day 2 - 1220 garry crighton definition assessment and monitoring hse performance revised 29-11-10
TRANSCRIPT
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
1/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 1
Defining Measurements,
Monitoring and Assessmentof HSE Performance
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
2/48
HSE, Quality and Security Management
Under its original title of the Northern Emirates Safety Association (NESA), first focused on just a few Emirates to
become a key voluntary author ity and force in the nations drive to improve occupational health, safety and
welfare standards for all of its citizens.
So influential is the group, that proposed new safety laws and regulations are filtered through the
organization before being officially enacted.
The ESG currently consists of 279 individual members and has attracted a signif icant 159 organisations,
representing not only the high safety challenges of the Construction industry, but also a broad spectrum of
business sectors such as, Oil & Gas, Manufacturing, Hospi tality, Healthcare etc..
The group is less about educating the general public, and more about reinforcing the safety message with the
stakeholders charged to deal with safety in their everyday lives; with a view to this knowledge trickling down
through organisations and into society.
Emirates Safety Group(ESG)
Garry Crighton - HSE and Quality Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
3/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management3
Dodsal
Headquartered in Dubai, the engineering, procurement and construction business has been involvedin the of execution of major projects over the last 20 years across the following sectors;
Power Generation BuildingsPower Distribution Water Supply and Distribution SystemOil & Gas Desalination PlantsMetallurgical Plants Roads & Highways
Current projects include;Qarn Alam Steam PDOMukhaiznah Refinery Expansion OXYRuwais Sulphur Recovery Plan GascoShah Gas Development 2 and 3 SaipemRuwais Sulphur Expansion SamsungFujeirah Water Transmission System Transco
ASAB Lean Gas LindeJumeirah Village III - Nakheel
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
4/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 4
Presentation ObjectivesManagement System Framework
Objective and TargetsCorporate/Project Specific
Performance Measurements, Moni tor ing and AssessmentManagement SystemHSE Behavioural Assessments
HSE Climate/Culture SurveysInspections/Audits/Incident Investigation/Risk Assessment
Procedures and TrainingHSE Leadership, Defensive Driving (In House), Subcontract Management
Achieving Targets & Bench markingCorporate/Project specific Targets / Bench marking across project & against Indust ry (OGP)
Management ReviewBoard Level Review (Monthly), BPI Plan (Bi-annually), Management Review (Annually)Road to HSE Excellence
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
5/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 5
1. POLICY, STRATEGY AND GOALS
2. PROCESSES AND PROCEDURES
3. RESOURCES AND ORGANISATION
4. IMPLEMENT, MONITOR AND CONTROL
5. DEMONSTRATE COMPLIANCE
6. MANAGEMENT REVIEW
CORRECT
REDEFINE
IMPROVE
PLAN DO
CHECK ACT
HSE Planningarrangements aredeveloped as part ofElements 1, 2 and 3 andimplementation continues
thro 4, 5 and 6.
Management System Framework
HSE Principles areadopted primarily viaManagement Processesand Procedures
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
6/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 6
Overall Goal/ Objectives:
With our HSE & Quality Policy, our overall Goal is to manage HSE, Quality and Secur ityrisks/vulnerabilit ies to a level that is as low as we can reasonably achieve and maintain and so deliverprojects safely and effectively.
To achieve this overall goal the fol lowing primary Objectives are derived and set;
Fully comply with all legal and other (contractual, standards, specifications etc.) requirements .
Minimize the exposure of our assets (people, environment, property and business operations) tooperational hazards/threats
Eliminate Lost Time Injuries
Maintain cost and schedule requirements
Eliminate customer complaints
From these objectives Corporate HSE, Quality and Security targets are set for all projects .
