    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 1

    Defining Measurements,

    Monitoring and Assessmentof HSE Performance

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    2/48

    HSE, Quality and Security Management

    Under its original title of the Northern Emirates Safety Association (NESA), first focused on just a few Emirates to

    become a key voluntary author ity and force in the nations drive to improve occupational health, safety and

    welfare standards for all of its citizens.

    So influential is the group, that proposed new safety laws and regulations are filtered through the

    organization before being officially enacted.

    The ESG currently consists of 279 individual members and has attracted a signif icant 159 organisations,

    representing not only the high safety challenges of the Construction industry, but also a broad spectrum of

    business sectors such as, Oil & Gas, Manufacturing, Hospi tality, Healthcare etc..

    The group is less about educating the general public, and more about reinforcing the safety message with the

    stakeholders charged to deal with safety in their everyday lives; with a view to this knowledge trickling down

    through organisations and into society.

    Emirates Safety Group(ESG)

    Garry Crighton - HSE and Quality Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    3/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management3

    Dodsal

    Headquartered in Dubai, the engineering, procurement and construction business has been involvedin the of execution of major projects over the last 20 years across the following sectors;

    Power Generation BuildingsPower Distribution Water Supply and Distribution SystemOil & Gas Desalination PlantsMetallurgical Plants Roads & Highways

    Current projects include;Qarn Alam Steam PDOMukhaiznah Refinery Expansion OXYRuwais Sulphur Recovery Plan GascoShah Gas Development 2 and 3 SaipemRuwais Sulphur Expansion SamsungFujeirah Water Transmission System Transco

    ASAB Lean Gas LindeJumeirah Village III - Nakheel

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    4/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 4

    Presentation ObjectivesManagement System Framework

    Objective and TargetsCorporate/Project Specific

    Performance Measurements, Moni tor ing and AssessmentManagement SystemHSE Behavioural Assessments

    HSE Climate/Culture SurveysInspections/Audits/Incident Investigation/Risk Assessment

    Procedures and TrainingHSE Leadership, Defensive Driving (In House), Subcontract Management

    Achieving Targets & Bench markingCorporate/Project specific Targets / Bench marking across project & against Indust ry (OGP)

    Management ReviewBoard Level Review (Monthly), BPI Plan (Bi-annually), Management Review (Annually)Road to HSE Excellence

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    5/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 5

    1. POLICY, STRATEGY AND GOALS

    2. PROCESSES AND PROCEDURES

    3. RESOURCES AND ORGANISATION

    4. IMPLEMENT, MONITOR AND CONTROL

    5. DEMONSTRATE COMPLIANCE

    6. MANAGEMENT REVIEW

    CORRECT

    REDEFINE

    IMPROVE

    PLAN DO

    CHECK ACT

    HSE Planningarrangements aredeveloped as part ofElements 1, 2 and 3 andimplementation continues

    thro 4, 5 and 6.

    Management System Framework

    HSE Principles areadopted primarily viaManagement Processesand Procedures

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    6/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 6

    Overall Goal/ Objectives:

    With our HSE & Quality Policy, our overall Goal is to manage HSE, Quality and Secur ityrisks/vulnerabilit ies to a level that is as low as we can reasonably achieve and maintain and so deliverprojects safely and effectively.

    To achieve this overall goal the fol lowing primary Objectives are derived and set;

    Fully comply with all legal and other (contractual, standards, specifications etc.) requirements .

    Minimize the exposure of our assets (people, environment, property and business operations) tooperational hazards/threats

    Eliminate Lost Time Injuries

    Maintain cost and schedule requirements

    Eliminate customer complaints

    From these objectives Corporate HSE, Quality and Security targets are set for all projects .

    Objectives and Targets

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    7/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management7

    Corporate HSE Targets for ProjectsThe following Corporate HSE targets (derived from overall goals and objectives) are set for all projects:

    Zero Fatalit ies and Lost Time Injur ies

    100% HSE Inductions for all personnel

    A Minimum of 0.85% of total Man-hours spent on HSE Training

    Daily PTST (Pre Task Safety Talk) for 100% of direct si te man power.

