1.0 Introduction 2
2.0 Purpose 53.0 Scope 6
4.0 Term and denition 6
5.0 Application for approval of scaffold design and drawing 6
6.0 Related information 7
7.0 General requirement 8
8.0 Duration of period 8
9.0 Scaffold alteration 8
Appendix 1 11
Appendix 2 12
Appendix 3 13
Appendix 4 14
Appendix 5 16
Appendix 6 17
Appendix 7 20
TABLE OF CONTENTS
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 3/22
2 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
1.0 INTRODUCTION
The purpose of this guideline is to provide a comprehensive approach on scaffolding designapproval for three (3) meter and above in height and assist those with responsibilities under theFactories and Machinery Act 1967 (Act 139). It is intended to Factories and Machinery (Building
Operations and Works of Engineering Construction) (Safety) Regulations 1986) (BOWEC 1986)- [P.U. (A) 328/86].
Based on the provisions under the BOWEC 1986, there are eleven (11) types of installation orerection of scaffold -
(i) Independent scaffold;(ii) Ladder jack scaffold;(iii) Outrigger scaffold;(iv) Plasterers inside scaffold;(v) Single line scaffold;(vi) Suspended scaffold or slung scaffold;(vii) Swinging scaffold;(viii) Trestles scaffold;(ix) Window jack scaffold;(x) Mobile scaffold or scaffold on wheels or skids; and(xi) Cantilever, jib, gure or bracket scaffolds.
Sample of types of installation or erection of scaffold -
Figure 1: Independent scaffold
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 4/22
3
Figure 2: Putlog scaffold
Figure 3: Bird cage tower scaffold
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 5/22
4 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
Figure 4: Basic part of modular scaffold
Figure 5: Sample basic assembly of scaffolding
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 6/22
5
2.0 PURPOSE
This guideline has been prepared to provide practical guidance for the compliance with therequirements set out in regulation 75 of the BOWEC 1986 regarding the approval of scaffolddesign and drawing. In this guideline, approval of scaffolding refers to erection of and subsequent
use of scaffolding for work carried out three (3) metres and above. It has been prepared for thescaffolding industry in particular and the construction industry in general. This guideline is intendedto the BOWEC 1986 -
• Provide requirements on provision 75(1) under the BOWEC 1986.• Be used to establish a framework on scaffolding design approval.• Provide requirements regarding duration of scaffold installed at the construction site or
building construction work.
• Give homogeneous information on scaffold design and diversi cation of the use of scaffold.
Citation from provision 75(1) of the BOWEC 1986;
(i) Metal tube scaffold exceeding 40 metres in height - • Non-prefabricated metal tube scaffold (tube and coupler scaffold): steel tubing
complying with BS 1139.
(ii) Other scaffold exceeding 15 metres in height - • Prefabricated metal tube scaffold: modular/system scaffold, frame scaffold.
• Non-prefabricated metal tube scaffold (tube and coupler scaffold): (aluminiumtubing complying with BS 1139).
• Non-prefabricated metal tube scaffold (tube and coupler scaffold): any metal
complying with other standards (other than BS 1139). • Non-metal tube scaffold.
(i) Metal tube scaffold equivalent to or less than 40 metres in height -• Non-prefabricated metal tube scaffold (tube and coupler scaffold): steel tubing
complying with BS 1139.
The scaffold members of steel tubing shall be complying with BS 1139 / EN 74 “Metal Scaffolding”.
75(1) Every metal tube scaffold exceeding 40 metres in height and every other scaffoldexceeding 15 metres in height shall be constructed in accordance with the design anddrawings of a Professional Engineer.
All other metal tube scaffolds shall have their designs and drawings approved by theChief Inspector.
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 7/22
6 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
3.0 SCOPE
These guidelines apply to building operations and works of engineering construction in Malaysiacovered by Factories and Machinery Act 1967.
These guidelines are primarily aimed at the building operation and work of an engineeringconstruction, in relation to the design of scaffolding.