Objectives and Targets
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
7/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management7
Corporate HSE Targets for ProjectsThe following Corporate HSE targets (derived from overall goals and objectives) are set for all projects:
Zero Fatalit ies and Lost Time Injur ies
100% HSE Inductions for all personnel
A Minimum of 0.85% of total Man-hours spent on HSE Training
Daily PTST (Pre Task Safety Talk) for 100% of direct si te man power.
Weekly completion of Management HSE Walkabouts
Monthly completion of HSE Committee meeting
Upon arrival to project, complete medical screening (Blood Pressure and Diabetes) of allpersonnel.
Maintain audit schedules with follow up and close out of all audit findings with in one month
Less than 135 kW (power consumption) per 1000 man hours
In addition to the above , all p rojects develop pro ject specific HSE objectives/targets .
Objectives and Targets
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
8/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 8
1. Leaders/Managers(HSE Mgt. System Assessment)
2.Teams(Safety Behavioural Assessments)
Individuals(HSE Culture/Climate Surveys)
Organisation(HSE Performance)
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
9/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 9
1. Management System Requirements (MSR) Assessment; Leaders/Managers
Total 10 Elements
Management, Leadership, Commitment & Accountability
Risk Assessment & Management
Design Engineering
Project Management and Construction Operations
Employee Competency & InvolvementOccupational Health
Third party Management
Impact upon the community & Emergency Planning
Incident Investigation & Analysis
Measurement, Audit & Review
Element 1
Overall
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
10/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 10
2. HSE Behavioural Assessments; Teams
Tendency for people to deviate from normal behaviour even in the most controlled
environments.
Complacency (natural reduction in risk perception or awareness over time), Peerpressure, Time constraints
At risk (or unsafe/unsound) behaviour can be observed and measured to develop a more
positive HSE Performance/Culture, i.e. raise the level of risk perception/awareness andso combat the natural decline (complacency) that would otherwise prevail.
Defining HSE Behaviour PPE and all other elements
Monthly Area/Function /
Over Time
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
11/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management11
3. HSE Climate/Culture Surveys: IndividualsGeneral attitude dimensions follow four broad elements with sub-elements;
Organisational Context
Management Commitment (MC) - Perceptions of managements overt commitment to health and safetyissues
Communication (C) - The nature and efficiency of health and safety communications within theorganization
Priority of Safety (PS) - The relative status of health and safety issues within the organization
Safety Rules and Procedures (SRP) - Views on the efficacy and necessity of rules and procedures
Social Environment
Supportive Environment (SE) - The nature of the social environment at work, and the support derivedfrom it
Involvement (INV) - The extent to which safety is a focus for everyone and all are involved
Individual Appreciation
Personal Prior iti es and Need for Safety (PP) - The individuals view of their own health and safetymanagement and need to feel safe
Personal Appreciation of Risk (PAR) - How individuals view the risk associated with work
Work Environment
Physical Work Environment (WE) - Perceptions of the nature of the physical environment
Organisation Specific Factors
Attitudes to specific safety related systems and procedures (for example, permit to work
systems) may be included as necessary.
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
12/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management12
HSE Climate/Culture Surveys
Statements made and answered to find perceptions/attitudes,
5ways Strongly Agree, Agree, Neither Agree nor Disagree, Disagree, Strongly Disagree
Especially aimed at Workers- Management operates an open door policy on safety issues (C)
- I am involved with safety issues at work (INV)
- Corrective action is always taken when management is told about unsafe practices (MC)
- I always get the equipment I need to do the job safely (WE)
+ Any other comments about Health and Safety in your workplace? For example, has there been a change in the lastfew months in any of the following? Coordination, management responsibility, worker consultation, safer construction
design, planning, training/briefings etc.
Some for Management- Safety is the number one priority in my mind when completing a job (PP)
- I believe that safety issues are assigned a high priority (PS)
- Operational targets never conflict with safety measures (WE)
- Health and Safety rules are really practical (SRP)
+ Any improvements regards Health and Safety in our workplace? For example, priority, sub-contractors, safer
construction methods, better planning, more time, more HSE training, greater penalties etc.
