Day 2

Gilles LE GALOEUROCONTROL DAP/SSH

1

WORKSHOP, Nicosia 2-3rd July 2008“Extension of SAFETY & QUALITY Common Requirements to the EMAC States”

Item 10a: Proposed Way Forward-Safety Management System

Page 2: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

~15th NovemberResults Safety Maturity

December/JanuaryKO Workshop

Finalisation Work Plan

EUROCONTROLWork Plan development

EUROCONTROL & ANSPs/NSAsWork Plan Implementation

2010 SMS Maturity Survey

Final Report(x) Workshops

(x) Training Sessions

2

Page 3: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Proposed Way Forward

3

Page 4: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Proposed Way Forward

4

Page 5: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Proposed Way Forward

GAP ANALYSIS

Safety Maturity ReportsImprovement Requirements

Identification and securement of resources

Improvement requirementsDraft implementation Plan

Implementation Plan

1. Implementation Plan

SES CRBest practices

Draft Generic Implementation

Plan

5

Page 6: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Proposed Way Forward

Interactive work(Working sessions)

Current situationImplementation plan Draft Generic

SMS procedure

Draft Generic SMS procedure

Internal activities:-Drafting specific procedure-Obtain Regulatory approval-Obtain Internal approval

Approved SMS

procedure

Identification of Staff

and their training

needs

Goto Training

SES CRGuidelines-Best practices

2. SMS procedures (SMM)

6

Page 7: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Safety Policy

Proposed Way Forward

SMS documentation

Reporting system(s) Investigation

Safety assessments External services Competency

Safety Surveys

Safety Monitoring Safety TargetsSafety Records

Lesson dissemination

7

Page 8: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Proposed Way Forward

Interactive work(Working session)

Draft Generic Organisation

Draft Generic Organisation and job description principles

Internal activities:-Define suitable SMS Organisation-Draft locally relevant JDs

Approved Organisation Job descriptions

Current situationImplementation plan

SES CRGuidelines-Best practices

Job description Principles &

examples

3. SMS organisationResponsibilities and accountabilities

8

Page 9: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Proposed Way Forward

Define prioritiesAssess opportunities

Training needs Training PlanNames/courses

Training PlanTraining deliverySupport EUROCONTROL

Trained staff

4. Proportionate number of competent staff (parallel activity)

Potential candidates

From 2.

9

Page 10: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Proposed Way Forward

Workshops Need for fostering safety cultureNeed to foster just culture

Enhanced understanding

of SC and JC

Enhanced understandingOf SC and JC

Local/regional initiativesPartnershipEUROCONTROL

Concrete measures

5. Enhanced Safety Culture & Just Culture

10

Page 11: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

But there is one thing more: Relationship with the NSA(s)

Proposed Way Forward

11

Page 12: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

But there is one thing more: Relationship with the NSA(s)

Proposed Way Forward

12

Page 13: Day 2 Gilles LE GALO EUROCONTROL DAP/SSH 1 WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item

Thank you for your attention

Gilles LE GALOEUROCONTROL DAP/SSH

Day 2