    Weekly completion of Management HSE Walkabouts

    Monthly completion of HSE Committee meeting

    Upon arrival to project, complete medical screening (Blood Pressure and Diabetes) of allpersonnel.

    Maintain audit schedules with follow up and close out of all audit findings with in one month

    Less than 135 kW (power consumption) per 1000 man hours

    In addition to the above , all p rojects develop pro ject specific HSE objectives/targets .

    Objectives and Targets

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    8/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 8

    1. Leaders/Managers(HSE Mgt. System Assessment)

    2.Teams(Safety Behavioural Assessments)

    Individuals(HSE Culture/Climate Surveys)

    Organisation(HSE Performance)

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    9/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 9

    1. Management System Requirements (MSR) Assessment; Leaders/Managers

    Total 10 Elements

    Management, Leadership, Commitment & Accountability

    Risk Assessment & Management

    Design Engineering

    Project Management and Construction Operations

    Employee Competency & InvolvementOccupational Health

    Third party Management

    Impact upon the community & Emergency Planning

    Incident Investigation & Analysis

    Measurement, Audit & Review

    Element 1

    Overall

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    10/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 10

    2. HSE Behavioural Assessments; Teams

    Tendency for people to deviate from normal behaviour even in the most controlled

    environments.

    Complacency (natural reduction in risk perception or awareness over time), Peerpressure, Time constraints

    At risk (or unsafe/unsound) behaviour can be observed and measured to develop a more

    positive HSE Performance/Culture, i.e. raise the level of risk perception/awareness andso combat the natural decline (complacency) that would otherwise prevail.

    Defining HSE Behaviour PPE and all other elements

    Monthly Area/Function /

    Over Time

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    11/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management11

    3. HSE Climate/Culture Surveys: IndividualsGeneral attitude dimensions follow four broad elements with sub-elements;

    Organisational Context

    Management Commitment (MC) - Perceptions of managements overt commitment to health and safetyissues

    Communication (C) - The nature and efficiency of health and safety communications within theorganization

    Priority of Safety (PS) - The relative status of health and safety issues within the organization

    Safety Rules and Procedures (SRP) - Views on the efficacy and necessity of rules and procedures

    Social Environment

    Supportive Environment (SE) - The nature of the social environment at work, and the support derivedfrom it

    Involvement (INV) - The extent to which safety is a focus for everyone and all are involved

    Individual Appreciation

    Personal Prior iti es and Need for Safety (PP) - The individuals view of their own health and safetymanagement and need to feel safe

    Personal Appreciation of Risk (PAR) - How individuals view the risk associated with work

    Work Environment

    Physical Work Environment (WE) - Perceptions of the nature of the physical environment

    Organisation Specific Factors

    Attitudes to specific safety related systems and procedures (for example, permit to work

    systems) may be included as necessary.

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    12/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management12

    HSE Climate/Culture Surveys

    Statements made and answered to find perceptions/attitudes,

    5ways Strongly Agree, Agree, Neither Agree nor Disagree, Disagree, Strongly Disagree

    Especially aimed at Workers- Management operates an open door policy on safety issues (C)

    - I am involved with safety issues at work (INV)

    - Corrective action is always taken when management is told about unsafe practices (MC)

    - I always get the equipment I need to do the job safely (WE)

    + Any other comments about Health and Safety in your workplace? For example, has there been a change in the lastfew months in any of the following? Coordination, management responsibility, worker consultation, safer construction

    design, planning, training/briefings etc.

    Some for Management- Safety is the number one priority in my mind when completing a job (PP)

    - I believe that safety issues are assigned a high priority (PS)

    - Operational targets never conflict with safety measures (WE)

    - Health and Safety rules are really practical (SRP)

    + Any improvements regards Health and Safety in our workplace? For example, priority, sub-contractors, safer

    construction methods, better planning, more time, more HSE training, greater penalties etc.

