department of energy oi andum - nrc: home pagealtomare (urc) led a isussion on neeioind for a common...
TRANSCRIPT
-
Department of Energy+states Government
....oi andum __( ++•> +-- • #4),8 p, RW-24,
Distribution of the Report of the April 22, 1986 Meeting of the DOE/N .-RCtAS Interagency coordinating Committee
Distribution
The fIrst:-Attachment to this memorandum is the report of the
second •'i ing of the DE/NnRC Licensing Support System (LSS)
Inteia g ' oordinating Cmmitte*O (ICC). This:meeting was open to 06301l1c lad was held in the ozl• estal Building, the DOE
ha010Ts building; at 1000 independen•e Ave.,, Washington, ".Crt of the nmeting is being distributed for you
rof+t~ t s of business conducted during the meeting was to reach ags, ment on the owrding of the charter for the ICC. After the meewtng, the lead DOB andN-RC eprzesentatives signed the charter., ' copy of the signed ch er is also attached for your infozmioa.
If. youq haeny questions concerning this meeting, or any of the attached.:4aterial,, I Can be rahdon -telephone number 202-252-. 5625. 1t- .
€c.- 3 •*ead, .Acting Leader Lcsing Team
Office of Geologic Repositories
Attachment:. I.1 meeting Report, Licensing SprtSystem,, DOE/NRC
InergecyCoordinating Cote,22 April 1986 2 .W ste.NghJv l 3 ioative Waste Repository,
fl~IngSUPPort System Interagency Coordinating .,ittee, signed April 22, 1986
cowr il •ltomareNRC S Phil Altomare,, NRC
WVIAReqJI fiW$�� P'�e�t Doc� No. - - -- ..--- -
PD� '-* - --
LPR..
+ ,%rL+,•+.-'8605280387 160501 PDR WASTE WVI-1 S PDR
23
-
-2 -
Distribution: R. August, DOE/RW-22 A. Avol,* SRP A. Bender, )(RCIDWN Ke Un~der # .P ID. Urezike Snvironaental Policy Institute C. Caseront NRC/OEWD J. Carison#, 11-32 a., Corny. `DoZ/0TI D. Christy,- Kisas. Dept, of Energy and Trans. M. Collins. ,NRC.Adain. L. Desell.r 1-0132J. Zbinqero- Yes Perce Tribe s. Schol, Dvow/0011. To J. Zrickson, Daeta Retrieval Karen x. Batch 7O/I
ReonomAropc Corp*
Me 1900.7 14ston
N. Ues. OS/252 3 16.. ýu1181 IIs -Attorney General's Office
0. s m O/2 TO.- ?iiq XACABeada b. Tonsle7.."3mam & Weiss D. Viethi, - -! 3. wittamae Utah State and Indian Tribe Contacts (14 copies)
-
Meeting Report Licensing Support System
DOE/NRC Interagency Coordinating Committee 22 April 1986
9 -.
Purpose: This oeeting was the second seeting of the DOE/NRC Interagency Coordinating Committee (ICC) that has been
established to coordinato development of the Geologic Repositorý
Licensing Support SysteAm (LBS). Tho specific top 4cs discussed
vere as specified in the agenda provided as Attachment (1).
Attendees:
Name
C. R. Read* 1Ralph Stain Stan Ichols J39• Carlso Lindaeell L.T. ..-Sk a.mr
C.. u I. lasle ey
PhulA~r
F~AD j~rm Kimc flU1i
~am Jonso
12K ro
Lisa "Spruill Darn:cflisty
Dave Derick
Affiliation
rDOZ/RW-24 DOZ/R-2 3 DOE/GC DOE/RW-32 Do0/RW-32 Roy F. Weston Weston
amZfase Vegas -o,
-'mm
SCor.