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
13/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 13 13
28%
61%
6% 4%1%
Ruwais Sulphur Expansion Phase III Project-ClimateSurvey Result
Strongly Agree
Agree
Neither Agree norDisagree
Disagree
Strongly Disagree
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
14/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 14 14
Performance Measurement, Monitoring and Assessment - Improvements
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
A s a b
L e a n
G a s
P i p e l i n e
E l i x i e r 2
G a n
P i p e l i n e
N G L P i p e l i n e
N e t w o r
k
R u w a
i s S u l p h u r
E x p a n s
i o n
F W T S 2
J u m e i r a h
P a r k
J u m e i r a h
V i l l a g e
Q a r n
A l a m
S t e a m
C C W P
Strongly agree
Agree
Neither agree nor disagree
Disagree
Strongly disagree
Climate across all projects:
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
15/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 15 15
Performance Measurement, Monitoring and AssessmentGeneral Atti tude Dimensions
Overall Dodsal General Attitude Dimensions
21%
44%
21%
14%
IA
OC
SE
WE
IA : Individual Appreciation, OC : Organisational Context, SE: Social Environment, WE: Work
Environment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
16/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 16 16
Performance Measurement, Monitoring and Assessment - ImprovementsSpecif ic Att itude Dimensions Disagree and Strongly Disagree
31%
37%
16%
16%
Organisational ContextC
MC
PS
SRP
C : Communication, MC : Management Commitment , PS :Priority of Safety , SRP : Safety Rules and Procedures
44%
56%
Individual Appreciation
PAR
PP
PAR : Personal Appreciation of Risk , PP : Personal
Priorities and Need for Safety,
33%
67%
Social Environment
INV
SE
INV : Involvement, SE : Supportive Environment ,
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
17/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 17 17
HSE Climate/Culture Surveys:
Organization Specif ic Factors
Road Safety:
Aspect: Journey Management
Issue: There is a significant flow of traffic between site and Abu Dhabi/Dubai esp. airports.
Suggested Improvement:
Plan the Abu Dhabi and Dubai trips wi th minimum vehicles centralised journey management
Maximise use of transit /rest houses in Abu Dhabi / Dubai for departing and arriving personnel duringnight time.
Codes of Conduct
Aspect: Discipl inary Measures
Issue: Recommendations for di scipl inary measures on grounds of HSE are not beingaddressed/honoured.
Suggested Improvement : Effective actions must be taken by each project and across projects(HR/HSE). This includes termination for serious v iolations.
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
18/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 18 18
HSE Climate/Culture Surveys:
Organization Specif ic Factors
Subcontractor HSE Management:
Aspect: Safety defau lt.
Issue: Safety default for subcontractor violation is not part of subcontractor contractualarrangements.
Suggested Improvement: Amend the corporate procedures of contractor HSE requirements &Contractors HSE Management to incorporate this issue and revise terms and condi tion of contractaccordingly.
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
19/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management19
Inspections/Audits
HSE/Inspection checklists revised in such a way that 80% of Inspections/audits focus on field activities(implementation) rather than on system extensiveness Link 1
Incident InvestigationIncident Notification procedure revised to include the requirements based on the Severity/Criticality of the
incidents- Link
Risk Assessments
The previous CAR (Consolidated Activity Risk) format was based on basic risk rating and controls. The newformat TRA (Task Risk Assessment) addresses PAER risk, residual risks after initial controls and recovery
measures in the event of barriers//controls being breeched.
Performance Measurement, Monitoring and Assessment
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
20/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management20
HSE Leadership
Promote the Business Benefits of robust HSE and Quality management and set theExpectations
Prioritise HSE and Quality before Production efficiencies will follow
Be Accountable for your roles, responsibilities and objectives for HSE and Quality HSEQ MSProgramme
Be aware of Leadership Practices and Styles Demonstrating HSE Leadership
Understand what is expected of you manager or leader?
