dess analyst value at risk

Upload: wajid-khan

Post on 03-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 DESS Analyst Value at Risk

    1/134

    DrakeDRAKE UNIVERSITYUNIVERSITEDAUVERGNE

    Market Riskand Value at Risk

    Finance 129

  • 8/12/2019 DESS Analyst Value at Risk

    2/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Market Risk

    Macroeconomic changes can createuncertainty in the earnings of the Financial

    institutions trading portfolio.Important because of the increased emphasison income generated by the trading portfolio.

    The trading portfolio (Very liquid i.e. equities,bonds, derivatives, foreign exchange) is notthe same as the investment portfolio (illiquidie loans, deposits, long term capital).

  • 8/12/2019 DESS Analyst Value at Risk

    3/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Importance of Market RiskMeasurement

    Management informationProvides info on the riskexposure taken by traders

    Setting LimitsAllows management to limitpositions taken by traders

    Resource AllocationIdentifying the risk and returncharacteristics of positions

    Performance Evaluationtrader compensationdidhigh return just mean high risk?

    RegulationMay be used in some cases todetermine capital requirements

  • 8/12/2019 DESS Analyst Value at Risk

    4/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Measuring Market Risk

    The impact of market risk is difficult tomeasure since it combines many sources of

    risk.Intuitively all of the measures of risk can becombined into one number representing theaggregate risk

    One way to measure this would be to use ameasure called the value at risk.

  • 8/12/2019 DESS Analyst Value at Risk

    5/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Value at Risk

    Value at Risk measures the market valuethat may be lost given a change in the

    market (for example, a change in interestrates). that may occur with a correspondingprobability

    We are going to apply this to look at marketrisk.

  • 8/12/2019 DESS Analyst Value at Risk

    6/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    A Simple Example

    Position A Position BPayout Prob Payout Prob-100 0.04 -100 0.04

    0 0.96 0 0.96VaR at 95%

    confidence

    level 0VaR at 95%

    confidence

    level 0From Dowd, Kevin 2002

  • 8/12/2019 DESS Analyst Value at Risk

    7/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    A second simple example

    Assume you own a 10% coupon bond thatmakes semi annual payments with 5 years until

    maturity with a YTM of 9%.The current value of the bond is then 1039.56

    Assume that you believe that the most the yieldwill increase in the next day is .2%. The new

    value of the bond is 1031.50

    The differencewould represent the value atrisk.

  • 8/12/2019 DESS Analyst Value at Risk

    8/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    VAR

    The value at risk therefore depends upon theprice volatility of the bond.

    Where should the interest rate assumptioncome from?

    historical evidence on the possible change ininterest rates.

  • 8/12/2019 DESS Analyst Value at Risk

    9/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Calculating VaR

    Three main methods

    VarianceCovariance (parametric)

    Historical

    Monte Carlo SimulationAll measures rely on estimates of thedistribution of possible returns and the

    correlation among different asset classes.

  • 8/12/2019 DESS Analyst Value at Risk

    10/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Variance / Covariance Method

    Assumes that returns are normallydistributed.

    Using the characteristics of the normaldistribution it is possible to calculate thechance of a loss and probable size of the loss.

  • 8/12/2019 DESS Analyst Value at Risk

    11/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    This slide and the next few based in part on Jorion, 1997

    Probability

    Cardano 1565 and Pascal 1654

    Pascal was asked to explain how to divide up

    the winnings in a game of chance that wasinterrupted.

    Developed the idea of a frequency distribution

    of possible outcomes.

  • 8/12/2019 DESS Analyst Value at Risk

    12/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    An example

    Assume that you are playing a game basedon the roll of two fair dice.

    Each one has six possible sides that may landface up, each face has a separate number, 1to 6.

    The total number of dice combinations is 36,the probability that any combination of thetwo dice occurs is 1/36

  • 8/12/2019 DESS Analyst Value at Risk

    13/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Example continued

    The total number shown on the dice rangesfrom 2 to 12. Therefore there are a total of

    12 possible numbers that may occur as partof the 36 possible outcomes.

    A frequency distribution summarizes thefrequency that any number occurs.

    The probability that any number occurs isbased upon the frequency that a givennumber may occur.

  • 8/12/2019 DESS Analyst Value at Risk

    14/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Establishing the distribution

    Let x be the random variable underconsideration, in this case the total number

    shown on the two dice following each role.The distribution establishes the frequencyeach possible outcome occurs and thereforethe probability that it will occur.

  • 8/12/2019 DESS Analyst Value at Risk

    15/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Discrete Distribution

    Value 2 3 4 5 6 7 8 9 10 11 12(xi)

    Freq 1 2 3 4 5 6 5 4 3 2 1(n i)

    Prob 1 2 3 4 5 6 5 4 3 2 1

    (pi

    ) 36 36 36 36 36 36 36 36 36 36 36

  • 8/12/2019 DESS Analyst Value at Risk

    16/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Cumulative Distribution

    The cumulative distribution represents thesummation of the probabilities.

    The number 2 occurs 1/36 of the time, thenumber 3 occurs 2/36 of the time.

    Therefore a number equal to 3 or less will

    occur 3/36 of the time.

  • 8/12/2019 DESS Analyst Value at Risk

    17/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Cumulative Distribution

    Value 2 3 4 5 6 7 8 9 10 11 12Prob 1 2 3 4 5 6 5 4 3 2 1

    (p i) 36 36 36 36 36 36 36 36 36 36 36

    Cdf 1 3 6 10 15 21 26 30 33 35 3636 36 36 36 36 36 36 36 36 36 36

  • 8/12/2019 DESS Analyst Value at Risk

    18/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Probability Distribution Function(pdf)

    The probabilities form a pdf. The sum of theprobabilities must sum to 1.