state of Utah
Takimal •itUan
and- namnsprttion
.Policy institute
Phone #
202-252-5625 202-252-5355 202-252-6947 202-252-9433 202-252-9738 301-963-5241 301-963-5242 615-576-1196 702-295-1836 702-295-0065 301-427-4483 301-427-4677 301-427-4426 101-427-46 6 4 301-427-4071 301-492-8689 301-492-4955 202-488-6340 301-538-5545 414-355-5900 202-342-3500 202-328-3500 601-359-3680
601-961-4733
202-544-2600
*Chairman
860280394 960501 PDR WIASTE 141-1 PDR
w -
-
-2 -
Discussion:
1. introduction and USS ICC Charter - After brief opening remarks, C. He-ad (DOEI) presented DOE's proposal for the Charter of the ICC. A draft'of the Charter had been developed during the first.1CC.meeting and was subsequently reviewed by WOE and ?m~samn.-The revisions that were mad* to the Charter as - ettof the management reviews vere identified and briefly dscssd one specific.. reiinta e. was the change to
tjwý'fta'efteot thOf v .. o4 Phunder *purpose". 22LU"revsionthe decision
Thsrvso4 et4ce whether this ansiu authority
'an CipCameron (both~~~A f~tt*i~ublty o
*zt~t.. 'an ndian. Tribes ~'2hj ~ararahVere aade
__ ~ peri~e deracion from the
pth~ti ts the Charter
W tots -0g -the following
a. -Oshietpriority
donuen MolLeton p-oedure imt have for all groups putting information into the LBS.
(2) A procedure for document collection within DOE Headquarters.
-
- 3 -
(3) Procedures for operation of the issue and commitment tracking subsystems of the LSS.
These documents are expected to be available for review outside DOE Headquarters by the end of Nay 1986.
in conjunction with. this presentation, there was a discussion of4 how to bmhnaw ,fthO baco of inftoration that already eit se ON iciUmanmAttachment 1, page4) th_4P44 $tl~.twwas that DOE' a plan to load all pqfl44$fl20In fler to passage of the Nuc~lea~r Wa•l te. iac.st••O uSm ... med reasonable, and no alternat ftionS tertnde. it was also noted
thti.s. f@atibetr earlier dates is used as' ai 40s Jln pication (or is to be used In. tfin 2smLtbbbs.ta information should also be`.. lae l t t T e a also a general a;OR" e of'the backlog, the process Othe I33 (collection,
Jz~xg\ C'~~sng-etc.) should start well ILI,~
(NRC) gave a T the
2(). Phil able for
ar, some worked out.
fqozrts), a c nts,
t capture
should F-RC information a of the is normally
bu8
4. -ItjlL""" S Lvi Bender (NRC) presented a reumirements for the
characteristi4csaOn LWS must have. The handout for this report is provided as Attament (3). C. Head (DOE) noted that the proposed NWC IS requirements were stated in general terms end could not be readily used by DOE in developing the systea, but suggested that they might be
3.
4W
• . .• ..• .....:•..:. ........ .-- - . ...%~t e
-
- 4 -
useful as a general checklist to check the LSS characteristics against as they are developed. Avi Bender
noted in response that the NRC requirements were intended to serve as guiding principles for system development.
DiscuSaiiM of. ='& ,0 Rs~C ead (DOE) opened Us: d£8e ion. a)an -explanation of part of
theh."- It noted that, altb* th ~ dtedafter
tt .. k b of paon of the of th nee4 for the
in~~~~ A d~,"n f,,ct, DOE is .i nit• >aIuse of the LSS with
lthe L88 ICC. Then
the 0961'@" vn. a. 2,S'4'
sztatAd that the Az.tb Le 18Is not
@U~UsS ia ~atikesd be twedls" gy. w• * (Joe), in response
tO :0000eM wi.'botbw0 state-I that provisions win-im havet bb -- Am for Giting the type of i•lfoWSio• that would normally be kept in handwritten and nargin notes.
5.
