1

1.0 Introduction 2

2.0 Purpose 53.0 Scope 6

4.0 Term and denition 6

5.0 Application for approval of scaffold design and drawing 6

6.0 Related information 7

7.0 General requirement 8

8.0 Duration of period 8

9.0 Scaffold alteration 8

Appendix 1 11

Appendix 2 12

Appendix 3 13

Appendix 4 14

Appendix 5 16

Appendix 6 17

Appendix 7 20

TABLE OF CONTENTS

Page 3: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 3/22

2 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

1.0 INTRODUCTION

The purpose of this guideline is to provide a comprehensive approach on scaffolding designapproval for three (3) meter and above in height and assist those with responsibilities under theFactories and Machinery Act 1967 (Act 139). It is intended to Factories and Machinery (Building

Operations and Works of Engineering Construction) (Safety) Regulations 1986) (BOWEC 1986)- [P.U. (A) 328/86].

Based on the provisions under the BOWEC 1986, there are eleven (11) types of installation orerection of scaffold -

(i) Independent scaffold;(ii) Ladder jack scaffold;(iii) Outrigger scaffold;(iv) Plasterers inside scaffold;(v) Single line scaffold;(vi) Suspended scaffold or slung scaffold;(vii) Swinging scaffold;(viii) Trestles scaffold;(ix) Window jack scaffold;(x) Mobile scaffold or scaffold on wheels or skids; and(xi) Cantilever, jib, gure or bracket scaffolds.

Sample of types of installation or erection of scaffold -

Figure 1: Independent scaffold

Page 4: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 4/22

3

Figure 2: Putlog scaffold

Figure 3: Bird cage tower scaffold

Page 5: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 5/22

4 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

Figure 4: Basic part of modular scaffold

Figure 5: Sample basic assembly of scaffolding

Page 6: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 6/22

5

2.0 PURPOSE

This guideline has been prepared to provide practical guidance for the compliance with therequirements set out in regulation 75 of the BOWEC 1986 regarding the approval of scaffolddesign and drawing. In this guideline, approval of scaffolding refers to erection of and subsequent

use of scaffolding for work carried out three (3) metres and above. It has been prepared for thescaffolding industry in particular and the construction industry in general. This guideline is intendedto the BOWEC 1986 -

• Provide requirements on provision 75(1) under the BOWEC 1986.• Be used to establish a framework on scaffolding design approval.• Provide requirements regarding duration of scaffold installed at the construction site or

building construction work.

• Give homogeneous information on scaffold design and diversi cation of the use of scaffold.

Citation from provision 75(1) of the BOWEC 1986;

(i) Metal tube scaffold exceeding 40 metres in height - • Non-prefabricated metal tube scaffold (tube and coupler scaffold): steel tubing

complying with BS 1139.

(ii) Other scaffold exceeding 15 metres in height - • Prefabricated metal tube scaffold: modular/system scaffold, frame scaffold.

• Non-prefabricated metal tube scaffold (tube and coupler scaffold): (aluminiumtubing complying with BS 1139).

• Non-prefabricated metal tube scaffold (tube and coupler scaffold): any metal

complying with other standards (other than BS 1139). • Non-metal tube scaffold.

(i) Metal tube scaffold equivalent to or less than 40 metres in height -• Non-prefabricated metal tube scaffold (tube and coupler scaffold): steel tubing

complying with BS 1139.

The scaffold members of steel tubing shall be complying with BS 1139 / EN 74 “Metal Scaffolding”.

75(1) Every metal tube scaffold exceeding 40 metres in height and every other scaffoldexceeding 15 metres in height shall be constructed in accordance with the design anddrawings of a Professional Engineer.

All other metal tube scaffolds shall have their designs and drawings approved by theChief Inspector.

Page 7: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 7/22

6 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

3.0 SCOPE

These guidelines apply to building operations and works of engineering construction in Malaysiacovered by Factories and Machinery Act 1967.

These guidelines are primarily aimed at the building operation and work of an engineeringconstruction, in relation to the design of scaffolding.