These guidelines should be used by Inspector who has a duty to ensure the safe working ofscaffolding including employers, employees, self-employed persons, architects, engineers,designers, erector, scaffolding inspector, scaffolding erector, manufacturers, suppliers and safetyand health officer (SHO).
This part covers standing scaffolds which are supported wholly or partly from their base. Thescaffolds may be either free-standing or held sideways by ties, rakers or other means. The scaffoldis use as working platform access and egress.
Regarding the loads on working platforms, all decking units of working platforms should haveadequate strength to meet the recommendations for the appropriate duty of that specied inthe following table (BS 1139:Part 5:1990, Table 1. Service loads for working platform, BS 1139:Part 5: 1990) as in Appendix 1.
4.0 TERM AND DEFINITIONS
“designated person” means a person who holds any of the classes certi cates of competency listedin the Appendix 2.
5.0 APPLICATION FOR APPROVAL OF SCAFFOLD DESIGN AND DRAWING
According to provision 4 and sub-provision 75(1) under the BOWEC 1986, any person whoundertakes any scaffold operation or works shall obtain approval from the Chief Inspector.
5.1 Metal tube scaffold
• Metal tube scaffold equivalent to or less than forty (40) metres in height. • Non-prefabricated metal tube scaffold (tube and coupler scaffold): steel tubing
complying with BS 1139.
(i) Application must be made in writing to the state DOSH office fortnight (14days) prior to the construction of the scaffolds.
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 8/22
7
(ii) The applicant shall furnish the following –
(a) Letter of undertaking from person who will undertake the scaffold work. (b) Design calculation and drawing of the scaffolds. (c) Specication of material.
(d) Method of statement, not limited to erection, dismantling, maintenance,inspection for the safe use of scaffolds.
(e) List of competent person involve with the scaffold work.
(iii) The Director of DOSH state office may issue approval letter when he nd theapplication is complete and satisfactory.
6.0 RELATED INFORMATION
6.1 Application letter
Application letter shall be submitted together with the details and purpose of the scaffoldto be installed.
6.2 Checklist
Applicant is required to comply with item listed in checklist as Appendix 3.
6.3 Calculation and drawing
All the calculating and drawing for metal tube scaffold prepared by the designated person.
6.3.1 Drawing
The scaffold drawing shall include site layout plan and detail the elevations andsections the scaffold. It is to be made available for inspection at theconstruction site. The scaffold drawing is required to address the followingissues, but not limited to these:
(i) Dimension include transom and ledger in Standard International (SI) unit; (ii) Foundation; (iii) Ties - Type and location (Mark on the drawing); (iv) Bracing;
(v) Raker / Outrigger; (vi) Access & Egress; (vii) Working platform; (viii) Edge protection.
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 9/22
8 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
6.3.2 Calculation
(i) Calculation in detail which consists, but not limited to these :
(a) List of components;
(b) New scaffold refer to manufacturer speci cation; (c) Load reduction for used scaffold at least 25% from manufacturer
specication including performance test by certication bodies;(d) Type of duty;
(Note: Refer Appendix 2)
(e) Total of dead load; (f) Total of live load; (g) Total of imposed load; (h) Safety factor; (i) Safe working load;
(j) References Standard.
7.0 GENERAL REQUIREMENT
The requirements of these guidelines should be in addition to, and not in derogation of, theprovisions of any other written law relating to occupational safety and health. The ow chart of the
process for approval of scaffold design and drawing specify under Appendix 4.
8.0 DURATION OF PERIOD
The Department is required to give feedback in written within fortnight (14) working days, afterreceive application from the contractor.
9.0 SCAFFOLD ALTERATION
The contractor has to resubmit the calculation, drawing and method of statement for theconstruction of scaffolds to state DOSH branch before making any alterations.
