![Page 1: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/1.jpg)
At the December 3, 2019 Board of County Commissioners (Board) meeting, Board members adopted Ordinance No. 19-122 approving the Miami Dade Aviation Department (MDAD) Capital Improvements Acceleration Ordinance (Acceleration Ordinance), which expedites the process for the award and administration of contracts for the design and construction of capital facilities such as: terminals, concourses, ramps, parking facilities and hotels at Miami International Airport (MIA) and the General Aviation Airports (GAA).
The Acceleration Ordinance requires placement of a monthly report known as the “Aviation Capital Program Report” on the Board agenda every 30 days with information related to: (1) procurement activities advertised or placed for public notice under the authority of Ordinance No. 19-122 including upcoming advertisements for contracts, their estimated contract value,qualifications for award beyond requisite licensing, the proposed contract measures, includingSmall Business Enterprise goals and Community Enterprise goals or Disadvantaged BusinessEnterprise goals, and (2) active capital projects by number, title, phase, estimated completiondate, adopted budget amount, current budget amount, previous month-to-date expenditures,current month-to-date expenditures, cumulative total expenditures, including indicators informingBoard members when capital project expenditures reach 30 percent, 60 percent and 90 percent ofthe approved budget amount with a comment section to explain variances.
The Department has placed its third “Aviation Capital Program Report” on today’s agenda, as attached, which has been prepared to promote transparency and accountability by providing residents and Board members open and easy access to key information regarding the procurement and financial status of MDAD’s capital projects. This report can be viewed on MDAD’s webpage each month at: http://www.miami-airport.com/transparency_report.asp. Each monthly report will be posted simultaneously with the placement of the Aviation Capital Program Report on a Board committee agenda.
Exhibit A of the Aviation Capital Program Report provides the status of MDAD’s capital projects procured under the seal of the Acceleration Ordinance, from the first phase of the County’s procurement process to the time contracts are awarded under the authority of the Ordinance. Additionally, as required by the Acceleration Ordinance, Exhibit A provides the estimated contract value, the project qualifications for award and the proposed contract measures. Prior to advertising capital projects, project solicitations are posted on the Internal Services Department’s webpage at: http://www.miamidade.gov/procurement/solicitations.asp and on the Small Business Development Division’s webpage at: http://www.miamidade.gov/smallbusiness/certification-programs.asp for industry review and comment for a minimum of two weeks.
Date:
To: Honorable Chairman Jose “Pepe” Diaz and Members, Board of County Commissioners
From: Daniella Levine CavaMayor
Subject: Miami-Dade Aviation Department: Aviation Capital Program Report – December 2020
D t t A i ti C
January 20, 2021
1
Agenda Item No. 2(B)(5)
![Page 2: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/2.jpg)
Honorable Chairman Jose “Pepe” Diaz and Members, Board of County Commissioners Page 2
Exhibit B of the Aviation Capital Program Report provides the financial status of MDAD’s capital projects implemented under the stamp of the Acceleration Ordinance including project budget information, project expenditures from the time a contract is awarded through project completion, and indicators that flag when project expenditures reach 30 percent, 60 percent and 90 percent of the approved budget amount.
In addition to Exhibits A and B, the Aviation Capital Program Report’s opening page consists of a Summary of Changes, which shows the differences between the previous month’s report (November 2020) and the current month’s report (December 2020) facilitating review of the most recent actions.
Pursuant to Ordinance No. 14-65, this memorandum will be placed on a Board agenda for review within 30 days.
Should you have any questions or require additional information, please contact Lester Sola, Miami-Dade Aviation Department Director at 305-876-7066.
