraj Civil
Developers Pvt.
Ltd., B-
15, Paras
Dersan Socity, S.
V. Road, Borivali
(East), Mumbai.
1955
3939
2.03
29.6.12
25.3.2011
2 DY.CE /C/GC/
NWR/ 2011/T-
5
Transportation of various type
of BG PSC sleepers from
sleeper factory such as Khatu,
Marwar Chapari, Degana,
Churu or any other sleeper
factory/place and P. way
materials
Ope
n te
nder
08.04.11 Single
Packet
system
12.5.11 04 - - yes 02
/NWR/Dy.
CE/C-
GC/JP
/2011-
12/JP-SIKR-
CUR &
SIKR-LHU
dt.
07.09.2011.
M/s Hanuman
Construction
Company,
Bhootra Niwas,
new market
Nokha. 3956
0390
.62
07.05.12 20.7.2011
3 DY.CE /C/GC/
NWR/ 2011/T-
3
Supplying and stacking 65mm
gauge stone ballast machine
crushed (hard stone)
conforming to RDSO
specifications
Ope
n te
nder
16.3.11 Single
Packet
system
21.4.11 08 01
M/s
CH
EV
RO
N M
INE
RA
LS A
sho
k
Kum
ar B
ansa
l & A
ssoc
iate
s, N
ew D
elhi
Not
aw
arde
d to
L1
03
/NWR/Dy.
CE/C-
GC/JP
/2011-
12/JP-SIKR-
CUR &
SIKR-LHU
dt.
23.09.2011.
M/s. Jai Mata
Construction Co.
House No.
14169, Stree No.
8A,
Ganesh Nagar,
Bhatinda
4135
4240
.00
15.08.12 17.08.2011
4 DY.CE /C/GC/
NWR/ 2011/T-
2
Supplying and stacking 65mm
gauge stone ballast machine
crushed (hard stone)
conforming to RDSO
specifications
Ope
n te
nder
16.3.11 Single
Packet
system
21.4.11 06 01
M/s
CH
EV
RO
N M
INE
RA
LS A
sho
k K
umar
Ban
sal &
Ass
ocia
tes,
New
Del
hi
Not
aw
arde
d to
L1
04
/NWR/Dy.
CE/C-
GC/JP
/2011-
12/JP-SIKR-
CUR &
SIKR-LHU
dt.
24.10.2011.
M/s Devender
Singh
Contractor, 7,
pratap nagar,
Saket Colony,
Rajgarh Raod,
Hissar
3596
5760
.00
01.09.12 17.09.2011
5 DY.CE /C/GC/
NWR/ 2011/T-
10
Supplying and stacking 65mm
gauge stone ballast machine
crushed (hard stone)
conforming to RDSO
specifications between
Km.0.000 to Km. 30.2718 (L.
C. No. 29) on Sikar - Churu
section
Ope
n te
nder
09.8.11 Single
Packet
system
15.9.11 07 -
-
Yes.
09
/NWR/Dy.
CE/C-
GC/JP
/2011-
12/JP-SIKR-
CUR &
SIKR-LHU
dt.
05.05.2012.
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10, 3rd
Floor,
Satyanikertan,
New Delhi
2,32
,72,
500.
00
11.01.13. 14.02.2012
6 DY.CE /C/ GC/
NWR/ 2011/T-
11
Supplying and stacking 65mm
gauge stone ballast machine
crushed (hard stone)
conforming to RDSO
specifications between Km.
30.2718 to Km. 59.901 (L. C.
No. 51) on Sikar - Churu
section
Ope
n te
nder
09.8.11 Single
Packet
system
15.9.11 09 02
1.M
/s J
BG
Con
stru
ctio
n C
o.29
07,
GH
GT
roa
d, N
ear
Zila
paris
had,
Bha
tinda
2. M
/s S
anto
sh C
onst
. Co.
, Sad
ar B
azar
, New
Mar
ket,
Nok
ha
Not
aw
arde
d to
L1
10
/NWR/Dy.
CE/C-
GC/JP
/2011-
12/JP-SIKR-
CUR &
SIKR-LHU
dt.
05.05.2012.
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10, 3rd
Floor,
Satyanikertan,
New Delhi
2778
6500
.00
24.01.13 14.02.2012
7 DY.CE /C/ GC/
NWR/ 2011/T-
15
Supplying and stacking 65mm
gauge stone ballast machine
crushed (hard stone)
conforming to RDSO
specifications at jhunjhunu
depot on-Sikar-Loharu section
Ope
n te
nder
23.9.11 Single
Packet
system
24.10.11 08 01
M/s
San
tosh
Con
st. C
o., S
adar
Baz
ar,
New
Mar
ket,
Nok
ha
Not
aw
arde
d to
L1
07
/NWR/Dy.
CE/C-
GC/JP
/2011-
12/JP-SIKR-
CUR &
SIKR-LHU
dt.
12.3.2012
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10, 3rd
Floor,
Satyanikertan,
New Delhi
2540
0000
.00
20.7.12 30.01.2012
8 DY.CE /C/ GC/
NWR/ 2011/T-
4R
Supplying and stacking 65mm
gauge stone ballast machine
crushed (hard stone)
conforming to RDSO
specifications between
Km.325.415 to Km. 360.900
(including Loharu station) on
Sikar - Loharu section Ope
n te
nder
28.9.11 Single
Packet
system
01.11.11 05 - - yes. 05
/NWR/Dy.
CE/C-
GC/JP
/2011-
12/JP-SIKR-
CUR &
SIKR-LHU
dt.
12.3.2012
M/s CHEVRON
MINERALS &
Mines Pvt. Ltd,
Flat No. 10, 3rd
Floor,
Satyanikertan,
New Delhi
2843
7200
.00
20.9.12 05.02.2012.
9 DY.CE /C/ GC/
NWR/ 2011/T-
14
Construction of New Major Bridge of span 12 X 6.10 m (Km. 319/6-7) and strengthening of Bridge no. 165 (3x6.10 M at Km. 268/5-6) and PSC Slabs as super-structure including earth work in approaches and other ancillary works in Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu Gauge conversion Project.
Ope
n te
nder
16.12.11 Single
Packet
system
25.01.12 06 - - Yes Contractor not
yet signed
agreement
M/s Surabhi
Maheshwar rao,
C-58, Road No.
1,
Film
Nagar,Jublee
Hills,
Hyderabad
2,76
,47,
151.
47
15.08.12
30.3.2012.
- -
10 DY.CE /C/ GC/
NWR/ 2011/T-
18
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-II (Km. 267.50 to Km. 314.00) including Dundlod Mukundgarh, Nua & Jhunjhunu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project
Ope
n te
nder
16.12.11 Single
Packet
system
20.01.12 02 - YES PG under
verified.
M/s Bharwal Lal
Bijarnia,
Villgae- Raipur,
Post- Prewari,
Distt. Nagour.
5,11
,16,
665.
77
06.03.13
11 DY.CE /C/ GC/
NWR/ 2011/T-
19
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-III (Km. 314.00 to Km. 360.70) including Ratan Shahar, Chirawa, Surajgarh & Loharu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.
Ope
n te
nder
16.12.11 Single
Packet
system
18.01.12 05 - YES PG verified,
agreement
not yet
signed by
the
contractor.
M/s Laxyo
Energy Pvt. Ltd.,
113, Bakhatgarh
Tower, 10/A,
New Plasia,
Indore (MP)
4,73
,94,
338.
37
06.03.13
12 DY.CE /C/ GC/
NWR/ 2011/T-
17
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-I (Km. 237.50 to Km. 267.50) including Sikar & Nawalgarh yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.
Ope
n te
nder
16.12.11 Single
Packet
system
23.01.12 04 03 1. M/s Bhika ram Dev rath, VPO- Dhiarla, Distt. Churu.
2. M/s Goel Brothers Rail Infra PVT. Ltd., Bareilly.
3. Shri Nahar Const. Co., Jodhpur.
L-4 PG verified,
agreement
not yet
signed by
the
contractor.
M/s Shupal
Kumawat, Rly.
Contractor,
Village & Post.-
Badhal, Distt.-
Jaipur.
3,30
,96,
619.
97
04.04.13
13 Dy.CE/C/GC/
2012/T-23
Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations including loading, unloading and and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Ope
n te
nder
05.03.12 Single
Packet
system
09.04.12 04 - - Yes Under
preparation
as PG Not
submitted.
M/s Hanuman
Construction
Company,
Bhootra Niwas,
new market
Nokha.
5,36
,48,
955.
93
19.06.13
Dy. CE/C/II-JP
Sr.No.
Tender No. Item / Nature of work.
Mode of tender
Date of Publication of NIT
Types of bidding (Single/ two bid system)
Last date of receipt of tender.
No. of tenders received
.
Nos. & Name of parties
qualified after technical
evaluation
Nos. & Name of parties
not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
contract No. and Date.
Name of contractor
Value of contract.
Schedule date
of completion of
supplies.
Actual date of start of work.
Actual date of
completion
Reason for delay if
any.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 JP-RGS/RUB/ Deposit/1RR
RUB in military cantt area
Open tender
- Single Packet System
31/8/07 4 M/s. P. J. Sood, BRC
3 NO Dy.CE(C)-II/JP/CA /13 dt. 27/12/07
M/s. P. J. Sood, BRC
355.269 24/9/08 12-04-2007
24/09/08 Extended upto 30/12/11
Phisically completed
2 NWR/S&C/KSG/ROB/28/1R-4
Constn. of ROB across Rly. track at LC No.28 in KSG yard at Km.266/8-9 on JP – AII section.
Open tender
Single Packet System
07-02-2008 3
Bharat Spun Pipe & Construction Co., Jaipur
2 YES Dy. CE(C)-II/JP/30 Dated 14/10/08
Bharat Spun Pipe& Const Co., JP
294.79 22/01/09
25/08/08
22/01/09 Extended upto 31/12/2011
Phisically completed
Dausa-Jaipur Doubling Project.
3 DO-JP/ Doubling/3R
Earth work & minor bridge
Open tender
- Single Packet System
30/3/07 M/s B. P. Modi Jaipur
YES DyCE(C)II/JP/CA/14dt. 29/12/07
M/s B. P. Modi Jaipur
762.91 17/12/08
20/11/07
17/12/08 extended upto 31/12/2010
Work completed & F/bill under tech. check.
4 DO-JP/ Doubling/4RR
Earth work & minor bridge
Open tender
- Single Packet System
21/09/07 1 M/s B. P. Modi Jaipur
0 YES DyCE(C)II/JP/CA/15dt. 29/12/07
M/s B. P. Modi Jaipur
749.56 02-01-2009
20/11/07
1/2/2009 extended upto 31/12/2010
Work completed & F/bill under tech. check.