These guidelines should be used by Inspector who has a duty to ensure the safe working ofscaffolding including employers, employees, self-employed persons, architects, engineers,designers, erector, scaffolding inspector, scaffolding erector, manufacturers, suppliers and safetyand health officer (SHO).

This part covers standing scaffolds which are supported wholly or partly from their base. Thescaffolds may be either free-standing or held sideways by ties, rakers or other means. The scaffoldis use as working platform access and egress.

Regarding the loads on working platforms, all decking units of working platforms should haveadequate strength to meet the recommendations for the appropriate duty of that specied inthe following table (BS 1139:Part 5:1990, Table 1. Service loads for working platform, BS 1139:Part 5: 1990) as in Appendix 1.

4.0 TERM AND DEFINITIONS

“designated person” means a person who holds any of the classes certi cates of competency listedin the Appendix 2.

5.0 APPLICATION FOR APPROVAL OF SCAFFOLD DESIGN AND DRAWING

According to provision 4 and sub-provision 75(1) under the BOWEC 1986, any person whoundertakes any scaffold operation or works shall obtain approval from the Chief Inspector.

5.1 Metal tube scaffold

• Metal tube scaffold equivalent to or less than forty (40) metres in height. • Non-prefabricated metal tube scaffold (tube and coupler scaffold): steel tubing

complying with BS 1139.

(i) Application must be made in writing to the state DOSH office fortnight (14days) prior to the construction of the scaffolds.

Page 8: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 8/22

7

(ii) The applicant shall furnish the following –

(a) Letter of undertaking from person who will undertake the scaffold work. (b) Design calculation and drawing of the scaffolds. (c) Specication of material.

(d) Method of statement, not limited to erection, dismantling, maintenance,inspection for the safe use of scaffolds.

(e) List of competent person involve with the scaffold work.

(iii) The Director of DOSH state office may issue approval letter when he nd theapplication is complete and satisfactory.

6.0 RELATED INFORMATION

6.1 Application letter

Application letter shall be submitted together with the details and purpose of the scaffoldto be installed.

6.2 Checklist

Applicant is required to comply with item listed in checklist as Appendix 3.

6.3 Calculation and drawing

All the calculating and drawing for metal tube scaffold prepared by the designated person.

6.3.1 Drawing

The scaffold drawing shall include site layout plan and detail the elevations andsections the scaffold. It is to be made available for inspection at theconstruction site. The scaffold drawing is required to address the followingissues, but not limited to these:

(i) Dimension include transom and ledger in Standard International (SI) unit; (ii) Foundation; (iii) Ties - Type and location (Mark on the drawing); (iv) Bracing;

(v) Raker / Outrigger; (vi) Access & Egress; (vii) Working platform; (viii) Edge protection.

Page 9: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 9/22

8 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

6.3.2 Calculation

(i) Calculation in detail which consists, but not limited to these :

(a) List of components;

(b) New scaffold refer to manufacturer speci cation; (c) Load reduction for used scaffold at least 25% from manufacturer

specication including performance test by certication bodies;(d) Type of duty;

(Note: Refer Appendix 2)

(e) Total of dead load; (f) Total of live load; (g) Total of imposed load; (h) Safety factor; (i) Safe working load;

(j) References Standard.

7.0 GENERAL REQUIREMENT

The requirements of these guidelines should be in addition to, and not in derogation of, theprovisions of any other written law relating to occupational safety and health. The ow chart of the

process for approval of scaffold design and drawing specify under Appendix 4.

8.0 DURATION OF PERIOD

The Department is required to give feedback in written within fortnight (14) working days, afterreceive application from the contractor.

9.0 SCAFFOLD ALTERATION

The contractor has to resubmit the calculation, drawing and method of statement for theconstruction of scaffolds to state DOSH branch before making any alterations.