Know yourself and others
Know the critical processes Link1 and Link 2
Assess your knowledge and identify any gaps in your knowledge
Compile Personal HSE Contracts
Complete a Site Checklist and.
Demonstrate Leadership Behaviour walk the walk, talk the talk
Integrate HSE and Quality in your routine
Monitor and Measure HSE and Quality Performance
Learn more along the way
Be aware of change in terms of HSE and Quality
Regularly review HSE and Quality outputs
Procedures and Training
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
21/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management21
Defensive Driving
Over 300 drivers trained in-house by certi fied trainer
Sub Contract Management
Subcontractor HSE Requirements and Subcontractor HSE Management procedures
introduced to more effectively measure , monitor and assess Subcont ractor HSEPerformance
Procedures and Training
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
22/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management22
Corporate HSE Objectives
Develop Safety Leadership programme c/w Personal Safety Plans - Completed
Procure and effectively implement Root Cause Analysis too l Taproot, Topset or equivalent Under review
Develop and roll out (training) corporate standards.
Emergency Preparedness and Response AchievedIncident, Classification, Investigation and Reporting Partly Completed
Revise Consol idated Activi ty Risks to new format of Task Risk Assessments On going
Complete campaign on need to identify and report and investigate Near Misses and First AidCases (FACs) - Completed
Revise old HSE handbook and issue new On going
Achieving Targets and Benchmarking
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
23/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management23
Project HSE Targets
Zero Fatalit ies and Lost Time Injuries Fatality 0, LTI - 1
100% HSE Inductions for all personnel Achieved
A Minimum of 0.85% of Man-hours spent on HSE Training 0.78%
Daily PTST (Pre Task Safety Talk) for 100% of direct si te man power - Achieved
Weekly completion of Management HSE Walkabouts - Achieved
Monthly completion of HSE Committee meeting Achieved
Upon arrival to project, complete medical screening (Blood Pressure and Diabetes)
of all personnel - Achieved
Maintain audit schedules with follow up and close out of all audit f indings within one
month - Achieved
Less than 135 kW (power consumption) per 1000 man hours See Graph
Achieving Targets and Benchmarking
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
24/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management24
Benchmarking across projects 2009
Achieving Targets and Benchmarking
1. Incident Statistics2. Total Annual Training Hours
3. Training Coverage Rate Monthly Average
4. Toolbox Talk Attendance (Average/Annum)
5. NCR/Observation Closeout Rate
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
25/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management25
Benchmarking with Industry (OGP)
Achieving Targets and Benchmarking
LTIF Industry ComparisonPer 1 Million Manhours worked
-0.2
0
0.2
0.4
0.6
0.8
1
1.2
1.4
2004 2005 2006 2007 2008 2009
Dodsal
OGP Contractors
OGP Contractors
Dodsal
TRIR Industry ComparisonPer 1 Million Manhou rs Worked
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
2004 2005 2006 2007 2008 2009
Dodsal
OGP Contractors
OGP Contractors
Dodsal
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
26/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management26
Board Level Review
Monthly for HSE & Quality
Business Process Improvement (BPI) Plan
Bi-annually