5 JP-DO/ Doubling/8
Construction of FOB bet. DO-JP section
Open tender
- Single Packet System
29.11.06 2 M/s. Sanjeev Brothers Jaipur
1 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. Sanjeev Brothers Jaipur
130.02 15.4.08 14.2.07 15/04/08 Extended upto 15/10/2010
Clearance required from Vig.
6 DO-JP/ Doubling/12RR
Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.
Open tender
- Single Packet System
30/11/07 2 M/s. B. M. Construction, GZB.
2 YES NWR/ S&C/ CA/100 dated 23/9/08
M/s. B. M. Construction, GZB.
846.08 27/04/2009
09-10-2008
27/04/2009 Exdtended upto 30/11/2010
Work completed & F/bill under tech. check.
7 DO-JP/ Doubling/14
Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.
Open tender
- Single Packet System
30.05.07 1 M/s. B. M. Construction, GZB.
0 YES NWR/ S&C/CA/99 dated 27/03/08
M/s. B. M. Construction, GZB.
1044.84 24.10.08
11-06-2007
24.10.08 extended upto 31/03/11.
Completed & final variation under techinical check
8 DO-JP-FL/ Doubling/16
Welding of 52Kg. /60Kg. Rails
Open tender
- Single Packet System
31/07/07 1 M/s. ITC, Kanpur.
0 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. ITC, Kanpur.
341.22 18/02/09
20/06/09
18/02/09 Extended upto 30/04/2011
Physically completed.
9 T. No. DO-JP/ Doubling/21
Dismantling of existing BG track, laying & linking in Zone-I DO (Excl.) to JT (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 1 M/s. B. S. Sangwan, Sonipat (Haryana)
0 YES Dy.CE(C)-II/JP/CA/34 dt. 20/06/09
M/s.B. S. Sangwan, Sonipat (Haryana)
206.44 22/09/09
04-10-
2009 22/09/09 Extended upto 15/07/10
Final bill under Tech. check.
10 T. No. DO-JP/ Doubling/22
Dismantling of existing BG track, laying & linking in Zone-II DO (Excl.) to JT (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 4 M/s. P. C. Sharma, Noida
3 YES Dy.CE(C)-II/JP/CA/33 dt. 05/06/09
M/s. P. C. Sharma, Noida
194.57 09-09-2009
04-01-
2009 9/9/2009 Extended upto 31/08/10
Final bill under process with SE/C/PW/JP
11 T. No. DO-JP/ Doubling/23
Dismantling of existing BG track, laying & linking in Zone-III BAI (Excl.) to KWP (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 3 M/s. P. C. Sharma, Noida
2 YES Dy.CE(C)-II/JP/CA/32 dt. 29/05/09
M/s. P. C. Sharma, Noida
187.06 09-09-2009
04-01-
2009 9/9/2009 Extended upto 31/01/11
Final bill under process with SE/C/PW/JP
12 T. No. DO-JP/ Doubling/24
Dismantling of existing BG track, laying & linking in Zone-IV KWP (Excl.) to JP (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 2 M/s. B. S. Sangwan, Sonipat (Haryana)
1 YES Dy.CE(C)-II/CA/35 dated 02/09/09
M/s.B. S. Sangwan, Sonipat (Haryana)
239.75 22/09/09
18/05/0
9 22/09/09 Extended upto 31/03/11
Finla bill under process
13 NWR/JP/C/2/ROB/DO-01 -
Construction of Road Over Bridge across the Railway track at Km.181/5-6 in between Dausa - Bhandana of Dausa-Jaipur section (Deposit work).
Open tender
_ Single Packet System
07-02-2008 Bharat Spun Pipe& Const Co., JP
YES Dy. CE(C)-CA/29 Dated 14/10/2008
Bharat Spun Pipe& Const Co., JP
547.26 02-10-2009
24/04/2008
Extended up to 15/03/2012
Completed Physically
14 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/1 RR
Construction of minor bridges, wing/return walls , earthwork in formation ,construction including addition and altertation of station buildings, passanger platforms & shelters.FOB etc between Jaipur (incl) & Ringus (incl) stations of Jaipur -Ringus Section
Open tender
_ Single Packet System
18/01/2011 Giriraj Civil Developers Pvt Ltrd. BorivaliBombay
YES NWR/S&C/CA/110 Dated 16/08/2011
Giriraj Civil Developers Pvt Ltrd. BorivaliBombay
2141 08-10-2012
07/04/2011
_ contract terminated
15 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/5 RR
Construction of Minor Bridges , Wing /Return walls.E/work in formation construction including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR
Open tender
_ Single Packet System
16/09/2011 Modi Construction(JV) Jaipur
YES Modi Construction(JV) Jaipur
1724 26/04/2013
02.01.2012
Work in progress
16 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/ 01(geotech)
Staking out alignment , conducting geotechnical investigation design of the sun/super structure of minor & major bridges , prepration of GAD got minor &Major bridges etc
Open tender
Single Packet System
20.12.2011 M/S Surbhi Enterprises Jagatpura Jaipur.
YES M/S Surbhi Enterprises Jagatpura Jaipur.
9.46 Lakhs
01.09.2012
Work in progress
17 TENDER NO. NWR/S&C/JP- SIKR/GC/T-3
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Ringus Km. 189.00 to SIKAR Km 238.70 on Ringus - SIKAR section in connection with Jaipur-Ringus-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open tender
22.1.12 Single Packet System
24.2.12 7 M/s Rajsthan Mining Engineers Jaipur
NO M/s Rajsthan Mining Engineers Jaipur
4.66 crors
22.4.13
CE/C/II-JP
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication of NIT
Types of bidding ( single /two bid system )
Last date of receipt
of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of work
Actual date of completion
Remarks/ Reason for delay if
any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
CE(C)I-JP
Dy. CE/C/DO
1
DO
/GG
C/N
L/8
-
Construction of
minor bridges
from Chainage
00.00 to 30000
Between Dausa
and Lalsot in
connection with
DO-GGC new BG
Line
Op
en t
end
er
Single
Packet
system
07
/12
/20
05
Yes NWR/S&C/
CA/78
dated
27.06.06
M/s Jain
construction
Co.(JV) Ajmer
6.33 crore 20/05/07
Further
extension
granted
upto
31/12/2007
04/04/06 Contract
terminated.
Final bill is being
processed for keeping
in deposit..
2
DO
/GG
C/N
L/9
Construction of
BG formation
from Chainage
1150 to 15000
between Dausa
Kala-Shekhpura in
connection with
DO-GGC new BG
line project.
O
pen
ten
der
Single
Packet
system
04
/01
/20
06
Yes NWR/S&C/
CA/81date
d 06.09..06
M/s Kewai
Construction (JV)
Jodhpur
6.45 crore 26/09/07
Further
extension
granted up
to
30/11/2011
12/07/06 - contract terminate on
24/11/12. Final
measurement under
process
3
DO
/GG
C/N
L/1
0
Construction of
BG formation
from Chainage
15000 to 28000
between Dausa
and Lalsot in
connection with
DO-GGC new BG
line project.
O
pen
ten
der
Single
Packet
system
16
/01
/20
06
Yes NWR/S&C/
CA/79
dated
30.06.06
M/s Parma Ram
Bhakar Jodhpur.
6.39 crore 17/07/07
extended
upto
30/11/2011
11/05/06 - contract terminate on
24/11/12. Final
measurement under
process
4
DO
/GG
C/N
L/1
4
Construction of
Major Bridges
with 1200mm dia
cast in situ board
piles & PSC girder
superstructure of
18.30 M between
DO-GGC in c/with
DO –GGC NLBG
Project
O
pen
ten
der
03
/10
/20
07
Single
Packet
system
14
/11
/20
07
Yes NWR/S&C/
CA/94
dated
18/02/200
8
M/s
Atlanta-ARSS
(JV) Bhubaneshwar
(Orissa).
41.63 crore 16/09/09
Extended
upto
31/12/2011
with token
penalty
20/02/08 - work completed
5
DO
/GG
C/N
L/1
5
Construction of
Minor Bridges
from chainage
30000.00 to
38500.00 &
Construction of
BG Formation
from chainage
28000.00 to
38500.00
between Dausa
and Lalsot in
connection with
DO-GGC New BG
line Project
O
pen
ten
der
0
3/1
0/2
00
7
Single
Packet
system
14
/11
/20
07
3 Yes Dy.
CE/C/I/JP/
CA/16
dated
29/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
(Orissa).
5.31Crores 09/06/09
Extended
upto
31/08/2011
24/01/08 - Work completed
6
DO
/GG
C/N
L/1
8
Construction of
Broad Gauge
Formation &
Minor Bridges
from Chainage
41000.00 to
45000.00
between Dausa
and Lalsot in
connection with
Dausa- Gangapur
City New Broad
Gauge line
project.
Op
en t
end
er
Single
packet
system
14
/11
/20
07
Yes NWR/S&C/
CA/97
dated
03/03/200
8
M/s Atlanta-ARSS
(JV) Bhubneshwar
(Orissa)
17.95 Crore 30/07/09
extended
upto
30/06/12wit
h penalty
14/03/0/8 - Work in progress
7
DO
/GG
C/N
L/2
1
Construction of
BG formation and
Minor Bridge
from chanaige
45000 to 60000
bet. Lalsot and
Gangapur City in
connection with
DO-GGC New B G
line Project
O
pen
ten
der
24
/09
/20
07
Single
Packet
system
02
/11
/20
07
3 Yes NWR/S&C/
CA/95
dated
18/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
8.41
Crores
20/03/09
Extended
upto
31/05/12
with
penalty.
Further
extension
under
process.
15/03/08 - Work in progress
8
DO
/GG
C/N
L/2
2
Construction of
BG formation and
Minor Bridge
from chanaige
60000to 75000
bet. Lalsot and
Gangapur City in
connection with
DO-GGC New B G
line Project
O
pen
ten
der
2
4/0
9/2
00
7
Single
Packet
system
02
/11
/20
07
3 Yes Dy.
CE/C/I/JP/
CA/17
dated
29/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
6.71 Crores 10/03/09
Extended
upto
29/02/12.
Further
extension
under
process
10/03/08 - Work held up. 7 days
notice issued on
28/03/2012
9
DO
/GG
C/N
L/2
3
Construction of
BG formation and
Minor Bridge
from chanaige
75000 to 90000
bet. Lalsot and
Gangapur City in
connection with
DO-GGC New B G
line Project
O
pen
ten
der
2
4/0
9/2
00
7
Single
Packet
system
02
/11
/20
07
3 Yes NWR/S&C/
CA/96
dated
18/02/200
8
M/s. ARSS
Infrastructure
Projects Limited,
Bhubaneshwar
8.56
Crores
20/03/09
Extended
upto
31/01/12
with token
penalty.
