Details of Alternate Alignment Study for the Project Highway Sl. No Parameters/Issues Option 1 Greenfield Alignment Remarks Option 2 Brownfield Alignment Remarks 1 Length (km) 162.126 185.459 2 Total land acquired (ha) 1411.67 1018.71 Govt. land (ha) 114.60 169.72 Pvt. Land (ha) 1297.07 848.99 Forest land (ha)* Nil 8.42 3 Area under protected/ important or sensitive species of flora or fauna/Wildlife Sanctuary The alignment does not pass through any wild life sanctuary, protected area and its eco sensitive zone. The alignment does not pass through any wild life sanctuary, protected area and its eco sensitive zone. 4 No. of trees 2446 nos 4551 nos. 5 Impact on flora and fauna 2446 nos. of tree are coming along the proposed alignment. 4551 nos. of tree are coming along the proposed alignment. 6 Area under water bodies (ha)* 6.67 Ha 1.53 Ha. 7 No. of structure to be impacted due to proposed alignment 36 nos. 846 nos. 8 No. of families 2615 nos. 4536 nos. 9 No. of structure to be constructed 1. MJB 9 nos. 2. MNB 51 nos. 1. MJB - 9 2. MNB - 63

Upload: others

Post on 12-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Details of Alternate Alignment Study for the Project Highwayenvironmentclearance.nic.in/writereaddata/Online/TOR/04_Jan_2019... · Details of Alternate Alignment Study for the Project

Details of Alternate Alignment Study for the Project Highway

Sl. No

Parameters/Issues Option 1 Greenfield Alignment

Remarks Option 2 Brownfield Alignment

Remarks

1 Length (km) 162.126 185.459

2 Total land acquired (ha) 1411.67 1018.71

Govt. land (ha) 114.60

169.72

Pvt. Land (ha) 1297.07 848.99

Forest land (ha)* Nil 8.42

3 Area under protected/ important or sensitive species of flora or fauna/Wildlife Sanctuary

The alignment does not pass through any wild life sanctuary, protected area and its eco sensitive zone.

The alignment does not pass through any wild life sanctuary, protected area and its eco sensitive zone.

4 No. of trees 2446 nos 4551 nos.

5 Impact on flora and fauna

2446 nos. of tree are coming along the proposed alignment.

4551 nos. of tree are coming along the proposed alignment.

6 Area under water bodies (ha)*

6.67 Ha 1.53 Ha.

7 No. of structure to be impacted due to proposed alignment

36 nos. 846 nos.

8 No. of families 2615 nos. 4536 nos.

9 No. of structure to be constructed

1. MJB – 9 nos. 2. MNB – 51 nos.

1. MJB - 9 2. MNB - 63

Page 2: Details of Alternate Alignment Study for the Project Highwayenvironmentclearance.nic.in/writereaddata/Online/TOR/04_Jan_2019... · Details of Alternate Alignment Study for the Project

Sl. No

Parameters/Issues Option 1 Greenfield Alignment

Remarks Option 2 Brownfield Alignment

Remarks

3. Box Culverts – 305 nos. 4. Pipe Culverts – 48 nos. 5. VUP – 23 nos. 6. VOP – 8 nos.(at Interchange

locations) 7. LVUP – 12 nos. 8. SVUP – 110 nos 9. Interchanges – 08 nos. 10. ROB – 1 no.

3. Box Culverts - 431 4. Pipe Culverts - 87 5. VUP - 46 6. LVUP - 18 7. PUP – 15 8. ROB – 1 9. Grade Separators - 4

10 Connectivity Khammam, Kodad, Wyra, Madhira, Penuballi, Sathupally, Eluru, Jangareddygudem, Devarapalli, Kovvur and Rajamundry

Khammam, Kodad, Wyra, Tallada, Penuballi, Sathupally, Dammapeta , Ashwaraopet, Jeelugumilli, Jangareddygudem, Koyyalagudem and Devarapalle.

11 Project cost (cr.) 3239.06 (Civil Cost) 3920.67 (Civil Cost)

Based on the above study the following observations are there:- 1. Option 2 leads to major impact on flora and fauna as more number of trees are falling under the alignment.

