MEMORANDUM DEPARTMENT OF PUBLIC WORKS County of Placer TO: FROM: BOARD OF SUPERVISORS .YJj KEN GREHM / KEVIN ORDWAY DATE: November 4, 2008 SUBJECT: STATE ROUTE 65 / SUNSET BOULEVARD INTERCHANGE PROJECT, PACIFIC GAS & ELECTRIC STATEMENT OF APPLICANT'S CONTRACT ANTICIPATED COSTS AGREEMENT ACTION REQUESTED / RECOMMENDATION Adopt a Resolution authorizing the Director of Public Works to execute an agreement with Pacific Gas & Electric (PG&E) in an estimated amount of $47,835.80 for the Statement of Applicant's Contract Anticipated Costs (SACAC), for the installation of PG&E's electric distribution lines and service extension for the traffic signals and street lights associated with the State Route 65 / Sunset Boulevard Interchange Project. BACKGROUND/SUMMARY The Department of Public Works (DPW) is proposing to replace the current at-grade signalized intersection with a grade-separated partial cloverleaf interchange with a six lane over-crossing at Sunset Blvd and State Route 65, the project will reduce traffic congestion, accidents and delays. The project will allow for the future expansion of State Route 65 to eight lanes with auxiliary lanes and will accommodate the increased traffic demand generated by existing and approved develop'ment in the project area of south Placer County. The SACAC identifies PG&E's estimated cost to provide the electrical service and engineering to support the installation of Traffic Signals and Lighting associated with the State Route 65 / Sunset Blvd. Interchange. The Electric Distribution line and Service Extension cost summary outlines the County's financial responsibilities and provides a refundable option of $891.82 should in ten (10) years additional service be provided to other PG&E customers from this source. The work to install this service will be provided by PG&E. ENVIRONMENTAL The Placer County Board of Supervisors approved the Mitigated Negative Declaration forthis project and a Notice of Determination was filed on May 23,2006. FISCAL IMPACT The Electric Distribution line and Service Extension as outlined in the SACAC is estimated to cost $47,835.80. The funding is included in the FY 2008/2009 Budget. Attachments: Resolution Copy of SACAC Agreement \ \';f1 T:\DPW\RoadwaysandBridges\Engineering\BOS\2008 BOS Items\November 4\Sunset - SR65 Interchange\Memo & Reso - SACAC.doc

Upload: lenguyet

Post on 30-Mar-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

MEMORANDUMDEPARTMENT OF PUBLIC WORKS

County of Placer

TO:

FROM:

BOARD OF SUPERVISORS.YJj

KEN GREHM / KEVIN ORDWAY

DATE: November 4, 2008

SUBJECT: STATE ROUTE 65 / SUNSET BOULEVARD INTERCHANGE PROJECT,PACIFIC GAS &ELECTRIC STATEMENT OF APPLICANT'SCONTRACT ANTICIPATED COSTS AGREEMENT

ACTION REQUESTED / RECOMMENDATIONAdopt a Resolution authorizing the Director of Public Works to execute an agreementwith Pacific Gas & Electric (PG&E) in an estimated amount of $47,835.80 for theStatement of Applicant's Contract Anticipated Costs (SACAC), for the installation ofPG&E's electric distribution lines and service extension for the traffic signals and streetlights associated with the State Route 65 / Sunset Boulevard Interchange Project.

BACKGROUND/SUMMARYThe Department of Public Works (DPW) is proposing to replace the current at-gradesignalized intersection with a grade-separated partial cloverleaf interchange with a sixlane over-crossing at Sunset Blvd and State Route 65, the project will reduce trafficcongestion, accidents and delays. The project will allow for the future expansion ofState Route 65 to eight lanes with auxiliary lanes and will accommodate the increasedtraffic demand generated by existing and approved develop'ment in the project area ofsouth Placer County.

The SACAC identifies PG&E's estimated cost to provide the electrical service andengineering to support the installation of Traffic Signals and Lighting associated with theState Route 65 / Sunset Blvd. Interchange. The Electric Distribution line and ServiceExtension cost summary outlines the County's financial responsibilities and provides arefundable option of $891.82 should in ten (10) years additional service be provided toother PG&E customers from this source. The work to install this service will be providedby PG&E.

ENVIRONMENTALThe Placer County Board of Supervisors approved the Mitigated Negative Declarationforthis project and a Notice of Determination was filed on May 23,2006.

FISCAL IMPACTThe Electric Distribution line and Service Extension as outlined in the SACAC isestimated to cost $47,835.80. The funding is included in the FY 2008/2009 Budget.

