INTRODUCTION OF INFRASTRUCTURE PROJECT

2014.05.20-23

Page 2: Ded butets english

THE PROJECT OF INFRASTRUCTURE

“ The infrastructure project” of the Ministry of Construction Urban

development was established the frame work of implementing policy by the

resolution 118 of 2013 the Mongolian Government housing policies and home

district's policy is to limit the amount of this policy.

Page 3: Ded butets english

Infrastructure projects are to construct to supply consumption, infrastructure engineering lines & network, and construction of facilities in the newly proposed districts with 42,000 apartments to be built in Ulaanbaatar, to serve 26700 seats school children, 7100 seats kindergarten, to serve 4350 residents per a day hospitals, 2,000 job vacancies public services centers, shopping centers, hotels, sports, swimming pool, cultural centers and office.

PURPOSE OF PROJECT

Page 4: Ded butets english

Implementing project the general planning of districts

“Yarmag ” residential district

“Bayan gol am” residential district

residential district “VII-р sub district ”

“Buyant-Ukhaa”residential district

Around “Public broadcasting center ”

“Ireedui complex ” district

Center of Ulaanbaatar

“Solongo” district

Page 5: Ded butets english

- Completed jobs - 6

- Ongoing work - 8

- Implementat ion of the new jobs - 12

26 construction works are ongoing the frame of "Infrastructure " project on the 7 districts of Ulaanbaatar.

Attributable to:

IMPLEMENTING JOBS

Page 6: Ded butets english

“BUYANT UKHAA ”RESIDENTIAL DISTRICT

This residential district is located near the Chingiss -Khaan

international airport or 12km from the center of capital city Ulaanbaatar

where has been planned to construct around 15,000 residential houses,

apartment buildings , schools , kindergartens, hospitals , and sports

complex with a modern architectural solution “Buyant- Ukhaa”

residential area which is planned to be established . The complex

system engineering infrastructure is to build the frame work of

infrastructure project “Buyant- Ukhaa” residential area.

Page 7: Ded butets english

1 . The construction work of Buyant-Ukhaa residential areas where have been

doing the drinking water sources , 20 pieces wells , V = 2800kh2 m3 of 2 pcs

reservoir and pump station , construction of power supply.

"BUYANT -UKHAA" DISTRICT ENGINEER INFRASTRUCTURE

Page 8: Ded butets english

2 . f400 mm 2863 m double line is continued from fresh water resource,

from the pump station to the ring line is continued 546m and a totally

3884 pipes , 120 m access channel construction work on the Buyant-

Ukhaa residential area.

Page 9: Ded butets english

3 . F 315 mm 10031, 2 m, F 110 mm diameter of fresh water 70 m ring line, and

80 m channel access of the construction work of Byant-Ukhaa residential area.

Page 10: Ded butets english

4 . F 200 mm 2242 m double line with waste water pressure , f 200 mm 2820

lines , f160 mm 1042 m line , 2 pieces stations and 40 m access channel

construction on the Buyant- Ukhaa residential area.

Page 11: Ded butets english

5 . From Shine Yarmag sub-station 10 kV 2 complex structures is to delivering

dispense facilities are 9.89 km , architecting and designing the 9.9 MW power

cable work and construction on the Buyant-Ukhaa residential area.

Page 12: Ded butets english

6. 2 complex division of 10 kVis distribution network of approximately 9.9

MW capacity to meet demand for the power supply, 2 * 400 Kwa capacity TP

25 kits , 33.0 km long 10 kV cable lines achecture has designed and

construction on the Buyant-Ukhaa residential area

Page 13: Ded butets english

6 . 10 pieces archectures design of heating & water delivering center,

construction on the 10th parts of Buyant- Ukhaa residential district

Page 14: Ded butets english

7 . The design and archectures of the 13v magistrali 400 double line of

heating and 100 m line 7th pump station is to pair to extend into f400 mm and

to become the corridor system construction on the Buyant- Ukhaa residential

district

Page 15: Ded butets english

8 . Design and 20,000 m3 of wastewater treatment plant construction Buyant- Ukhaa

residential area.

