delivering results project management...2019/10/18  · what is project management? …the...

55
Delivering Results Project Management h Module 3.1

Upload: others

Post on 26-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Delivering Results –Project Managementh

Module 3.1

Page 2: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

2 Rialtas na hÉireann | Government of Ireland

Assumes personal responsibility for and delivers on agreed objectives/ goals

Manages and progresses multiple projects and work activities successfully

Accurately estimates time parameters for projects and manages own time efficiently, anticipating obstacles and making contingencies for overcoming these

Maintains a strong focus on meeting the needs of customers at all times

Ensures all outputs are delivered to a high standard and in an efficient manner

Use resources effectively, at all times challenging processes to improve efficiencies

Delivery of

Results

AO Competency Indicators

Page 3: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

3 Rialtas na hÉireann | Government of Ireland

Agenda

‒ Part 1 – Introduction to Project Management

‒ Part 2 – Phases of the Project Management life cycle

‒ Part 3 – Project Initiation and tools

‒ Part 4 – Project Planning tools

Page 4: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Rialtas na hÉireann | Government of Ireland

Introduction to Project Management

Page 5: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

5 Rialtas na hÉireann | Government of Ireland

Activity

With the person to your right discuss:

‒ What makes a project a project?

‒ What is project management?

Page 6: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

6 Rialtas na hÉireann | Government of Ireland

What is a “Project”?

‒ Unique

‒ Timescale – start & end

‒ Budget

‒ Limited resources

‒ Beneficial change

‒ Risk

Page 7: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

7 Rialtas na hÉireann | Government of Ireland

What is Project Management?

…the application of knowledge, skills, tools & techniques to

project activities in order to meet stakeholder’s needs &

expectations from a project.” (Project Management Institute

– U.S.)

Page 8: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

8 Rialtas na hÉireann | Government of Ireland

Scope

Cost

Time

Quality

Deliverables

• Estimating

• Budgeting

• Controlling

• Boundaries

• In-scope/Out-of scope

• Estimating

• Scheduling

• Monitoring

• Establish standards

• Monitor

• Quality assurance

What is Project Management?

Page 9: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

9 Rialtas na hÉireann | Government of Ireland

What is Project Management?

Managing the HOW:

Integration

Communication

Human Resources

Risk

Procurement

Page 10: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

10 Rialtas na hÉireann | Government of Ireland

Activity

Project Failure:

‒ Why projects fail?

‒ Name 2 project failures and why

they failed?

Page 11: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

11 Rialtas na hÉireann | Government of Ireland

Why Projects Fail

Lack of skilled resources

Unclear objectives

Lack of management commitment

Poor estimating

Unrealistic user expectations

Problems with external suppliers

Inadequate controls

Poor planning

Politics

Unrealistic deadlines

Moving goal posts

Page 12: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

12 Rialtas na hÉireann | Government of Ireland

Edinburgh Trams – Public Sector

Profile

In 2007 Lothian Regional Transport (LRT) was awarded best bus

operator in the UK

The number 22 bus ran from the

west side of the city (near the

airport) through the city centre to

the Newhaven area via the Leith

area of the city.

Page 13: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Rialtas na hÉireann | Government of Ireland

The Project Lifecycle

Page 14: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

14 Rialtas na hÉireann | Government of Ireland

1. Initiation

2. Planning

3. Execution

4. Closure

The Project Lifecycle

Project Definition

Detailed Planning

Monitor & Control

Post Implementation

Review

Page 15: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Rialtas na hÉireann | Government of Ireland

Project

Initiation

Page 16: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

16 Rialtas na hÉireann | Government of Ireland

Phase 1: Initiation

‒ Project ‘Kick-off’

‒ Key tasks:

‒ Create Business Case

‒ Create Project Charter

‒ Appoint Project Team

Page 17: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

17 Rialtas na hÉireann | Government of Ireland

Goals and Objectives

Goals - Why

- Purpose

Objectives - What

Page 18: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

18 Rialtas na hÉireann | Government of Ireland

Project Goals

‒ Usually qualitative

‒ Strategic level

‒ Often shared with other projects

‒ Sense of purpose

‒ Context for Objectives definition

‒ Must be given to Project Manager

Page 19: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

19 Rialtas na hÉireann | Government of Ireland

Project Objectives

‒ Quantitative/measurable

‒ Achieved by one project alone

‒ Demonstrable when achieved

‒ Basis for success/failure judgement

‒ Usually relate to end products

Page 20: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

20 Rialtas na hÉireann | Government of Ireland

Project Scope

‒ Project scope is the definition of what the project is supposed to

accomplish and the resources (time, materials and budget) allocated to

achieve these objectives.

‒ It is critical that any change in the project scope is matched with a change

in the allocated resources in order for the project to be successful.

‒ Scope changes can often occur as “scope creep” where several small

changes are made that cumulatively amount to a substantial amount.

Page 21: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

21 Rialtas na hÉireann | Government of Ireland

Project Team Exercise

Initiation

‒ Define the project scope – what is in scope and out of scope?