Attachments: ResolutionCopy of SACAC Agreement

\ \';f1T:\DPW\RoadwaysandBridges\Engineering\BOS\2008 BOS Items\November 4\Sunset - SR65 Interchange\Memo & Reso - SACAC.doc

Before the Board of SupervisorsCounty of Placer, State of California

In the matter of: A RESOLUTION AUTHORIZINGTHE DIRECTOR OF PUBLIC WORKS TO APPROVEAND EXECUTE A SACAC AGREEMENT WITH PG&ETO INSTALL THEIR FACILITIES AS OUTLINED INTHE ELECTRICAL DISTRIBUTION LINE ANDSERVICE EXTENSION COST SUMMARY FOR THESTATE ROUTE 65/ SUNSET BLVD. INTERCHANGEPROJECT.

Resal. No: .

Ord. No: ..

First Reading: .

The following RESOLUTION was duly passed by the Board of Supervisors

of the County of Placer at a regular meeting held _

by the following vote on roll call:

Ayes:

Noes:

Absent:

Signed and approved by me after its passage.

Attest:Clerk of said Board

Chairman, Board of Supervisors

BE IT HEREBY RESOLVED by the Board of Supervisors of the County of Placer,State of California, that this Board authorizes the Director of Public Works to signa SACAC Agreement with PG&E for the installation of their facilities as outlined inthe Electric Distribution Lines and Service Extension Cost Summary for theproposed State Route 65/ Sunset Blvd. Interchange Project.

\ \00

August 8, 2008

COUNTY OF PLACER, Government Agency3091 COUNTY CENTER DR #220AUBURN, CA 95603

RE: Contract ID: 1075110: SR 65 / SUNSET

DearCOUNTY OF PLACER, Government Agency,

Enclosed are gas and/or electric agreements for your project located at:

SR 65 / SUNSET, ROCKLIN, 95677

This letter summarizes the agreements for this project.

Electric·Dist(ibOtr.oh.a6Cl8er,\jjc~?Ii~te~r)§

Less CreeJit'(~8§ i6'~~ti,B,g\\~,~~~"~~~:;$~f~~;'TOTAL **

TOTAL PAYMENT DUE

Non-RefundablePayment

$46,943,98

$47,835.80

RefundableOption*

$891,82

OR

* Only applies to Rule 15 Refundable Amounts. Amount shown is less credit for associated Applicant work,** The Income Tax Component of Contribution (ITCC) is included in the above charges when applicable.

Please sign both copies of the agreement and return one copy of the agreement to the address below along with yourpayment and retain one copy for your records, If the agreement is not returned to PG&E within 90 days of the date of thisletter, the proposed agreement is canceled and PG&E may need to re-estimate the job,

Changes to the agreement, either to any of the terms or to the amount owing, are not permitted, and any change orinterlineations voids the agreement. The payment of any amount less than the full amount shown will be deposited byPG&E, but PG&E will no~ begin any work on this contract until the amount is paid in full. The contract shall be deemedeffective the date a fUlly executed copy is received by PG&E. Please allow 5 days from PG&E's receipt of the Agreementfor construction to commence.

PG&E is committed to providing timely and efficient service and we look forward to continuing to work with you on thisand future projects,

Should you have any questions regarding these contracts, please contact your project manager Mary J, Westfall at530-889-3114 or MJWB@pge,com.

Please send the executed Agreements and payment to:

PG&E CFM/PPC DEPARTMENTPO BOX 997340Sacramento, CA 95899-73400

Sincerely,

MO\\'j ~~??~r

Marty NepperService Planning Supervisor

1IIIIIIIIIIIIIIllllllllllllllllllll~IIIIIIIIIIIIIIII~1I11I102956183E

\\.~ \Ref: Contract 10: 1075110: SR 65/ SUNSET, ROCKLIN, 95677

Dear COUNTY OF PLACER, Government Agency,

In response to your application for service, enclosed is the new CPUC-required form, "Statement of Applicant'sContract Anticipated Costs," (SACAC) which identifies PG&E's cost for the refundable work that is PG&E'sresponsibility to install as part your job.. However, this is work that you can elect to provide under the competitivebidding provisions of G~s/Electric Rules 15 and 16. You can perform this work yourself, hire a contractor, or hirePG&E to do this work. Regardless of whom you choose to do the work, you must complete and return this form.

" If you elect to perform this work or have a contractor do it, please enter your costs in the section ofthe form entitled "Applicant Costs."