-
£1,
-5
b. Attacet 7 At the beginning of the discussion, C. Read, (DN)point*&,.out fthat there is a typographical
eorin the attachmnt,os ae7udr op2,tion should be #61
Ak•
as rthi tonera i
S~~Ith•itls ecoeou will
aoeate "My "
e tiet fnles
S,:•ml . mate for
ames @~b*stes
d. bo
that, this .orkshops on
tr ad -ntio n t mst ~~ 1 ~~ot patie to ganitentagree that a
amtmeft has been mas.
-1. JAAA -5an There were no comments on these
6. P - p. Altomare (URC) led a isussion On neeioind for a common set of keyvords for use -the TLABS. Nis ipresetaon package is included as
Attachentn� 4. There was general agreement that a common set of keyvords is desirable. C. Head (DOE) pointed out that DO2 is already vorking on such a set. Tom Tinsley (SAIC)
* 4,..~ t C---*-u
-
- 6 -
considered as a common keyword structure, or as a source of key words.
7. At the end of the meeting, Lisa Spruill (Mississippi) commented to P. Altomare (NRC) that the Mississippi representatives would submit their comments in writing.
S. Next Meeting - It was agreed that next LSS ICC meeting would be hold in wid-June 1986. Topics to be discussed include:
a. DOE's proposed procedure and specification for document collection.
b. DOE's plans for development of a common keyword
list.
c. Standard approach for interim document collection:
- Header
- Standards for electronic text
- Standards for electronic image
C. R. Heads DOE Philktimiei Rr
Date: 28/piJt/9 Date: '~ 7~
kTTACDMENTS:
(1) Agenda for the DOE/NRC Licensing Support System Interagency Coordinating Committee Meeting on April 22, 1986
(2) Division of Waste Management Pilot Project, Licensing Support System, Open Items Management System, April 22, 1986
(3) NRC proposed requirements for the Licensing Support System, April 22, 1986
(4) Common Keyword Indexing/Vocabulary
-
Agenda for the
DOE/NRC Licensing Support System Interagency Coordinating Committee Meeting
on April 22 1986
Opening Remarks and Introductions C.
Completion of the LSS ICC Charter C. P.
R. Head
R. Head & Altomare
9:45AM Status of DOE LSS Development C. R. Head
10:15AM Break
11:15AM Status of NRC Pilot Project P. Altomare
12:00PW Lunih
1:00WP Discussion of DOE memorandum titled "Scope of the OGR System to Handle nformation to Support Repository
LicensingO (previously distributed) C. R. Head
3:00WP Break
3:15PM Discussion of NRC proposed requirements for a Licensing-Support System A. Bender
4:30PM Discussion of a cmmon vocabulary/taxonomy for mnlear vasto management P. Altomare
5:00WP Closing Remarks C. R. Head
9:00AM
9:1SAM
-
Charter
High-Level Radioactive Waste Repository Licensing Support System Interagency Coordinating Committee
A. PURPOSE
The objective of the Licensing Support System (LSS) is to make all documents and other information pertinent to repository licensing available as far as practicable before submittal of the license application, thus reducing the need to rely on discovery, and shortening the time required for the hearing process.
The objective of the Interagency Coordinating Committee (ICC) is to provide guidance to the DOE in the development and implementation of an LSS that will minimize the time necessary for discovery and facilitate timely completion of the licensing hearing. DOE has responsibility for developing the LSS. It is anticipated that information developed by the ICC will provide essential information for use in any future NRC rulemaking on the LSS.
The ICC shall review reports and other information provided by DOE, NRC, State, and Indian Tribe members and recommend system requirements, the nature and scope of an automated document management system to support licensing of high-level radioactive waste (HLW) repositories. The committee will consider and make recommendations concerning:
1) System performance requirements 2) Roles and responsibilities of contributors and users 3) Uniform record management procedures 4) System design and operation plans 5) Progress and system implementation 6) Other LSS related topics as may be requested by the DOE
or other members and agreed to by the Committee
The ICC will, in particular, give early attention to the following:
1) Definition of requirements to meet the needs of users 2) Identification of information that must be included in
the system 3) Establishment of a common vocabulary and taxonomy to
index/classify present documents for reliable storage, search, and retrieval
4) Establishment of standard formats to capture documents in electronic form where possible, for later transfer to the LSS
-
- 2 -
Annually, the ICC will review the function it is performing and determine whether it should continue to exist.
