Dialogue Session With Datuk Bandar KLOn Road Dispersal System in Bangsar & Brickfields
Dialogue Session with Datuk Bandar KL
CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS
Dialogue Session with Datuk Bandar KLCURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS
1) Traffic is heavy on the main roads in and around Bangsar & Brickfields i.e. i i f l / l l S b h / l
CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS
intersection of Jalan Travers/ Jalan Bangsar; Jalan Tun Sambanthan/ Jalan Travers; Jalan Tun Sambanthan/ Jalan Tun Sambanthan 4 and Jalan Tun Sambanthan/ Jalan Robson.
Side roads in and around residential areas are also heavy.
CAUSES OF HEAVY TRAFFIC IN THE AREACAUSES OF HEAVY TRAFFIC IN THE AREAi. Current roads are unable to cope with the surge in traffic volume due to the
fast‐paced development in and around Brickfields notably KL Sentralii. Illegal parking of vehicles (especially on the main roads in Brickfields) g p g ( p y )
compound the situation due to insufficient parking areasiii. Signalised junctions have already reached their optimum capacity
Dialogue Session with Datuk Bandar KL
CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDSCURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS
Dialogue Session with Datuk Bandar KLTRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS AFTERTRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS AFTER IMPROVEMENT
PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS
Dialogue Session with Datuk Bandar KL
from KL Sentral to Jalan Damansara and Lebuhraya Mahameru
Intersection of Jalan Travers/Jalan Bangsar
PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS
Mahameru/ g
Slip road from Jalan B t J lBangsar to Jalan Maarof
Dialogue Session with Datuk Bandar KL
PROPOSED TRAFFIC SOLUTION UNDER RM110 MILLION STIMULUS PACKAGES
Package 1: Construction of Flyover at Jalan Travers/Jalan Bangsar Intersection
Package 2: Construction of Flyover from KL Sentral to Jalan Damansara & g yLebuhraya Mahameru
Package 3: Upgrading of Jalan Tun Sambanthan and its vicinity
Package 4: Construction of Pedestrian Bridges & Linkages
k d d i d i S lPackage 5: Upgrade and Repair Roads in KL Sentral
Package 6: Construction of Elevated Road from Jalan Bangsar to Jalan Maarof
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 1:CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
Flyover at intersection of Jalan Travers/Jalan Bangsar
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 1:CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
View ofFlyoverfrom JalanBBangsar
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 1:CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
Vi f Fl f J l TView of Flyover from Jalan Travers
Dialogue Session with Datuk Bandar KL
View of flyover from 1 Sentral Building on Jalan Travers
STIMULUS PACKAGE 1:CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
y g
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 2:CONSTRUCTION OF FLYOVER FROM KL SENTRAL TO JALAN DAMANSARA & LEBUHRAYA MAHAMERU
Flyover from KL Sentral to Jalan Damansara/Lebuhraya Mahameru
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 2:CONSTRUCTION OF FLYOVER FROM KL SENTRAL TO JALAN DAMANSARA& LEBUHRAYA MAHAMERU
View of Flyover from KL Sentral to Jalan Mahameru and Jalan Damansara
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3:UPGRADING OF JALAN TUN SAMBANTHAN
The upgrading works include widening and beautification of roads in Brickfields as well asThe upgrading works include widening and beautification of roads in Brickfields as well as conversion of roads to one‐way system
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN WITH THE UPGRADING & CONVERSION TO ONE-WAY STREET
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN
More artist impression of the new one‐way p ystreet system
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN
Artist impression of the new one‐way street system alongside Nu Sentral Mall by 2012
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 4:CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
Dialogue Session with Datuk Bandar KLSTIMULUS PACKAGE 4STIMULUS PACKAGE 4:CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
Artist impression of a pedestrian bridge linking KL Monorail to Nu Sentral Mall
Dialogue Session with Datuk Bandar KLSTIMULUS PACKAGE 4STIMULUS PACKAGE 4:CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
Artist impression of a pedestrian bridge near 348 Sentral
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 4:CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
Artist impression of a pedestrian bridge near 348 Sentral
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 5: UPGRADE AND REPAIR ROADS AT KL SENTRAL
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 5: UPGRADE AND REPAIR ROADS AT KL SENTRAL
Jalan Stesen Sentral, one of the roads in the KL Sentral would undergo upgrade and repair
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 6:CONSTRUCTION OF ELEVATED ROAD FROM JALAN BANGSAR TO JALAN MAAROF
Elevated road from Jalan Bangsar to Jalan Maarof
Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 6:CONSTRUCTION OF ELEVATED ROAD FROM JALAN BANGSAR TO JALAN MAAROF
View of elevated road from Jalan Bangsar
ONGOING IMPLEMENTATION OF A PROPOSED TRAFFIC SOLUTION
Dialogue Session with Datuk Bandar KL
(currently in progress) ONGOING IMPLEMENTATION OF A PROPOSED TRAFFIC SOLUTION
Dialogue Session with Datuk Bandar KL
PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS
RM110 MILLION TRAFFIC DISPERSAL SCHEME HAS BEEN LAUNCHED
PACKAGE 1 HAS COMMENCED WORK ON 1 OCTOBER 2009
SUBSEQUENT PACKAGES WILL BE IMPLEMENTED ACCORDING TO SCHEDULE
THE WHOLE PROJECT IS EXPECTED TO BE COMPLETED BY EARLY 2011
Dialogue Session with Datuk Bandar KL
Based on the outcome of the dialogue on 9 October 2009, a one month period has been given to the Bangsar/Brickfields/Federal Hills community
PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS
period has been given to the Bangsar/Brickfields/Federal Hills community to comment & provide feedback on the matter. The agreed deadline was for a month ending by 5pm on 8 November 2009.
M hd KhiMohd Khir,Engineer, Public Works DepartmentDewan Bandaraya Kuala Lumpury p19th, Menara DBKL 1, Jalan Raja Laut50350 Kuala Lumpur
Tel: 03 2617 9000 / 2617 9402Tel: 03-2617 9000 / 2617 9402Fax: 03-2691 9149Email: [email protected]
Dialogue Session with Datuk Bandar KL
TERIMA KASIH