G If you elect to perform this work yourself or have a contractor do it and choose not to provide your costs,please so indicate in the section entitled "Applicant's Election Not To Provide Costs," date, sign andreturn the form.

If you want PG&E to perform the work, check the section "Applicant's Election Not To Provide Costs,"date, sign and return the form.

PG&E's costs. are valid for 90 days from 08/08/2008

PG&E cannot proceed with any work on your application until you sign and return the SACAC form.

Please return this document with any other contract documents regarding this job to:

PG&E CFM/PPC DEPARTMENTPO BOX 997340Sacramento, CA 95899-7340

If you have any questions regarding this form please contact your project manager or our contract helpline at 1-800-422-0436.

I1111111111111111111111111111111111111111111I1111I1I11111II1

102956183E

STATEMENT OF APPLICANT'S CONTRACTANTICIPATED COSTS.*

Project Name: SR 65/ SUNSET

Project Location: SR 65/ SUNSET, ROCKLIN, 95677

Notification Number: 102956183

PM Number(s): (Gas) (Electric) 30623433

APPLICANT COSTS

The following statement must only include the contracted anticipated installed costs offacilities installed by the Applicant that are refundable and that are PG&E's responsibilityunder its tariffs.

The costs provided by the Applicant must be taken from the Applicant's contract with itscontractor. If the Applicant will be performing the work itself, the Applicant must alsocomplete and sign this form.

The Applicant's statement of costs will be compared with PG&E's estimated installed costs ofthe same facilities, the lower of which will be used to determine the amount subject toallowances and refunds in accordance with the provisions of PG&E's Gas and Electric Rules 15and 16.

If the Applicant chooses not to provide its costs, it must complete the last section of thisform. Until the Applicant either provides the refundable cost from its contract with itscontractor (or its own cost, if applicable), or returns this form indicating that it will notdo so, PG&E will not proceed with any work on the Applicant's project.

GAS

Residential Service Facilities:

Applicant: $._---------~

PG&E:

ELECTRIC

Residential Service Facilities:

Applicant: $-----------PG&E:

Number of gas service: ..Q Stubs: 0 Number of Electric service: 0

• Applicant's statement of costs include: overhead or underground service conductors,poles, service transformers, connection fittings, service pipe, valves, service connections,and other PG&E-owned service equipment, as detailed in Gas and Electric Rule 16.

• Applicant's statement of costs DOES NOT include: inspection fees, nonresidentialservice costs, regulators, or PG&E-owned metering equipment.

1111I111111111111111111111111I1111I1I1111111111111111111I111

102956183E

Page 1 of 2

* Autornatsd document, Preliminary Stalem,:=mt, Part ,~

Tarilfs aridAdvice 24-S8-G-C237q·r:

,\'2~ Decisir)il O:>03-eU2LJ -...kffective: -iuiy\. 2CiC)·1

$458.94

GAS

Gas Distribution Facilitiesand Non-Residential Service Services:

Applicant: $-----------

PG&E:

GAS DISTRIBUTION TRENCH

Applicant: $-----------

PG&E:

ELECTRIC

Electric Distribution Facilitiesand Non-Residential Service Services:

Applicant: $'-- _

PG&E:

G Applicant's statement of costs include: cables, switches, transformers, distributionmain, valves, regulators, nonresidential service costs, and other distribution facilities·required to complete the distribution line extension, as detailed in Gas and Electric Rule 15as PG&E's responsibility.

G Applicant's statement of costs DOES NOT include: inspection fees, tie-in of system byPG&E, distribution substructures, electric trench, conduits, feeder conduits, or protectivestructures, as detailed in Gas and Electric Rule 15. .

L ---' --------------------'

I declare under penalty of perjury that the foregoing is true and correct

[] APPLICANTS ELECTION NOT TO PROVIDE COSTS: (if this option selected, box must be checked)

I choose not to provide to the utility my refundable costs for this project as taken from mycontract with my contractor, or as performed by myself, and acknowledge that PG&E will useits estimate of the refundable costs for this project in the contract between it and me.