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    13/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 13 13

    28%

    61%

    6% 4%1%

    Ruwais Sulphur Expansion Phase III Project-ClimateSurvey Result

    Strongly Agree

    Agree

    Neither Agree norDisagree

    Disagree

    Strongly Disagree

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    14/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 14 14

    Performance Measurement, Monitoring and Assessment - Improvements

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    A s a b

    L e a n

    G a s

    P i p e l i n e

    E l i x i e r 2

    G a n

    P i p e l i n e

    N G L P i p e l i n e

    N e t w o r

    k

    R u w a

    i s S u l p h u r

    E x p a n s

    i o n

    F W T S 2

    J u m e i r a h

    P a r k

    J u m e i r a h

    V i l l a g e

    Q a r n

    A l a m

    S t e a m

    C C W P

    Strongly agree

    Agree

    Neither agree nor disagree

    Disagree

    Strongly disagree

    Climate across all projects:

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    15/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 15 15

    Performance Measurement, Monitoring and AssessmentGeneral Atti tude Dimensions

    Overall Dodsal General Attitude Dimensions

    21%

    44%

    21%

    14%

    IA

    OC

    SE

    WE

    IA : Individual Appreciation, OC : Organisational Context, SE: Social Environment, WE: Work

    Environment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    16/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 16 16

    Performance Measurement, Monitoring and Assessment - ImprovementsSpecif ic Att itude Dimensions Disagree and Strongly Disagree

    31%

    37%

    16%

    16%

    Organisational ContextC

    MC

    PS

    SRP

    C : Communication, MC : Management Commitment , PS :Priority of Safety , SRP : Safety Rules and Procedures

    44%

    56%

    Individual Appreciation

    PAR

    PP

    PAR : Personal Appreciation of Risk , PP : Personal

    Priorities and Need for Safety,

    33%

    67%

    Social Environment

    INV

    SE

    INV : Involvement, SE : Supportive Environment ,

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    17/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 17 17

    HSE Climate/Culture Surveys:

    Organization Specif ic Factors

    Road Safety:

    Aspect: Journey Management

    Issue: There is a significant flow of traffic between site and Abu Dhabi/Dubai esp. airports.

    Suggested Improvement:

    Plan the Abu Dhabi and Dubai trips wi th minimum vehicles centralised journey management

    Maximise use of transit /rest houses in Abu Dhabi / Dubai for departing and arriving personnel duringnight time.

    Codes of Conduct

    Aspect: Discipl inary Measures

    Issue: Recommendations for di scipl inary measures on grounds of HSE are not beingaddressed/honoured.

    Suggested Improvement : Effective actions must be taken by each project and across projects(HR/HSE). This includes termination for serious v iolations.

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    18/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 18 18

    HSE Climate/Culture Surveys:

    Organization Specif ic Factors

    Subcontractor HSE Management:

    Aspect: Safety defau lt.

    Issue: Safety default for subcontractor violation is not part of subcontractor contractualarrangements.

    Suggested Improvement: Amend the corporate procedures of contractor HSE requirements &Contractors HSE Management to incorporate this issue and revise terms and condi tion of contractaccordingly.

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    19/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management19

    Inspections/Audits

    HSE/Inspection checklists revised in such a way that 80% of Inspections/audits focus on field activities(implementation) rather than on system extensiveness Link 1

    Incident InvestigationIncident Notification procedure revised to include the requirements based on the Severity/Criticality of the

    incidents- Link

    Risk Assessments

    The previous CAR (Consolidated Activity Risk) format was based on basic risk rating and controls. The newformat TRA (Task Risk Assessment) addresses PAER risk, residual risks after initial controls and recovery

    measures in the event of barriers//controls being breeched.

    Performance Measurement, Monitoring and Assessment

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    20/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management20

    HSE Leadership

    Promote the Business Benefits of robust HSE and Quality management and set theExpectations

    Prioritise HSE and Quality before Production efficiencies will follow

    Be Accountable for your roles, responsibilities and objectives for HSE and Quality HSEQ MSProgramme

    Be aware of Leadership Practices and Styles Demonstrating HSE Leadership

    Understand what is expected of you manager or leader?

    Know yourself and others

    Know the critical processes Link1 and Link 2

    Assess your knowledge and identify any gaps in your knowledge

    Compile Personal HSE Contracts

    Complete a Site Checklist and.

