PP-2 DESERT COOLER REQUIREMENT FOR THE YEAR 2016 Sr.No. Department Location No. Period months TOTAL
1
Operation
CWPH 1 7
13
2 Boiler 0 met operator room 1 73 lub oil operator room 1 74 dredge pump house operator room 1 75 ladies rest room 1 76 AGM operation staff room 1 47 Dispatch room 1 48 Canteen (manager) 1 49 canteen ( staff room ) 1 4
10 Turbine BFP cabin 1 411 ICH canteen kitchen 1 412 ash brick plant 1 413 IAC 4 operator room 1 414
DM PLANTAnalysis lab 1 4
315 oil analysis lab 1 416 coal analysis lab 1 417
CHP
staff room (Repair shop) 1 4
7
18 Incharge room (Repair shop) 1 419 Operation room 1 420 Operation room 1 421 Dozer operator room 1 422 Dozer operator room 1 423 stone picking room 1 424
EMD
Labour hall 1 4
525 Tech Meeting room 1 426 Shift staff room 1 427 EMD store,tech new room 1 428 EMD motor repair shop 1 429
STORE
store hall 1 4
430 store Hall 1 431 stora hall 1 432 store R & M 1 433 safety Training room 1 4 234 Training room 1 435 TMD TG hall ground floor 1 4 236 TMD shed offsite area 1 437
CISFGate PP-2 1 4
338 GatePP-2 1 439 CABIN 1 440 BMD Store 1 4 241 BMD STAFF 1 442 C & I Technician room 1 4 143 IT G2 IT room 1 4 1
TOTAL 43 43
DATE - 17.11.2015