B. Roles and Responsibilities
DOE will have responsibility for designing and implementing the LSS, incorporating on-line, full text storage and retrieval techniques. NRC will continue to operate its pilot project to demonstrate system capabilities within its budget constraints and through the committee will participate in defining the requirements and operating procedures to support the NRC's licensing review and hearing.
The ICC shall commit to providing recommendations in a timely manner and shall establish work plans and schedules to complete their task.
C. Interagency Coordinating Committee Membership
Membership shall consist of representation by DOE and NRC headquarters. A DOE representative will act as chairman.
State and Indian Tribe attendance and participation in Committee meetings will be actively sought and encouraged. It will also be strongly encouraged that the States and Indian Tribes arrange for continuity in their participants at the meetings so that the attendees will have the maximum potential for understanding and affecting this complex activity.
D. Meetings
Meetings will be held on an approximate quarterly schedule in the Washington, DC area or as determined necessary by the Committee members.
ICC meetings will be open to the public, and all attendees will be afforded the opportunity to participate in the meetings. Correspondence received by the Committee Chairman or members pertaining to LSS ICC business will be entered into the meeting minutes if so requested. DOE will have the responsibility to maintain Committee records and eventually enter them into the LSS.
Agendas will be prepared and information to be discussed at the meetings distributed to Committee Members, States and Indian Tribes at least two weeks prior to the meetings.
-
- 3 -
E. Meeting Minutes and Reports
Meeting minutes will be prepared and signed prior to the end of the ICC meetings. The chairman shall have responsibility for distributing meeting minutes to the members and State and Indian Tribe representatives.
Committee reports as required will be published and distributed by DOE.
for DOE I,'
Date: 22 ADP£YL IY�.for NRC
Date: ~ f-
-
FOR OCRWM DISTRIBUTION
SUBJECT: Distribution of the Report of the April 22, 1986 Meeting of the DOE/NRC LSS Interagency Coordinating Committee
ADDRESSEE: Distribution as follows:
-#r.- der T. Tinsley N. HGAvey 0. Thompson 3. wittuan D. Tousley
P. a. R. L. G. 3.
Altonare Mann August Olson Higgins Neff
D. Vieth M. Bender A. Avel S. Ichols R. Ross