Attachments C: Geri Bonzon-Keenan, County Attorney
Office of Mayor Senior Staff Lester Sola, Aviation Director Yinka Majekodunmi, CPA, Commission Auditor Eugene Love, Agenda CoordinatorMelissa Adames, Acting Director, Clerk of the Board
________________________ Jimmy Morales Chief Operations Officer
2
![Page 3: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/3.jpg)
Miami-Dade Aviation Department: Aviation Capital Program Report Summary of Changes December 2020
Page 1 of 1
Exhibit A – Procurement Status
Ordinance No. 19-122
Contract Number & Description Summary of Changes
Yes Contract No. A19-MDAD-01 MIA Terminal Wide Re-roofing and Lightning System Upgrades
First Tier Review 10/28/2020
Exhibit B – Financial Status – No Changes
3
![Page 4: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/4.jpg)
EXHIBIT A
4
![Page 5: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/5.jpg)
ID:1
1St
atus
:In
Proc
ess
Acce
lera
te O
rdin
ance
:Ye
s
Dis
tric
t(s)
:Var
ious
Reso
lutio
n #:
Adve
rtis
emen
t Dat
e / C
OS
Begi
ns:
7/10
/202
0
Cont
ract
Num
ber:
A19-
MDA
D-02
Cont
ract
Ter
m:
Five
(5) y
ears
Awar
d Re
com
men
datio
n D
ate
/ CO
S En
ds:
Cont
ract
Typ
e:N
otice
to P
rofe
ssio
nal C
onsu
ltant
s (A/
E)Es
timat
ed C
ontr
act A
mou
nt:
$22,
055,
000.
00Aw
arde
d Co
ntra
ct A
mou
nt:
$0.0
0
OM
B Pr
ojec
t #:
OM
B Pr
ojec
t Des
crip
tion:
BCC
Mee
ting
Dat
e:BC
C Co
mm
ittee
Mee
ting:
Firm
(s) A
war
ded:
Loca
tion(
s):A
LL A
IRPO
RTS
Proj
ect N
ame
/ Des
crip
tion:
Fac
ility
Des
ign
Serv
ices
Prop
osed
M
etho
d of
Aw
ard
Cont
ract
Mea
sure
sPr
e-Pr
opos
al
Conf
eren
ce /
Site
Vis
it
Prop
osal
Due
Dat
eSe
lect
ion
Com
mitt
ee
Appt
. Dat
e:
Eval
uatio
n M
eetin
g D
ate:
Ora
l Pre
sent
atio
n1s
t Tie
r / S
tep
1 Se
lect
ion
2nd
Tier
/ St
ep 2
Sel
ectio
n O
ral P
rese
ntat
ion
Neg
otia
tions
M
eetin
g D
ate(
s):
Fina
l Act
ion
Out
com
e
High
est
Rank
ed F
irmDB
E- 2
8.00
%Pr
e-Pr
opos
al:
7/17
/202
09/
23/2
020
Com
men
ts:
Sum
mar
y of
Min
imum
Exp
erie
nce
& Q
ualif
icat
ions
: It i
s pre
ferre
d th
at th
e Pr
ime
cons
ulta
nt h
ave
a cu
mul
ativ
e fiv
e (5
) yea
rs o
f exp
erie
nce
with
in th
e la
st tw
enty
(20)
yea
rs m
odify
ing
and/
or d
esig
ning
airp
ort f
acili
ties a
t maj
or a
irpor
t hub
s.
Page
1 o
f 3
Avi
atio
n C
apita
l Pro
gram
Rep
ort -
Pro
cure
men
t Sta
tus
5
![Page 6: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/6.jpg)
ID:1
2St
atus
:In
Proc
ess
Acce
lera
te O
rdin
ance
:Ye
s
Dis
tric
t(s)
:06
Reso
lutio
n #:
Adve
rtis
emen
t Dat
e / C
OS
Begi
ns:
5/28
/202
0
Cont
ract
Num
ber:
A19-
MDA
D-01
Cont
ract
Ter
m:
2555
Cal
enda
r Da
ys/S
even
(7) y
ears
Awar
d Re
com
men
datio
n D
ate
/ CO
S En
ds:
Cont
ract
Typ
e:N
otice
to P
rofe
ssio
nal C
onsu
ltant
s (A/
E)Es
timat
ed C
ontr
act A
mou
nt:
$14,
232,
603.