    Demonstrate Leadership Behaviour walk the walk, talk the talk

    Integrate HSE and Quality in your routine

    Monitor and Measure HSE and Quality Performance

    Learn more along the way

    Be aware of change in terms of HSE and Quality

    Regularly review HSE and Quality outputs

    Procedures and Training

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    21/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management21

    Defensive Driving

    Over 300 drivers trained in-house by certi fied trainer

    Sub Contract Management

    Subcontractor HSE Requirements and Subcontractor HSE Management procedures

    introduced to more effectively measure , monitor and assess Subcont ractor HSEPerformance

    Procedures and Training

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    22/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management22

    Corporate HSE Objectives

    Develop Safety Leadership programme c/w Personal Safety Plans - Completed

    Procure and effectively implement Root Cause Analysis too l Taproot, Topset or equivalent Under review

    Develop and roll out (training) corporate standards.

    Emergency Preparedness and Response AchievedIncident, Classification, Investigation and Reporting Partly Completed

    Revise Consol idated Activi ty Risks to new format of Task Risk Assessments On going

    Complete campaign on need to identify and report and investigate Near Misses and First AidCases (FACs) - Completed

    Revise old HSE handbook and issue new On going

    Achieving Targets and Benchmarking

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    23/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management23

    Project HSE Targets

    Zero Fatalit ies and Lost Time Injuries Fatality 0, LTI - 1

    100% HSE Inductions for all personnel Achieved

    A Minimum of 0.85% of Man-hours spent on HSE Training 0.78%

    Daily PTST (Pre Task Safety Talk) for 100% of direct si te man power - Achieved

    Weekly completion of Management HSE Walkabouts - Achieved

    Monthly completion of HSE Committee meeting Achieved

    Upon arrival to project, complete medical screening (Blood Pressure and Diabetes)

    of all personnel - Achieved

    Maintain audit schedules with follow up and close out of all audit f indings within one

    month - Achieved

    Less than 135 kW (power consumption) per 1000 man hours See Graph

    Achieving Targets and Benchmarking

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    24/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management24

    Benchmarking across projects 2009

    Achieving Targets and Benchmarking

    1. Incident Statistics2. Total Annual Training Hours

    3. Training Coverage Rate Monthly Average

    4. Toolbox Talk Attendance (Average/Annum)

    5. NCR/Observation Closeout Rate

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    25/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management25

    Benchmarking with Industry (OGP)

    Achieving Targets and Benchmarking

    LTIF Industry ComparisonPer 1 Million Manhours worked

    -0.2

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    1.4

    2004 2005 2006 2007 2008 2009

    Dodsal

    OGP Contractors

    OGP Contractors

    Dodsal

    TRIR Industry ComparisonPer 1 Million Manhou rs Worked

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    4.5

    2004 2005 2006 2007 2008 2009

    Dodsal

    OGP Contractors

    OGP Contractors

    Dodsal

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    26/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management26

    Board Level Review

    Monthly for HSE & Quality

    Business Process Improvement (BPI) Plan

    Bi-annually

    PLAN

    PRIORITYPROGRESS

    EARNED VALUE

    Management System ReviewCompleted at years end to define next years objectives

    Road towards excellence

    Management Review

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    27/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management27

    THANK YOU

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    28/48

    HSE Q li d S i M

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    29/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 29Back

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    3.50

    4.00

    4.50

    5.00

    1 2 3 4 5 6 7 8 9 10

    Element

    L e v e l

    Desir ed 2010 ACTUAL 2009 ACTUAL 2008 ACTUAL 2007

    ACTUAL 2006

    HSEQ PERFORMANCE ASSESSMENT 2006/2009

    Elem ent

    1 - Managem ent, Leaders hip, Comm itm ent & Acc ou nt abil it y

    2 - Risk Ass ess ment & Management

    3 - Des ign/Engin eer ing

    4 - Project Managm ent and Constr uctionOperations

    5 - Emp loyee Compe tency & Involveme nt

    6 - Occupational Health

    7 - Thir d Part y Managem ent

    8 - Im pact upon the Com m unity & Eme rge ncy Plan

    9 - Incident Investigation & Analysis

    10 - Measurem ent, Audit & Review

    HSE Q li d S i M

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    30/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 30