OCRWN Distribution: IN, Stein, RVo23 j . P Knight, RW-24 Orlgsinat'8s Chront C. Head OCU CN . RUJ-23 (5) OwRaabom - ile L&• DLv. Fchron LBR~ Div. Fil@o# 6510. 502.4
BCC:D. Siefken, Weston
UF-t4tCC.Nead:CHtR22-5625:typed 4/23/1986 PC Code: LOS-ICC.004 Head Diskette # 4
coWNCUMRNcES:
* RZN-24
-
DIVISION OF WASTE MANAGEMENT
PILOT PROJECT
- LICENSING SUPPORT SYSTEM
- OPEN ITEMS MANAGEMENT SYSTEM
PHIL ALTOMARE AVI BENDER
APRIL 21, 1986
-
BRIEFING FORMAT
PRESENTATION
O OVERVIEW
o LICENSING SUPPORT SYSTEM
- PROGRESS - SYSTEM DESCRIPTION - PLANS
O OPEN-ITEM TRACKING SYSTEM
- PROGRESS - SYSTEM DESCRIPTION - PLANS
O DEMONSTRATION
PILOT PROJECT 85/,
-
OVERVIEW
WHAT THE PILOT PROJECT SUPPORTS
"¾TREAMLINING THE LICENSING PROCESS
I. LICENSING PROCESS
- MINIMIZE DISCOVERY TIME (NEGOTIATED RULEMAKING)
II. LICENSING DATA BASE
- DOE/NRC AGREEMENT
- DOE LSS DEVELOPMENT
- BUILD DATA BASE - ALL DOCUMENTS NECESSARY TO MAKE A LICENSING DECISION
III. CLOSING ISSUES
- GENERIC ISSUES IDENTIFICATION AND RESOLUTION
- SITE SPECIF'IC ISSUE IDENTIFICATION AND RESOLUTION
LICENSING SUPPORT SYSTEM
EN ITEM MANAGEM[NT SYSTEM
w
1'
-
LICENSING SUPPORT SYSTEM
0
0
0
PILOT PROJECT
PROGRESS
SYSTEM DESCRIPTION
PLANS
- 3-, ' t'
-
NRC LICENSING SUPPORT SYSTEM - PROGRESS
O INITIATED EFFORT IN JULY OF '84
O MET WITH DOE, STATES, AND INDIAN TRIBES - AUG-SEPT 1984
O PILOT PROJECT STARTED JULY '85
0 AGREEMENT THAT DOE WILL DEVELOP SYSTEM - JANUARY '86 (RFP STATEMENT OF WORK IN PREPARATION)
O NRC/DOE COORDINATING GROUP WITH STATES AND INDIAN TRIBE PARTICIPATION ESTABLISHED - FIRST MEETING - FEBRUARY '86
0 2,300 PAGES OF TEXT IN LSS - 5,000 PAGES MORE BEING 4 PREPARED FOR INCLUSION
O DEMONSTRATIONS GIVEN OR PLANNED TO BE GIVEN TO NRC STAFF, DOE
AND DOE CONTRACTORS, STATES AND INDIAN TRIBES
o PILOT PROJECT HAS BEEN INCORPORATED INTO NRC DOCUMENT MANAGEMENT SYSTEM REPLACEMENT PLANNING
O BEGINNING TO PROVIDE FOR USE OF LSS IN THE LICENSING HEARING
ILOT PROJECT 86/04/11,4
-4-
-
ol
I ELECTRONIC S IMAGE CAPTURING'
PLANNED
L..
Ml' R(A HARD *,
( I MA(, ARCH
OCR = OPTICAL CHARACTER READER
DOCUMENT CAPTURE AND RETRIEVAL
-
LICENSING SUPPORT SYSTEM - FUTURE PLANS
PILOT PROJECT
O COMPLETE FULL-TEXT FILE RECORDS
O DEVELOP ROUTINE WORD PROCESSOR DOCUMENT TRANSFER TO FULL TEXT STORAGE AND RETRIEVAL
O INITIATE ELECTRONIC IMAGE/TEXT CAPTURE DEMONSTRATION
O DEVELOP POLICIES AND PROCEDURES FOR DOCUMENT HANDLING, STORAGE, AND RETRIEVAL
O SYSTEM EVALUATION REPORT
O INITIATE INTERIM SYSTEM DOCUMENT CAPTURE AND RETRIEVAL (TRANSFER DOCUMENT DATA BASE TO DOE LSS WHEN AVAILABLE)
DOE, STATES, AND INDIAN TRIBES INTERACTION