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 10/22
9
REFERENCES
1. Factories and Machinery (Building Operations and Works of Engineering Construction)(Safety) Regulations 1986.
2. Factories and Machinery Act 1967
3. Occupational Safety and Health Act 19944. MS 1462-2-1:2010 - Metal Scaffolding – Part 2: Tubular (Tube and coupler) Scaffold –
Section 1 : Specication for steel tubes5. MS 1462-2-2:2010 – Metal Scaffolding - Part 2: Tubular (Tube and coupler) Scaffold
Section 2: Specication for aluminum tubes6. MS 1462-2-3:2011 - Metal Scaffolding – Part 2: Tubular (Tube and coupler) Scaffold –
Section 3: Specication for steel and aluminium couplers, tting and accessories.7. MS 1462-3-1: 2011- Metal Scaffolding – Part 3: Prefabricated scaffolds – Section 1:
Specication for steel and aluminium modular system scaffolding8. MS 1462-3-2: 2011- Metal Scaffolding – Part 3: Prefabricated scaffoldings – Section 2:Particular mothods of structural design for steel and aluminium modular system scaffoldings
9. MS 1462-4-2:2013 - Metal Scaffolding – Part 4: Temporary works equipment- Section 2:Information on materials
10. BS 1139 Tube scaffolds
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 11/22
10 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
APPENDIX
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 12/22
11
APPENDIX 1
TABLE 1: SERVICE LOADS FOR WORKING PLATFORM, BS 1139: PART 5:1990
MINIMUM IMPOSED LOADS
Duty Use of platformDistributed load on
platform
Concentrated load tobe applied on plan
over any square witha 300mm side and atthe end portion of a
cantilever
Inspection andvery light duty
Inspection, painting, stonecleaning, light cleaning and
access0.75 kN/m 2 2 kN
Light dutyPlastering, painting, stone
cleaning, glazing andpointing
1.5 kN/m 2 2 kN
General purpose
General building includingbrickwork, window and
mullion, xing, rendering,plastering
2 kN/m 2 2 kN
Heavy dutyBlockwork, brickwork, heavy
cladding2.5 kN/m 2 2 kN
Masonry orspecial duty
Masonry work,concrete blockwork and very
heavy cladding3 kN/m 2 2 kN
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 13/22
12 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
APPENDIX 2
TABLE 2: DESIGNATED PERSON (BASIC, INTERMEDIATE AND ADVANCED)
DESIGNATED PERSON
No Type of level Type of scaffold
1 Basic
• Independent
• Mobile Tower Scaffold• Static Tower Scaffold• Birdcage Scaffold• Putlog / Single line Scaffold• Trestle Scaffold
2 Intermediate
• Truck Access/Gantry (Tension and Compression)• Truss-out (Spur)• Barrow Ramp• Cantilever Scaffold• Cantilever Catch Platform (Protective Fan)• Outrigger Scaffold
3 Advanced• Hung Scaffold• Slung Scaffold
• Suspended Scaffold
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 14/22
13
CHECKLIST FOR APPROVAL OF DESIGN SCAFFOLDING
1. Name and address of applicant:
2. Telephone and fax number :3. Project title and location :4. Person in charge:5. Related document :
Bil Description Tick ( √)
1 Types of scaffold -
(a) Metal tube scaffold- Metal tube scaffold exceeding 40 metres in height
(b) Other scaffold- Other scaffold exceeding 15 metres inheight
(c) Metal tube scaffold equivalent to orless than 40 metres in height-Non-prefabricated metal tube scaffold(tube and coupler scaffold): steel tubingcomplying with BS 1139
2 A copy of design drawing at least A3 size
(a) Plan;(b) Front view; and(c) Side elevation.