2. Option 2 leads to more impact on structure and families as number affected families are high as compared to option 1. If alignment option 2 is followed then it will leads to more impacts on Environment & Social components, hence Option 1 is followed. The

map showing alternatives site on Survey of India toposheet is given below:-

Page 3: Details of Alternate Alignment Study for the Project Highwayenvironmentclearance.nic.in/writereaddata/Online/TOR/04_Jan_2019... · Details of Alternate Alignment Study for the Project

TELANGANAANDHRAPRADESH

TELANGANA

ANDHRAPRADESH

TELANGANA

ANDHRAPRADESH

TELA

NGAN

A

ANDH

RAPR

ADES

H

TELANGANA

ANDHRAPRADESH

TELANGANA

ANDHRAPRADESH

TELDARUPALLI

GUDIMALLA

AGRAHARAM

BASWAPURAM

ALIPURAMVANDANAM

KODMUR

CHINNA GOPATI

BOTLAKUNTAGOPARAM

GANDAGAPADU

SOMAVARAM

PINAPAKA

SIRIPURAM

LAKSHMIPURAM

KESHAVAPURAM

RAMANUJAVARAM MUCHAVARAM

LAKSHMIPURAM LINAGALA

CHANDRUPATLA PERUVANCHA

CHAITANYANAGAR

VENKATAPURAM

MUTTAGUDEM

PATA KARAIGUDEM

KANDIMALLAVARI BANJAR

KONDRUPADU

ADASARLAPADU

ERRAKUNTA

VEMSURU

LINGAPALEM

BHIMAVARAM

ADASARLAPADU

TUMBURU

TUMBURU

VEMSURU

ENDAPALLI

MALLESWARAM

RAGHAVAPUTRAMKOTTAGUDEM

KOTTAGUDEM

KANTAMPALEM

GANIJARALA

SETTIVARIGUDEM

VENKATADRIGUDEM

RECHERLA

KAMMUGUDEM

T NARASAPURAMGURAVAYYAGUDEM EPIGUNTASRIRAMAVARAM

TIRUMALADEVIPETA MADHYANNAPUVARIGUDEM

VENKATAPURAM

BORRAMPALEM

SINGARAYAPALEM

PUTLAGATLAGUDEM

DEVULAPALLILAKKAVARAM

PERAMPETA

NAGULAGUDEMGURVAYAGUDEM

PANGIDIGUDEM

SINGARAYAPALEM

YERRAMPETA

TIMMANAKUNTA

YADAVOLU

CHINNAYAGUDEM

DUDDUKURU

BANDAPURAM

GOLLAGUDEM

DEVARAPALLI

KISHTAPURAM

LINGAGUDEM

PEDDA GOPATI

DHAMSALAPURAM

NAYAKUNIGUDEM

KAMALAPURAM

SADASIVUNIPALEM

SH-4

4S

H-4

4

SH

-42

SH

-42SH

-43

SH

-43

KUPPENAKUNTLA

TE

LAN

GA

NA

AN

DH

RA

PR

AD

ES

H

TE

LAN

GA

NA

AN

DH

RA

PR

AD

ES

H

TELA

NG

ANA

ANDH

RAPR

ADES

H

TELA

NGAN

A

ANDH

RAPR

ADES

H

TELANGANAANDHRAPRADESH

TELANGANAANDHRAPRADESH

TELANGANAANDHRAPRADESH

TELA

NG

AN

A

AN

DH

RA

PRA

DES

H

ANDHRAPRADESH

TELANGANA

TELA

NGANA

ANDH

RAPR

ADES

H

TELANGANA

ANDHRAPRADESH

TELA

NG

ANA

ANDH

RAPR

ADES

H

ST

AR

T O

F T

HE

PR

OJE

CT

AT

CH

:584

60

RAJAMUNDRY

KALLURU

NH

-30

NH

-30

EN

D O

FT

HE

PR

OJE

CT

AT

CH

:220

586.

5

TIRUVURU

WYRA

SATTUPALLI

JANGAREDDYGUDEM

PEDDAVENKATAGIRI

KHAMMAMTALLAMPADU

58460

60000

65000

70000

75000

80000

85000 90000

95000

100000

105000

110000 115000 120000

125000

130000 135000

140000

145000

150000

155000

160000

165000

170000

175000

180000

185000

190000

195000

200000

205000

210000

215000

220000

220586.513

KO

DA

D-K

HA

MM

AM

(NH

365

A)

END OF THE PROJECTAT CH:186.858

NH

365

A

<<< SURYAPET

LEGEND:

SURYAPET-KHAMMAM ALIGNMENT

GREEN-FIELD ALIGNMENTOPTION-01

GUNDUGOLANU-DEVARAPALLI-KOVVURU ALIGNMENT

KHAMMAM-DEVARAPALLYGREEN-FIELD ALIGNMENT

NATIONAL HIGHWAY

STATE HIGHWAY

ANDHRA PRADESH -TELANGANA BOUNDARY

W E

S

N

KHAMMAM-KURVI BYPASS

KODAD-KHAMMAM ROAD

ALTERNATE ALIGNMENTOPTION-02

ALTERNATE ALIGNMENTOPTION-02

KHAMMAM-ASWARAOPET(NH-365BB) ALT.OPTION-02

KHAMMAM-DEVARAPALLEGREEN-FIELD ALIGNMENTOPTION-01