O CONTINUE DOE, NRC, STATES, INDIAN TRIBE COORDINATION
O ESTABLISH PROGRAM FOR INTERIM DOCUMENT CAPTURE
O ESTABLISH APPROACH/STANDARDS FOR ELECTRONIC CAPTURE OF DOCUMENTS - SITE CHARACTERIZATION PLANS - CONTRACTOR REPORTS - FIELD OFFICE, STATES, AND INDIAN TRIBE INVOLVEMENT
O WORK TOWARQS COMMON KEYWORD INDEX/VOCABULARLY, INCLUDE STATES AND IN,)IAN TRI.EC
O COMPLETE NEGOTIATED RULEMAKING
PILOT PROJECT 86/04/14 -.6-9
-
OPEN-ITEM MANAGEMENT SYSTEM
0
0
0
PILOT PROJECT
PROGRESS
SYSTEM DESCRIPTION
PLANS
- 7 -81 ' i4
-
OPEN ITEM TRACKING SYSTEM - PROGRESS
O INITIATED EFFORT - JULY OF '84
O MET WITH DOE, STATES, AND TRIBES - AUG-SEPT '84
O SYSTEM DESIGN SPECS - APRIL 1985
O PROTOTYPE SYSTEM (PC-DBASE III) AVAILABLE - OCTOBER 1985
O TASK FORCE ESTABLISHED TO IDENTIFY OPEN ITEMS - OCTOBER 1985
O DRAFT SET IDENTIFIED FOR NNWSI IN WASTE PACKAGE AND SEISMOLOGY - FEBRUARY 1986
O DEMONSTRATIONS GIVEN TO DOE, NRC, STATES, TRIBES, AND OTHERS
PILOT PROJfCT "-8-
-
OPEN ITEM TRACKING SYSTEM - PLANS
0
0
0
i .OT PROJECT
INTERNAL AGREEMENT ON SYSTEM APPROACH, LEVEL OF DETAIL
PLACE SYSTEM ON MAIN FRAME, LINKAGE TO LSS
FULL IMPLEMENTATION - INCLUDE OPEN ITEMS FOR ALL SITES
- 10 -
1*
¶ *1
k�/' �
ft.
86/0'1/ 11,
744 .k -.
-
NRC IROPOSED REQUIREMENTS FOR THE
LICENSING SUPPORT SYSTEM
APRIL 22, 1986
PHILIP ALTOMARE, SECTION LEADER AVI BENDER, PROJECT MANAGER
-
BRIEFING OBJECTIVES
0 PROVIDE NRC'S REQUIREMENTS FOR A SYSTEM NEEDED TO SUPPORT A 3 YEAR LICENSE REVIEW PROCESS
* IDENTIFY DESIREABLE LSS PERFORMANCE FEATURES
-
NRC*S VIEW OF THE LSS ROLE
* LSS SHOULD GUARANTEE OPTIMAL ACCESS TO LICENSING INFORMATION
* LSS SHOULD PROVI'DE MEANS TO OBVIATE NORMAL COURSE OF DISCOVERY
* LSS SHOULD BE THE DATABASE TO SUPPORT FINDINGS FOR ALL LICENSING DfCI sION')
LSS COMPONENTS
• PROCEDURES
* PARTICIPANTS
* INFORMATION
• TECHNOLOGY
- ENHANCE ACCESS - IMPROVE RECALL
LSS BRIEFING 2
-
pp
MAJOR SYSTEM DESIGN REQUIREMENTS
',-
0 RETRIEVABILITY
- MAXIMUM RECALL ANU PRECISION - ON-LINE QUERY OF FULL-TEXT AND DOCUMENT SURROGATE - SYTEM AVAILABLE AT REASONABLE COST FOR STATES, TRIBES, PUBLIC
0 COMPLETENESS
CONTAIN ALL DOCUMENTS RELEVANT TO LICENSING AND SUBJECT TO DISCOVERY AND FOIA UNLESS EXEMPT ALL PARTIES TO LICENSING PROCESS SHOULD ADOPT COMMON PROCEDURES T', ASSURE COMPLETENESS OF LSS
0 UNITARY DESIGN
SINGLE COMPREHENSIVE SYSTEM NOT A COLLECTION OF DISPARATE DATABASES -- COMMON PROCEDURES (INDEXING, CAPTURE, EXEMPTION..) - - COMMON CONTROLLED VOCABULARY AND THESAURUS
CERTIFIED SUBMISSION OF INFORMATION TO LSS BY ALL PARTIES
.-. 4 : ' '",S BRIEFING
3
t
t.