• Tubular• Frame and
modular• Other scaffold
3 Design calculation
4 Method of statement for the construction ofscaffolds
5 List of competent person
6 Copy of scaffolder certificate
7 Letter of undertaking from person who willundertake the scaffold work
8 Catalogue (special requirement for otherscaffold)
……………………………… ..Date : ……………….. (Signature of applicant)
APPENDIX 3
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 15/2214
G U I D E L I N
E S F O R
A P P R O V A L O F D E S I G N
S C A F F O L D I N G
T e r i m a
P e r m o
h o n a n
T a m a
t
K e
l u a r k a n
S u r a
t
K e
l u l u s a n
K e
l u a r k a n
S u r a
t
T i d a k
B e r j a y a
M i n t a M a
k l u m a
t T a m
b a
h a n
S e m a
k
K e n a
l p a s t i
j e n
i s b a
h a n
p e r a n c a
h
K e
l u l u s a n
P e
j a b a
t N e g e r i
P e
j a b a
t n e g e r
i k e l u a r k a n s u r a
t
k e p a
d a p e m o h o n u n
t u k m e r u
j u k
k e p a
d a
I b u
P e
j a b a
t b a g
i
m e n
d a p a t k a n
k e l u l u s a n
B
A
P e n g a r a
h N e g
e r i / T
P / K e
t u a
C a w a n g a n
( 2 h a r i )
1 0 h a r i
K e
t u a
S e
k s y e n
/ P e g a w a
i
( 2 h a r i )
L e
b i h d a r i
7 h a r i p e r m o
h o n a n
d i t o l a k
L e n g
k a p
G a
g a
l
L u
l u s
D i n y a t a k a n
d a l a m B O W E C 1 9 8 6
T i d a k d i n y a t a k a n d a l a m B O W E C 1 9 8 6 ( e . g
J I S , A l u m i n i u m
,
B l a c k S t e e l e t c . )
T i d a
k L e n g
k a p
C A R T A
A L I R
P E J A B A T N E G E R I
A P P E N D I X 4
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 16/22
1 5
T e r i m
a P e r m o
h o n a n
T a m a
t
K e
l u a r k a n S u r a
t T i d a
k
B e r j a y a
k e p a
d a p e m o
h o n
K e
l u a r k a n
S u r a
t K e
l u l u s a n
K h a s
k e p a
d a p e m o
h o n
M i n t a M a
k l u m a
t T a m
b a
h a n
S e m a
k
P e m o
h o n
m e m
b e n
t a n g
k a n
j u s t i
f i k a s i p e m
i l i h a n
b a
h a n
k e p a
d a
J a b a
t a n
B
A
P e n g a r a
h B a
h a g
i a n K
e s e
l a m a
t a n
T a p a
k B i n a
( 2
h a r i )
M a
k l u m
k a n
k e p a
d a
p e
j a b a
t n e g e r i
1 0 h a r i
K e
t u a
S e
k s y e n
/ P e g a w a
i
( 2 h a r i )
L e
b i h d a r i 7
h a r i p e r m o
h o n a n
d i t o l a k
L e n g
k a p
L u
l u s
G a g a
l
T i d a
k L e n g
k a p
B
M a
k l u m
k a
n k e p a
d a
p e
j a b a t n e g e r i
C A R T A
A L I R
I B U
P E J A B A T
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 17/22
16 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
APPENDIX 5
Ruj. Tuan :Ruj. Kami :Tarikh :
Tuan,
PERMOHONAN KEBENARAN PEMASANGAN PERANCAH
NAMA PROJEK : …………………………………………………………… .
LOKASI : …………………………………………………………… .
2. Dimaklumkan bahawa Jabatan telah menyemak permohonan kebenaranpemasangan perancah bagi projek di atas. Kebenaran pemasangan tertaklukkepada butiran seperti berikut:
Nama dan alamat Pemohon :
No. Telefon dan Faksimili :Nama Projek dan Lokasi :
Nombor Pendaftaran Tapak bina :Jenis Perancah :Ketinggian Perancah :Tempoh Pemasangan Perancah :
3. Sekiranya terdapat perubahan pada butiran di atas, kebenaran ini akanterbatal dengan sendirinya. Sehubungan dengan itu, pihak Tuan masih tertaklukdibawah peruntukkan perundangan Jabatan ataupun Agensi Penguatkuasaan yang
berkaitan.
Sekian, terima kasih.
‘BERKHIDMAT UNTUK NEGARA’
Saya yang menurut perintah,
(PENGARAH NEGERI)
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 18/22
17
APPENDIX 6
Ruj. Tuan :Ruj. Kami :Tarikh :
Tuan,
PERMOHONAN KEBENARAN PEMASANGAN PERANCAH
NAMA PROJEK :……………………………………………………………
.