PLAN
PRIORITYPROGRESS
EARNED VALUE
Management System ReviewCompleted at years end to define next years objectives
Road towards excellence
Management Review
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
27/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management27
THANK YOU
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
28/48
HSE Q li d S i M
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
29/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 29Back
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
1 2 3 4 5 6 7 8 9 10
Element
L e v e l
Desir ed 2010 ACTUAL 2009 ACTUAL 2008 ACTUAL 2007
ACTUAL 2006
HSEQ PERFORMANCE ASSESSMENT 2006/2009
Elem ent
1 - Managem ent, Leaders hip, Comm itm ent & Acc ou nt abil it y
2 - Risk Ass ess ment & Management
3 - Des ign/Engin eer ing
4 - Project Managm ent and Constr uctionOperations
5 - Emp loyee Compe tency & Involveme nt
6 - Occupational Health
7 - Thir d Part y Managem ent
8 - Im pact upon the Com m unity & Eme rge ncy Plan
9 - Incident Investigation & Analysis
10 - Measurem ent, Audit & Review
HSE Q li d S i M
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
30/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 30
Safety Behavior Performance RatingObservation Date Area SupervisorObserved By: Site Location:
Observation of EventNotified if at
Risk (yes/no)Total Safe
Observation
(proper use)
Total At-RiskObservation
(improper use)
Total NumberObserved
1. PERSONAL PROTECTIVEEQUIPMENT 0Hard hat yes 21 1 22Safety glasses with shields 21 3 24
Hearing protection-ear plug or muffs 6 4 10Face shield 12 12 24Respiratory protection-P2/P3 soft mask,half face, air line 3 1 4Protective clothing-overalls, L/S shirt +trousers 25 25 50Gloves 0
00
Total Observations 88 46 134Positive Safety Behaviour 65.67164
HSE Q lit d S it M t
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
31/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 31
Elements of Safety Behavioral Assessments
1. Personal Protective Equipment
2. Welding Procedures
3. Ladders
4. Scaffolding
5. Working at height
6. Housekeeping
7. Excavation
8. Permits
9. Confined Space10. Chemical Handling & Storage
11. Vehicle & Mobile Plant
12. Rigging & Craneage
13. Lifting Gear
14. Gas cylinder (Oxy/Acetylene, LPG)
15. Electrical Awareness
16. Tools & Equipments
17. Cutting & Grinding Equipment
18. Fire Prevention
19. First Aid / Medical Facilities
20. Safety Promotion
21. Tool Box/Pre Start/ Site HSE meetings
22. Management Involvement
23. Risk Assessment24. Material Handling
25. Environmental (Pollution. Social Impact, Energy Conservation)
26. Occupational Health /Illness
27. Others
1. Personal Protective Equipment
2. Welding Procedures
3. Ladders
4. Scaffolding
5. Working at height
6. Housekeeping
7. Excavation
8. Permits
9. Confined Space10. Chemical Handling & Storage
11. Vehicle & Mobile Plant
12. Rigging & Craneage
13. Lifting Gear
14. Gas cylinder (Oxy/Acetylene, LPG)
15. Electrical Awareness
16. Tools & Equipments
17. Cutting & Grinding Equipment
18. Fire Prevention
19. First Aid / Medical Facilities
20. Safety Promotion
21. Tool Box/Pre Start/ Site HSE meetings
22. Management Involvement
23. Risk Assessment24. Material Handling
25. Environmental (Pollution. Social Impact, Energy Conservation)
26. Occupational Health /Illness
27. Others
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
32/48
HSE Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
33/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 33
1. PERSONAL PROTECTIVE EQUIPMENT
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