Page 16: Ded butets english

Water, hearing 10 pieces center

Delivering station 25 pieces

20 pecies deep well

9 600 м wast woter line

10 031 м fresh water line

2х2800 м3 volume water pool

ENGINEERING INFRASTRUCTURE OF “BUYANT

UKHAA” RESIDENTIAL DISTRICT

Page 17: Ded butets english

GENERAL PLANNING OF THE BUYANT-UKHAA

RESIDENTS DISTRICT

Page 18: Ded butets english

PLANNING PROJECTS OF IMPLEMENTING IN THE FUTURE

Д/д Project in action , construction , capacity , location Standard price of

construction /billion tugrig г/

VII, XIV, residential districts engineering lines

1 6 pieces of water and heat transferring center’s design and construction12 Part of 7th District 1.558

2 6 pieces of Archecture and design of near the Public broadcasting district 1.558

Engineering lines of Berlin Eco Residential district

3 Berlin eco Town , outside heat , clean water f32 3000 - 300 -mm m main line drawings and construction 2.767

4 Berlin –eco town , 2 pieces , water , heat transferring center design and construction 0.52

5 Berlin 2000 , in addition to eco - town sewer m main line drawings and construction 0.399

" Rainbow " residential area of engineering line works

6 " Rainbow " area outside water pipes expand and sewage main line drawings and construction 0.529

Yarmag housing areas of engineering networks

7 Yarmag apartments 15.0 km of water main line design and construction 4.831

8 Yarmag apartments 14.5 km sewage main line drawings and construction 2.711

9

Yarmag districts electrical supply for the 10 kV distribution network, estimated to provide 14.3 MW of capacity

utilization close to 10 kV with AE - 3 complex , 2 * 400kVA mighty TP 36 kits , 37.6 km long 10 kV cable picture

project and construction

8.807

10near Yarmag bridge district substation 10 kV 1 NT 12 km into the complex 15 MW power cable for use by the design and construction

1.035

“Ireedui” complex areas of engineering networks

11 Future complex area’s water f150 - 350 11 - mm main line 4377 m , swimming pool design and construction 2.333

  Totally 27.048

Page 19: Ded butets english

PROJECT RESULTS

  Currently, " Infrastructure " project has been fulfilled successfully 95.6

billion worth, total 5 distribution facilities of the electricity supplies, 59

closed buildings substation with a capacity of 250 - 630kV with equipment,

112.2 km long cable line construction, 20 heat transferring centeral

buildings , 20 wells of clean water supplyment , 2 water tank pools with a

capacity of 2,800 m3 , 18.2 km long line pipe F110 - 315 -mm diameter are

constructed , and 2 waste water pump station , 14.1 km long pipeline F150 -

600 -mm diameter assembled were successfully completed in Ulaanbaatar.

ACHIEVEMENTS OF PROJECT

Page 20: Ded butets english

1. Nowadays there are some solve problems have been appeared which

are depended on the lines and equipment of plants very fewer. So using

the importing the most equipment is from the Republic of China and

Russia to construction works of infrastructure. Beside them, to waste

the time, lost money for importing very much that is appeared the

negative results for the country’s economics. In order to decide those

solve problems to involve the foreign investment and to establish lines

and equipment’s plants such as engineering infrastructure lines and

equipment etc. which are most important role to execute the

infrastructure.

PROPOSAL OF INVESTMENT

Page 21: Ded butets english

2. In recently, there has been using the solar energy power intensively,

especially geotherma, sun, wind, water solar power energy which are

using on the worldwide renewable energy . In order to decide the

infrastructure issues which are most virtual need to requirement in

Mongolia increasingly. In this regard, we are ready to joint work with the

business activities of foreign investors in this field to express their

willingness to cooperate with you.

Page 22: Ded butets english

We have confidence with you to cooperate the filed of infrastructure

which is to implement the policy of Mongolian government that is

increase housing supply, to support the manufacturing of construction

materials, based on the development of modern technology.

Page 23: Ded butets english

Thank you very much

for attention