    Safety Behavior Performance RatingObservation Date Area SupervisorObserved By: Site Location:

    Observation of EventNotified if at

    Risk (yes/no)Total Safe

    Observation

    (proper use)

    Total At-RiskObservation

    (improper use)

    Total NumberObserved

    1. PERSONAL PROTECTIVEEQUIPMENT 0Hard hat yes 21 1 22Safety glasses with shields 21 3 24

    Hearing protection-ear plug or muffs 6 4 10Face shield 12 12 24Respiratory protection-P2/P3 soft mask,half face, air line 3 1 4Protective clothing-overalls, L/S shirt +trousers 25 25 50Gloves 0

    00

    Total Observations 88 46 134Positive Safety Behaviour 65.67164

    HSE Q lit d S it M t

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    31/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 31

    Elements of Safety Behavioral Assessments

    1. Personal Protective Equipment

    2. Welding Procedures

    3. Ladders

    4. Scaffolding

    5. Working at height

    6. Housekeeping

    7. Excavation

    8. Permits

    9. Confined Space10. Chemical Handling & Storage

    11. Vehicle & Mobile Plant

    12. Rigging & Craneage

    13. Lifting Gear

    14. Gas cylinder (Oxy/Acetylene, LPG)

    15. Electrical Awareness

    16. Tools & Equipments

    17. Cutting & Grinding Equipment

    18. Fire Prevention

    19. First Aid / Medical Facilities

    20. Safety Promotion

    21. Tool Box/Pre Start/ Site HSE meetings

    22. Management Involvement

    23. Risk Assessment24. Material Handling

    25. Environmental (Pollution. Social Impact, Energy Conservation)

    26. Occupational Health /Illness

    27. Others

    1. Personal Protective Equipment

    2. Welding Procedures

    3. Ladders

    4. Scaffolding

    5. Working at height

    6. Housekeeping

    7. Excavation

    8. Permits

    9. Confined Space10. Chemical Handling & Storage

    11. Vehicle & Mobile Plant

    12. Rigging & Craneage

    13. Lifting Gear

    14. Gas cylinder (Oxy/Acetylene, LPG)

    15. Electrical Awareness

    16. Tools & Equipments

    17. Cutting & Grinding Equipment

    18. Fire Prevention

    19. First Aid / Medical Facilities

    20. Safety Promotion

    21. Tool Box/Pre Start/ Site HSE meetings

    22. Management Involvement

    23. Risk Assessment24. Material Handling

    25. Environmental (Pollution. Social Impact, Energy Conservation)

    26. Occupational Health /Illness

    27. Others

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    32/48

    HSE Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    33/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 33

    1. PERSONAL PROTECTIVE EQUIPMENT

    0.00%

    10.00%

    20.00%

    30.00%

    40.00%

    50.00%

    60.00%

    70.00%

    80.00%

    90.00%

    100.00%

    Wk 30 Wk 31 Wk32 Wk33 Wk34 Wk35 Wk36

    Week Num ber

    % S a f e t y B e h a v

    i o u r

    HSE Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    34/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 34Back

    SCORE SET STANDARD

    SECTION SECTION NAME COMPONENT MAXIMUMPOSSIBLE

    ASSESSEDTOTAL

    REPEATDEFICIENCY

    IMMINENTDANGER

    ENVIRONMENTALDANGER

    FINAL SCORE MINIMUMSTANDARD

    MET /NOT MET

    51 Housekeeping SE 23.0 23.0 0.00 0.00 0.00 23.00 20.7 MET52 Communication and Coordination HSE 7.0 7.0 0.00 0.00 0.00 7.00 6.3 MET53 Health & Hygiene HSE 53.0 53.0 0.00 0.00 0.00 53.00 47.7 MET54 Pre-Commissioning & Commissioning S 6.0 6.0 0.00 0.00 0.00 6.00 5.4 MET55 Spill Control and Prevention SE 14.0 14.0 0.00 0.00 0.00 14.00 12.6 MET56 Work Area Lighting S 10.0 10.0 0.00 0.00 0.00 10.00 9 MET57 Personal Protective Equipment (P.P.E.) HSE 92.0 92.0 0.00 0.00 0.00 92.00 82.8 MET