    The distribution can be characterized by twovariables, its mean and standard deviation

    111

    1

    i

    ip

  • 8/12/2019 DESS Analyst Value at Risk

    19/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Mean

    The mean is simply the expected value fromrolling the dice, this is calculated by

    multiplying the probabilities by the possibleoutcomes (values).

    In this case it is also the value with thehighest frequency (mode)

    736

    252)(

    11

    1

    i

    iixpxE

  • 8/12/2019 DESS Analyst Value at Risk

    20/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Standard Deviation

    The variance of the random variable isdefined as:

    The standard deviation is defined as the

    square root of the variance.

    36210)]([)(

    11

    1

    2 i ii xExpxV

    415.2)()( xVxSD

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    21/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Using the example in VaR

    Assume that the return on your assets isdetermined by the number which occursfollowing the roll of the dice.

    If a 7 occurs, assume that the return for thatday is equal to 0. If the number is less than 7a loss of 10% occurs for each number less

    than 7 (a 6 results in a 10% loss, a 5 resultsin a 20% loss etc.)

    Similarly if the number is above 7 a gain of10% occurs.

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    22/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Discrete Distribution

    Value 2 3 4 5 6 7 8 9 10 11 12(xi)

    Return -50% -40% -30% -20% -10% 0 10% 20% 30% 40% 50%(n i)

    Prob 1 2 3 4 5 6 5 4 3 2 1(p i) 36 36 36 36 36 36 36 36 36 36 36

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    23/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    VaR

    Assume you want to estimate the possibleloss that you might incur with a given

    probability.Given the discrete dist, the most you mightlose is 50% of the value of your portfolio.

    VaR combines this idea with a givenprobability.

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    24/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    VaR

    Assume that you want to know the largestloss that may occur in 95% of the rolls.

    A 50% loss occurs 1/36 = 2.77% 0f the time.This implies that 1-.027 =.9722 or 97.22% ofthe rolls will not result in a loss of greaterthan 40%.

    A 40% or greater loss occurs in 3/36=8.33%of rolls or 91.67% of the rolls will not resultin a loss greater than 30%

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    25/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Continuous time

    The previous example assumed that therewere a set number of possible outcomes.

    It is more likely to think of a continuous set ofpossible payoffs.

    In this case let the probability density function

    be represented by the function f(x)

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    26/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Discrete vs. Continuous

    Previously we had the sum of the probabilitiesequal to 1. This is still the case, however thesummation is now represented as an integralfrom negative infinity to positive infinity.

    Discrete Continuous

    111

    1

    i

    ip

    1)( dxxf

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    27/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Discrete vs. Continuous

    The expected value of X is then found usingthe same principle as before, the sum of theproducts of X and the respective probabilities

    Discrete Continuous

    dxxxfXE )()(

    n

    i

    iixpXE1

    )(

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    28/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Discrete vs. Continuous

    The variance of X is then found using thesame principle as before.

    Discrete Continuous

    dxxfXExXV )()]([)( 2

    N

    i

    ii XExpXV1

    2)]([)(

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    29/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Combining Random Variables

    One of the keys to measuring market risk isthe ability to combine the impact of changes

    in different variables into one measure, thevalue at risk.

    First, lets look at a new random variable, thatis the transformation of the original randomvariable X.

    Let Y=a+bX where a and b are fixedparameters.

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    30/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Linear Combination

    The expected value of Y is then found usingthe same principle as before, the sum of theproducts of Y and the respective probabilities

    dxxxfXE )()(

    dxxyfYE )()(

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    31/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Linear Combinations

    We can substitute since Y=a+bX, then simplify byrearranging

    )(

    )()()()()(

    )()(

    XbEa

    dxxxfbdxxfadxxfbXabXaE

    dxxyfYE

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    32/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Variance

    Similarly the variance can be found

    )()()]([

    )()]([

    )()]()[()()(

    222

    2

    2

    XVbdxxfXExb

    dxxfXbEabxa

    dxxfbXaEbXabXaVYV

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    33/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Standard Deviation

    Given the variance it is easy to see that the standarddeviation will be

    )(XbSD

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    34/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Combinations of RandomVariables

    No let Y be the linear combination of two randomvariables X1and X2the probability density function(pdf) is now f(x1,x2)

    The marginal distribution presents the distributionas based upon one variable for example.

    )(),( 12212 xfdxxxf

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    35/134

    UNIVERSITE

    DAUVERGNE

    DrakeDrake University

    Expectations

    )()()()(

    ),(),(

    ),(),(

    ),()()(

    2122221111

    212111222121211

    21212212121121

    2121212121

    XEXEdxxfxdxxfx

    dxdxxxfxxdxdxxxfx

    dxdxxxfxdxdxxxfx

    dxdxxxfxxXXE

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    36/134

    UN V S

    DAUVERGNE

    DrakeDrake University

    Variance

    Similarly the variance can be reduced

    ),(2)()(

    ),()]([

    )(

    2121

    2121

    2

    212121

    21

    XXCovXVXV

    dxdxxxfXXExx

    XXV

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    37/134

    DAUVERGNE

    DrakeDrake University

    A special case

    If the two random variables are independentthen the covariance will reduce to zero which

    implies thatV(X1+X2) = V(X1)+V(X2)

    However this is only the case if the variablesare independentimplying hat there is nogain from diversification of holding the twovariables.

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    38/134

    DAUVERGNE

    DrakeDrake University

    The Normal Distribution

    For many populations of observations as thenumber of independent draws increases, thepopulation will converge to a smooth normal

    distribution.

    The normal distribution can be characterized by itsmean (the location) and variance (spread) N(m,s2).

    The distribution function is

    2

    2 )(

    2

    1

    22

    1)(

    ms

    s

    x

    exf

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    39/134

    DAUVERGNE

    DrakeDrake University

    Standard Normal Distribution

    The function can be calculated for variousvalues of mean and variance, however the

    process is simplified by looking at a standardnormal distribution with mean of 0 andvariance of 1.