Further
extension
under
process
15/03/08 -
Work held up. 7 days
noticed issued on
28/03/2012
10
DO
/GG
C/N
L/8
(R&
C)
Construction of
Minor Bridges
from Chainage
00.00 to 30000.00
between Dausa
and Lalsot in
connection with
Dausa Gangapur
city new Broad
gauge line
project.
Op
en t
end
er
17
/01
/20
08
Single
packet
system
20
/02
/20
08
1 Yes Dy.
CE/C//DO/
CA/20
Dated23/0
6/2008
M/s Kewai
Construction Co.
(J/V), Jodhpur
5.98 Crore 01/01/09
Extended
upto
30/06/12
28/08/08 - Withdrawal of 48 hrs
notice under pcocess.
11
JP/C
/W/4
8R
R/R
OB
Dau
sa
Construction of
Road Over Bridge
across the
Railway track in
Dausa Yard at
Level Crossing No.
181-B at Km.
179/10-11 on
Jaipur Bandikui
section.
Op
en t
end
er
16
/12
/20
07
Single
packet
system
18
/01
/20
08
1 - Yes NWR/S&
C/CA/94
dated
18/02/200
8.
M/s Bharat Spun
Pipe & Construction
Co., Jaipur
3.82 Crore 15/07/09
Extended
upto
30/06/12
25/04/2009- - Work is on advance
stage of completion
12
DO
/GG
C/N
L/2
9
Construction of
platforms,
earthwork in
platform in
connection with
Dausa-
Gangapurcity new
BG line project.
Op
en t
end
er
27
/01
/20
09
Single
packet
system
02
/03
/20
09
9 - - Yes Dy.CE/C/D
O/CA/ 35
dated: 15
/10/2009
M/s Bharat- Kamal
(J/V), Jaipur
5.47 crore 04/08/10
Extended
upto
30/06/12
07/08/2009 - work in progress.
13
DO
/GG
C/N
L/3
6
Construction of
broad gauge
formation &
muior bridges
from Chainage
90000 to 92700
between Lalsot
and Gangapurcity
new Broad gauge
line project. Op
en t
end
er
22
/11
/20
09
Single
packet
system
28
/12
/20
09
2 - - yes Dy.
CE/C/DO/C
A/43 dated
07/04/201
0
M/s Mohan Singh
Jat, Gangapurcity
1.50 crore 05/12/2010
Extended
upto
6/12/11
further
extension
under
process
07/04/2010 - Work held up .
14
DO
/GG
C/N
L/3
1
Construction of
ROBs across
Railway track at
chainage
37034,83925 &
37925 and
drainage over
pass at chainage
36960 & 37520
between
salempura to
Udaikalan station
inconnection with
Dausa-
Gangapurcity new
BG line project Op
en t
end
er
Single
packet
system
16
/02
/20
10
11 - - Yes NWR/S&C/
CA/105
dated
22/11/201
0
M/s Shree Ram
Kripa Construction
Jaipur
13.44 Crore 29/02/2012.
31/05/2012.
Further
extension
under
process
- - Work in progress
15
DO
/GG
C/N
L/3
2
Construction of
150unit type II, 7
units type-III staff
quarters & IOW
office and other
ancillary works
the water supply,
sewerage,
drinakge, roads,
parking, sanitary
and provision of
electrical//
communication
conduits & metal
boxes for NWR
residential colony
at various
stations between
Dausa-
Gangapurcity new
BG line project. Op
en t
end
er
Single
packet
system
05
/07
/20
1
02 - - Yes NWR/S&C/
CA/107
dated
28/03/201
1
M/s L.N. Agrawal-
MCD Pvt. Ltd., (J/V)
Jaipur
15.65 Crore 31/03/2012
further
extension
under
process
- - Work in progress.
16
DO
/GG
C/N
L/3
0
Construction of
single line 13
standard straight
alignment tunnel
in soil and rock
including cut and
cover portion
between
chainage 38/720
to 40/840
including side
drain and other
approaches of
tunnel between
Didwana- Lalsot
Railway station in
connection with
Dausa-
Gangapurcity new
BG line project. Op
en t
end
er
Single
packet
system
27
/07
/20
09
12 - - Yes NWR/S&C/
CA/106
dated
29/12/10
M/s Valecha-
Transtonelstroey
(J/V) Mumbai
53.02 Crore 27/09/2012 - - Work in progress
17
DO
/GG
C/N
L/2
6
DO/GGC/NL/26-
Supplying and
stacking 50mm
gauge machine
crushed stone
track ballast in
stacks as per
Railway’s
specification
between Km. 1.00
to 41.00 (Dausa-
Lalsot) section in
connection with
Dausa-
Gangapurcity new
BG line project. Op
en t
end
er
Single
packet
system
07
/01
/20
11
6 Yes
Dy.CE/C/D
O/CA/54
dated
22/07/11
M/s R.K. Infra (J/V),
Jaipur
7.74 Crore 05/04/2012
Extended
upto
05/04/2013
Work in progress
18
DO
/GG
C/N
L/2
8
Construction of
Broad gauge
formation in
cutting,
construction of
rail side drain,
catch water drain
& slope
protection work
from chainage
36000 to 38500
between Dausa
and Lalsot in
connection with
Dausa-
Gangapurcity new
BG line project Op
en t
end
er
15
/03
/20
11
Single
packet
system
21
/04
/20
11
3 - - Yes
Dy.CE/C/D
O/CA/57
dated
30/11/201
1
M/s Jagdish Prasad
Agrawal, Alwar
6.03 Crore 31/12/2012 17/10/11 work in progress
19
DO
/GG
C/N
L/4
0
Laying and
linking of BG track
and
transportation of
P.Way material,
PSC sleepers etc
between Dausa-
Deedwana
section in
connection with
Dausa-
Gangapurcity new
BG line project. Op
en t
end
er
28
/03
/20
11
Single
packet
system
18
/05
/20
11
6 - - Yes
Dy.CE/C/D
O/CA/56
dated
18/10/11
M/s Goel Brothers
Rail Infra Pvt. Ltd.,
Bareilly.
5.66 Crore 01/08/2012 13/09/11 Work in progress
20
DO
/GG
C/N
L/4
3
Construction of
duty bunk
miscellaneous
structures and
road work etc.
between Dausa
Gangapurcity
section in
connection with
Dausa
Gangapurcity
new BG line
project.
Op
en T
end
er
21
/05
/20
11
Single
packet
system
27
/06
/20
11
4 - - Yes - M/s Bharat –Kamal
(J/V), Udaipur
5.31 Crore 18/10/12 - - Contract proposed to
be closed vide letter
dated 19/03/2012
21
DO
/GG
C/N
L/3
9R
R
Construction of
station
buildings,
signaling
structures and
miscellaneous
structures etc.
at various
stations
between Dausa
(excl.) to
Gangapurcity
(excl.) in
connection with
Dausa
Gangapurcity
new BG line
project.
Op
en T
end
er
28
/06
/20
11
Single
packet
system
05
/08
/20
11
3 - - Yes NWR/S&C/
CA/115
dated
21/03/201
2
M/s Bharat-Kamal
(J/V), Udaipur
8.25 Crore 28/02/13 - - work in progress
22
DO
/GG
C/N
L/9
(R
&C
)
Construction of
Broad Gauge
Formation from
chainage 1150.00
to 15000.00
between Dausa
Kala and
Shekhpura
Villages in
connection with
Dausa-Gangapur
City New Broad
Gauge line
Project(Risk &
Cost tender).
Op
en t
end
er
25
/11
/20
11
Single
packet
system
28
/12
/20
11
7 - - Yes Dy.CE/C/D
O/CA/58
dated
21/02/201
12
M/s Jai Salasar
Balaji Construction
Co. (J/V) Jaipur
4.60 04/05/12
Extended
upto
04/09/2012
21/01/12 - Withdrawal of 48 hrs.
notice is under
process.
23
DO
/GG
C/N
L/1
0 (
R&
C)
Construction of
Broad Gauge
Formation from
chainage
15000.00 to
28000.00
between Dausa
and Lalsot in
connection with
Dausa-Gangapur
City New Broad
Gauge line
Project(Risk &
Cost tender).
Op
en t
end
er
25
/11
/20
11
Single
packet
system
28
/12
/20
11
7 - - Yes Dy.CE/C/D
O/CA/59
dated
21/02/201
12
M/s Jai Salasar
Balaji Construction
Co. (J/V) Jaipur
2.95 04/05/12
Extended
upto
04/09/2012
21/01/12 - Withdrawal of 48 hrs
notice is under process
DY. CE/C/I-UDZ
Sr.
No.
T.No Item/Nature
of work
Mode of
tender
Date of
publication
of NIT
Type of
bidding
(Single/Two
bid system)
Last date
of receipt
of tender
Nos of
tenders
received
Nos&
Names of
parties
qualified
after
technical
evaluation
Nos &
names of
parties not
qualified
after
technical
evaluation
Weather
contract
awarded
to lowest
tenderer/
evaluate
d LI
Contract no
& date
Name of
contractor
Value of
contract (In
Rs. Lacs)
Schedule
d date of
completio
n of
supplies
Actual
date of
start of
work
Actual
date of
completio
n
Reason for
delay if any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 T.NO.UDZ-
HMT/GC/M
B/T-2
Const.,
minor
bridges from
Km. 160/0 to
187/0 in in
connection
with UDZ-
HMT Section
Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/
CA/109 dtd.
16.8.11
M/s
Braham
Prakash
ModiRavi
Constn.Co
. (JV) ,
Jaipur
1212.6
21.09.12 30.04.11 Work in
Progress
2 T.NO.UDZ-
HMT/MB/T/
1
Construction
of Major
bridges from
DNRP-HMT
in connection
with UDZ-
HMT section.
Open 19.11.10 Single 21.12.10 2 Yes NWR/S&C/
CA/111 dtd.
9.9.11
M/S Om
Prakash
Goyal &
Co.,
Neemach
1568
29.11.12 10.08.11 Work in
Progress
3 T.NO.UDZ-
HMT/GC/E
W/T/3
Construction
of Minor
bridges frm
Km. 270/0 to
320/0 in
connection
with UDZ-
HMT section.
Open 08.12.10 Single 20.01.11 5 Yes NWR/S&C/
CA/112 dtd.
21.10.11
Amit-Mass
(JV) ,
Alkapuri,
VADODAR
A
1665.1
20.01.13 03.08.11 Work in
Progress
4 T.NO.UDZ-
HMT/GC/E
W/T/4
Construction
of Minor
bridges frm
Km. 207/0 to
250/0 in
connection
with UDZ-
HMT section.
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s
Rahee-
Triveni
(J/V),
Kolkatta
3045.2
07.02.13 23.08.11 Work in
Progress
Dy. CE/C/DNPR-BANSWARA
Sr.
No.