Executed on

By:

Print Applicant Name:

Signed:

Title:

III11111111I1111111111 ~IIIIIIIIIIIIIIIIIIIIIII ~11111111111102956183E

(Date)at AUBURN, CA

(City)

Page 2 of 2

'Automated document, Preliminary Statement, Part A

Forni Tt'-' '1 00::::Tariffs and Ccrnpli"inc;;

Advice 2458-G-Ci23?::}·F

\ \"ll \ Decision 03-U3-0:120'"\ Effective .July '. 2(}:)-l

Pacific Gas andElectric Company@

DISTRIBUTION SERVICE AND EXTENSION AGREEMENTDECLARATIONS 1

DISTRIBUTION:

~Applicant (. copy)Division (copy)CFM (Original)T&CS

REFERENCES:

Notification #

Contract #

E-PM#

G-PM#

Prior MLX E IG

Customer #

102956183

1075110

30623433

'Submitted to 1\\J?\\cant b'J',MI\R'i j. \N'CS\r I\\..\..

Date o~ issuance', August 4, 2008

1. COUNTY OF PLACER, GOVERNMENT AGENCY (Applicant), has requested

PACIFIC GAS & ELECTRIC COMPANY, a California corporation (PG&E), to deliverElectric energy to the property situated at SR 65/ SUNSET, ROCKLIN, 95677 and shownon the attached drawings.

2. Applicable Documents. The cost summary for the facilities to be installed is attached hereto as Exhibit A.These facilities shall be installed in accordance with the applicable rules on file with the California Public UtilitiesCommission (which may include Gas and Electric Rules 2, 13, 15, 16, and 20), as well as the requirementsset forth in the Provisions and the General Terms and Conditions for Gas and Electric Service by Applicant.

These documents are located online in PG&E's Tariff Book, which is available athttp://wwwpge.com/customer_service/new_construction_services/. Should you require hard copiesplease contact your PG&E Representative.

3. Construction Options. The responsibility for providing line extension work is divided between PG&E and the Applicant.However, Applicant may choose to have a qualified contractor perform some of the work that is PG&E's responsibility,

and may choose to have PG&E perform some or all of the work that is the Applicant's responsibility. PG&E will reimburseor collect money based on its estimate of the costs, subject to the applicable rules. Based on Applicant's request, thecontract costs are based on the following construction options:

1 To Be Performed ByPG&E Responsibility

PG&E Aoolicant

Main Trench 0 DGas Main Pipe Installation 0 D

Service Pipe Installation 0 D.Distribution Wire and

0 DEquipment InstallationElectric

Service Wire Installation [X] D2 To Be Performed By

Applicant ResponsibilityPG&E Applicant

Gas Service Trench 0 DDistribution Trench 0 DService Trench 0 DElectric

Distribution Substructure0 DInstallation

Service Substructure Installation [X] D....

1. PG&E s responsibilities per Rule 15.b.1.b and Rule 16.0.22. Applicant's responsibilities per Rule 15.b.1.a and Rule 16.0.1

1III111111111111111111I1I111111111111I11111111111I1111111I11

1029S6183E

Page 1 of 2

Automated document, Preliminary Statement, Part A '~i~~d ~~'3~~~~:~~E:~~::~~')

- or

o Non-Refundable 50% Discount Option

(Authorized Signature)

Service Planning Supervisor

Sierra

4. [~] N/A

RefundlDiscount Option Selection

Applicant, in accordance with PG&E's extension rules, must select one of the following options for each commodityyou are requesting service (gas and/or electric). Once the selection has been made, it cannot be changed.

r::---------------..---------------~-----,

IGas Electric

I D 10-Year Subject to Refund Option D 10-Year Subject to Refund OptionII __ -or

~"J Non-Refundable 50% Discount Option

ACCEPTED:

APPLICANT: COUNTY OF PLACER, GOVERNMENT AGENCY

r'By:

(Authorized Signature)

I1_-------------------------------1

(Type or Print Name)

~ITLE:I DATE:

MAILING ADDRESS: 3091 COUNTY CENTER DR #220AUBURN, CA 95603

PACIFIC GAS AND ELECTRIC COMPANY:

r'BY:1---I Marty Nepper~-------------------(T-yp-e-'o:....rP-r-in:""tN'--a-m-,e)------------I

ITITLE'

l~IYISION:I DATE:L----- ---J

1111\11111111111111111111111111111111111111111111111111\1111

1029S6183E

Page 2 of 2

Revised Decf;n;~)(::( 2.UU;:';

Pacific Gas and Electric CompanyDISTRIBUTION AND SERVICE EXTENSION AGREEMENTEXHIBIT A • COST SUMMARY