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    40/134

    DAUVERGNE

    DrakeDrake University

    Standard Normal Distribution

    Standard Normal Distributions are symmetricaround the mean. The values of the

    distribution are based off of the number ofstandard deviations from the mean.

    One standard deviation from the meanproduces a confidence interval of roughly

    68.26% of the observations.

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    41/134

    DAUVERGNE

    DrakeDrake University

    Prob Ranges for Normal Dist.

    68.26%95.46%

    99.74%

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    42/134

    DAUVERGNE

    DrakeDrake University

    An Example

    Lets define X as a function of a standard normalvariable e (in other words e is N(0,1))

    X= m es

    We showed earlier that

    Therefore

    )()( XbEabXaE

    mesmsem )()( EE

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    43/134

    DAUVERGNE

    DrakeDrake University

    Variance

    We showed that the variance was equal to

    Therefore

    22 )()( sessem VV

    )()( 2

    XVbbXaV

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    44/134

    DAUVERGNE

    DrakeDrake University

    An Example

    Assume that we know that the movements inan exchange rate are normally distributed

    with mean of 1% and volatility of 12%.Given that approximately 95% of thedistribution is within 2 standard deviations ofthe mean it is easy to approximate the

    highest and lowest return with 95%confidence

    XMIN= 1% - 2(12%) = -23%

    XMAX= 1% + 2(12%) = +25%

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    45/134

    DAUVERGNE

    DrakeDrake University

    One sided values

    Similarly you can find the standard deviationthat represents a one sided distribution.

    Given that 95.46% of the distribution liesbetween -2 and +2 standard deviations of themean, it implies that (100% - 95.46)/2 =2.27% of the distribution is in each tail.

    This shows that 95.46% + 2.27% = 97.73%of the distribution is to the right of this point.

    UNIVERSITE

  • 8/12/2019 DESS Analyst Value at Risk

    46/134

    DAUVERGNE

    DrakeDrake University

    VaR

    Given the last slide it is easy to see that youwould be 97.73% confident that the loss

    would not exceed -23%.

  • 8/12/2019 DESS Analyst Value at Risk

    47/134

    UNIVERSITE

    A G

  • 8/12/2019 DESS Analyst Value at Risk

    48/134

    DAUVERGNE

    DrakeDrake University

    VAR A second example

    Assume that the mean yield change on a bondwas zero basis points and that the standard

    deviation of the change was 10 Bp or 0.001Given that 90% of the area under the normaldistribution is within 1.65 standard deviations

    on either side of the mean (in other words

    between mean-1.65sand mean +1.65s)

    There is only a 5% chance that the level ofinterest rates would increase or decrease by

    more than 0 + 1.65(0.001) or 16.5 Bp

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    49/134

    DAUVERGNE

    DrakeDrake University

    Price change associated with16.5Bp change.

    You could directly calculate the price change,by changing the yield to maturity by 16.5 Bp.

    Given the duration of the bond you also couldcalculate an estimate based upon duration.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    50/134

    DAUVERGNE

    DrakeDrake University

    Example 2

    Assume we own seven year zero couponbonds with a face value of $1,631,483.00

    with a yield of 7.243%Todays Market Value

    $1,631,483/(1.07243)7=$1,000,000

    If rates increase to 7.408 the market value is$1,631,483/(1.07408)7= $989,295.75

    Which is a value decrease of $10,704.25

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    51/134

    DAUVERGNE

    DrakeDrake University

    Approximations - Duration

    The duration of the bond would be 7 since itis a zero coupon.

    Modified duration is then 7/1.07143 = 6.527The price change would then be

    1,000,000(-6.57)(.00165) = $10,769.55

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    52/134

    DAUVERGNE

    DrakeDrake University

    Approximations - linear

    Sometimes it is also estimated by figuring thethe change in price per basis point.

    If rates increase by one basis point to 7.253%the value of the bond is $999,347.23 or aprice decrease of $652.77.

    This is a 652.77/1,000,000 = .06528%

    change in the price of the bond per basispoint

    The value at risk is then

    1,000,000(.00065277)(16.5) = $10,770.71

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    53/134

    DAUVERGNE

    DrakeDrake University

    Precision

    The actual calculation of the change shouldbe accomplished by discounting the value of

    the bond across the zero coupon yield curve.In our example we only had one cash flow.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    54/134

    D AUVERGNE

    DrakeDrake University

    DEAR

    Since we assumed that the yield change wasassociated with a daily movement in rates, wehave calculated a daily measure of risk for the

    bond.DEAR = Daily Earnings at Risk

    DEAR is often estimated using our linear

    measure:(market value)(price sensitivity)(change in yield)

    Or

    (Market value)(Price Volatility)

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    55/134

    D AUVERGNE

    DrakeDrake University

    VAR

    Given the DEAR you can calculate the Valueat Risk for a given time frame.

    VAR = DEAR(N)0.5

    Where N = number of days

    (Assumes constant daily variance and noautocorrelation in shocks)

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    56/134

    D AUVERGNE

    DrakeDrake University

    N

    Bank for International Settlements (BIS) 1998market risk capital requirements are based on

    a 10 day holding period.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    57/134

    D AUVERGNE

    DrakeDrake University

    Problems with estimation

    Fat TailsMany securities have returns thatare not normally distributed, they have fat

    tails This will cause an underestimation ofthe risk when a normal distribution is used.

    Do recent market events change thedistribution? Risk Metrics weights recent

    observations higher when calculatingstandard Dev.

    UNIVERSITE

    DAUVERGNEI t t R t Ri k

  • 8/12/2019 DESS Analyst Value at Risk

    58/134

    D AUVERGNE

    DrakeDrake University

    Interest Rate Risk vs.Market Risk

    Market risk is more broad, but Interest RateRisk is a component of Market Risk.