1-
plc"
!
-
RECORD MANAGEMENT PROCEDURES
WHAT GETS IN
0 IDENTIFY ALL SOURCES OF DOCUMENTS
* ESTABLISH MECHANISMS TO INSURE DOCUMENT CAPTURE
* INSURE THAT FULL TEXT COPIES ARE TRUE REPRESENTATIVES OF ORIGINAL
* DETERMINE FORMAT £ SURROGATE, FULL TEXT, BOTH...)
HOW TO PROCESS DOCUMENTS
0 SURROGATION OR ENHANCEMENT SHOULD BE CONTROLLED AT EACH STAGE
0 DOCUMENT PROCESSING MUST BE CONSISTANT AND AT THE STATE-OF-THE-ART
0 MUST BE BASED ON RECORD MANAGEMENT PROCEDURES
WHAT GETS OUT
* LSS SHOULD PROVIDE ACCESS TO A DOCUMENT AND/OR ITS SURROGATE
* QUERY-HANDLING AND DATABASE-SEARCHING TECHNIQUES MUST OPTIMIZE RECALL AND PRECISION
0 COPIES OF DOCUMENTS - ORIGINAL HARD COPIES (SEVERAL DAYS) - DOWN-LOAD SMALL REPORTS AT USER PC
BR I EF I NG 86/04,10
5
1 - - �
-
RECORD MANAGEMENT PROCEDURES (CONT0D)
QUALITY ASSURANCE
0 RECALL AND PRECISION AUDIIS
* IMPROVEMENTS THROUGH LESSONS LEARNED
LSS BRIEFING6
86/04/1 '
-
INFORMATION CAPTURE
0 FULL TEXT ELECTRONIC REOCRDS (ENHANCED): WORD PROCESSOR TRANSFER, ELECTRONIC TRAN9lMITTED"MAIL, COPUTER-COMPUTER TRANSFER, MAGNETIC TAPE AND DISK
* HARD COPY CONVERSION TO ELECTRONIC RECORD: OPTICAL CHARACTER READER, MANUAL KEYED ENTRY, DIGITAL IMAGE SCAN (GRAPHICS)
* ELECTRONIC INFORMATION FOR HARD COPY, MICROFICHE, AND PHYSICAL ITEMS:
INDEX, KEYWORDS BIBLIOGRAPHIC DATA, ABSTRACT
* HARD COPY AND MICROFICHE: ORIGINAL RECORDS, ARCHIVE FILES
* PHYSICAL ITEMS: STORAGE OF PHYSICAL MATERIAL, AND LARGE ITEMS NOT CONDUCIVE TO ELECTRONIC CAPTURE (E.G. DRAWINGS)
86/04 '18fiRIEFING7
-
ISS BRIEFING
4.