T.No Item/Nature of work Mode
of
tender
Date of
publication of
NIT
Type of
bidding
(Single/
Two bid
system)
Last date
of receipt
of tender
Nos of
tenders
received
Nos &
Names of
parties
not
qualified
after
technical
evaluation
Nos &
names of
parties not
qualified
after
technical
evaluation
Weather
contract
awarded
to lowest
tenderer/e
valuated
LI
Contract no
& date
Name of
contracor
Value of
contract
Schedule
d date of
completio
n of
supplies
Actual date
of start of
work
Actual date
of
completion
Reason for
delay if
any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Dy.CE/C/
UDZ/DN
RP-
RTM/FLS
/2011/T/1
Carrying out final
location of survey &
….other preliminary
activities in
connection with
new BG line
between DNRP-
RTM via Banswara
Open 1/6/11 &
30/6/11 (NIT
& First
cirrugbdum)
Single 1/7/11 10 Dy.CE/C/U
DZ/DNRP-
RTM/FLS/2
011/T/1
M/s
S.M.Consult
ants,Bhubne
swar
4.99 Cr 12/11/12 28/11/11 14/11/12 Work in
progress
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication of NIT
Types of bidding ( single /two bid system )
Last date of receipt
of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of work
Actual date of completion
Remarks/ Reason for delay if
any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
CE(C)III-JP
Dy. CE/C/I-AII
1
AM
P/N
L /
T/1
4R
Const. of station building at Pushkar station & construction of various types of quarters bet. Ajmer-Pushkar in c/with Ajmer-Pushkar New BG Line.
Open 20.10.08
Single 25-11-08
2 Nos. - - Yes AII/AMP/NL/CA/9 Dt. 29-05-09
M/s Omprakash Goyal & Co. Neemuch
548.60 lakhs 24-01-10 Extended upto 28-02-2012
03-11-2009 - Work completed
2
AM
P/N
L/T
/19
Linking of B.G. track in main line, loop lines, sidings including points & crossing, transportation of P. way material & other miscellaneous works between stations Madar (including) to Pushkar (including) in connection with Madar-Pushkar new BG Line Project.
Open 03.10.10
Single 26-04-10
07 Nos.
- - Yes AII/AMP/NL/ CA/14 Dt 09-12-10
M/s Bhanwar Lal Bijarnia, Village Rajpura, Post Parevadi, Tehsil Nawa, Distt. Nagaur
526.50 Lakhs 16-12-2010 Extended upto 15-01-2012
23-06-10 - Work completed
3
Aii/
Co
nst/ L
oco/M
od/T
/1
Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of Loco Workshop at Ajmer.
Open 25.08.09
Single 28-10-09
07 Nos.
- - Yes NWR/S&C/ CA/31 Dt. 17-06-10
M/s Bharat Span- GPT (JV) 43 Industrial Area, Jhotwara, Jaipur
3829.48 Lakhs
22-04-2012 & 06-11-2012
27-03-10 - Work is in progress.
4
Aii/
Co
nst/ C
&W
/Mod
. /T
/3/R
Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of C&W Workshop at Ajmer.
Open 14.06.10
Single 07-07-2010
- - - Yes Under execution
M/s Prem Fabricators 301 Meera Manon Arcude, Near Krupa Petrol Pump, Parimal Garden, Ellis Bridge, Ahmedabad.
1524.97 Lakhs
05-12-2012
05-09-2011 - Work is in progress.
5
AII/B
NG
M-R
AS
/ N
L/T
/2 Construction of
major bridge including earth work on the approaches between BNGM (Excl.)-RAS (incl.) section in c/with BNGM-RAS New B.G. Rail Line Project.
Open 11.03.10
Single 12-10-2010
07 Nos.
- - Yes Under execution
M/s SB-SHC-MCDPL (JV) C-10, Vaishali Nagar, Jaipur.
Rs. 1592.08 Lakhs
18-07-2012
23.07.2011 - Work is in progress.
6
AII/B
NG
M-R
AS
/
NL/T
/3(R
)
Earthwork in bank/cutting and construction of minor bridges between Km. 0.00 to 10.50
Open 12.07.11
Single 03.08.11
07 Nos.
- - Yes Under execution
M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar
Rs. 1060.43 Lakhs
30-10-2012
10.11.2011 - Work is in progress.
7
AII/B
NG
M-R
AS
/ N
L/T
/4
Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 10.50 to 20.50) section in c/with Bangurgram-RAS new BG Rail Link Project.
Open 16.12.10
Single 24.01.11
10 Nos.
- - Yes Under execution
M/s Jai Mata Di Energy System (JV) VPO-Narodara, Tehsil - Laxmangarh Sikar (Raj.)
Rs. 1103.49 Lakhs
16-06-2012
29.06.2011 - Work is in progress.
8
AII/B
NG
M-R
AS
/ N
L/T
/5
Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 20.50 to 28.50) section in c/with Bangurgram-RAS new BG Rail Link Project.
Open 16.12.10
Single 24.01.11
08 Nos.
- - Yes Under execution
M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar
Rs. 825.62 Lacs
19-06-2012
04.07.2011 - Work is in progress.
9
AII/B
NG
M-R
AS
/ N
L/T
/8
Supplying and Stacking machine crushed stone track Ballast in stacks as per Railways’ specifications between Km. 0.00 to 28.50 [Bangurgram to Ras] in connection with Bangurgram - Ras new rail line project.
Open 19.08.11
Single 27.09.11
4 Nos. - - Yes Under execution
M/s Rajesh Kumar Gupta, 54, Nehru Nagar, Kush Marg, Alwar(Raj.)
Rs. 406.50 Lacs
25-12-2012
08.02.2012 - Work is in progress.
Dy. CE/C/II-AII
S.No.
Tender No. , Item/Nature of work Mode of Tender Inquiry
Dt. of Publica- tion of NIT
Types of bidding (single/ two-bid system)
Last date of receipt of
tender
Nos. of tenders received
Nos. & Name of Parties qualified after technical evaluation
Nos. & Name of Parties not qualified after technical evaluation
Whether tender
awarded to lowest
tenderer/ Evaluated
L1
Agreement No. & Date.
Name of Contractor
Value of Contract
Scheduled date of completion of supplies
Actual Date of start of work
Actual date of completion
Reason for delay if any
1 T.No.AII/KVJ-KRJD/I/BG Doubling/T/3: Earthwork in bank/cutting for formation between Keshavganj (incl.) – Swarupganj (Excl.) section in connection with Keshavganj– Swarupganj Patch Doubling Project.
Open 24.09.10 Single 01.11.10 14 Nos. Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6
Jalam Vilas Scheme, Poata B.
Road, Jodhpur
NIL Yes NWR/S&C/CA/32 Dt. 21.07.11
M/S Varaha Infra Ltd., Umesh Smriti-6
Jalam Vilas Scheme, Poata B.
Road, Jodhpur
`896.90
Lacs.
17.11.2011, 31.03.2012 & 30.06.2012
01.02.11 17.11.11 Work under progress
2 T.No.AII/KVJ-KRJD/I/BGD/T/2R: Construction/Extension of Major/minor bridges including earthwork on the approaches between Keshavganj (incl.) – Swarupganj (Excl.) section with Railway’s design & drawing and construction of ORH at Abu Road in connection with Keshavganj-Swarupganj Patch Doubling Project.
Open 04.02.11 Single 03.03.11 04 Nos. Ist Lowest M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17,
Vijaya Building,
Barakhamba Road,
Connaught Place, New
Delhi.
NIL Yes NWR/S&C/CA/33 Dt. 30.08.11
M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17,
Vijaya Building,
Barakhamba Road,
Connaught Place, New
Delhi.
`1095.38
Lacs.
20.02.2012 & 30.06.2012
-- 20.02.12 Work under progress
3 T.No.AII/KVJ-KRJD/I/BG Doubling/T/6– Supplying and stacking 50mm machine crushed stone track ballast confirming to Railway specifications in stacks on cess along the track and in yards at various stations between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project
Open 04.04.2011 Single 10.05.11 05 Nos. Ist Lowest M/s
Bhaniyana Construction
, 28, Kanishka Resort,By
Pass Road, PAL,Distt.
Jodhpur(Raj.)
NIL Yes Dy.CE(C)AII/KVJ-
SRPJ/BGD/CA/69 Dtd. 16.11.2011
Ist Lowest M/s
Bhaniyana Construction
, 28, Kanishka Resort,By
Pass Road, PAL,Distt.
Jodhpur(Raj.)
`371.12
Lacs.
17.05.2012 -- 17.05.12 Work under progress
4 T.No.AII/KVJ-KRJD/I/BG Doubling/T/8-R:Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project.
Open 27.07.11 Single 02.09.11 6 Nos. Ist Lowest M/s Laxyo
Energy Pvt. Ltd., 46/1, TIT Road,
Ratlam (M.P.)
NIL Yes Dy.CE(C)AII/KVJ-
SRPJ/BGD/CA/71 Dtd. 05.12.2011
Ist Lowest M/s Laxyo
Energy Pvt. Ltd., 46/1, TIT Road,
Ratlam (M.P.)
`371.12
Lacs.
14.04.2012 & 30.09.2012
-- 14.04.12 Work under progress
Dy. CE/C/Jodhpur
S N Tender No. Item/ Nature of work
Mode of tender enquiry
Date of publication
of NIT
Types of bidding (Single / Two bid system).
Last date of receipt of tender
No. of tender recei-ved.
Nos. & name of parties
qualified after technical
evaluation
Nos. & name of parties not qualified after
technical evaluat-ion
Whether contract
awarded to lowest tender
/ evaluated L.I.
Contract No. & date
Name of Contractor Value of contract
(Rs) Fig. in lacs.
of Rs.
Schedule date of completion
Actual date of start of
work
Actual date of complet-
ion
Reasons for delays, if any.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1. 1 JU/Const.-1/ 19/2008-09,
Zone-I - Laying & linking of BG track.
Open Tender
24.03.09 Single 28.04.09 3 1 (M/s P.C. Sharma, A-87,
Noida [UP])
1 (M/s Bhanwar
Lal Bijarnia)
Yes Dy.CE/C-I/JU /16/2009-10 dtd.06.09.09
M/s P.C. Sharma, A-87, Distt. Gautam Budh Nagar [UP]
236.35 212.22
05.11.09 31.03.10 15.02.10 31.03.10 30.04.10
23.07.09 30.04.10 Final C&A has been vetted by AFA/C/JU on 14.11.11 & sent to HQ office for Sanction and now vetted by Finance.
2. 2 JU/Const.-1/ 25/2008-09,
Depot supply of Stone ballast
Open Tender
06.05.09 Single 10.06.09 3 1 (M/s Vinayak
Const. Co., Jaswantgarh)
1 (M/s J.K. Const. Co.,
Nokha)
Yes Dy.CE/C-I/JU /21/2009-10 dtd.26.11.09
M/s Vinayak Const. Co., Jaswantgarh
143.68 173.88
28.12.09 31.01.10 31.03.10 15.05.10 15.06.10
28.12.09 - Contractor has been instructed to remove rejected ballast from
Railway Land & case is also with Vig. Branch.