REFERENCES: Notification #

Contract #

E-PM#

G-PM #

102956183

1075110

30623433

Applicant: COUNTY OF PLACER, GOVERNMENT AGENCY

Project Location/Name: SR 65 I SUNSET, ROCKLIN, 95677

SUMMARY OF PAYMENTS

The total cash payment you need to make depends upon your selection of the 10 Year Refundable AdvanceOption or the Non-Refundable Discount Option for your gas and/or electric extension under Rule 15. Since youmay elect one option for the gas extension and a different option for the electric extension, several different cashpayments are available. Each payment option is summarized below. These payments include all billing underthis Agreement including payments SUbject to refund, and non-refundable payments. To determine what isrefundable or non-refundable, or to see full detailed billing information, please see the attached cost summaries.Even if you have no payment due for your gas and/or electric extension (Rule 15), you must still elect the 10 YearRefundable or Non-Refundable Discount Option for each extension on the second page of the Declarations.

10 Year Refundable Advance Option. Gas & Electric (1)

-- OR

Non-Refundable Discount Option _Gas & Electric (1)

-- OR

10 Year Refundable Advance Option _Gas / (1)

Non-Refundable Discount Option - Electric

-- OR

10 Year Refundable Advance Option. Electric / (1)

Non-Refundable DiscountOption - Gas

$47,835.80 (2)

(3)$47,389.89

(2)$47,389.89

(2)$47,835.80

(1) Amounts shown do not include reimbursements for facilities that are normally the responsibility of PG&E per ourtariffs. See the Reimbursement Summary for a total of all Reimbursements to be paid upon acceptance of facilities.

(2) The payment amount shown on this line includes both refundable payments under Rule 15 for the gas and/or electricextension, plus other non-refundable payments. The total payment is not subject to refund. Please see the attacheddetailed Cost Summaries to determine the portion of this payment that may be subject to refund.

(3) The payment amount shown on this line includes only non-refundable payments under Rule 15 for the gas and/or electricextension, plus other non-refundable payments. None of the payment shown is subject to refund.

Page 1 of 1

II IIII11I11 I102956183E

\016\_4.1;27 iR"" '~f('i';"

_ ..I' \1 t .. "i .,..... l.!

Serilce Pfann:n9Advice No. 1633-Gin·i2·E

Automated document, Preiiminary Statement, Part A Effective 4j{;~:!9'1

Pacific Gas and Electric CompanyDISTRIBUTION AND SERVICE EXTENSION AGREEMENTEXHIBIT A - COST SUMMARY *

REFERENCES:

Notification #

Contract #

PM#

MLX #

102956183

107511030623433

Applicant: COUNTY OF PLACER, GOVERNMENT AGENCY

Project Location/Name: SR 65 / SUNSET, ROCKLIN, 95677

ELECTRIC DISTRIBUTION LINE AND SERVICE EXTENSION COST SUMMARY

Cost of Ownership charges as described in the rules and in the Unsupported Extension Cost section of the Provisions of this

Agreement: Apply

Total number of residential lots/units for this project:

Total number of non-residential lots/units for this project:

Calculations to determine excess residential service allowance to be applied to distribution line refundable amount on a perlot/unit basis:

(5)Cost of Services:

Engineering & Administrative Costs

Value of Applicant Design Work

Service Tie-In Cost (Energized) by PG&E

Electric MeteringOthers (N/A)

Inspection Fees

Service Cost - PG&E installed

Service Cost - Applicant installed

# Services

# Services

oo

(+)

(+)

(+)

(+)

(+)(+)

(+)

$0.00$0.00

$0.00$0.00$0.00$0.00(4)

$0.00$0.00(5)

Total Estimated Cost of Service Subject to Allowance

Cost of Service Within Allowance:

less Total Residential Service Allowance

$2,02900 x 0 =Excess Service Cost

Estimated Service Cost Within Allowance (Total less Excess)

Average Cost per Lot or Unit Within Allowance

(=)

(-)(=)

(=)

$0.00(1),$0.00

$0.00

o =

Excess Service Allowance Applied to Distribution Line Extension Refundable

Amount per Lot or Unit:

$2,029.00 $0.00 =Allowance Ave. Cost / Unit

II IIII II1I1

1029S6183E

\ \Q7(~"-'"-,..... ,," -'- "),1<.1'J .11. ',"J ,'......