Page 10: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 10/22

9

REFERENCES

1. Factories and Machinery (Building Operations and Works of Engineering Construction)(Safety) Regulations 1986.

2. Factories and Machinery Act 1967

3. Occupational Safety and Health Act 19944. MS 1462-2-1:2010 - Metal Scaffolding – Part 2: Tubular (Tube and coupler) Scaffold –

Section 1 : Specication for steel tubes5. MS 1462-2-2:2010 – Metal Scaffolding - Part 2: Tubular (Tube and coupler) Scaffold

Section 2: Specication for aluminum tubes6. MS 1462-2-3:2011 - Metal Scaffolding – Part 2: Tubular (Tube and coupler) Scaffold –

Section 3: Specication for steel and aluminium couplers, tting and accessories.7. MS 1462-3-1: 2011- Metal Scaffolding – Part 3: Prefabricated scaffolds – Section 1:

Specication for steel and aluminium modular system scaffolding8. MS 1462-3-2: 2011- Metal Scaffolding – Part 3: Prefabricated scaffoldings – Section 2:Particular mothods of structural design for steel and aluminium modular system scaffoldings

9. MS 1462-4-2:2013 - Metal Scaffolding – Part 4: Temporary works equipment- Section 2:Information on materials

10. BS 1139 Tube scaffolds

Page 11: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 11/22

10 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

APPENDIX

Page 12: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 12/22

11

APPENDIX 1

TABLE 1: SERVICE LOADS FOR WORKING PLATFORM, BS 1139: PART 5:1990

MINIMUM IMPOSED LOADS

Duty Use of platformDistributed load on

platform

Concentrated load tobe applied on plan

over any square witha 300mm side and atthe end portion of a

cantilever

Inspection andvery light duty

Inspection, painting, stonecleaning, light cleaning and

access0.75 kN/m 2 2 kN

Light dutyPlastering, painting, stone

cleaning, glazing andpointing

1.5 kN/m 2 2 kN

General purpose

General building includingbrickwork, window and

mullion, xing, rendering,plastering

2 kN/m 2 2 kN

Heavy dutyBlockwork, brickwork, heavy

cladding2.5 kN/m 2 2 kN

Masonry orspecial duty

Masonry work,concrete blockwork and very

heavy cladding3 kN/m 2 2 kN

Page 13: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 13/22

12 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

APPENDIX 2

TABLE 2: DESIGNATED PERSON (BASIC, INTERMEDIATE AND ADVANCED)

DESIGNATED PERSON

No Type of level Type of scaffold

1 Basic

• Independent

• Mobile Tower Scaffold• Static Tower Scaffold• Birdcage Scaffold• Putlog / Single line Scaffold• Trestle Scaffold

2 Intermediate

• Truck Access/Gantry (Tension and Compression)• Truss-out (Spur)• Barrow Ramp• Cantilever Scaffold• Cantilever Catch Platform (Protective Fan)• Outrigger Scaffold

3 Advanced• Hung Scaffold• Slung Scaffold

• Suspended Scaffold

Page 14: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 14/22

13

CHECKLIST FOR APPROVAL OF DESIGN SCAFFOLDING

1. Name and address of applicant:

2. Telephone and fax number :3. Project title and location :4. Person in charge:5. Related document :

Bil Description Tick ( √)

1 Types of scaffold -

(a) Metal tube scaffold- Metal tube scaffold exceeding 40 metres in height

(b) Other scaffold- Other scaffold exceeding 15 metres inheight

(c) Metal tube scaffold equivalent to orless than 40 metres in height-Non-prefabricated metal tube scaffold(tube and coupler scaffold): steel tubingcomplying with BS 1139

2 A copy of design drawing at least A3 size

(a) Plan;(b) Front view; and(c) Side elevation.