CONCEPTUAL LSS SEARCH AND RETRIEVAL
r ! aMr, tn .r r
PHYSICAL ITEMS 1 I I I-.-, . . . . -
8
-
SPECIFIC EXAMPLES OF DOCUMENT SEARCH AND RETRIEVAL DESIGN CONS I DERAT IONS
* HARDWARE/SOFTWARE COFIGURATION
* NUMBER OF USERS
* TELECOMMUNICATION
0 DATA BASE CREATION/ORGANIZATION
" FEATURES OF QUERY LANGUAGE
4 DOCUMENT ACCESS
* SECURITY/QUALITY CONTROL
* COSTS/BENEFITS OF CONFIGURATION
* USER INTERFACE
0 MULTI-MEDIA ACCOMODATION
f RESPONSE TIME
a OPERATIONAL AVAILABILTY
-
SUMMARY
LSS MUST BE DEVELOPED WITH A SENSE OF URGENCY
POTENTIAL LSS PROBLEMS SHOULD BE RESOLVED
- STANDARDIZED PROCEDURES
- INTEGRATION OF ALL DOE SYSTEMS
COOPERATION NEEDED BY ALL PARTICIPANTS TO THE LICENSING PROCESS
CONTINGENCY MANAGEMENT APPROACH
86/04./1
LSS BRIEFING 10
S
-
COMMON KEYWORD INDEXING/VOCABULARY
O THE ABILITY TO USE AND SEARCH ON KEYWORDS IN COMPUTERIZED DOCUMENT DATA BASES
PROVIDES THE CAPABILITY TO APPLY THE EQUIVALENT OF MULTIPLE DOCUMENT INDEXING
O THE USE OF COMMON KEYWORD INDEXING SUBSTANTIALLY IMPROVES DOCUMENT RETRIEVAL RECALL AND PRECISION
O RECOMMENDATION - WORK TOWARDS AN AGREED TO SET OF KEYWORDS FOR DOCUMENT .IDENTIFICATION/INDEXING
O ADDITIONALLY DEVELOP A WASTE MANAGEMENT THESARUS
2
-
I
EXAMPLE CATEGORIES FOR MULTIPLE KEYWORD INDEXING
ORGANIZATION
FEDERAL AGENCIES
DOE NRC
STATE
UTAH HLNWO
INDIAN TRIBES YAKIMA NATION
PUBLIC INTEREST
TECHNICAL AREA
NATURAL SCIENCES
HYDROLOGY GEOLOGY
SOCIAL
SOCIOECONOMIC TRANSPORTATION
ENGINEERING BACKFILL WASTE PACKAGE
EXISTING FILE
100 HIGH-LEVFL WA-¶,
101 BWIP 102 NNWSI
200 LOW-LEVEL WA5$F
201 SITE INFO
300 TECHNICAL 301 HYDROLOGY
5
-
GRAFI co": SuBJECT MATTER
0100 PROGRAM MANAGUENT
0200 PROGRam FiNANCEs
0300 XUTEZACTION WITH STATES * INDIAN TRIBES. LOCAL
GOVMUNMMNT, AND TKI PULIC
0400 PROGRAM DOMUKZTS AND KIL&MESTOK FIRST GBOLOGIC RIPOSITORT
0450 PROGRAM DOCUMUVTS AND NILZSTONKZS/ SECOND GEOLOGIC REPOSITORY
0500 SITM
0600 SOCIO&COUOMXC CONDITIONS
0700 GEOLOGIC CONDITIONS
0800 KrDR0L0GIC CONDITIONS
0900 UVIRONKMNAL SETTING
1000 DISPOSAL £LTERNATIVUS
1100 TRUSPORTAT ION
1200 LEGAL ASPECTS
1300 RISK
1400 LicusES/LICUNSI3G
um0 Dcluss WASTEs
1600 WASTS ACCEPTANCK SCWEDULE
1700 miEsI/EUGisnEimG
.
-
DRAFI ml SUBJECT MATTER
0100 PROGRAM AMANCV(INT
0200 PROGRAM FINANCES
0300 INTERACTION WITH STATts, zwIDIA TRIUzs. LOCAL GOVIRMUNTS * AND THE PUBLIC
0400 PROGRAM DOCUMUT AND MILESTOEES/ FIRST GEOLOGIC REPOSITOIX
0450 PROGRAM DOCUKtWTS AND MILESTOKES/ SECOWD GEOLOGIC RILPOSITORY
0500 SITU
0600 SOCIOECONMaIXC CONDITIONS
0700 GEOLOGIC CONDITions
0600 HTDROLOGIC CONDITIONS
0900 MVIROWKUrAL SETING
1000 DISPOSAL ALTEnxATi YES
1100 TRANSPORTAT ION
13200 LEGA ASPECTS
1300 RIan
11400 ICENSCS/LICCNSIUG
UN0 DoFusE WASTE
1600 WASTE ACCEPTANCE SCHEDULE
1700 DESIG/EIw IIRIGv
r