‒ Overall Goal

‒ Up to 5 Objectives & deliverables

Page 22: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

22 Rialtas na hÉireann | Government of Ireland

Business Case

‒ Reasons for undertaking the project

‒ Benefits

‒ Tangible

‒ Intangible

‒ Benefits realisation

‒ Cost and Time scale (derived from the Project Plan),

‒ Investment Appraisal (Cost: Benefit Analysis).

*M

M- =

+M

-M

12

3

45

6

78

9

000

¥

%

Ö

+

=x

ON

CE

C

.991.75

3.16

28.03

7.15

2.90

Page 23: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

23 Rialtas na hÉireann | Government of Ireland

Options

Do Nothing

Do Something

Do Everything

Page 24: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

24 Rialtas na hÉireann | Government of Ireland

Cost/Benefit Analysis

Payback

Return on Investment

Net Present Value

Calculations & Analysis performed by experts

Costs

Benefits

Page 25: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

25 Rialtas na hÉireann | Government of Ireland

Project Team Exercise

Initiation

‒ Complete the High Level Business Case

‒ Options

‒ Benefits

‒ High Level Risks

Page 26: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

26 Rialtas na hÉireann | Government of Ireland

Project Management Roles

Project Completion

Page 27: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

27 Rialtas na hÉireann | Government of Ireland

Project Management RolesRole Who Are They? Responsibilities

Project Sponsor

• Internal client

• Identified need for change

• Committed to making it happen

• Propose project

• Procure resources

• Champion & support

Stakeholders

• Individuals or groups with direct or

indirect impact or involvement

• Provide feedback to the project

team on impacts

• Collaborate to achieve project

outcomes

Suppliers

• Identified for skills, knowledge &

expertise

• Allocated as external resources to the

project

• Provide goods & services

Page 28: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

28 Rialtas na hÉireann | Government of Ireland

Project Management Roles

Role Who Are They? Responsibilities

Project Team Members

• Individuals identified for their skills,

knowledge & expertise

• Allocated as internal resources to the

project

• Executing tasks & producing

deliverables

Project Manager

• Single point of responsibility for all

activities & outcomes

• Integrate & co-ordinate all

contributions

• Guide to successfully complete

the project

Page 29: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Rialtas na hÉireann | Government of Ireland

Project

Planning

Page 30: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

30 Rialtas na hÉireann | Government of Ireland

The Three Project Interests - Planning

SupplierUser

Business

Business• A business need

• VFM

User• Use the final product• Impacted by outcome

Supplier• Provides resources

• Skills• In-house or external

Page 31: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

31 Rialtas na hÉireann | Government of Ireland

Phase 2: Planning

‒ Resource Planning & Scheduling

‒ Stakeholder Analysis

‒ Communication plan

‒ Risk/Issue Management

‒ Quality Management

‒ Procurement

‒ Finance plan

Project Definition

Detailed Planning

1. Initiation

2. Planning

Page 32: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

32 Rialtas na hÉireann | Government of Ireland

Phase 2: Planning – Stakeholder Analysis

Steps:

1. Identify Stakeholders

2. Prioritise

3. Understand

−Interest in outcomes

−Motivators

−Information

−Influencers

Page 33: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

33 Rialtas na hÉireann | Government of Ireland

Phase 2: Planning – Communication Plan

Keep stakeholders adequately informed:

—What needs to be communicated?

—How will it be communicated?

—To whom will it be communicated?

—By whom will it be communicated?

—When will it be communicated?

Page 34: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

34 Rialtas na hÉireann | Government of Ireland

Project Team Exercise

Planning

‒ Design the high level communications plan for stakeholder

management

Page 35: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

35 Rialtas na hÉireann | Government of Ireland

A RISK is ……

A possible event that may prevent

the project meeting its objectives.

UNCERTAINTY

Page 36: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

36 Rialtas na hÉireann | Government of Ireland

What is a risk?

Uncertainty of Outcome

(Positive opportunity or negative threat)

The task of risk

management is to manage

a project’s exposure to risk

Page 37: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

37 Rialtas na hÉireann | Government of Ireland

Project Risk“The chance of exposure to the adverse consequences of future events”

Controlling

Monitoring

Resourcing

Planning

Risk Analysis

Risk Management

Estimation

Evaluation

Identification

Page 38: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

38 Rialtas na hÉireann | Government of Ireland

Risks and Issues

What’s the difference?

Risks – what could possibly go wrong?

— As you identify tasks think of the risks associated with these tasks and their likelihood of

failure.

— Write these in your Risk list and allocate a number.

Issues – what has already gone wrong?

— As you begin planning questions and doubts will arise, policy matters will be identified,

and cost implications will be raised.

— Record these in your Issue Register and put the assigned number here.

Page 39: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

39 Rialtas na hÉireann | Government of Ireland

Risks Analysis

Risk

Identification

Risk

Estimation

Likelihood – how probable is it?