    58 Hand Tools S 13.0 13.0 0.00 0.00 0.00 13.00 11.7 MET59 Powder Actuated Tools S 17.0 17.0 0.00 0.00 0.00 17.00 15.3 MET60 Power Tools and Power Equipment SE 46.0 46.0 0.00 0.00 0.00 46.00 41.4 MET61 Hot Work (Welding, Heating, Burning) S 103.0 103.0 0.00 0.00 0.00 103.00 92.7 MET62 Electrical S 62.0 62.0 0.00 0.00 0.00 62.00 55.8 MET63 Equipment Operations S 159.0 159.0 0.00 0.00 0.00 159.00 143.1 MET

    64 First Line Breaks HSE 36.0 36.0 0.00 0.00 0.00 36.00 32.4 MET65 Excavation and Trenching HS 39.0 39.0 0.00 0.00 0.00 39.00 35.1 MET

    66Steel Erection and Floor and WallOpening S 52.0 52.0 0.00 0.00 0.00 52.00 46.8 MET

    67 Material Handling and Storage HSE 31.0 31.0 0.00 0.00 0.00 31.00 27.9 MET

    FINALSCORE

    REDUCTION

    FIELD IMPLEMENTATION

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    35/48

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    36/48

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    37/48

    HSE Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    38/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management 38

    Power Consumption Trend - Yearwise

    0

    50

    100

    150

    200

    250

    300

    2007 2008 2009 2010

    K W / 1 0 0 0 M a n

    h o u r s Parametersunclear /

    InaccurateReporting

    Corporatefocus/attention

    PositiveTrend

    HSE Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    39/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management39

    Incident Statis tics by Project 2009

    17

    3121598

    76

    2

    2461814224

    44

    813264380519

    In the Previous

    Review Period

    153963273

    217741281401219259644479Total

    1245651000005100226609New LNG TrainSKIKDA Proj ect

    1180406070141001446118785213Trans co WTS1644027700400510102840000NGL Pip eline

    0116230000010387203770279Jumeirah Park

    134585700112042107479445Qarn Alam Steam

    033618750100000104678136Ruwais Sulphur

    Exp

    073154500900106003335482Oxy Mukhaizna0202784400200134103874436

    Jumeirah Village

    III

    076016570015011426116320945QP- CCWP

    165624061409734161018333934RGX-2

    RTAVehicleKM sEIFIPDIRWCMTCFACNMLTIFatalMan-hours

    workedProject

    17

    3121598

    76

    2

    2461814224

    44

    813264380519

    In the Previous

    Review Period

    153963273

    217741281401219259644479Total

    1245651000005100226609New LNG TrainSKIKDA Proj ect

    1180406070141001446118785213Trans co WTS1644027700400510102840000NGL Pip eline

    0116230000010387203770279Jumeirah Park

    134585700112042107479445Qarn Alam Steam

    033618750100000104678136Ruwais Sulphur

    Exp

    073154500900106003335482Oxy Mukhaizna0202784400200134103874436

    Jumeirah Village

    III

    076016570015011426116320945QP- CCWP

    165624061409734161018333934RGX-2

    RTAVehicleKM sEIFIPDIRWCMTCFACNMLTIFatalMan-hours

    workedProject

    SR Severity Rate

    VAR Vehicle Acci dent RateRTA Road Traffic AccidentLTIFR Los t Time Inju ry Frequency RateFI Fire Incid entEI Environmental IncidentRWC Restric ted Work CasePDI Property Damage IncidentFAC First Aid CasesMTC Medical Treatment CaseLTI Lost Time InjuryNM Near-missFTC: Fatality

    SR Severity Rate

    VAR Vehicle Accid ent RateRTA Road Traffic AccidentLTIFR Lost Time Inju ry Frequency RateFI Fire Incid entEI Environmental IncidentRWC Restric ted Work CasePDI Property Damage IncidentFAC First Aid CasesMTC Medical Treatment CaseLT I Lost Time InjuryNM Near-missFTC: Fatality