00Aw
arde
d Co
ntra
ct A
mou
nt:
$0.0
0
OM
B Pr
ojec
t #:
OM
B Pr
ojec
t Des
crip
tion:
BCC
Mee
ting
Dat
e:BC
C Co
mm
ittee
Mee
ting:
Firm
(s) A
war
ded:
Loca
tion(
s):M
IA
Proj
ect N
ame
/ Des
crip
tion:
MIA
Ter
min
al W
ide
Re-r
oofin
g an
d Lig
htni
ng S
yste
m U
pgra
des
Prop
osed
M
etho
d of
Aw
ard
Cont
ract
Mea
sure
sPr
e-Pr
opos
al
Conf
eren
ce /
Site
Vis
it
Prop
osal
Due
Dat
eSe
lect
ion
Com
mitt
ee
Appt
. Dat
e:
Eval
uatio
n M
eetin
g D
ate:
Ora
l Pre
sent
atio
n1s
t Tie
r / S
tep
1 Se
lect
ion
2nd
Tier
/ St
ep 2
Sel
ectio
n O
ral P
rese
ntat
ion
Neg
otia
tions
M
eetin
g D
ate(
s):
Fina
l Act
ion
Out
com
e
High
est
Rank
ed F
irmSB
E- A
&E
30.0
0%SB
E- S
ervi
ces
2.00
%
Pre-
Prop
osal
: 6/
8/20
209/
2/20
2010
/28/
2020
Com
men
ts:
Sum
mar
y of
Min
imum
Exp
erie
nce
& Q
ualif
icat
ions
: It i
s hig
hly
pref
erab
le fo
r the
Prim
e to
hav
e at
leas
t one
staf
f mem
ber t
hat h
as o
ne o
f the
follo
win
g ro
of R
egist
ered
Wat
er P
roof
ing
Cons
ulta
nt c
ertif
icatio
ns b
y th
e Ro
of C
onsu
ltant
s Ins
titut
e: 1
. Reg
ister
ed R
oof C
onsu
ltant
(RRC
) cer
tifica
tion
2. R
egist
ered
Wat
erpr
oofin
g Co
nsul
tant
(RW
C)- i
ndiv
idua
l cer
tifica
tion
3.
Regi
ster
ed E
xter
ior W
all C
onsu
ltant
(REW
C)- i
ndiv
idua
l cer
tifica
tion
4. R
egist
ered
Bui
ldin
g En
velo
pe C
onsu
ltant
(RBE
C)- a
cqui
red
by h
avin
g th
e ab
ove
thre
e ce
rtific
atio
ns
Page
2 o
f 3
Avi
atio
n C
apita
l Pro
gram
Rep
ort -
Pro
cure
men
t Sta
tus
6
![Page 7: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/7.jpg)
ID:1
0St
atus
:Fin
al A
ctio
nAc
cele
rate
Ord
inan
ce:
Yes
Dis
tric
t(s)
:11
Reso
lutio
n #:
R-84
2-20
Adve
rtis
emen
t Dat
e / C
OS
Begi
ns:
5/1/
2020
Cont
ract
Num
ber:
MDA
D-CI
P-V0
09A
Cont
ract
Ter
m:
609
Cale
ndar
Day
s to
Subs
tant
ial C
ompl
etio
n 90
Cal
enda
r Day
s to
Fina
l Com
plet
ion
Awar
d Re
com
men
datio
n D
ate
/ CO
S En
ds:
7/30
/202
0
Cont
ract
Typ
e:In
vita
tion
to B
idEs
timat
ed C
ontr
act A
mou
nt:
$15,
856,
216.
48Aw
arde
d Co
ntra
ct A
mou
nt:
$13,
301,
531.
44
OM
B Pr
ojec
t #:2
0000
0104
9O
MB
Proj
ect D
escr
iptio
n:Re
plac
e bu
ildin
gs 1
02 a
nd 1
09 a
t Mia
mi E
xecu
tive
Airp
ort;
cons
truct
inte
rior s
ervi
ce ro
ad
at M
iam
i-Opa
lock
a Ex
ecut
ive
Airp
ort (
OPF
); co
nstru
ct ru
nway
incu
rsio
n m
itiga
tion
optio
n 2-
Pha
se 1
pro
ject
at M
iam
i Exe
cutiv
e Ai
rpor
t; an
d co
nstru
ct ru
nway
incu
rsio
n m
itiga
tion
hot s
pot #
1 w
ith T
axiw
ay H
- wes
t ext
ensio
n to
Thr
esho
ld 9
R at
Mia
mi
Exec
utiv
e Ai
rpor
t. BC
C M
eetin
g D
ate:
Sept
embe
r 1, 2
020
BCC
Com
mitt
ee M
eetin
g:N
/A
Firm
(s) A
war
ded:
H&R
Pavi
ng, I
nc.