Wk 30 Wk 31 Wk32 Wk33 Wk34 Wk35 Wk36
Week Num ber
% S a f e t y B e h a v
i o u r
HSE Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
34/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 34Back
SCORE SET STANDARD
SECTION SECTION NAME COMPONENT MAXIMUMPOSSIBLE
ASSESSEDTOTAL
REPEATDEFICIENCY
IMMINENTDANGER
ENVIRONMENTALDANGER
FINAL SCORE MINIMUMSTANDARD
MET /NOT MET
51 Housekeeping SE 23.0 23.0 0.00 0.00 0.00 23.00 20.7 MET52 Communication and Coordination HSE 7.0 7.0 0.00 0.00 0.00 7.00 6.3 MET53 Health & Hygiene HSE 53.0 53.0 0.00 0.00 0.00 53.00 47.7 MET54 Pre-Commissioning & Commissioning S 6.0 6.0 0.00 0.00 0.00 6.00 5.4 MET55 Spill Control and Prevention SE 14.0 14.0 0.00 0.00 0.00 14.00 12.6 MET56 Work Area Lighting S 10.0 10.0 0.00 0.00 0.00 10.00 9 MET57 Personal Protective Equipment (P.P.E.) HSE 92.0 92.0 0.00 0.00 0.00 92.00 82.8 MET
58 Hand Tools S 13.0 13.0 0.00 0.00 0.00 13.00 11.7 MET59 Powder Actuated Tools S 17.0 17.0 0.00 0.00 0.00 17.00 15.3 MET60 Power Tools and Power Equipment SE 46.0 46.0 0.00 0.00 0.00 46.00 41.4 MET61 Hot Work (Welding, Heating, Burning) S 103.0 103.0 0.00 0.00 0.00 103.00 92.7 MET62 Electrical S 62.0 62.0 0.00 0.00 0.00 62.00 55.8 MET63 Equipment Operations S 159.0 159.0 0.00 0.00 0.00 159.00 143.1 MET
64 First Line Breaks HSE 36.0 36.0 0.00 0.00 0.00 36.00 32.4 MET65 Excavation and Trenching HS 39.0 39.0 0.00 0.00 0.00 39.00 35.1 MET
66Steel Erection and Floor and WallOpening S 52.0 52.0 0.00 0.00 0.00 52.00 46.8 MET
67 Material Handling and Storage HSE 31.0 31.0 0.00 0.00 0.00 31.00 27.9 MET
FINALSCORE
REDUCTION
FIELD IMPLEMENTATION
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
35/48
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
36/48
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
37/48
HSE Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
38/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management 38
Power Consumption Trend - Yearwise
0
50
100
150
200
250
300
2007 2008 2009 2010
K W / 1 0 0 0 M a n
h o u r s Parametersunclear /
InaccurateReporting
Corporatefocus/attention
PositiveTrend
HSE Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
39/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management39
Incident Statis tics by Project 2009
17
3121598
76
2
2461814224
44
813264380519
In the Previous
Review Period
153963273
217741281401219259644479Total
1245651000005100226609New LNG TrainSKIKDA Proj ect
1180406070141001446118785213Trans co WTS1644027700400510102840000NGL Pip eline
0116230000010387203770279Jumeirah Park
134585700112042107479445Qarn Alam Steam
033618750100000104678136Ruwais Sulphur
Exp
073154500900106003335482Oxy Mukhaizna0202784400200134103874436
Jumeirah Village
III
076016570015011426116320945QP- CCWP
165624061409734161018333934RGX-2
RTAVehicleKM sEIFIPDIRWCMTCFACNMLTIFatalMan-hours
workedProject
17
3121598
76
2
2461814224
44
813264380519
In the Previous
Review Period
153963273
217741281401219259644479Total
1245651000005100226609New LNG TrainSKIKDA Proj ect
1180406070141001446118785213Trans co WTS1644027700400510102840000NGL Pip eline
0116230000010387203770279Jumeirah Park
134585700112042107479445Qarn Alam Steam
033618750100000104678136Ruwais Sulphur
Exp
073154500900106003335482Oxy Mukhaizna0202784400200134103874436
Jumeirah Village
III
076016570015011426116320945QP- CCWP
165624061409734161018333934RGX-2
RTAVehicleKM sEIFIPDIRWCMTCFACNMLTIFatalMan-hours
workedProject
SR Severity Rate
VAR Vehicle Acci dent RateRTA Road Traffic AccidentLTIFR Los t Time Inju ry Frequency RateFI Fire Incid entEI Environmental IncidentRWC Restric ted Work CasePDI Property Damage IncidentFAC First Aid CasesMTC Medical Treatment CaseLTI Lost Time InjuryNM Near-missFTC: Fatality