    Market risk should include the interaction ofother economic variables such as exchangerates.

    Therefore, we need to think about thepossibility of an adverse event in theexchange rate market and equity marketsetc.. Not just a change in interest rates..

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    59/134

    D AUVERGNE

    DrakeDrake University

    DEAR of a foreign Exchange Position

    Assume the firm has Swf 1.6 Million tradingposition in swiss francs

    Assume that the current exchange rate isSwf1.60 / $1 or $.0625 / Swf

    The $ value of the francs is then

    Swf1.6 million ($0.0625/Swf) =$1,000,000

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    60/134

    D AUVERGNE

    DrakeDrake University

    FX DEAR

    Given a standard deviation in the exchangerate of 56.5Bp and the assumption of a

    normal distribution it is easy to find the DEAR.We want to look at an adverse outcome thatwill not occur more than 5% of the time soagain we can look at 1.65s

    FX volatility is then 1.65(56.5bp) = 93.2bp or0.932%

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    61/134

    D AUVERGNE

    DrakeDrake University

    FX DEAR

    DEAR = (Dollar value )( FX volatility)

    =($1,000,000)(.00932)

    =$9,320

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    62/134

    D AUVERGNE

    DrakeDrake University

    Equity DEAR

    The return on equities can be split intosystematic and unsystematic risk.

    We know that the unsystematic risk can bediversified away.

    The undiversifiable market risk will equal bebased on the beta of the individual stock

    22

    mis

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    63/134

    D AUVERGNE

    DrakeDrake University

    Equity DEAR

    If the portfolio of assets has a beta of 1 thenthe market risk of the portfolio will also have

    a beta of 1 and the standard deviation of theportfolio can be estimated by the standarddeviation of the market.

    Let sm= 2% then using the same confidence

    interval, the volatility of the market will be

    1.65(2%) = 3.3%

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    64/134

    UV GN

    DrakeDrake University

    Equity DEAR

    DEAR = (Dollar value )( Equity volatility)

    =($1,000,000)(0.033)=$33,000

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    65/134

    DrakeDrake University

    VAR and Market Risk

    The market risk should then estimate thepossible change from all three of the assetclasses.

    This DOES NOT just equal the summation ofthe three estimates of DEAR because thecovariance of the returns on the differentassets must be accounted for.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    66/134

    DrakeDrake University

    Aggregation

    The aggregation of the DEAR for the threeassets can be thought of as the aggregationof three standard deviations.

    To aggregate we need to consider thecovariance among the different asset classes.

    Consider the Bond, FX position and Equitythat we have recently calculated.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    67/134

    DrakeDrake University

    Variance Covariance

    Seven Yearzero

    Swf/$1US StockIndex

    Seven YearZero

    1 -.20 .4

    Swf/$1 1 .1

    US StockIndex

    1

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    68/134

    DrakeDrake University

    variance covariance

    2

    1

    USz,

    USSwf,

    Swfz,

    2

    US

    2

    Swf

    2

    Z

    )2(

    )2(

    )2()(DEAR)(DEAR)(DEAR

    Portfolio

    DEAR

    USZ

    USSwf

    SwfZ

    DEARDEAR

    DEARDEAR

    DEARDEAR

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    69/134

    DrakeDrake University

    VAR for Portfolio

    969,39$

    )33)(77.10)(4)(.2(

    )33)(32.9)(1)(.2(

    )32.9)(77.10)(2.(2(

    )(33)(9.32)(10.77

    Portfolio

    DEAR

    2

    1222

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    70/134

    DrakeDrake University

    Comparison

    If the simple aggregation of the threepositions occurred then the DEAR would havebeen estimated to be $53,090. It is easy toshow that the if all three assets were perfectlycorrelated (so that each of their correlationcoefficients was 1 with the other assets) you

    would calculate a loss of $52,090.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    71/134

    DrakeDrake University

    Risk Metrics

    JP Morgan has the premier service forcalculating the value at risk

    They currently cover the daily updating andproduction of over 450 volatility andcorrelation estimates that can be used incalculating VAR.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    72/134

    DrakeDrake University

    Normal Distribution Assumption

    Risk Metrics is based on the assumption thatall asset returns are normally distributed.

    This is not a valid assumption for many asstsfor example call optionsthe most aninvestor can loose is the price of the calloption. The upside is large, this implies a

    large positive skew.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    73/134

    DrakeDrake University

    Normal Assumption Illustration

    Assume that a financial institution has a largenumber of individual loans. Each loan can bethought of as a binomial distribution, the loaneither repays in full or there is default.

    The sum of a large number of binomialdistributions converges to a normal

    distribution assuming that the binomial areindependent.

    Therefore the portfolio of loans could b

    thought of as a normal distribution.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    74/134

    DrakeDrake University

    Normal Illustration continued

    However, it is unlikely that the loans are trulyindependent. In a recession it is more likelythat many defaults will occur.

    This invalidates the normal distributionassumption.

    The alternative to the assumption is to use ahistorical back simulation.

  • 8/12/2019 DESS Analyst Value at Risk

    75/134

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    76/134

    DrakeDrake University

    Back Simulation

    Step 1: Measure exposures. Calculate thetotal $ valued exposure to each assets

    Step 2: Measure sensitivity. Measure thesensitivity of each asset to a 1% change ineach of the other assets. This number is thedelta.

    Step 3: Measure Risk. Look at the annual %change of each asset for the past day andfigure out the change in aggregate exposure

    that day.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    77/134

    DrakeDrake University

    Back Simulation

    Step 4 Repeat step 3 using historical data foreach of the assets for the last 500 days

    Step 5 Rank the days from worst to best.Then decide on a confidence level. If youwant a 5% probability look at the return with95% of the returns better and 5% of the

    return worse.Step 6 calculate the VAR

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    78/134

    DrakeDrake University

    Historical Simulation

    Provides a worst case scenario, where Riskmetrics the worst case is a loss of negativeinfinity

    Problems:

    The 500 observations is a limited amount, thusthere is a low degree of confidence that it

    actually represents a 5% probability. Shouldwe change the number of days??