S N Tender No. Item/ Nature of work
Mode of tender enquiry
Date of publication
of NIT
Types of bidding (Single / Two bid system).
Last date of receipt of tender
No. of tender recei-ved.
Nos. & name of parties
qualified after technical
evaluation
Nos. & name of parties not qualified after
technical evaluat-ion
Whether contract
awarded to lowest tender
/ evaluated L.I.
Contract No. & date
Name of Contractor Value of contract
(Rs) Fig. in lacs.
of Rs.
Schedule date of completion
Actual date of start of
work
Actual date of complet-
ion
Reasons for delays, if any.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3. 3 T.No.JU/ Const.-I/30 /
2009-10
AT Welding of rail joint
Open Tender
19.09.09 Single 22.10.09 1 1 (The India Thermit Corp.
Kanpur)
- Yes Dy.CE/C JU /22/2009-10
dt.29.3.10
The India Thermit Corp. Kanpur
103.63 77.31
22.04.10 31.08.10 15.11.10 31.03.11 30.05.11
28.11.09 - Final C&A sanctioned & final bill under finalisation
4. 4 JU/C/04/04-05
Bridge work No. 31 & 72 SMR- BLDI
Open tender
6.6.04 Single 6.7.04 08 Nos M/S Rachna Const. Company
N/A L I NWR/S&C/CA/53 Dt. 20.1.05
M/S Rachna Const. Comp.,. TAL- Ankleshwar Distt Bharuch
394.31 465.25 403.15
23.11.05 15.3.05 31.07.09
Final variation will be prepared after sanction of NS items which is under preparatio.
5. 5 JU/C/02/04-05
Civil work KM. 0.00 to 60 SMR-BLDI GC.
Open tender
6.6.04 Single 6.7.04 4 Nos M/S Rachna Const. Company
N/A L I NWR/S&C/CA/56 Dt. 07.03.05
“DO” 703.07 253.85
19.12.05 1.3.05 31.8.09 Work completed. Final bill passed by Accounts on 09.05.12.
6. 6 JU/C/08/04-05 Dt.19. 11.04
Bridge work 30,56 & 76 SMR- BLDI
Open tender
Single 29.12.04 NWR/S&C/CA/ 64 dt .14.9.05
M/S Rachna Const. Company
373.42 318.74 254.22
11.06.06 7.10.05 30.11.09 Final C&A sanctioned by C.A. (CAO/C) vide letter, dtd. 26.6.12.
7. 7 JU/C-
II/01/09-10 Const. of ROB at LC
36-C( At MKN) & 63-C (At NGO)
Open single 14.7,09 05 M/S Rachana Const Co.
N/A L-I DyCE/C-II/JU/29/2009-10 Dated 25.2.2010
M/S Rachana Const Co. Unjha
546.95 09.07.10 30.10.11 31.01.12 20.02..12 30.04.12
24.8.09 Work in progress
8. 8 JUConst-/
03/2010-11 Earth work in
cutting in filling …. PLC – Bye pas
Open tender
02.07.2010 Single 03.08.10 01 M/S Bhanwar Lal Bijarnia
N/A L-1 DyCE/C-II/JU/30/2010-11 Dated 02.02.20110
M/S Bhanwar Lal 106.04 13.07.11 30.08.11 15.11.11 31.12.11
28.10.10 Work completed.
-
9. 9 JU/Const-
6/10-11 Const of ROB at L.C. No. C-325 at
(BME)
Open tender
15.10.2010 Single 16.09.10 06 M/S Rachana const. comp.
N/A L-1 Dy CE/C /JU/34/2011-12 dt. 21.10.11
M/S Rachana const. comp.
380.99 07.11.11 31.07.12
28.06.11 Work in progress
-
10. 10 JUConst-/
08/2010-11 Extension of Bay
No.4 inside Diesal Shad BGKT
Open temder
22.09.2010 Single 25.10.10 02 M/s Anil Trading co.
Sikar
M/S Jai Bala Ji Const. co. Sri-
Gananagar
L-1 Dy CE/C /JU/35/2011-12
dt. 21.10.11
M/s Anil Trading co. Sikar
242.85 16.11.11 30.07.12
15.03.11 Work in progress
-
11. 11 JUConst-/
09.R/2010-
11
E/Work in cutting & filling for foundation,
Const.of ROB insted of level crossing etc.
Open temder
21.02.11 Single 07.06.11 01 M/s Bhanwar Lal Briainiya Vill. Rajpura Distt. NGO
- L-1 - M/s Bhanwar Lal Briainiya
289.66 29.09.12 10.10.11 Work in progress
-
CE/C/IV-JP
Dy. CE/C/II-BKN
SN Tender No
Item/Nature of work Mode of tender inquiry
Dt.of publication NIT
Type of bidding (Single/two bid system
Last date of receipt of tender
Nos.of tenders received
Nos & names of parties qualified after technical evaluation
Nos & names of parties not qualified after technical evaluation.
Contract No. & dt.
Name of contractor
Value of contract
Scheduled date date of completion of supplies
Actual date of start of work
Actual date of completion/extended date of completion
Remarks/Reason for delay if any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 Const/BKN/42/2009-10
Construction of RRI Building & Sick line office complex and construction & modification of station building, platforms, platform shelters, conversion of MG sick line shed into Track machine shelter and dismantling of MG AC maintenance shed, FOB landing and other miscellaneous works at Bikaner in connection with Sadulpur - Bikaner Gauge conversion project
open tender
29.03.09 single 29.04.09
08 Nos
Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
150-NWR/Dy CE/C-I/BKN Dt 24.12.09
M/S Govind Gupta, 5/99, Chopra Patti Narwana Distt Jind ( Haryana)
Rs 377.44 lakhs
02.09.09 21.09.09 15.03.12 Work is almost completed.Minor works in progress.
2 Const/BKN/02/2010-11
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-10 (Ch 435500 to Ch 462100 including Gadhwala, Bikaner Eaast and Bikaner station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project
Open tender
06.05.10 single 10.06.10
05 Nos
Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
161-NWR/Dy CE/C-I/BKn Dt 06.09.2010
M/S Shree Shyam Engineering Co., Poonia Colony Churu ( Raj)
Rs171.59 lakhs
07.03.11 08.07.10 31.12.11 Work completed & final variation in process.
3 Const/BKN/04/2010-11dated 19.06.2010
Construction of BG Rail level P/F at Belasar, Painting & colour washing on various stations, Brick on edge flooring on P/F and miscellaneous, residual protection & safety related works between Km 325 to 462 in Ratangarh Bikaner section in connection with Sadulpur- Bikaner gauge conversion project.
Open tender
22.06.10 single 23.07.10
04 Nos
Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
165-NWR/Dy CE/C-I/BKN Dt 28.12.2010
M/S Payre Lal Dhaka Const. Company. B-63, Sanik Basti Churu
Rs 185.98 lakhs
21.09.11 08.10.10 31.12.11 Final bill passed.
4 Const/BKN/03/2010-11dated 19.06.2010
Const. of twenty four coach length BG washing line after dismantling of existing MG washing line and oher related miscellaneous works at Bikaner in connection with BKN-SDLP GC
Open tender
11.06.10 single 14.07.10
09 Nos
Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
163-NWR/Dy CE/C-I/BKN Dt 14.12.2010
M/S Jitender Singh , V&PO- Kakoda Distt. Jhujhunu
Rs 279.82 lakhs
16.10.10 12.11.10 31.03.12 Washing line completed & commissioned and work of under ground water tank is in progress.
5 Const/BKN/18/2009-10/RE-HSR/Std-II dated 18.02.2010
Const. of Station biliding and other service buildimnngs etc. between Rewari ( excluiding ) to Hansi in c/with RE-HSR Std-II panel interlocking.
Open tender
18.02.10 single 26.03.10
05 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
102-NWR/Dy CE/C-II/BKN Dt 19.10.2010
M/S V.K.Const. Co. 2-D-37, Jawahar Nagar Sri Ganganagar
Rs 416.38 lakhs
15.05.11 15.06.10 30.10.12 Buildings at Jatusana, Kosli, Jharli, Manheru, Charkhi Dadri and Bhawani Khera handed over to S&T deptt. Roof casted at Jitakheri & Hansi and finishing work is pending. Circulating area work at Jatusana and Kosli is in progress.
6 Const/BKN/08/HSR - RE/2010-11 dated 04.09.2010
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Manheru, Bawani Khera, Jitakheri and Hansi on Rewari - Hisar section.
Open tender
04.09.10 single 13.10.10
03 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
106-NWR/Dy CE/C-II/BKN/2010-11 Dt 03.02.11
M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)
Rs216.41 lakhs
08.09.11 26.12.10 08.09.11 All ordinary sleeper & 33 sets turnout sleeper out of 36 reached at site. Contractor has requested for closing of contract on administrative grounds due to non availability of P.way material & funds constraints with Railways. Matter is in process.
7 Const/BKN/07/HSR - RE/2010-11 dated 04.09.2010
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Kishangarh Balawas, Jausana, Kosli, Jharli & Charkhi Dadari on Rewari - Hisar section.
Open tender
04.09.10 single 13.10.10
04 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
107-NWR/Dy CE/C-II/BKN/2010-11 Dt 04.02.11
M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)
Rs 230.69 lakhs
27.09.11 18.01.11 30.06.12 All ordinary sleepers and turnout sleepers have been transported at site. 52kg Rails (New) has been transported to stations KGBS, JTS, and KSI & JRL. Pre NI work has been completed at KGBS & JTS stations and is in progress at KSI. Interim connection of JTS siding has been done on 11.11.2011.Kishangarh Balawas & Jatusana stations have been commissioned on 30.03.2012 & 10.04.2012.Kosli station has also been commissioned on 10.06.2012.
8 Const/BKN/09 ( R) /HSR - RE/2010-11 dated 24.12.2010
Supplying and stacking 47600 cum 65mm gauge stone ballast machine crushed ( hard stone) conforming to RDSO specificationsin connection with Std-III and MACL Signaling work in HSR-RE section.
Open tender
24.12.10 single 02.02.11
03 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
111-NWR/Dy CE/C-II/BKN/2011-12 Dt 04.05.11
Sh Devender Singh , H.No.7, Pratap Nagar , Saket Colony , Rajgarh Road , Hisar.
Rs 342.72 lakhs
14.12.11 21.03.11 14.12.11 Ballast supply was in progress at Jharli when the work was held up due to want of funds. Cumulative progress so far is 11031 cum. The Contractor has been instructed to restart the work and apply for currency of the contract which has expired on 14th Dec 2011.The Contractor has requested to closure of contract on admn. grounds.