Consequences - what is the impact?

Risk

Evaluation

Acceptable or not?

What ACTIONS?

What could possibly go wrong?

Page 40: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

40 Rialtas na hÉireann | Government of Ireland

How to List Risks

Description of Risk

— A clear description of a potential future event that you can imagine but would like to

avoid.

— Use at least one full sentence to describe the risk.

— Be as specific as possible.

Mitigation Strategy

— What you plan to do to reduce the likelihood of the risk occurring or to minimise the

impact .

Risk Factor (High / Medium/ Low)

— Probability - the likelihood of the risk occurring

— Impact – the effect on the project of the risk occurring

Page 41: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

41 Rialtas na hÉireann | Government of Ireland

Risk Factor

Page 42: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

42 Rialtas na hÉireann | Government of Ireland

Risk

ACCEPTANC

E

Prevention

Reduction

Transference

Contingency

Acceptance

Make sure it does not occur or has no

impact

Reduce likelihood of occurrence

Reduce the Impact if it does

Pass to third party

Use only if Risk occurs

Will not occur

Actions are too expensive

Page 43: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

43 Rialtas na hÉireann | Government of Ireland

Phase 2: Planning – Risk Management Plan

Risks – may impact project deliverables

Risk = Likelihood x Potential Impact

Record in Risk Log

Implement Controls

Review

Page 44: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

44 Rialtas na hÉireann | Government of Ireland

Exercise Planning – Assessing Risk

Using the high level risks identified in your business case,

complete a risk management plan and the action you will

take

Page 45: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

45 Rialtas na hÉireann | Government of Ireland

Exercise Planning: Product

Breakdown Structure

Consider:

Activities and tasks that will be required deliver your

project?

Page 46: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

46 Rialtas na hÉireann | Government of Ireland

Milestones

Should be:

‒ Significant

‒ Measurable / Testable

‒ Zero duration

Can be:

‒ Decision Points

‒ Achievement recognition

‒ Payment points

‒ Variance checks from Planned times

Page 47: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

47 Rialtas na hÉireann | Government of Ireland

Project Milestones

Contractor

appointed

Trams

delivered

and testedRails laid

Trams are

operationalTram route

agreed

Page 48: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

48 Rialtas na hÉireann | Government of Ireland

List the Main Tasks – Task List

HeadingsYou need to record what has to be done to achieve each milestone.

At this early stage it’s not always possible to capture everything which has

to be done in detail.

A Task List Heading is a list of tasks that have a common purpose and

that contribute to a milestone.

If you don’t know what tasks need to be done yet put in a task list heading

and leave it blank until you find out.

Page 49: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

49 Rialtas na hÉireann | Government of Ireland

Task List Headings

Contractor

appointed

Trams

delivered

and testedRails laid

Trams are

operationalTram route

agreed

Route proposed Stakholder

agreement

Agreed by Govt

Tender process

Contracts signed

Unitilities moved

Rails placed

Roads resurfaced

Page 50: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

50 Rialtas na hÉireann | Government of Ireland

Task List Headings

Contractor

appointed

Trams

delivered

and testedRails laid

Trams are

operationalTram route

agreed

Stakeholder agreement

1. Plans shared with local

businesses

2. Plans shared with

residents

3. Feedback received

4. Alterations

5. Agreement

Agreed by Govt

1. Proposal submitted

2. Feedback received

3. Alterations made

4. Proposal re-submitted

5. Agreed by Govt

For each tasklist list all the things

that will need to be done

Page 51: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

51 Rialtas na hÉireann | Government of Ireland

Exercise Planning

Milestones and Key Task Headings

Using notes from the last exercise :

Arrange your under Key Task Headings

and decide on you project milestones and

list the activities below each KTH

Page 52: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

52 Rialtas na hÉireann | Government of Ireland

High Level Schedule - Gantt

Page 53: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

53 Rialtas na hÉireann | Government of Ireland

Exercise Planning

Milestones and Key Task Headings

You have arranged your under Key Task

Headings decided on you project

milestones

Now begin to transfer onto a Gantt Chart

Page 54: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

Body Level One

Body Level Two

Body Level Three

Body Level Four

Body Level Five

54 Rialtas na hÉireann | Government of Ireland

Reflection

Take time to reflect on the day

Note your key learnings

Note the actions you will take

following today to apply your

learning

Page 55: Delivering Results Project Management...2019/10/18  · What is Project Management? …the application of knowledge, skills, tools & techniques to project activities in order to meet

55 Rialtas na hÉireann | Government of Ireland

DPER Graduate Development Team:

(E): [email protected]

(P): 076 100 7215 – Gerald Harty

Belfast

Think People Consulting

12th Floor Causeway

Tower

9 James St South

Belfast. BT2 8ND

Tel: 028 9031 0450

Dublin

Think People Consulting

6 Redleaf Business Park

Roseville, Turvey

Donabate, Co Dublin

Tel: 01 969 7865