LOKASI :……………………………………………………………
.
Dengan hormatnya saya di arah merujuk kepada perkara tersebut di atas.
2. Dimaklumkan bahawa Jabatan memerlukan maklumat-maklumat berikutuntuk tujuan pemprosesan permohonan tuan:
Dokumen yang diperlukan adalah seperti berikut:
Bil Description Tick ( √ )
1 Type of scaffold
(a) Metal tube scaffold
- Metal tube scaffold exceeding 40 metres in height
(b) Other scaffold
- Other scaffold exceeding 15 metres in height
(c) Metal tube scaffold equivalent to or less than 40metres in height
-Non-prefabricated metal tube scaffold (tube and couplerscaffold): steel tubing complying with BS 1139
2 Design drawing
A copy of design drawing at least A3 size
(a) Plan;(b) Front view; and(c) Side elevation.(d) Detail drawing consist of -
(i) Dimension include transom and ledger inStandard International (SI) unit
(ii) Foundation
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 19/22
18 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
(iii) Ties-Type and location (Mark on the drawing)
(iv) Bracing
(v) Raker / Outrigger(vi) Access & Egress(vii) Base plate
3 Design calculation
(a) List of components(b) New scaffold refer to manufacturer specification(c) Load reduction for used scaffold at least 25% from
manufacturer specificationNote: MS 1462 Part 2-1:2010 (New scaffold 100%; usedscaffold 75%)
(d) Type of duty (Refer Appendix 2)(e) Total of dead load(f) Total of live load(g) Total of imposed load(h) Safety factor(i) Safe working load(j) References Standard
4 Method of statement for the construction of scaffolds
including
(a) Methodology of scaffolding installation(b) Hazard identification risk assessment and risk
control (HIRARC)(c) Safe operationg procedure (SOP)
5 List and copy of scaffolder certificate
6 Letter of declaration between employer (Main contractor orsub contractor) and scaffolder
7 Catalogue
Note: Special requirement for other scaffold
3. Maklumat ini hendaklah dikemukakan dalam tempoh tujuh (7) hari daripadatarikh surat ini. Sebarang kelewatan perlu dimaklumkan dengan kadar segerakepada pihak Jabatan. Sekiranya Tuan gagal berbuat demikian, pihak Jabatanmenganggap Tuan tidak berminat dan permohonan Tuan akan ditolak.
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 20/22
19
4. Kerjasama daripada pihak Tuan amatlah diharapkan. Sebarang pertanyaan,sila berhubung dengan ………………………………………… .. ditalian …………………….
Sekian, terima kasih.
‘BERKHIDMAT UNTUK NEGARA’
Saya yang menurut perintah,
(b.p PENGARAH NEGERI)
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 21/22
20 GUIDELINES FOR APPROVAL OF DESIGN SCAFFOLDING
Ruj. Tuan :Ruj. Kami :Tarikh :
Tuan,
KEPUTUSAN PERMOHONAN KEBENARAN PEMASANGAN PERANCAH
NAMA PROJEK : …………………………………………………………… .
LOKASI : …………………………………………………………… .
Dengan hormatnya saya di arah merujuk kepada perkara tersebut di atas.
2. Berdasarkan hasil semakan yang dibuat oleh Jabatan, permohonan Tuandidapati tidak dapat dipertimbangkan untuk kelulusan di bawah Peraturan 75,Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-KerjaBinaan Kejuruteraan) (Keselamatan) 1986.
3. Walau bagaimanapun, Tuan boleh membuat permohonan semula setelahmemenuhi syarat-syarat yang ditetapkan.
Sekian terima kasih.
‘BERKHIDMAT UNTUK NEGARA’
Saya yang menurut perintah,
(PENGARAH NEGERI)
APPENDIX 7
8/16/2019 Design Scaffold 2016
http://slidepdf.com/reader/full/design-scaffold-2016 22/22