9 Const/ BKN/02(R)/ SDRA/ 2010-11 Dated 05.06.10
Construction of station building , passenger platforms, staff quarters , duty huts for L-Xing, earthwork in embankment etc. in connection with Provision of B class station at Sudhrana .
Open tender
11.06.10 Single 14.07.10
09 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence further offer not discussed.
103/NWR/Dy CE/C-II/BKN Dt 13.12.2010
M/S Jitender Singh , VPO- Kakoda Distt Jhunjhnu
RS 366.52 lakhs
18.10.11 01.11.10 30.09.12 Work is in progress.
10 Const/BKN/25/007-08
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe wall/retaining wall, stone pitching etc. I bet Km.323.50 to Km. 388.00 on BKN-SDLP section
Open tender
12.07.07 single 13.08.07
1 Nos. Tender awarded to evaluated L-1 further offers not discussed by TC
Tender awarded to lowest valid and eligible tenderer
91-NWR/DY CE/C-I/BKN /2007-08 dated 07.07.08
M/S Bharon Singh Rathore & Co. Survodya Basti near Narsingh Sagar Talab, Bikaner
2.40 Crores
24.12.08 30.01.08 31.03.11 Final variation under finance vetting.
11 Const/BKN/26(R )/2007-08
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc, from Km.388.00 to Km 455.00 on BKN-SDLP section
open tender
18.12.07 single 23.01.08
1 Nos. Tender awarded to evaluated L-1 further offers not discussed by TC
Yes, tender awarded to lowest valid and eligible tenderer
120 NWR/DY CE/C-I/BKN/ 2008-09 dt 16.02.09
M/S Bheron Singh Rathore & Co. Sarvoday Basti, Bikaner (Raj)
3.08 Crores
15.03.09 28.08.08 31.03.11 Cross section of earthwork for 67 km under technical checking.
12 Const/BKN/26(R ) /2008-09
Earthwork (including Blanketing material) in formation in bank & cutting with mechanical compaction, construction of 2 Nos RUBs having spans 2x10.50m & 1 No. RUB having spans of 1x6.10m and 5 Nos RUBs cum balancing culverts of spans 1x 3.66m ( all RCC boxes) including other ancillary works for construction of Ratangarh Bye Pass in connection with Bikaner-Ratangarh-Sadulpur gauge conversion project
open tender
18.02.09 single 23.03.09
10 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
CE/S&C/CA/28 dated 12.10.09
M/S Maya Const. Co. Pvt. Ltd., A-20, Shyam Darshan Society, Harivila Road, New Naroda, Ahmedabad-382346.
Rs 829.25 lakhs
13.08.09 27.08.09 15.05.11 Final variation in process.
13 Const/BKN/12/2009-10
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-8 (Ch 375500 to Ch 398500 including Sri Dungargarh station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.
open tender
20.05.09 single 24.06.09
01 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
152-NWR/Dy CE/C-I/BKN Dt 04.01.10
M/S Karnani Constructions, New Lane Gangasahar Bikaner
Rs 129.74 lakhs
17.08.09 01.10.09 15.10.11 Final bill under passing.
14 Const/BKN/10 (R )/2009-10
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-6 (Ch 325500 to Ch 351500 including Rajaldesar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.
open tender
07.08.09 single 07.09.09
05 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
162-NWR/Dy CE/C-I/BKN Dt 17.09.10
M/S Bhanwar Lal Bijarniya, Bhaiya Hotel, Bombay Motor Chouraha
Rs 139.06 lakhs
05.10.09 07.10.09 31.07.11 Final variation under preparation.
15 Const/BKN/11 (R )/2009-10
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-7 (Ch 351500to Ch 375500 including Persneu & Bigga station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.
open tender
07.08.09 single 07.09.09
07 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
158-NWR/Dy CE/C-I/BKN Dt 29.07.10
M/S Shree Nahar Agencies, A-328, Shastri Nagar Jodhpur
Rs 136.30 lakhs
05.10.09 07.10.09 31.05.11 Final variation under preparation.
16 Const/BKN/01/2010-11
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-09 (Ch 398500 to Ch 435500 including Benisar, Sudsar and Napasar station yard) on Ratangarh - Bikaner section in connection with Sadulpur-Ratangarh-Bikaner Gauge conversion project.
Open tender
06.05.10 single 10.06.10
04 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
160-NWR/Dy CE/C-I/BKN dt 06.09.10
M/S P.C.Sharma, A-87, Sector- 49, Noida (UP)
Rs 208.29 lakhs
18.03.11 19.07.10 30.07.11 Final variation is in process.
17 Const/BKN/23 ( R-2) /2007-08 dated 06.06.08
Earthwork in banks and cutting for formation including side drain , trolley refuses etc. including supply of cement in Sadulpur -Churu section from km 224 to 282 on BKN-SDLP GC project
Open tender
10.06.08 single 11.07.08
01 Nos
Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
118-NWR/Dy CE/C-I/BKN Dt 29.01.09
The Birhi Kalan L/C Co.OP. Society Ltd. Birhi Kalan, Tehsil - Charkhi Dadri Distt. Bhiwani
Rs 348.83 lakhs
03.09.09 25.11.08 31.05.10 Final variation under finance vetting
18 Const/BKN/04/2011-12/BKN-SDLP-RTGH-SRDR
Supplying and stacking 55000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
14.09.11 single 14.10.11
08 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
172-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S Jai Mata Const.Co. H.No.14169 Street no.8A Ganesh Nagar Bhatinda( Pb)
Rs 305.25 lakhs
25.05.12 10.01.12 31.07.12 Work is in progress. 32150 cum supplied.
19 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR
Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
17.09.311
single 17.10.11
2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
173-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat
Rs 534.82 lakhs
01.06.12 05.01.12 01.12.12. Work is in progress.
20 Const/BKN/05/2011-12/BKN-SDLP-RTGH-SRDR
Supplying and stacking 60000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between km 19 to Sardarshahar on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
14.09.11 single 14.10.11
07 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
174-NWR/Dy CE/C-I/BKN Dt 31.03.2012.
M/S Chevron Minerals & Mines Pvt Ltd.Flat No.10, 3rd Floor Satya Niketan , Opposite Venkateshaware College , Near Dhaula Kuan , New Delhi- 110021
Rs 364.20 lakhs
17.07.12 29.01.12 17.07.12 Work is in progress. 25060 cum supplied.
21 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project
Open tender
20.01.12 single 22.02.12
2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
PG submitted.
M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003
Rs 531.61 lakhs
25.12.12 24.05.12 25.12.2012 Work in progress.
22 Const/BKN/52/2007-08 (R )
Supplying and stacking 36200 cum 65mm gauge stone ballast machine crushed ( hard stone ) confirming to RDSO specifications between Km. 57 to 77 on Sarupsar-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
open tender
25.04.08 single 09.06.08
2 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 further offers not discussed by TC
109-NWR/Dy CE/C-I/BKN Dt 19.12.08
M/S J.K.Const. Co., New Market Nokha Distt. Bikaner (Rajasthan)
Rs 3.57 Crores
07.04.09 18.08.08 30.01.12 Final bill under passing.
23 Const/BKN/53/2007-08 (R )
Supplying and stacking 33800 cum 65mm gauge stone ballast machine crushed ( hard stone ) confirming to RDSO specifications between Km. 77 to 97 on Sarupsar-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project.
open tender
25.04.08 single 09.06.08
3 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 further offers not discussed by TC
110-NWR/Dy CE/C-I/BKN Dt 24.12.08
M/S J.K.Const. Co., New Market Nokha Distt. Bikaner (Rajasthan)
Rs 3.52 Crores
29.04.09 09.09.08 30.04.12 Final bill under preparation.
24 Const/BKN/37/ 2008-09
Construction and Modification of station building, RRI Building,TTM Rest Shelter, earthwork in filling for buildings, Raising /shifting of existing platform shelter, providing & fixing A.C. Sheet roofing & other misc. works at station Sri Ganganagar in connection with Sarupsar- Sri Ganganagar G.C. project
Open tender
26.11.08 single 27.12.08
02 Nos
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
139-NWR/Dy CE/C-I/BKN Dt 22.09.09
M/S V.K. Construction Co.2-D-37A Jawahar Nagar Sri Ganganagar)
Rs 190.57 lakhs
28.03.10 08.08.09 31.05.12 Work completed.
25 Const/BKN/20 /2009-10
Construction and modification of station building, CC Apron,RRI building, platform, raising/shifting of existing platform shelter, providing & fixing AC sheet roof, linking of BG track on CC Apron, dismantling of MG tracks and points & crossings,etc. and other misc. works at Suratgarh station in connection with Sarupsar-Srigangar gauge project
Open tender
02.07.09 single 06.08.09
07 Nos
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
147-NWR/Dy CE/C-I/BKN Dt 16.11.09
M/S Inderjeet Chhouda Contractor ,8-A-17, Jawahar Nagar Sri Ganganagar
Rs 396.99 lakhs
01.08.10 24.10.09 29.02.12 Work completed.Final bill under preparation.
26 Const/BKN/02/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-02 (Km. 50.00 to 81.00 including Rai Singhnagar & Gajsinghpur station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
08.08.10 single 08.09.10
01 no. Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
3-NWR/Dy CE/C-III/BKN Dt 14.12.10
M/S Jhawar Sales Corporation, Rani Bazar Bikaner
Rs 194.62 lakhs
26.06.11 15.12.10 31.03.12 Work completed.Final bill is to be recorded by SE/C/PW/SOG
27 Const/BKN/03/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-03 ( Km.81.00 to 115.00 including Sri Karanpur & Keasri Singhpur station yard) on Suratgarh –Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
08.08.10 single 08.09.10
03 Nos.
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
9-NWR/Dy CE/C-III/BKN Dt 09.03.2011.
M/S Bhanwar Lal Bijarnia Village-Rajpura Post-Parewadi Tehsil-Nawa Distt: Nagaur (Raj)
Rs 178.57lakhs
31.05.11 15.12.10 30.03.12 Work completed.Final bill is to be recorded by SE/C/PW/SOG
28 Const/BKN/04/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-04 (Km. 115.00 to 138.00 including Prithvirajpur & Sri Gangashahar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
08.08.10 single 08.09.10
03 Nos.
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
7-NWR/Dy CE/C-III/BKN Dt 25.01.11
M/S Karnani Construction New Line Gangashahar, Bikaner(Raj)
Rs 138.34 lakhs
05.06.11 15.12.10 30.08.12 Work is in progress.
29 Const/BKN/01 (R)/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-01 (Km. 20.500 to 50.00 including Bhagwansar, Sarupsar & Mohansar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
07.10.10 single 08.11.10
02 Nos.
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
6-NWR/Dy CE/C-III/BKN Dt 19.01.11.