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    79/134

    DrakeDrake University

    Monte Carlo Approach

    Calculate the historical variance covariancematrix.

    Use the matrix with random draws to simulate10,000 possible scenarios for each asset.

    UNIVERSITE

    DAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    80/134

    DrakeDrake University

    BIS Standardized Framework

    Bank of International Settlements proposed astructured framework to measure the marketrisk of its member banks and the offsettingcapital required to manage the risk.

    Two options

    Standardized Framework (reviewed below)

    Firm Specific Internal Framework

    Must be approved by BIS

    Subject to audits

    UNIVERSITE

    DAUVERGNE

    k h

  • 8/12/2019 DESS Analyst Value at Risk

    81/134

    DrakeDrake University

    Risk Charges

    Each asset is given a specific risk chargewhich represents the risk of the asset

    For example US treasury bills have a riskweight of 0 while junk and would have a riskweight of 8%.

    Multiplying the value of the outstandingposition by the risk charges provides capitalrisk charge for each asset.

    Summing provides a total risk charge

    UNIVERSITEDAUVERGNE

    f k h

  • 8/12/2019 DESS Analyst Value at Risk

    82/134

    DrakeDrake University

    Specific Risk Charges

    Specific Risk charges are intended to measurethe risk of a decline in liquidity or credit riskof the trading portfolio.

    Using these produces a specific capitalrequirement for each asset.

    UNIVERSITEDAUVERGNE

    G l M k Ri k Ch

  • 8/12/2019 DESS Analyst Value at Risk

    83/134

    DrakeDrake University

    General Market Risk Charges

    Reflect the product of the modified durationand expected interest rate shocks for eachmaturity

    Remember this is across different types ofassets with the same maturity.

    UNIVERSITEDAUVERGNE

    V i l Off

  • 8/12/2019 DESS Analyst Value at Risk

    84/134

    DrakeDrake University

    Vertical Offsets

    Since each position has both long and shortpositions for different assets, it is assumedthat they do not perfectly offset each other.

    In other words a 10 year T-Bond and a highyield bond with a 10 year maturity.

    To counter act this the is a vertical offset ordisallowance factor.

    UNIVERSITEDAUVERGNE

    H i t l Off t

  • 8/12/2019 DESS Analyst Value at Risk

    85/134

    DrakeDrake University

    Horizontal Offsets

    Within Zones

    For each maturity bucket there are

    differences in maturity creating again theinability to let short and long positions exactlyoffset each other.

    Between Zones

    Also across zones the short an long positionsmust be offset.

    UNIVERSITEDAUVERGNE

    V R P bl

  • 8/12/2019 DESS Analyst Value at Risk

    86/134

    DrakeDrake University

    VaR Problems

    Artzner (1997), (1999) has shown that VaR isnot a coherent measure of risk.

    For Example it does not posses the propertyof subadditvity. In other words the combined

    portfolio VaR of two positions can be greaterthan the sum of the individual VaRs

    UNIVERSITEDAUVERGNE

    A Si l E l *

  • 8/12/2019 DESS Analyst Value at Risk

    87/134

    DrakeDrake University

    A Simple Example*

    Assume a financial institution is facing thefollowing three possible scenarios andassociated losses

    Scenario Probability Loss1 .97 02 .015 100

    3 .015 0

    The VaR at the 98% level would equal = 0

    UNIVERSITEDAUVERGNE

    A Si l E l

  • 8/12/2019 DESS Analyst Value at Risk

    88/134

    DrakeDrake University

    A Simple Example

    Assume you the previous financial institution and itscompetitor facing the same three possible scenarios

    Scenario Probability Loss A Loss B Loss A & B

    1 .97 0 0 02 .015 100 0 1003 .015 0 100 100

    The VaR at the 98% level for A or B alone is 0The Sum of the individual VaRs = VaRA+ VaRB= 0

    The VaR at the 98% level for A and B combinedVaR(A+B)=100

    UNIVERSITEDAUVERGNE

    C h f i k

  • 8/12/2019 DESS Analyst Value at Risk

    89/134

    DrakeDrake University

    Coherence of risk measures

    Let (X) and (Y) be measures of riskassociated with event X and event Yrespectively

    Subadditvity implies (X+Y) < (X) + (Y).

    Monotonicity. Implies X>Y then (X) >(Y).

    Positive homogeneity:Given l > 0 (lX) =

    l(X).Translation Invariance. Given an additionalconstant amount of loss a, (X+a) = (X)+a.

    UNIVERSITEDAUVERGNE

    C h t M f Ri k

  • 8/12/2019 DESS Analyst Value at Risk

    90/134

    DrakeDrake University

    Coherent Measures of Risk

    Artzner (1997, 1999) Acerbi and Tasche(2001a,2001b), Yamai and Yoshiba (2001a,2001b) have pointed to Conditional Value at Risk

    or Tail Value at Risk as coherent measures.

    CVaR and TVaR measure the expected lossconditioned upon the loss being above the VaR

    level.

    Lien and Tse (2000, 2001) Lien and Root (2003)have adopted a more general method looking at

    the expected shortfall UNIVERSITEDAUVERGNE

    T il V R*

  • 8/12/2019 DESS Analyst Value at Risk

    91/134

    DrakeDrake University

    Tail VaR*

    TVaRa(X) = Average of the top (1-a)% loss

    For comparison let VaRa(X) = the (1-a)% loss

    * Meyers 2002 The Actuarial Review

    UNIVERSITEDAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    92/134

    DrakeDrake University

    Scenario X1 X2 X1+X2

    1 4 5 9

    2 2 1 33 1 2 3

    4 5 4 9

    5 3 3 6

    VaR60% 4 4 9

    TVaR60% 4.5 4.5 9

    UNIVERSITEDAUVERGNE

    Normal Distribution

  • 8/12/2019 DESS Analyst Value at Risk

    93/134

    DrakeDrake University

    Normal Distribution

    How important is the assumption thateverything is normally distributed?