• Tubular• Frame and

modular• Other scaffold

3 Design calculation

4 Method of statement for the construction ofscaffolds

5 List of competent person

6 Copy of scaffolder certificate

7 Letter of undertaking from person who willundertake the scaffold work

8 Catalogue (special requirement for otherscaffold)

……………………………… ..Date : ……………….. (Signature of applicant)

APPENDIX 3

Page 15: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 15/2214

G U I D E L I N

E S F O R

A P P R O V A L O F D E S I G N

S C A F F O L D I N G

T e r i m a

P e r m o

h o n a n

T a m a

t

K e

l u a r k a n

S u r a

t

K e

l u l u s a n

K e

l u a r k a n

S u r a

t

T i d a k

B e r j a y a

M i n t a M a

k l u m a

t T a m

b a

h a n

S e m a

k

K e n a

l p a s t i

j e n

i s b a

h a n

p e r a n c a

h

K e

l u l u s a n

P e

j a b a

t N e g e r i

P e

j a b a

t n e g e r

i k e l u a r k a n s u r a

t

k e p a

d a p e m o h o n u n

t u k m e r u

j u k

k e p a

d a

I b u

P e

j a b a

t b a g

i

m e n

d a p a t k a n

k e l u l u s a n

B

A

P e n g a r a

h N e g

e r i / T

P / K e

t u a

C a w a n g a n

( 2 h a r i )

1 0 h a r i

K e

t u a

S e

k s y e n

/ P e g a w a

i

( 2 h a r i )

L e

b i h d a r i

7 h a r i p e r m o

h o n a n

d i t o l a k

L e n g

k a p

G a

g a

l

L u

l u s

D i n y a t a k a n

d a l a m B O W E C 1 9 8 6

T i d a k d i n y a t a k a n d a l a m B O W E C 1 9 8 6 ( e . g

J I S , A l u m i n i u m

,

B l a c k S t e e l e t c . )

T i d a

k L e n g

k a p

C A R T A

A L I R

P E J A B A T N E G E R I

A P P E N D I X 4

Page 16: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 16/22

1 5

T e r i m

a P e r m o

h o n a n

T a m a

t

K e

l u a r k a n S u r a

t T i d a

k

B e r j a y a

k e p a

d a p e m o

h o n

K e

l u a r k a n

S u r a

t K e

l u l u s a n

K h a s

k e p a

d a p e m o

h o n

M i n t a M a

k l u m a

t T a m

b a

h a n

S e m a

k

P e m o

h o n

m e m

b e n

t a n g

k a n

j u s t i

f i k a s i p e m

i l i h a n

b a

h a n

k e p a

d a

J a b a

t a n

B

A

P e n g a r a

h B a

h a g

i a n K

e s e

l a m a

t a n

T a p a

k B i n a

( 2

h a r i )

M a

k l u m

k a n

k e p a

d a

p e

j a b a

t n e g e r i

1 0 h a r i

K e

t u a

S e

k s y e n

/ P e g a w a

i

( 2 h a r i )

L e

b i h d a r i 7

h a r i p e r m o

h o n a n

d i t o l a k

L e n g

k a p

L u

l u s

G a g a

l

T i d a

k L e n g

k a p

B

M a

k l u m

k a

n k e p a

d a

p e

j a b a t n e g e r i

C A R T A

A L I R

I B U

P E J A B A T

Page 17: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 17/22

16 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

APPENDIX 5

Ruj. Tuan :Ruj. Kami :Tarikh :

Tuan,

PERMOHONAN KEBENARAN PEMASANGAN PERANCAH

NAMA PROJEK : …………………………………………………………… .

LOKASI : …………………………………………………………… .

2. Dimaklumkan bahawa Jabatan telah menyemak permohonan kebenaranpemasangan perancah bagi projek di atas. Kebenaran pemasangan tertaklukkepada butiran seperti berikut:

Nama dan alamat Pemohon :

No. Telefon dan Faksimili :Nama Projek dan Lokasi :

Nombor Pendaftaran Tapak bina :Jenis Perancah :Ketinggian Perancah :Tempoh Pemasangan Perancah :

3. Sekiranya terdapat perubahan pada butiran di atas, kebenaran ini akanterbatal dengan sendirinya. Sehubungan dengan itu, pihak Tuan masih tertaklukdibawah peruntukkan perundangan Jabatan ataupun Agensi Penguatkuasaan yang

berkaitan.

Sekian, terima kasih.

‘BERKHIDMAT UNTUK NEGARA’

Saya yang menurut perintah,

(PENGARAH NEGERI)

Page 18: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 18/22

17

APPENDIX 6

Ruj. Tuan :Ruj. Kami :Tarikh :

Tuan,

PERMOHONAN KEBENARAN PEMASANGAN PERANCAH

NAMA PROJEK :……………………………………………………………

.