Loca
tion(
s):M
IAM
I EXE
CUTI
VE A
IRPO
RT
Proj
ect N
ame
/ Des
crip
tion:
Mia
mi E
xecu
tive
Airp
ort (
TMB)
Run
way
Incu
rsio
n M
itiga
tion
(RIM
). Pr
opos
ed
Met
hod
of
Awar
d
Cont
ract
Mea
sure
sPr
e-Pr
opos
al
Conf
eren
ce /
Site
Vis
it
Prop
osal
Due
Dat
eSe
lect
ion
Com
mitt
ee
Appt
. Dat
e:
Eval
uatio
n M
eetin
g D
ate:
Ora
l Pre
sent
atio
n1s
t Tie
r / S
tep
1 Se
lect
ion
2nd
Tier
/ St
ep 2
Sel
ectio
n O
ral P
rese
ntat
ion
Neg
otia
tions
M
eetin
g D
ate(
s):
Fina
l Act
ion
Out
com
e
Low
est P
rice
/ Lo
wes
t Re
spon
sive,
Re
spon
sible
Bi
dder
DBE-
13.
79%
Pre
Prop
osal
Co
nfer
ence
- 5/
11/2
020
6/5/
2020
N/A
N/A
N/A
N/A
N/A
N/A
Cont
ract
Aw
arde
d
Com
men
ts:
Sum
mar
y of
Min
imum
Exp
erie
nce
& Q
ualif
icat
ions
: Gen
eral
Con
tract
or: 1
) The
Sta
te o
f Flo
rida
Cons
truct
ion
Indu
stry
Lice
nsin
g Bo
ard,
pur
suan
t to
the
prov
ision
s of S
ectio
n 48
9.11
5 of
th
e Fl
orid
a St
atut
es; o
r 2) T
he M
iam
i-Dad
e Co
unty
Con
stru
ctio
n Tr
ades
Qua
lifyi
ng B
oard
, pur
suan
t to
the
prov
ision
s of S
ectio
n 10
-3 (a
) of t
he M
iam
i-Dad
e Co
unty
Cod
e. H
olde
rs o
f Mia
mi-
Dade
Cou
nty
Certi
ficat
es o
f Com
pete
ncy
mus
t also
hol
d Ce
rtific
ates
of R
egist
ratio
n iss
ued
by th
e St
ate
of F
lorid
a Co
nstru
ctio
n In
dust
ry L
icens
ing
Boar
d, p
ursu
ant t
o th
e pr
ovisi
ons o
f Se
ctio
n 48
9.17
7, F
lorid
a St
atut
es.
Page
3 o
f 3
Avi
atio
n C
apita
l Pro
gram
Rep
ort -
Pro
cure
men
t Sta
tus
7
![Page 8: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/8.jpg)
EXHIBIT B
8
![Page 9: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal](https://reader036.vdocuments.us/reader036/viewer/2022081622/613cc5ed4c23507cb6359889/html5/thumbnails/9.jpg)
Cont
ract
No.
Proj
ect D
escr
iptio
nPr
ojec
t Pha
se
Estim
ated
Co
mpl
etio
n Da
te
FY 2
020-
21Ad
opte
d Bu
dget
Am
ount
Cur
rent
Ap
prov
ed
Budg
et
Amou
nt
Prio
r Ex
pend
iture
s Cu
rren
t Mon
th
Expe
nditu
res
Cum
ulat
ive
Ex
pend
iture
s to
Dat
e
Expe
nditu
res
Indi
cato
r at
30%
Expe
nditu
res
Indi
cato
r at
60%
Expe
nditu
res
Indi
cato
r at
90%
Com
men
ts
A19-
MDA
D-02
Notic
e to
Pro
fess
iona
l Con
sulta
nts -
Facil
ity D
esig
n an
d Co
nstr
uctio
nIn
spec
tion
Serv
ices
Pre-
Awar
d09
/25/
2522
,055
,000
$
-$
-$
-
$
-$
-
-
-
A19-
MDA
D-01
MIA
Ter
min
al W
ide
Re-ro
ofin
g an
d Lig
htni
ng S
yste
m U
pgra
des
Pre-
Awar
d09
/25/
27$1
4,23
2,60
3-
$
-
$
-$
-
$
-
-
-
MDA
D-CI
P-V0
09A
Mia
mi E
xecu
tive
Airp
ort (
TMB)
Run
way
In
curs
ion
Miti
gatio
n (R
IM)
Awar
ded
09/3
0/22
15,8
56,2
16$
13
,301
,531
$
-$
-
$
-$
-
-
-
Proj
ect a
war
ded
on7/
30/2
020.
TO
TAL
52,1
43,8
19$