    It depends on how and why a distributiondiffers from the normal distribution.

    UNIVERSITEDAUVERGNE

  • 8/12/2019 DESS Analyst Value at Risk

    94/134

    DrakeDrake University

    S&P 500 Monthly Returns vs. Normal Dist

    -30

    20

    70

    120

    170

    220

    - 0 . 4 7 5 - 0 . 4 2 5 - 0 . 3 7 5 - 0 . 3 2 5 - 0 . 2 7 5 - 0 . 2 2 5 - 0 . 1 7 5 - 0 . 1 2 5 - 0 . 0 7 5 - 0 . 0 2 5 0 . 0 2 5 0 . 0 7 5 0 . 1 2 5 0 . 1 7 5 0 . 2 2 5 0 . 2 7 5 0 . 3 2 5 0 . 3 7 5 0 . 4 2 5 0 . 4 7 5

    Returns

    Observations

    S&P

    Nor mal

  • 8/12/2019 DESS Analyst Value at Risk

    95/134

    UNIVERSITEDAUVERGNE

    D kTwo explanations of Fat Tails

  • 8/12/2019 DESS Analyst Value at Risk

    96/134

    DrakeDrake University

    Two explanations of Fat Tails

    The true distribution is stationary andcontains fat tails.

    In this case normal distribution would beinappropriate

    The distribution does change through time.

    Large or small observations are outliers drawnfrom a distribution that is temporarily out ofalignment.

    UNIVERSITEDAUVERGNE

    D kImplications

  • 8/12/2019 DESS Analyst Value at Risk

    97/134

    DrakeDrake University

    Implications

    Both explanations have some truth, it isimportant to estimate variations from theunderlying assumed distribution.

    UNIVERSITEDAUVERGNE

    D kMeasuring Volatilities

  • 8/12/2019 DESS Analyst Value at Risk

    98/134

    DrakeDrake University

    Measuring Volatilities

    Given that the normality assumption is centralto the measurement of the volatility andcovariance estimates, it is possible to attemptto adjust for differences from normality.

    UNIVERSITEDAUVERGNE

    D kMoving Average

  • 8/12/2019 DESS Analyst Value at Risk

    99/134

    DrakeDrake University

    Moving Average

    One solution is to calculate the moving average ofthe volatility

    M

    rM

    i

    it

    1

    2

    s

    UNIVERSITEDAUVERGNE

    D kMoving Averages

  • 8/12/2019 DESS Analyst Value at Risk

    100/134

    DrakeDrake University

    Moving Averages

    Moving Avergages of Volatility S&P 500 Monthly Return

    0

    0.002

    0.004

    0.006

    0.008

    0.01

    0.012

    0.014

    0.016

    0.018

    0 100 200 300 400 500 600 700 800 900

    1 year

    2 year

    5 year

    UNIVERSITEDAUVERGNE

    D kHistorical Simulation

  • 8/12/2019 DESS Analyst Value at Risk

    101/134

    DrakeDrake University

    Historical Simulation

    Another approach is to take the daily pricereturns and sort them in order of highest tolowest.

    The volatility is then found based off of aconfidence interval.

    Ignores the normality assumption! But

    causes issues surrounding window ofobservations.

    UNIVERSITEDAUVERGNE

    D kNonconstant Volatilities

  • 8/12/2019 DESS Analyst Value at Risk

    102/134

    DrakeDrake University

    Nonconstant Volatilities

    So far we have assumed that volatility isconstant over time however this may not bethe case.

    It is often the case that clustering of returnsis observed (successive increases ordecreases in returns), this implies that thereturns are not independent of each other aswould be required if they were normallydistributed.

    If this is the case, each observation should

    not be equally weighted. UNIVERSITEDAUVERGNE

    D kRiskMetrics

  • 8/12/2019 DESS Analyst Value at Risk

    103/134

    DrakeDrake University

    RiskMetrics

    JP Morgan uses an Exponentially WeightedMoving Average.

    This method used a decay factor thatweights each days percentage price change.

    A simple version of this would be to weight bythe period in which the observation took

    place.

  • 8/12/2019 DESS Analyst Value at Risk

    104/134

    UNIVERSITEDAUVERGNE

    DrakeDecay Factors

  • 8/12/2019 DESS Analyst Value at Risk

    105/134

    DrakeDrake University

    Decay Factors

    JP Morgan uses a decay factor of .94 for dailyvolatility estimates and .97 for monthlyvolatility estimates

    The choice of .94 for daily observationsemphasizes that they are focused on veryrecent observations.

    UNIVERSITEDAUVERGNE

    Drake

  • 8/12/2019 DESS Analyst Value at Risk

    106/134

    DrakeDrake University

    Decay Factors

    0

    0.01

    0.02

    0.03

    0.04

    0.05

    0.06

    0 20 40 60 80 100 120 140 160

    Days

    Weighting

    0.94

    0.97

    UNIVERSITEDAUVERGNE

    DrakeMeasuring Correlation

  • 8/12/2019 DESS Analyst Value at Risk

    107/134

    DrakeDrake University

    Measuring Correlation

    Covariance:

    Combines the relationship between the stocks

    with the volatility.(+) the stocks move together

    (-) The stocks move opposite of each other

    iBBiAAi PkkkkABCov ))(()(

    UNIVERSITEDAUVERGNE

    DrakeMeasuring Correlation 2

  • 8/12/2019 DESS Analyst Value at Risk

    108/134

    DrakeDrake University

    Measuring Correlation 2

    Correlation coefficient: The covariance isdifficult to compare when looking at different

    series. Therefore the correlation coefficient isused.