LOKASI :……………………………………………………………

.

Dengan hormatnya saya di arah merujuk kepada perkara tersebut di atas.

2. Dimaklumkan bahawa Jabatan memerlukan maklumat-maklumat berikutuntuk tujuan pemprosesan permohonan tuan:

Dokumen yang diperlukan adalah seperti berikut:

Bil Description Tick ( √ )

1 Type of scaffold

(a) Metal tube scaffold

- Metal tube scaffold exceeding 40 metres in height

(b) Other scaffold

- Other scaffold exceeding 15 metres in height

(c) Metal tube scaffold equivalent to or less than 40metres in height

-Non-prefabricated metal tube scaffold (tube and couplerscaffold): steel tubing complying with BS 1139

2 Design drawing

A copy of design drawing at least A3 size

(a) Plan;(b) Front view; and(c) Side elevation.(d) Detail drawing consist of -

(i) Dimension include transom and ledger inStandard International (SI) unit

(ii) Foundation

Page 19: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 19/22

18 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

(iii) Ties-Type and location (Mark on the drawing)

(iv) Bracing

(v) Raker / Outrigger(vi) Access & Egress(vii) Base plate

3 Design calculation

(a) List of components(b) New scaffold refer to manufacturer specification(c) Load reduction for used scaffold at least 25% from

manufacturer specificationNote: MS 1462 Part 2-1:2010 (New scaffold 100%; usedscaffold 75%)

(d) Type of duty (Refer Appendix 2)(e) Total of dead load(f) Total of live load(g) Total of imposed load(h) Safety factor(i) Safe working load(j) References Standard

4 Method of statement for the construction of scaffolds

including

(a) Methodology of scaffolding installation(b) Hazard identification risk assessment and risk

control (HIRARC)(c) Safe operationg procedure (SOP)

5 List and copy of scaffolder certificate

6 Letter of declaration between employer (Main contractor orsub contractor) and scaffolder

7 Catalogue

Note: Special requirement for other scaffold

3. Maklumat ini hendaklah dikemukakan dalam tempoh tujuh (7) hari daripadatarikh surat ini. Sebarang kelewatan perlu dimaklumkan dengan kadar segerakepada pihak Jabatan. Sekiranya Tuan gagal berbuat demikian, pihak Jabatanmenganggap Tuan tidak berminat dan permohonan Tuan akan ditolak.

Page 20: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 20/22

19

4. Kerjasama daripada pihak Tuan amatlah diharapkan. Sebarang pertanyaan,sila berhubung dengan ………………………………………… .. ditalian …………………….

Sekian, terima kasih.

‘BERKHIDMAT UNTUK NEGARA’

Saya yang menurut perintah,

(b.p PENGARAH NEGERI)

Page 21: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 21/22

20 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING

Ruj. Tuan :Ruj. Kami :Tarikh :

Tuan,

KEPUTUSAN PERMOHONAN KEBENARAN PEMASANGAN PERANCAH

NAMA PROJEK : …………………………………………………………… .

LOKASI : …………………………………………………………… .

Dengan hormatnya saya di arah merujuk kepada perkara tersebut di atas.

2. Berdasarkan hasil semakan yang dibuat oleh Jabatan, permohonan Tuandidapati tidak dapat dipertimbangkan untuk kelulusan di bawah Peraturan 75,Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-KerjaBinaan Kejuruteraan) (Keselamatan) 1986.

3. Walau bagaimanapun, Tuan boleh membuat permohonan semula setelahmemenuhi syarat-syarat yang ditetapkan.

Sekian terima kasih.

‘BERKHIDMAT UNTUK NEGARA’

Saya yang menurut perintah,

(PENGARAH NEGERI)

APPENDIX 7

Page 22: Design Scaffold 2016

8/16/2019 Design Scaffold 2016

http://slidepdf.com/reader/full/design-scaffold-2016 22/22