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    40/48

    HSE, Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    41/48

    HSE, Quality and Security Management

    Garry Crighton - HSE and Quality Management41

    Training Coverage Rate (Monthly Average by project) - 2009

    TCR Monthly Aver age by Project

    0.000.10

    0.20

    0.30

    0.400.50

    0.60

    0.70

    0.800.90

    CCWP RGX2 Trans co Gas coNGL

    RuwaisSulphur

    JVS3 JP Qarn Alam

    Oxy Skikda

    Average

    HSE, Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    42/48

    , Q y y g

    Garry Crighton - HSE and Quality Management42

    Toolbox Talk Attendance (Average/Annum by project) 2009

    HSE, Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    43/48

    , Q y y g

    Garry Crighton - HSE and Quality Management43

    NCR/Observation Closeout Rate by Project - 2009

    100

    92.3

    80.26

    43.36

    94.44

    76.69

    100

    9092.59

    0

    20

    40

    60

    80

    100

    120

    QASP Oxy Ruwais

    Sulphur

    Transco JV3 Jumeirah

    Park

    NGL Gasco CCWP RGX2

    Closeout rate

    Total Observations

    Observations Closed

    Observations Open

    NCR / Observation Close out Rate by Project

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    44/48

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    45/48

    HSE, Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    46/48

    Garry Crighton - HSE and Quality Management 46

    PERCENTAGE CALCULATION PER ACTIVITY

    ACTIVITY NO: IMS 1 PROGRESS(%) SCORE 20

    Short description: Complete IMS Manual

    ALLOCATED PROGRESS IS CALCULATED ON THE FOLLOWING "WEIGHTING":

    Estimated Weighting of ImpactSTAGE OF % Completion

    DEVELOPMENT

    Initiation 10Definition/Planning 20

    Development/ApprovalDevelopment/ApprovalDevelopment/ApprovalImplementation/RolloutEvaluation

    HSE, Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    47/48

    Garry Crighton - HSE and Quality Management 47

    Business Process Improvement Plan 2006 -2009

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    90.00

    100.00

    Progress to Date - Percentage Overall Comp letio n*

    % E a r n e

    d V a l u e

    P1

    P2

    P3

    P1 10.00 10.19 8.87 16.29 23.55 29.52 30.43 30.43 31.06

    P2 13.51 14.82 14.41 21.40 31.82 44.93 52.69 66.45 73.15

    P3 10 20 12.037037 16.11 16.11 12.56 64.30 55.00 55.00

    Q1-Q22006

    Q3-Q42006

    Q1-Q22007

    Q3-Q42007

    Q1-Q22008

    Q3-Q42008

    Q1-Q22009

    Q3-Q42009

    Q1-Q22010

    *= Sum(Earned Values)/Sum(Weighted Prior ities)

    Work load increased du eto Project Less ons Learntexercise (Num ber ofactivities incres ed)

    HSE, Quality and Security Management

  • 8/13/2019 Day 2 - 1220 Garry Crighton Definition Assessment and Monitoring HSE Performance Revised 29-11-10

    48/48

    Garry Crighton - HSE and Quality Management 48

    HSE Excellence Zero Harm

    BSC 5 Star Awardfor 3 projects

    July 2010

    D o d s

    a l B u s

    i n e s

    s

    D o d s

    a l H S

    E

    HSE MS fornew business sector

    July 2010

    Businessexcellence

    BSC Sword of Ho nourNovember 20 10

    Business Processes

    Re-EngineeringJune 2010

    Review Operationsagainst ISO 10006

    BS 31100May 2010

    Re view Securitya rrangements

    again st ISO/PAS 22399May 2010

    Implement Quality (Business)Performance procedure

    September 2010

    Measure Quality (Business)Performance and

    define ImprovementsSeptember 2010

    Fully Implement SafetyLeadership and

    Contractor HSECapability programmes

    June 2010Roll out HSE Surveillanceand Inspection procedure

    June 2010

    Roll ou t Competence Assuran ceprocess/procedure

    September 2010

    OUR ROAD TOWARDS HSE EXCELLENCE