    The correlation coefficient will range from

    -1 to +1

    )/()( BAAB ABCovr ss

    UNIVERSITEDAUVERGNE

    DrakeTiming Errors

  • 8/12/2019 DESS Analyst Value at Risk

    109/134

    DrakeDrake University

    Timing Errors

    To get a meaningful correlation the pricechanges of the two assets should be taken atthe exact same time.

    This becomes more difficult with a highernumber of assets that are tracked.

    With two assets it is fairly easy to look at a

    scatter plot of the assets returns to see if thecorrelations look normal

    UNIVERSITEDAUVERGNE

    DrakeSize of portfolio

  • 8/12/2019 DESS Analyst Value at Risk

    110/134

    DrakeDrake University

    Size of portfolio

    Many institutions do not consider it practicalto calculate the correlation between each pairof assets.

    Consider attempting to look at a portfolio thatconsisted of 15 different currencies. For eachcurrency there are asset exposures in various

    maturities.To be complete assume that the yield curvefor each currency is broken down into 12

    maturities UNIVERSITEDAUVERGNE

    DrakeCorrelations continued

  • 8/12/2019 DESS Analyst Value at Risk

    111/134

    DrakeDrake University

    Correlations continued

    The combination of 12 maturities and 15currencies would produce 15 x 12 = 180separate movements of interest rates that

    should be investigated.

    Since for each one the correlation with eachof the others should be considered, this would

    imply 180 x 180 = 16,110 separatecorrelations that would need to bemaintained.

    UNIVERSITEDAUVERGNE

    DrakeReducing the work

  • 8/12/2019 DESS Analyst Value at Risk

    112/134

    DrakeDrake University

    Reducing the work

    One possible solution to this would bereducing the number of necessarycorrelations by looking at the mid point of

    each yield curve.

    This works IF

    There is not extensive cross asset trading

    (hedging with similar assets for example)There is limited spread trading (long in oneassert and short in another to take advantageof changes in the spread)

    UNIVERSITEDAUVERGNE

    DrakeA compromise

  • 8/12/2019 DESS Analyst Value at Risk

    113/134

    DrakeDrake University

    A compromise

    Most VaR can be accomplished by developinga hierarchy of correlations based on theamount of each type of trading. It also will

    depend upon the aggregation in the portfoliounder consideration. As the aggregationincreases, fewer correlations are necessary.

    UNIVERSITEDAUVERGNE

    DrakeBack Testing

  • 8/12/2019 DESS Analyst Value at Risk

    114/134

    DrakeDrake University

    Back Testing

    To look at the performance of a VaR model,can be investigated by back testing.

    Back testing is simply looking at the loss on aportfolio compared to the previous days VaRestimate.

    Over time the number of days that the VaR

    was exceed by the loss should be roughlysimilar to the amount specified by theconfidence in the model

    UNIVERSITEDAUVERGNE

    DrakeBasle Accords

  • 8/12/2019 DESS Analyst Value at Risk

    115/134

    DrakeDrake University

    Basle Accords

    To use VaR to measure risk the Basle accordsspecify that banks wishing to use VaR mustundertake two different types of back testing.

    Hypotheticalfreeze the portfolio and testthe performance of the VaR model over aperiod of time

    Trading OutcomeAllow the portfolio tochange (as it does in actual trading) andcompare the performance to the previous

    days VaR UNIVERSITEDAUVERGNE

    DrakeBack Testing Continued

  • 8/12/2019 DESS Analyst Value at Risk

    116/134

    DrakeDrake University

    Back Testing Continued

    Assume that we look at a 1000 day windowof previous results. A 95% confidenceinterval implies that the VaR level should have

    been exceed 50 times.

    Should the model be rejected if the it is foundthat the VaR level was exceeded 55 times?

    70 times? 100 times?

    UNIVERSITEDAUVERGNE

    DrakeBack test results

  • 8/12/2019 DESS Analyst Value at Risk

    117/134

    DrakeDrake University

    Back test results

    Whether or not the actual number ofexceptions differs significantly from theexpectation can be tested using the Z score

    for a binomial distribution.

    Type I errorthe model has beenerroneously rejected

    Type II errorthe model has beenerroneously accepted.

    Basle specifies a type one error test.

    UNIVERSITEDAUVERGNE

    DrakeOne tail versus two tail

  • 8/12/2019 DESS Analyst Value at Risk

    118/134

    DrakeDrake University

    One tail versus two tail

    Basle does not care if the VaR modeloverestimates the amount of loss and thenumber of exceptions is low ( implies a one

    tail test)The bank, however, does care if the numberof exceptions is low and it is keeping toomuch capital (implies a two tail test).

    Excess Capital

    Trading performance based upon economiccapital

    UNIVERSITEDAUVERGNE

    DrakeApproximations

  • 8/12/2019 DESS Analyst Value at Risk

    119/134

    DrakeDrake University

    Approximations

    Given a two tail 95% confidence test and 1000days of back testing the bank would accept 39to 61 days that the loss exceeded the VaR

    level.

    However this implies a 90% confidence for theone tail test so Basle would not be satisfied.

    Given a two tail test and a 99% confidencelevel the bank would accept 6 to 14 days thatthe loss exceeded the trading level, under the

    same test Basle would accept 0 to 14 days UNIVERSITEDAUVERGNE

    DrakeEmpirical Analysis of VaR

    (B t 1998)

  • 8/12/2019 DESS Analyst Value at Risk

    120/134

    DrakeDrake University(Best 1998)

    Whether or not the lack of normality is not aproblem was discussed by Best 1998(Implementing VaR)

    Five years of daily price movements for 15assets from Jan 1992 to Dec 1996. Thesample process deliberately chose assets that

    may be non normal.VaR Was calculated for each asset individuallyand for the entire group as a portfolio.