SR Severity Rate
VAR Vehicle Accid ent RateRTA Road Traffic AccidentLTIFR Lost Time Inju ry Frequency RateFI Fire Incid entEI Environmental IncidentRWC Restric ted Work CasePDI Property Damage IncidentFAC First Aid CasesMTC Medical Treatment CaseLT I Lost Time InjuryNM Near-missFTC: Fatality
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
40/48
HSE, Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
41/48
HSE, Quality and Security Management
Garry Crighton - HSE and Quality Management41
Training Coverage Rate (Monthly Average by project) - 2009
TCR Monthly Aver age by Project
0.000.10
0.20
0.30
0.400.50
0.60
0.70
0.800.90
CCWP RGX2 Trans co Gas coNGL
RuwaisSulphur
JVS3 JP Qarn Alam
Oxy Skikda
Average
HSE, Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
42/48
, Q y y g
Garry Crighton - HSE and Quality Management42
Toolbox Talk Attendance (Average/Annum by project) 2009
HSE, Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
43/48
, Q y y g
Garry Crighton - HSE and Quality Management43
NCR/Observation Closeout Rate by Project - 2009
100
92.3
80.26
43.36
94.44
76.69
100
9092.59
0
20
40
60
80
100
120
QASP Oxy Ruwais
Sulphur
Transco JV3 Jumeirah
Park
NGL Gasco CCWP RGX2
Closeout rate
Total Observations
Observations Closed
Observations Open
NCR / Observation Close out Rate by Project
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
44/48
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
45/48
HSE, Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
46/48
Garry Crighton - HSE and Quality Management 46
PERCENTAGE CALCULATION PER ACTIVITY
ACTIVITY NO: IMS 1 PROGRESS(%) SCORE 20
Short description: Complete IMS Manual
ALLOCATED PROGRESS IS CALCULATED ON THE FOLLOWING "WEIGHTING":
Estimated Weighting of ImpactSTAGE OF % Completion
DEVELOPMENT
Initiation 10Definition/Planning 20
Development/ApprovalDevelopment/ApprovalDevelopment/ApprovalImplementation/RolloutEvaluation
HSE, Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
47/48
Garry Crighton - HSE and Quality Management 47
Business Process Improvement Plan 2006 -2009
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
Progress to Date - Percentage Overall Comp letio n*
% E a r n e
d V a l u e
P1
P2
P3
P1 10.00 10.19 8.87 16.29 23.55 29.52 30.43 30.43 31.06
P2 13.51 14.82 14.41 21.40 31.82 44.93 52.69 66.45 73.15
P3 10 20 12.037037 16.11 16.11 12.56 64.30 55.00 55.00
Q1-Q22006
Q3-Q42006
Q1-Q22007
Q3-Q42007
Q1-Q22008
Q3-Q42008
Q1-Q22009
Q3-Q42009
Q1-Q22010
*= Sum(Earned Values)/Sum(Weighted Prior ities)
Work load increased du eto Project Less ons Learntexercise (Num ber ofactivities incres ed)
HSE, Quality and Security Management
-
8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10
48/48
Garry Crighton - HSE and Quality Management 48
HSE Excellence Zero Harm
BSC 5 Star Awardfor 3 projects
July 2010
D o d s
a l B u s
i n e s
s
D o d s
a l H S
E
HSE MS fornew business sector
July 2010
Businessexcellence
BSC Sword of Ho nourNovember 20 10
Business Processes
Re-EngineeringJune 2010
Review Operationsagainst ISO 10006
BS 31100May 2010
Re view Securitya rrangements
again st ISO/PAS 22399May 2010
Implement Quality (Business)Performance procedure
September 2010
Measure Quality (Business)Performance and
define ImprovementsSeptember 2010
Fully Implement SafetyLeadership and
Contractor HSECapability programmes
June 2010Roll out HSE Surveillanceand Inspection procedure
June 2010
Roll ou t Competence Assuran ceprocess/procedure
September 2010
OUR ROAD TOWARDS HSE EXCELLENCE