M/S P.C.Sharma, A-87, Sector-49, Nodia, Gautam Budh Nagar ( UP)
Rs 174.99 lakhs
21.07.11 15.12.10 31.07.12 work is in progress.
30 Const/BKN/09/2010-11/SGNR-SRPR
Supplying and fixing of Hectometer post, kilometer post, gradient post, fouling mark, benches and construction of duty huts , trolley refuges & other ancillary work between Km. 81.00 to 138.00 between Sarupsar-Sri Ganganagar section in connection with Sarupsar -Sriganganagar Gauge conversion project
Open tender
25.09.10 single 27.10.10
05 Nos.
Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
11-NWR/Dy CE/C-III/BKN Dt 21.04.11
M/S Shree Jaswant Const. Co. Kanta Khutria Colony, Bikaner
Rs 129.54lakhs
26.08.11 03.01.11 31.03.12 Work completed. Final bill is to be recorded by SSE/C/Works/SGNR
31 Const/BKN/08/2010-11/SGNR-SRPR
Supplying and fixing of Hectometer Post, Kilometer Post, Gradient Post, Fouling Mark, Benches and Const of trolley refuses and other ancillary works between Km.20.00 to Km.81.00 and Supplying & fixing of Lifting Barrier between Sarupsar -Sri ganganagar Section in Connection with Sarupsar -Sri ganganagar Gauge Conversion Project.
Open tender
25.09.10 single 27.10.10
07 Nos.
Tender awarded to evaluated L-1 .
M/S Attscon India II 18969 St.No. 15 Guruteg Bahadur Nagar , Bhatinda
10-NWR/Dy CE/C-III/BKN Dt 08.04.11
M/S Shree Jee Builders, Jail Well Bikaner
Rs 131.57lakhs
09.09.11 10.01.11 30.04.12 Final variation under finance vetting.
32 Const/BKN/12/2010-11/SGNR-HMH-SURP
Construction, Strengthening/extension of existing Minor bridges and placement of PSC slabs with RCC ballast retainers of span upto 6.10m including earthwork in approaches of bridges and other ancillary works in Diplana (excluding) to Suratpura (including) section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
09.10.10 single 10.11.10
04 nos Tender awarded to evaluated L-1 .
02 Nos (i) M/S Vikas Const. Co. Bhagina Road Near Water Works Pilani (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh
132-NWR/Dy CE/C-II/BKN dt 07.03.12
M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar
Rs 165.50 lakhs
23.02.12 05.10.11 15.05.12 work is in progress.
33 Const/BKN/10/2010-11/SGNR-HMH-SURP
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall etc, including supply of cement between Diplana (excluding) to Suratpura (including) to section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
09.10.10 single 10.11.10
06 nos Tender awarded to evaluated L-1 .
03 Nos (i) M/S Rajender Singh Contractor, 817, Sector-15A, Hisar (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh (iii) M/S Devender Singh Naveen (JV),7 Pratap Nagar , Saket Colony Rajgarh Road Hisar.
122-NWR/Dy CE/C-II/BKN dt 26.11.2011.
The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani
Rs 510.15 lakhs
23.03.12 26.07.11 23.07.12 work is in progress.
34 Const/BKN/23/2010-11/SGNR-HMH-SURP
Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 88.00 to 132.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open tender
11.12.10 single 12.01.11
04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
14-NWR/Dy CE/C-2/BKN Dt 15.09.2011
M/S Gawar Const. Ltd. DDS 378, Sector 16-17, Hisar
Rs 653.23lakhs
06.05.12 01.07.11 31.10.12 Work is in progress
35 Const/BKN/11 ( R) /2009-10
Construction of Road Over Bridge in lieu of Level crossing No. 53-C at Km 82/13-14 on Delhi- Rewari – Bhatinda Railway Line Xing Bhiwani – Tosham Road at RD 85.04 in Bhiwani District.
Open tender
27.11.09 single 30.12.09
01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No.99-NWR/Dy CE/C-II/BKN dated 03.06.2010.
Shree Gautam Construction Co. Ltd, A.T.Road, Opposite Pan Bazar , Over Bridge , Paltan Bazar Guwahati ( Assam)
Rs 653.23lakhs
31.01.12 05.08.10 31.07.12 Work is in progress.
36 Const/BKN/ 19/2008-09/SOG-BTI
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of existing turnouts, leading of P.way material and other miscellaneous works at all stations in connection with Standard–III and MACL signaling work at Birangkhera, Mandi Dabwali, Bagwali, Sangat, Gurusar Sahnewala and Bhatinda A & B Cabins on Suratgarh-Bathinda section
Open tender
27.02.09 single 01.04.09
01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No.78-NWR/Dy CE/C-II/BKN dated 17.08.2009
M/s Ganpati Const. Co., H.No. 430-B-1 Shant Nagar, Bathinda (Pb)
Rs174.63lakhs
31.08.11 24.07.09 31.12.11 Contract is being processed for short closure on administrative grounds.
37 Const/BKN/ 20/2008-09/SOG-BTI
Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of and other miscellaneous works at all stations in c/w Standard–III and MACL signaling work at Rangmahal, Pilibanga, Dabli Rathan, Maneksar, Sangaria and Dhaban stations on Suratgarh-Bathinda section.
Open tender
27.02.09 single 01.04.09
01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No- 78-NWR/Dy CE/C-II/BKN dated 17.08.2009
M/s Karnani Const. New Line, Ganga Shahar, Bikaner
Rs 202.39 lakhs
14.06.11 12.06.09 31.03.12 Contract is being processed for short closure on administrative grounds.
38 Const/BKN/ 62/2007-08
Supplying and stacking 21900 cum 65mm gauge stone ballast machine between Suratgarh & Bathinda Railway stations in c/w Standard-III & MACL signaling work on Suratgarh-Bathinda section.
Open tender
17.12.07 single 18.01.08
02 nos Tender awarded to evaluated L-1 .
01 nos (i) M/S Ganpati Construction Co. H.No.430-B,/1 (22333) Shanti Nagar, Bhatinda
Agmt No 63/NWR/Dy CE/C-II/BKN dated 31.10.2008
M/s T.C. Const. Co, (JV), Nokha
Rs 211.38 lakhs
30.10.10 30.07.08 30.10.10 Contract is being processed for short closure on administrative grounds.
39 Const/BKN/ 13/2010-11
Supply of 52 kg /90 UTS SKV welding portions to the Railways for welding of rail joints from km 20.500 to 138.00 between Sarupsar (including) to Sri Ganganagar (including) in connection with Sarupsar to Sri Ganganagar Gauge conversion project.
Open tender
20.01.10 single 29.01.12
02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No17/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 28.02.2012
M/S India Thermit Corporation Ltd. 84/22, Fazal Ganj, Kanpur
Rs181.73 lakhs
29.01.12 28.08.11 30.06.12 work in progress
40 Const/BKN/03 /2011-12/SRPR-SGNR
Widening & extension of High level platform No 3,4 & 5,providing hydrants for coach filling , Dismantling of old FOB, Shifting of PF shelters, Dismantling of MG washing line & goods platform, construction of road approach for BG goods platform at Suratgarh , Construction of type -II & III quarter at Sarupsar, Construction of duty hut & gate lodge at Suratgarh , Brick pitching for slope protection and other misc. work at Suratgarh and on Suratgarh -Sri Ganganagar ( excluding) section in connection with Sarupsar - Sri Ganaganagar gauge conversion project
Open tender
18.09.11 single 31.10.11
03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No16/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 17.01.12
M/S Aditya Traders 38, Gurudawara Gali, Hanumangarh Jn
Rs 458.32 lakhs
28.08.12 12.12.11 28.08.12 Work in progress
41 Const/BKN/03/2011-12/SURP-HMH-SGNR Dt. 19.05.2011
Construction / modification of station building & structures i.e. S&T buildings, platforms, PF shelters , duty bunk and other ancillary works between Tehsil Bhadra ( excluding) to Sidhmukh (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project
Open tender
26.05.11 single 29.06.11
03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
126-NWR/Dy CE/C-II/BKN dated 11.01.12
M/S Agarwal Const Co. Dudhwa Khara , Churu
Rs 418.60 lakhs
10.10.12 11.11.11 10.10.12 work in progress
42 Const/BKN/27®/2010-11/SGNR-HMH-SURP dated 28.06.2011
Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory / place including unloading and stacking /spreading at site from km 88.000 to 178.580 ( including Suratpura yard ) in connection with Sri Ganganagar – Hanumangarh – Suratpura gauge conversion project
Open tender
02.07.11 single 03.08.11
05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Contract Agmt No. 124/11-12 dated 19.12.2011. of /Dy CE/C-II/BKN
M/S Har Har Const. Co. Surender Nagar ).
Rs 192.38 lakhs
02.10.12 07.11.11 02.10.12 work in progress
43 Const/BKN/02/SURP-HMH-SGNR/11-12
Construction / modification of station building & structures i.e. S&T buildings, platforms, duty bunk and other ancillary works between Sidhmukh ( excluding) to Suratpura Jn. (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project
Open tender
26.05.11 single 29.06.11
05 nos Tender awarded to evaluated L-1 .
(i) M/S Ridhi Sidhi Construction Co. Sujangarh Road , Nokha , Bikaner ( Raj) (ii) M/S Sangam Construction Company C/O Nasar Latif S/O Abdul Khan Moh. Nardiyan Ward No.17, Rajgarh , Sadulpur ( Churu)
129-NWR/Dy CE/C-II/BKN Dt 02.02.12.
M/S Pyare Lal Dhaka Copnst. Co. Churu)
Rs 315.48 lakhs
04.11.12 23.11.11 04.11.12 work in progress
44 Const/BKN/01/SURP-HMH-SGNR/11-12
Supplying and stacking 50000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specification at Narwasi, Gogameri & sidhmukh depots in c/w SURP-HMH-SGNR GC project.
Open tender
25.08.11 single 26.09.11
08 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
135-NWR/Dy CE/C-II/BKN Dt 01.05.2012
M/S Chevron Minerals & Mines Pvt Ltd Flat No. 10, 3rd Floor, Staya Niketan, Opposite Venkteshware College Near, Dhualan Kuan, New Delhi-110021).
Rs362.90 lakhs
18.11.12 08.02.12 18.11.12 work in progress
45 Const/BKN/ 33/2011-12/SURP-HMH-SGNR dt. 15.03.2012
Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Paharsar Halt, Hansiawas Halt, Anupsahar & any other suitable location between Km. 132.00 to 175.00 on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open tender
19.03.12 single 20.04.12
5 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
PG not submitted.
M/S Jai Mata Const. Co.Bathinda
Rs 532.35 lakhs
17.05.12 work under mobilisation
16.03.13 Due to non commencement and non submission of work by the contractor, contract has been terminated and being re-invited.