Tariffs and Cornpii2n'~i':'

,A,dl/ice 2552-C-Bi2Sri -E.-F3Page 1 of 4 Decision 04-05-05':,

" A,utomated document, Preliminary Statement, Part ,4 Effective: Julv 2G '.2U():1

Allowances

Residential:$2,029.00Allowance

x oLots / Units

(=)

plus ITCC @ 22% Residential Allowances

SUB TOTAL Residential Allowance

Non-Residential: $0.00 0.1680 (=)Net Annual Revenue Cost-of-Service-Factor

plus ITCC @ 22% Non-Residential Allowances

SUB TOTAL Non-Residential Allowances

less Residential Service Allowance:

o-Lots/Units

x $0.00 ) + 22% =Ave. Cost / Unit ITCC

Total Distribution Line Extension Allowance

Amount Subject to Refund

Engineering & Administrative Costs

Value of Applicant Design Work

Tie-In of Distribution Line Extension by PG&E

Electric Metering (Non-Residential Projects)

Other Taxable Charges: N/A

PG&E installed - Cost of Distribution Line and Non-Res Svcs.

Applicant installed - Cost of Distribution Line and Non-Res Svcs.

Value of Distribution Substructures

Inspection Fees

SUB TOTALplus ITCC @ 22%

Total Refundable Amount

Less Total Allowances (not to exceed Total Refundable Amount)

Balance: Net Refundable Amount

(+)

(+)

(+)

(+)

(+)

(+)

(+)

(+)

(=)(+)

(=)(-)(=)

$210.06

$0.00

$0.00

$62.00

$0.00

$458.94$0.00 (5)

$0.00$0.00 (4)

$731.00

$160.82

$891.82

$0.00

$891.82

$891.82(2)(=)

$891.82

$445.91

$891.82

$0.00$0.00 (5)

$0.00

(-)(-)

(- )

(- )=0.50Discount Rate

10 Year Refundable Advance Option

Balance: Net Refundable Amount

Less Credit for Value of Applicant Design Work

Less Cost of Dis\. Line Ext. and Non-Res Svcs. installed by Applicant

Less Distribution Substructures by Applicant

Net 10 Year Refundable Advance Option Payment

Non-Refundable Discount Option

Balance: Net Refundable Amount

less Discount $891.82 xBalance

Less Credit for Value of Applicant Design Work

Less Cost of Dist. Line Ext. and Non-Res Svcs. installed by Applicant

Less Distribution Substructures by Applicant

(- )

(-)(-)

$0.00$0.00 (5)

$0.00

Net Non-Refundable Discount Option Payment (=) $445.91 (2)

\111 I II III II1029S6183E

Tariffs and CDrnpli~;inCi·~

Ad\/ice 2552-G-BI25! 7-t-BPage 2 of 4 Decision 04-05-05;:"

, Automated document, Preliminary Statement, Part ,u. Effective: July ;Zi), 20C'"

Non-Refundable PaymentsRule 16 Non-Refundable Payments

Excess Service Costs

Service Costs Beyond Preferred Service Location

Service Riser

Value of Rule 16 Land Rights Costs

Value of Service Trench, Conduits & Substructures in theFranchise Area or on 3rd Party Property

Inspection Fees

Rule 16 Trench Permits Obtained by PG&E

Other Taxable Charges: N/A

Cost of Additional Rule 16 Applicant Design Plan Checks

SUB TOTAL

Plus ITCC @ 22%

Other Non-taxable Charges: N/A

0.04-05-055 Line Extension Costs - Residential

0.04-05-055 Line Extension Costs - Non-Residential

Inspection Fees (not subject to ITCC)

Plus Service Trench, Conduits, & Substructures installed byPG&E on Private Property

Less Excess Service Facilities Installed by Applicant

Less Service Costs Beyond Preferred Location by Applicant

Less Service Riser Installed by Applicant

Less Service Trench, Conduits, & Substructures in theFranchise Area & 3rd Party Property installed by Applicant

Less Rule 16 Applicant Design Work Associated with Excess

Tatal Rule 16 Non-Refundable Payment

Rule 15 Non-Refundable Payments

Inspection Fees

Re-engineering / Composite Fees

Cost of Additional Applicant Design Plan Checks

Value of Distribution Conduits

Distribution Risers Installed by PG&E

Value of Distribution Trench

PG&E Land Rights Costs

Rule 15 Trench Permits Obtained by PG&E

N/A

SUB TOTAL

Plus ITCC @ 22%

Less Distribution Conduits Installed by Applicant

Less Distribution Trench Provided by Applicant

Total Non-Refundable Electric Rule 15 Payment

Relocation / Rearrangement of PG&E Facilities

Value of Relocation/Rearrangement Facilities

Value of Relocation/Rearrangement Conduits & Substructures

Value of Relocation/Rearrangement Trench & Excavation

Engineering & Administrative Costs

(+)