    UNIVERSITEDAUVERGNE

    DrakeFigures 4. Empirical Analysis of VaR

    (Best 1998)

  • 8/12/2019 DESS Analyst Value at Risk

    121/134

    DrakeDrake University(Best 1998)

    All Assets have fatter tails than expectedunder a normal distribution.

    Japanese 3-5 year bonds show significantnegative skew

    The 1 year LIBOR sterling rate shows nothingclose to normal behavior

    Basic model work about as well as moreadvanced mathematical models

    UNIVERSITEDAUVERGNE

    DrakeBasle Tests

  • 8/12/2019 DESS Analyst Value at Risk

    122/134

    DrakeDrake University

    Requires that the VaR model must calculateVaR with a 99% confidence and be testedover at least 250 days.

    Table 4.6

    Low observation periods perform poorly whilehigh observation periods do much better.

    Clusters of returns cause problem for theability of short term models to perform, thisassumes that the data has a longer memory

    UNIVERSITEDAUVERGNE

    DrakeBasle

  • 8/12/2019 DESS Analyst Value at Risk

    123/134

    a eDrake University

    The Basle requirements supplement VaR byRequiring that the bank originally hold 3 timesthe amount specified by the VaR model.

    This is the product of a desire to producesafety and soundness in the industry

  • 8/12/2019 DESS Analyst Value at Risk

    124/134

    UNIVERSITEDAUVERGNE

    DrakeStress Testing

  • 8/12/2019 DESS Analyst Value at Risk

    125/134

    Drake University

    g

    Stress Testing is basically a large scenarioanalysis. The difficulty is identifying theappropriate scenarios.

    The key is to identify variables that wouldprovide a significant loss in excess of the VaRlevel and investigate the probability of those

    events occurring.

    UNIVERSITEDAUVERGNE

    DrakeStress Tests

  • 8/12/2019 DESS Analyst Value at Risk

    126/134

    Drake University

    Some events are difficult to predict, forexample, terrorism, natural disasters, politicalchanges in foreign economies.

    In these cases it is best to look at similar pastevents and see the impact on various assets.

    Stress testing does allow for estimates of

    losses above the VaR level.You can also look for the impact of clusters ofreturns using stress testing.

    UNIVERSITEDAUVERGNE

    DrakeStress Testing withHistorical Simulation

  • 8/12/2019 DESS Analyst Value at Risk

    127/134

    Drake UniversityHistorical Simulation

    The most straightforward approach is to lookat changes in returns.

    For example what is the largest loss thatoccurred for an asset over the past 100 days(or 250 days or)

    This can be combined with similar outcomes

    for other assets to produce a worst casescenario result.

    UNIVERSITEDAUVERGNE

    DrakeStress Testing

    Other Simulation Techniques

  • 8/12/2019 DESS Analyst Value at Risk

    128/134

    Drake UniversityOther Simulation Techniques

    Monte Carlo simulation can also be employedto look at the possible bad outcomes basedon past volatility and correlation.

    The key is that changes in price and returnthat are greater than those implied by a threestandard deviation change need to beinvestigated.

    Using simulation it is also possible to ask whathappens it correlations change, or volatilitychanges of a given asset or assets.

    UNIVERSITEDAUVERGNE

    DrakeManaging Risk with VaR

  • 8/12/2019 DESS Analyst Value at Risk

    129/134

    Drake University

    g g

    The Institution must first determine itstolerance for risk.

    This can be expressed as a monetary amountor as a percentage of an assets value.

    Ultimately VaR expresses an monetaryamount of loss that the institution is willing to

    suffer and a given frequency determined bythe timing confidence level..

    UNIVERSITEDAUVERGNE

    DrakeManaging Risk with VaR

  • 8/12/2019 DESS Analyst Value at Risk

    130/134

    Drake University

    g g

    The tolerance for loss most likely increaseswith the time frame. The institution may bewilling to suffer a greater loss one time each

    year (or each 2 years or 5 years), but that isdifferent than one day VaR.

    For Example, given a 95% confidence level

    and 100 trading days, the one day VaR wouldoccur approximately once a month.

    UNIVERSITEDAUVERGNE

    DrakeSetting Limits

  • 8/12/2019 DESS Analyst Value at Risk

    131/134

    Drake University

    g

    The VaR and tolerance for risk can be used toset limits that keep the institution in anacceptable risk position.

    Limits need to balance the ability of thetraders to conduct business and the risktolerance of the institution. Some risk needs

    to be accepted for the return to be earned.

    UNIVERSITEDAUVERGNE

    DrakeVaR Limits

  • 8/12/2019 DESS Analyst Value at Risk

    132/134

    Drake University

    Setting limits at the trading unit level

    Allows trading management to balance thelimit across traders and trading activities.

    Requires management to be experts in thecalculation of VaR and its relationship withtrading practices.

    Limits for individual tradersVaR is not familiar to most traders (they d onot work with it daily and may not understandhow different choices impact VaR.

    UNIVERSITEDAUVERGNE

    DrakeVaR and changes in volatility

  • 8/12/2019 DESS Analyst Value at Risk

    133/134

    Drake University

    One objection of many traders is that achange in the volatility (especially if it iscalculated based on moving averages) can

    cause a change in VaR on a given position.Therefore they can be penalized for a positioneven if they have not made any trading

    decisions.Is the objection a valid reason to not use

    VaR?

    UNIVERSITEDAUVERGNE

    DrakeStress Test Limits

  • 8/12/2019 DESS Analyst Value at Risk

    134/134

    Drake University

    Similar to VaR limits should be set on theacceptable loss according to stress limittesting (and its associated probability).