46 Const/BKN/09(R)/2011-12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.
Construction and modification of station buildings, platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
20.01.12 single 28.03.12
04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
PG not submitted.
M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)
Rs 647.31 lakhs
03.03.13 work under mobilisation
03.03.13 Work under mobilisation.
Dy. CE/C/HMH
S. No
Tender No Item/ Nature of work
Mode of tender inquiry
Date of publication of NIT
Types of bidding (Single/ Two-old System)
Last date of receipt of tender
Nos. of tender received
Nos & name of parties qualified after technical evaluation
Nos & names of parties not qualified after technical evaluation
Whether contract awarded to lowest tenderer/ evaluated L-1
Contract No & date
Name of contractor
Value of contract
Schedule date of completion of supply
Actual date of start of work
Actual date of completion
Reason for delay if any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Const/ BKN/11/10-11/ SGNR-HMH-SURP dt. 04.10.10
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc between Hanumangarh Jn (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
09.10.2010 One packet system
10.11.10 7 1 6 Yes, L-1
Const/ BKN/ 11/10-11/ SGNR-HMH-SURP Dt: - 13.01.11
The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani
660.84 12.01.12 04.03.11 12.01.12 31.05.12
Work is in progress.
2 Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt. 04.10.10
Rebuilding, Construction, Strengthening/ extension of existing Minor bridges and upto 6.10m including earthwork in in Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
09.10.2010 One packet system
10.11.10 4 1 3 Yes, L-1
Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt: - 05.02.11
M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar
425.56 04.02.12 24.11.11 04.02.12 30.09.12
Work is in progress.
3 Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 02.12. 2010
Construction/modification of station buildings & structures i.e. S&T buildings, Platforms, P.F. Shelters/ FOB, between Sadul Shahar (excluding) to Hanumangarh Jn. (excluding) section in c/w SURP-HMH-SGNR GC project.
Open Tender
05.12.2010 One packet system
12.01.11 8 1 7 Yes, L-1
Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 17.02.11
M/s Jai Matadi Energy System, VPO-Narodara, Tehsil-Laxmangarh, Distt-Sikar.)
402.09 16.02.12 30.03.11 16.02.12 30.06.12
Work is in progress.
4 Const/ BKN/ 21/2010-11 Dated 04.12.2010
Supplying and stacking 75000 cum 65mm gauge stone ballast between Km. 0.00 to 44.00 on Hanumangarh-Suratpura in c/w SURP-HMH-SGNR GC project.
Open Tender
11.12.2010 One packet system
12.01.11 6 1 5 Yes, L-1
Const/ BKN/ 21/2010-11 Dated 17.02.11
Sh. Devender Singh, 7, Pratap Nagar, Saket Colony, Rajgarh Road, Hisar
617.25 16.02.12 10.05.11 16.02.12 31.08.12
Work is in progress.
5 Const/ BKN/15/10-11/ SGNR-HMH-SURP dt. 02.12.10
“Rebuilding, Construction, Strengthening/extension of existing Minor bridges PSC slabs with RCC ballast retainers of span upto 6.10m in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
05.12.2010 One packet system
12.01.11 3 1 2 Yes, L-1
Const/ BKN/15/ 10-11/ SGNR-HMH-SURP dt. 25.03.11
M/s G.K. Contractor, House No. 157, Sector No. 9, Extension, Hanumangarh Jn.
273.28 24.03.12 10.07.11 24.03.12 31.08.12
Work is in progress
6 Const/ BKN/ 22/2010-11 Dated 04.12.10
Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 44.00 to 88.00 on Hanumangarh–Suratpura section in
Open Tender
11.12.2010 One packet system
12.01.11 6 1 5 Yes, L-1
Const/ BKN/ 22/2010-11 Dated 07.05.11
M/s Jai Mata Const. Co. H.No. 14169 Street No. 8A, Bathinda
686.25 07.05.11 25.07.11 07.05.12 31.10.12
Work is in progress.
connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
7 Const/ BKN/ 22/2010-11 Dated 04.12.10
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc, including supply of cement between Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
01.01.2011 One packet system
12.01.11 7 1 6 Yes, L-1
Const/ BKN/ 14/2010-11 Dated 07.05.11
M/s Jaimatadi Energy Systems (JV), VPO Narodara, Teh. Laxmangarh, Dist. Sikar
416.61 06.05.12 01.07.11 06.05.12 Work is in progress.
8 Const/BKN/16/ 2010-11/ SGNR-HMH-SURP dt. 02.12.10
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, PF shelters / FOB, duty bunk and other ancillary works between Sri Ganganagar (excluding) to Sadul Sahar (including) section c/w SURP-HMH-SGNR GC project.
Open Tender
01.01.2011 One packet system
12.01.11 6 1 5 Yes, L-1
Const/BKN/16/2010-11/SGNR-HMH-SURP 07.05.11
M/s Surender Kumar Bansal,59 P Block, Shri Ganga Nagar
547 17.05.12 27.05.11 17.05.12 Work is in progress.
9 Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 19.02.11
Construction/Rebuilding of substructure of Bridge No. 40 (1 x 45.70 m Open Web Girder) at km 141.515 on Gang Canal, Bridge No. 2-A (2 x 61.0 m Open Web Girder) at km 2.347 on Ghaggar River, Bridge No. 14-B (2 x 61.0 m Open Web Girder) at km 18.345 on Ghaggar River and Bridge No. 21-A (1 x 76.20 m Open Web Girder) at km 28.638 on Indira Gandhi Main Canal including other ancillary works in c/w SURP-HMH-SGNR
Open Tender
24.02.2011 One packet system
30.03.11 5 1 4 Yes, L-1
Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 15.07.11
M/s Jaimatadi Energy System, JV, VPO Narodara, Teh. Laxmangarh, Dist. Sikar
13.34 Cr.
14.07.12 01.02.12 14.07.12 Work is in progress.
GC project.
10 Const/ BKN/ 26 (R)/ 2010-11/ SGNR-HMH-SURP dt. 28.06.11
Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory/place including unloading and stacking/ spreading at site from km. 0.000 to 88.000 (Excluding Hanumangarh Yard) in connection with Sri Ganganagar-Hanumangarh-Suratpura Gauge Conversion Project.”
Open Tender
02.07.2011 One packet system
03.08.2011
6 1 5 Yes, L-1
CConst/ BKN/ 26 (R)/ 2010-11/SGNR-HMH-SURP Dated: - 03.10.11
M/s Har Har Company, Doshi Chambers, Mehta Market, Surenderanagar. (Guj)
152.19 lakh
02.10.12 11.11.11 02.10.12 Work is in progress.
11 Const/ BKN/ 16/2011-12/ SURP-HMH-SGNR Dated–16.08.2011
Construction of Foot Over Bridge and Platform Shelter at Hanumangarh Junction, Hanumangarh Town, Ellenabad and Nohar station in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.””
Open Tender
28.08.2011 One packet system
28.09..2011
2 1 1 Yes, L-1
Const/BKN/16/2011-12/SURP-HMH-SGNR Dated: - 16.12.2011
M/s Sajneev Brothers, C-10, Vaishali Nagar, Jaipur
302.87 Lakh
15.12.12 20.03.12 15.12.12 work is in progress
12 Const/BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 10.10.2011
Supplying and stacking 40000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Banwali, Fateh Singhwala, Budh Singhwala & between Km.201.00 to 202.00 Depot on Sri Ganganagar–Diplana section in connection with Suratpura-
Open Tender
14.10.2011 One packet system
18.11.2011
4 1 3 Yes, L-1
Const/ BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 14.12.2011
M/s Jai Mata Const. Co., House No. 14169, Street No. 8A, Ganesh Nagar, Bathinda
439.70 LAKH
13.06.12 17.12.11 13.06.12 Work is in progress
Hanumangarh-Sri Ganganagar Gauge Conversion project.
13 Const/BKN/20)/SURP-HMH-SGNR/ 2011-12 Dated – 19.10.11
Rebuilding of existing Major & Minor bridges with RCC BOX of span upto 6.0 m including earthwork in approaches of bridges and other ancillary works in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project..
Open Tender
25.10.2011 One packet system
30.11.2011
2 1 3 Yes, L-1
Const/BKN/20)/SURP-HMH-SGNR/ 2011-12 Dated – 16.12.11
M/s Sanjeev Brothers. C-10, Vaishali Nagar, Jaipur
450.87 LAKH
15.06.12 19.12.11 15.06.12 Work terminated
14 Const/BKN/SURP-HMH-SGNR/ 19(R-1)/ 2010-11 dt. 19. 10.11
Supplying and stacking 65000 cum 65mm gauge stone ballast between Km.137.250 to 171.00 (including Sri Ganganagar) on Sri Ganganagar–Hanumangarh section in c/w SURP-HMH-SGNR GC project..
Open Tender
25.10.2011 One packet system
30.11.2011
4 1 3 Yes, L-1
Const/BKN/SURP-HMH-SGNR/ 19(R-1)/ 2010-11 dt. 14.12.11
M/S J.K.Const. Co. New Market, Nokha
719.90 LAKH
13.08.12 23.12.11 13.08.12 Work is in progress.
15 Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 05.12.2011
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in section & at LC’s of Zone-1 (Ch. 138.000 to 204.130) on Sri Ganganagar-Hanumangarh section c/w SURP-HMH-SGNR GC project.
Open Tender
10.12.11 One packet system
11.01.12 3 1 2 Yes, L-1
Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 22.01.12
M/s RAVI INFRABUILD PROJECTS PVT. LTD., 95, Hiran Magri Sector-11, Udaipur
904.54 21.01.13 01.02.12 21.01.13 Work is in progress
16 Const/HMH/ 20(R-2)/ SURP-HMH-SGNR/2010-11 Dated 22.12.2011
Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km.171.00 to 204.130 (including Hanumangarh) on Sri Ganganagar–Hanumangarh section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.
Open Tender
25.12.11 One packet system
25.01.12 5 1 4 Yes, L-1
Const/HMH/20(R-2)/SURP-HMH-SGNR/2010-11 Dated 24.02.12
M/s Sura Const. Co., Sector-13, 1323/1133, Hisar.
687.05 23.10.12 25.02.12 23.10.12 Work is in progress
17 Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12
Supplying and stacking 90000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications in various Depots i.e. near Hanumangarh Junction, Talwara Jhil, Ellenabad, Nohar, Diplana & any other location on Hanumangarh-Diplana section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.
Open Tender
13.01.12 One packet system
13.03.12 5 1 4 Yes, L-1
Const/HMH/25/SURP-HMH-SGNR/2011-12 Dated–09.05.12
(Sh. Devender Singh, 7, Pratap Nagar,Saket Colony, Rajgarh Road, Hisar).
874.71 08.05.13 - 08.05.13 Work is yet to be started
For CAO/C/JP