(+)

(+)

(+)

(+)(+)

(+)

(+)

(=)

(+)

(+)(+)

(+)

(+)

(+)

(-)

(-)

(-)

(-)

(-)

(+)

(+)

(+)(+)

(+)

(+)

(+)

(+)

(=)

(+)

(-)(-)

(+)

(+)

(+)

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$185.00

$0.00

$22.00

$0.00

$0.00

$0.00

$0.00

$0.00

(=)

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

(=)

$24,861.73

$0.00

$0.00

$13,447.27

$207.00

I111111111I111111111111I111111111111I11I11

Form 79-1 OC'!Tariffs and Cornplia:~c,.:.

Advice 2552-G-Bi2517-E-8Page 3 of 4 Decision 04-05-0'')5

., ...'\utomated document, Preliminary Statement, Part A Effective: ,july 2b. 20:}/1

Value of Relocation Applicant Design Work

Cost of Additional Applicant Design Plan Checks

Tie-In of Relocation/Rearrangement by PG&E

Relocation/Rearrangement Trench Permits. Obtained by PG&ERelocation/Rearrangement Land Rights

Relocation/Rearrangement Inspection FeesSUB TOTAL

Plus ITCC @ 22%

Plus Relocation/Rearrangement - Non Taxable

Less Relocation/Rearrangement Facilities Installed by Applicant

Less Conduits & Substructures Installed by Applicant

Less Trench & Excavation Provided by Applicant

Less Value of Relocation Applicant Design Work

Less Relocation/Rearrangement Salvage

Total Relocation / Rearrangement of PG&E Facilities Payment

(+)

(+)

(+)(+)(+)

(+)

(=)

(+)

(+)

H.(-)(-)(-)(-)

$0.00$0.00

$0.00

$0.00$0.00$0.00

$38,309.00

$8,427.98'$0.00

$0.00

$0.00

$0.00$0.00 .

$0.00

(=) $46J36.98

(+)

(+)

(+)

Total Payment for Electric Distribution Line and Service Extension

Cash Payment -10-Year Refundable Advance Option

Rule 15 Refundable Advance Payment

Rule 16 Non-Refundable Payment

Rule 15 Non-Refundable Payment

Relocation/Rearrangement of PG&E Facilities PaymentTotal

--OR--

$891.82 (3)

$207.00

$0.00

$46,736.98

(=) $47,835.80

Cash Payment· Non-Refundable Discount Option

Rule 15 Non-Refundable Discount Option Payment

Rule 16 Non-Refundable Payment (Not Subject to Discount)

Rule 15 Non-Refundable Payment (Not Subject to Discount)

Relocation/Rearrangement of PG&E FacilitiesPaymentTotal

(+)

(+)

(+)

$445.91 (3)

$207.00

$0.00

$46,736.98

(=) $47,389.89

Value of Electric Facility Reinforcements by PG&E: $0.00 based upon Applicant's estimated

demand of: 000 kVa

(Reference: Payment Adjustments. Excess Facilities section of the Provisions)

(1) Total Service Allowance not to exceed the Cost of Service(2) 10 Year Refundable and Discount Option credit amounts will be paid upon acceptance of facilities. Credit amounts are subject

to future deficiency billing in accordance with the tariff.(3) 10 Year Refundable and Discount Option credit amounts do not offset Other Non-Refundable or Relocation Fees, See Reimbursement

Summary for a total of Reimbursements and Credits to be paid upon acceptance of facilities.(4) Inspection Fees (Only Refundable if Applicant's Actual Cost is Used. Applicant's Actual Cost + Inspection Cannot Exceed

PG&E's Estimate)(5) The lower of PG&E's estimated costs or the Applicant's Contract Anticipated Costs (as documented on Form 79-1003

"Statement of Contract Anticipated Costs") will be used to establish the cost of Service and Distribution Line Extension subject to Allowance

** PG&E USE ONLY

Excess service allowance applied to distribution refundable amount per lot/unit

$0.00 + $0.00 (=) $0.00Allowance 22% ITCe Refund per Residential LoUUnit

111I1111111111I1I111111I111I1I1I1II11102956183E

Tariffs and Con:pild:-:ceAdvice 2552-G-8!25! 7-E-G

Page 4 of 4 Decision OA-OS-,:(i;:,

~ Automated document, Preliminary Statement, Part A Effective: July "2b, :2DiJ;l

Pacific Gas and Electric CompanyDISTRIBUTION AND SERVICE EXTENSION AGREEMENTEXHIBIT A • COST SUMMARY

REFERENCES:

Notification #

Contract #

E15-PM #

E16R-PM #

E20B-PM #

E20C-PM #

G15-PM #

G16R-PM #

102956183

1075110

30623433

30623433

30623433

30623433

Applicant: COUNTY OF PLACER, GOVERNMENT AGENCYProject Location/Name: SR 65/ SUNSET, ROCKLIN, 95677

REIMBURSEMENT SUMMARYReimbursements are provided for facilities that are installed by the Applicant which are normally the responsibility ofPG&E per our tariffs. Reimbursements will be made after the facilities are accepted by PG&E, operational and ready tosupply service, Reimbursable payments made for services will be reimbursed at the average rate shown as each serviceis connected. All reimbursements will be based upon PG&E's estimated costs.

Electric Rule 15

10 Year Refundable Advance Credit Amount $0.00(1)

Non-Refundable Discount Option Credit Amount

Joint Pole Credits

PG&E Betterments

(+)(+)

- or ­

$0.00(1)

$0.00

$0.00

SUB TOTAL: w/ 10 Year Refundable Advance Credit Amount (=)

- or -

w/ Non-Refundable Discount Credit Amount (=)

Electric Rule 16Joint Pole Credits

Applicant Design Work within the Allowance

SUB TOTAL:

(+)$0.00

$0.00

(=)

Reimbursements per Service Completion. Electric

Energized System(2)

$0.00 /service

Non-energized System $0.00 /service (2)

Electric Rule 20BJoint Pole Credits

Rule 20B Payment Credit

SUB TOTAL:

(+)

$0.00

. $0.00

(=)

Electric Rule 20eJoint Pole Credits

Rule 20C Payment Credit

SUB TOTAL:

(+)$0.00

$0.00

(=)

Forrn 79··· ,·;O{)~·:

Decision ·,,· ..-,-u,nJ,_'L

Efft:;ctl\fe: .JUlY 'I. ?C\,,",

Tariffs an(j.Advice 2458-G-C!237E\-t:·C.

Page 1 of 2

* J\utornated document, Preliminary Statement, Pari A102956183E

111111111111111111111111111 111111111111111 1III1I111111111111

$0.00(+) $0.00

(+) $0.00

(+) $O~OO

(+) $0.00

(+) $0.00

(+) $0.00

(+) $0.00

(=) $0.00

LS-2Connections

SUB TOTAL:

StreetlightsLS·1Standard Luminaries

Standard Poles &Arms

Protective TubesInternal Wiring

Overhead Conductor

Underground Conductor

Connections

Non-Refundable Discount Option Credit Amount

PG&E Betterments

Gas Rule 15

10 Year Refundable Advance Credit Amount

SUB TOTAL: w( 10 Year Refundable Advance Credit Amount

w( Non-Refundable Discount Credit Amount

(1)

$0.00

- or-(1)

$0.00 .

(+) $0.00

(=) $0.00

- or-

(=) $0.00

Gas Rule 16Stub Services

Applicant Design Work within the Allowance

SUB TOTAL:

(+)

$0.00

$0.00

(=)

Reimbursements per Service Completion - Gas

Pressurized System(2)

$0.00 (service

Non-Pressurized System(2)

$0.00 (service

Total Reimbursement

10 Year Refundable Advance Option - Gas & Electric-- OR

Non-Refundable Discount Option. Gas & Electric

•• OR

10 Year Refundable Advance Option - Gas ( Non-Refundable Discount Option· Electric

-. OR

10 Year Refundable Advance Option· Electric (Non·Refundable Discount Option - Gas

(3)

$0.00

(3)

$0.00

(3)

$000

(3)

$0.00

..........-._-- -----------------------------------------(1) 10 Year Refundable and Discount Option credit amounts will be paid upon acceptance of facilities. Credit amounts are su bject

to future deficiency billing in accordance with the tariff.(2) This Reimbursement will be paid on a per service basis as each service is completed.(3) Excludes service completion reimbursements made under Rule 16. Service completion reimbursements will be made as each

service is connected, on a per service basis.

1111111111111111111111111111111111111~~111111111111111III1029S6183E

Page 2 of 2

• Automated document. Preliminary Statement, Part ,r:".

Forrn 79- 'I (':0·:3.Tariffs and CO!!,;:;:;",,"/-:

Advice 2458-G-C!2379-E-CDecision O:~-n:)·Ci32

Effective: Jui~il , 2[;0: