At the December 3, 2019 Board of County Commissioners (Board) meeting, Board members adopted Ordinance No. 19-122 approving the Miami Dade Aviation Department (MDAD) Capital Improvements Acceleration Ordinance (Acceleration Ordinance), which expedites the process for the award and administration of contracts for the design and construction of capital facilities such as: terminals, concourses, ramps, parking facilities and hotels at Miami International Airport (MIA) and the General Aviation Airports (GAA). The Acceleration Ordinance requires placement of a monthly report known as the “Aviation Capital Program Report” on the Board agenda every 30 days with information related to: (1) procurement activities advertised or placed for public notice under the authority of Ordinance No. 19-122 including upcoming advertisements for contracts, their estimated contract value, qualifications for award beyond requisite licensing, the proposed contract measures, including Small Business Enterprise goals and Community Enterprise goals or Disadvantaged Business Enterprise goals, and (2) active capital projects by number, title, phase, estimated completion date, adopted budget amount, current budget amount, previous month-to-date expenditures, current month-to-date expenditures, cumulative total expenditures, including indicators informing Board members when capital project expenditures reach 30 percent, 60 percent and 90 percent of the approved budget amount with a comment section to explain variances. The Department has placed its third “Aviation Capital Program Report” on today’s agenda, as attached, which has been prepared to promote transparency and accountability by providing residents and Board members open and easy access to key information regarding the procurement and financial status of MDAD’s capital projects. This report can be viewed on MDAD’s webpage each month at: http://www.miami-airport.com/transparency_report.asp. Each monthly report will be posted simultaneously with the placement of the Aviation Capital Program Report on a Board committee agenda. Exhibit A of the Aviation Capital Program Report provides the status of MDAD’s capital projects procured under the seal of the Acceleration Ordinance, from the first phase of the County’s procurement process to the time contracts are awarded under the authority of the Ordinance. Additionally, as required by the Acceleration Ordinance, Exhibit A provides the estimated contract value, the project qualifications for award and the proposed contract measures. Prior to advertising capital projects, project solicitations are posted on the Internal Services Department’s webpage at: http://www.miamidade.gov/procurement/solicitations.asp and on the Small Business Development Division’s webpage at: http://www.miamidade.gov/smallbusiness/certification- programs.asp for industry review and comment for a minimum of two weeks. Date: To: Honorable Chairman Jose “Pepe” Diaz and Members, Board of County Commissioners From: Daniella Levine Cava Mayor Subject: Miami-Dade Aviation Department: Aviation Capital Program Report – December 2020 D t t A i ti C January 20, 2021 1 Agenda Item No. 2(B)(5)

Upload: others

Post on 11-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

At the December 3, 2019 Board of County Commissioners (Board) meeting, Board members adopted Ordinance No. 19-122 approving the Miami Dade Aviation Department (MDAD) Capital Improvements Acceleration Ordinance (Acceleration Ordinance), which expedites the process for the award and administration of contracts for the design and construction of capital facilities such as: terminals, concourses, ramps, parking facilities and hotels at Miami International Airport (MIA) and the General Aviation Airports (GAA).

The Acceleration Ordinance requires placement of a monthly report known as the “Aviation Capital Program Report” on the Board agenda every 30 days with information related to: (1) procurement activities advertised or placed for public notice under the authority of Ordinance No. 19-122 including upcoming advertisements for contracts, their estimated contract value,qualifications for award beyond requisite licensing, the proposed contract measures, includingSmall Business Enterprise goals and Community Enterprise goals or Disadvantaged BusinessEnterprise goals, and (2) active capital projects by number, title, phase, estimated completiondate, adopted budget amount, current budget amount, previous month-to-date expenditures,current month-to-date expenditures, cumulative total expenditures, including indicators informingBoard members when capital project expenditures reach 30 percent, 60 percent and 90 percent ofthe approved budget amount with a comment section to explain variances.

The Department has placed its third “Aviation Capital Program Report” on today’s agenda, as attached, which has been prepared to promote transparency and accountability by providing residents and Board members open and easy access to key information regarding the procurement and financial status of MDAD’s capital projects. This report can be viewed on MDAD’s webpage each month at: http://www.miami-airport.com/transparency_report.asp. Each monthly report will be posted simultaneously with the placement of the Aviation Capital Program Report on a Board committee agenda.

Exhibit A of the Aviation Capital Program Report provides the status of MDAD’s capital projects procured under the seal of the Acceleration Ordinance, from the first phase of the County’s procurement process to the time contracts are awarded under the authority of the Ordinance. Additionally, as required by the Acceleration Ordinance, Exhibit A provides the estimated contract value, the project qualifications for award and the proposed contract measures. Prior to advertising capital projects, project solicitations are posted on the Internal Services Department’s webpage at: http://www.miamidade.gov/procurement/solicitations.asp and on the Small Business Development Division’s webpage at: http://www.miamidade.gov/smallbusiness/certification-programs.asp for industry review and comment for a minimum of two weeks.

Date:

To: Honorable Chairman Jose “Pepe” Diaz and Members, Board of County Commissioners

From: Daniella Levine CavaMayor

Subject: Miami-Dade Aviation Department: Aviation Capital Program Report – December 2020

D t t A i ti C

January 20, 2021

1

Agenda Item No. 2(B)(5)

Page 2: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

Honorable Chairman Jose “Pepe” Diaz and Members, Board of County Commissioners Page 2

Exhibit B of the Aviation Capital Program Report provides the financial status of MDAD’s capital projects implemented under the stamp of the Acceleration Ordinance including project budget information, project expenditures from the time a contract is awarded through project completion, and indicators that flag when project expenditures reach 30 percent, 60 percent and 90 percent of the approved budget amount.

In addition to Exhibits A and B, the Aviation Capital Program Report’s opening page consists of a Summary of Changes, which shows the differences between the previous month’s report (November 2020) and the current month’s report (December 2020) facilitating review of the most recent actions.

Pursuant to Ordinance No. 14-65, this memorandum will be placed on a Board agenda for review within 30 days.

Should you have any questions or require additional information, please contact Lester Sola, Miami-Dade Aviation Department Director at 305-876-7066.

Attachments C: Geri Bonzon-Keenan, County Attorney

Office of Mayor Senior Staff Lester Sola, Aviation Director Yinka Majekodunmi, CPA, Commission Auditor Eugene Love, Agenda CoordinatorMelissa Adames, Acting Director, Clerk of the Board

________________________ Jimmy Morales Chief Operations Officer

2

Page 3: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

Miami-Dade Aviation Department: Aviation Capital Program Report Summary of Changes December 2020

Page 1 of 1

Exhibit A – Procurement Status

Ordinance No. 19-122

Contract Number & Description Summary of Changes

Yes Contract No. A19-MDAD-01 MIA Terminal Wide Re-roofing and Lightning System Upgrades

First Tier Review 10/28/2020

Exhibit B – Financial Status – No Changes

3

Page 4: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

EXHIBIT A

4

Page 5: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

ID:1

1St

atus

:In

Proc

ess

Acce

lera

te O

rdin

ance

:Ye

s

Dis

tric

t(s)

:Var

ious

Reso

lutio

n #:

Adve

rtis

emen

t Dat

e / C

OS

Begi

ns:

7/10

/202

0

Cont

ract

Num

ber:

A19-

MDA

D-02

Cont

ract

Ter

m:

Five

(5) y

ears

Awar

d Re

com

men

datio

n D

ate

/ CO

S En

ds:

Cont

ract

Typ

e:N

otice

to P

rofe

ssio

nal C

onsu

ltant

s (A/

E)Es

timat

ed C

ontr

act A

mou

nt:

$22,

055,

000.

00Aw

arde

d Co

ntra

ct A

mou

nt:

$0.0

0

OM

B Pr

ojec

t #:

OM

B Pr

ojec

t Des

crip

tion:

BCC

Mee

ting

Dat

e:BC

C Co

mm

ittee

Mee

ting:

Firm

(s) A

war

ded:

Loca

tion(

s):A

LL A

IRPO

RTS

Proj

ect N

ame

/ Des

crip

tion:

Fac

ility

Des

ign

Serv

ices

Prop

osed

M

etho

d of

Aw

ard

Cont

ract

Mea

sure

sPr

e-Pr

opos

al

Conf

eren

ce /

Site

Vis

it

Prop

osal

Due

Dat

eSe

lect

ion

Com

mitt

ee

Appt

. Dat

e:

Eval

uatio

n M

eetin

g D

ate:

Ora

l Pre

sent

atio

n1s

t Tie

r / S

tep

1 Se

lect

ion

2nd

Tier

/ St

ep 2

Sel

ectio

n O

ral P

rese

ntat

ion

Neg

otia

tions

M

eetin

g D

ate(

s):

Fina

l Act

ion

Out

com

e

High

est

Rank

ed F

irmDB

E- 2

8.00

%Pr

e-Pr

opos

al:

7/17

/202

09/

23/2

020

Com

men

ts:

Sum

mar

y of

Min

imum

Exp

erie

nce

& Q

ualif

icat

ions

: It i

s pre

ferre

d th

at th

e Pr

ime

cons

ulta

nt h

ave

a cu

mul

ativ

e fiv

e (5

) yea

rs o

f exp

erie

nce

with

in th

e la

st tw

enty

(20)

yea

rs m

odify

ing

and/

or d

esig

ning

airp

ort f

acili

ties a

t maj

or a

irpor

t hub

s.

Page

1 o

f 3

Avi

atio

n C

apita

l Pro

gram

Rep

ort -

Pro

cure

men

t Sta

tus

5

Page 6: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

ID:1

2St

atus

:In

Proc

ess

Acce

lera

te O

rdin

ance

:Ye

s

Dis

tric

t(s)

:06

Reso

lutio

n #:

Adve

rtis

emen

t Dat

e / C

OS

Begi

ns:

5/28

/202

0

Cont

ract

Num

ber:

A19-

MDA

D-01

Cont

ract

Ter

m:

2555

Cal

enda

r Da

ys/S

even

(7) y

ears

Awar

d Re

com

men

datio

n D

ate

/ CO

S En

ds:

Cont

ract

Typ

e:N

otice

to P

rofe

ssio

nal C

onsu

ltant

s (A/

E)Es

timat

ed C

ontr

act A

mou

nt:

$14,

232,

603.

00Aw

arde

d Co

ntra

ct A

mou

nt:

$0.0

0

OM

B Pr

ojec

t #:

OM

B Pr

ojec

t Des

crip

tion:

BCC

Mee

ting

Dat

e:BC

C Co

mm

ittee

Mee

ting:

Firm

(s) A

war

ded:

Loca

tion(

s):M

IA

Proj

ect N

ame

/ Des

crip

tion:

MIA

Ter

min

al W

ide

Re-r

oofin

g an

d Lig

htni

ng S

yste

m U

pgra

des

Prop

osed

M

etho

d of

Aw

ard

Cont

ract

Mea

sure

sPr

e-Pr

opos

al

Conf

eren

ce /

Site

Vis

it

Prop

osal

Due

Dat

eSe

lect

ion

Com

mitt

ee

Appt

. Dat

e:

Eval

uatio

n M

eetin

g D

ate:

Ora

l Pre

sent

atio

n1s

t Tie

r / S

tep

1 Se

lect

ion

2nd

Tier

/ St

ep 2

Sel

ectio

n O

ral P

rese

ntat

ion

Neg

otia

tions

M

eetin

g D

ate(

s):

Fina

l Act

ion

Out

com

e

High

est

Rank

ed F

irmSB

E- A

&E

30.0

0%SB

E- S

ervi

ces

2.00

%

Pre-

Prop

osal

: 6/

8/20

209/

2/20

2010

/28/

2020

Com

men

ts:

Sum

mar

y of

Min

imum

Exp

erie

nce

& Q

ualif

icat

ions

: It i

s hig

hly

pref

erab

le fo

r the

Prim

e to

hav

e at

leas

t one

staf

f mem

ber t

hat h

as o

ne o

f the

follo

win

g ro

of R

egist

ered

Wat

er P

roof

ing

Cons

ulta

nt c

ertif

icatio

ns b

y th

e Ro

of C

onsu

ltant

s Ins

titut

e: 1

. Reg

ister

ed R

oof C

onsu

ltant

(RRC

) cer

tifica

tion

2. R

egist

ered

Wat

erpr

oofin

g Co

nsul

tant

(RW

C)- i

ndiv

idua

l cer

tifica

tion

3.

Regi

ster

ed E

xter

ior W

all C

onsu

ltant

(REW

C)- i

ndiv

idua

l cer

tifica

tion

4. R

egist

ered

Bui

ldin

g En

velo

pe C

onsu

ltant

(RBE

C)- a

cqui

red

by h

avin

g th

e ab

ove

thre

e ce

rtific

atio

ns

Page

2 o

f 3

Avi

atio

n C

apita

l Pro

gram

Rep

ort -

Pro

cure

men

t Sta

tus

6

Page 7: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

ID:1

0St

atus

:Fin

al A

ctio

nAc

cele

rate

Ord

inan

ce:

Yes

Dis

tric

t(s)

:11

Reso

lutio

n #:

R-84

2-20

Adve

rtis

emen

t Dat

e / C

OS

Begi

ns:

5/1/

2020

Cont

ract

Num

ber:

MDA

D-CI

P-V0

09A

Cont

ract

Ter

m:

609

Cale

ndar

Day

s to

Subs

tant

ial C

ompl

etio

n 90

Cal

enda

r Day

s to

Fina

l Com

plet

ion

Awar

d Re

com

men

datio

n D

ate

/ CO

S En

ds:

7/30

/202

0

Cont

ract

Typ

e:In

vita

tion

to B

idEs

timat

ed C

ontr

act A

mou

nt:

$15,

856,

216.

48Aw

arde

d Co

ntra

ct A

mou

nt:

$13,

301,

531.

44

OM

B Pr

ojec

t #:2

0000

0104

9O

MB

Proj

ect D

escr

iptio

n:Re

plac

e bu

ildin

gs 1

02 a

nd 1

09 a

t Mia

mi E

xecu

tive

Airp

ort;

cons

truct

inte

rior s

ervi

ce ro

ad

at M

iam

i-Opa

lock

a Ex

ecut

ive

Airp

ort (

OPF

); co

nstru

ct ru

nway

incu

rsio

n m

itiga

tion

optio

n 2-

Pha

se 1

pro

ject

at M

iam

i Exe

cutiv

e Ai

rpor

t; an

d co

nstru

ct ru

nway

incu

rsio

n m

itiga

tion

hot s

pot #

1 w

ith T

axiw

ay H

- wes

t ext

ensio

n to

Thr

esho

ld 9

R at

Mia

mi

Exec

utiv

e Ai

rpor

t. BC

C M

eetin

g D

ate:

Sept

embe

r 1, 2

020

BCC

Com

mitt

ee M

eetin

g:N

/A

Firm

(s) A

war

ded:

H&R

Pavi

ng, I

nc.

Loca

tion(

s):M

IAM

I EXE

CUTI

VE A

IRPO

RT

Proj

ect N

ame

/ Des

crip

tion:

Mia

mi E

xecu

tive

Airp

ort (

TMB)

Run

way

Incu

rsio

n M

itiga

tion

(RIM

). Pr

opos

ed

Met

hod

of

Awar

d

Cont

ract

Mea

sure

sPr

e-Pr

opos

al

Conf

eren

ce /

Site

Vis

it

Prop

osal

Due

Dat

eSe

lect

ion

Com

mitt

ee

Appt

. Dat

e:

Eval

uatio

n M

eetin

g D

ate:

Ora

l Pre

sent

atio

n1s

t Tie

r / S

tep

1 Se

lect

ion

2nd

Tier

/ St

ep 2

Sel

ectio

n O

ral P

rese

ntat

ion

Neg

otia

tions

M

eetin

g D

ate(

s):

Fina

l Act

ion

Out

com

e

Low

est P

rice

/ Lo

wes

t Re

spon

sive,

Re

spon

sible

Bi

dder

DBE-

13.

79%

Pre

Prop

osal

Co

nfer

ence

- 5/

11/2

020

6/5/

2020

N/A

N/A

N/A

N/A

N/A

N/A

Cont

ract

Aw

arde

d

Com

men

ts:

Sum

mar

y of

Min

imum

Exp

erie

nce

& Q

ualif

icat

ions

: Gen

eral

Con

tract

or: 1

) The

Sta

te o

f Flo

rida

Cons

truct

ion

Indu

stry

Lice

nsin

g Bo

ard,

pur

suan

t to

the

prov

ision

s of S

ectio

n 48

9.11

5 of

th

e Fl

orid

a St

atut

es; o

r 2) T

he M

iam

i-Dad

e Co

unty

Con

stru

ctio

n Tr

ades

Qua

lifyi

ng B

oard

, pur

suan

t to

the

prov

ision

s of S

ectio

n 10

-3 (a

) of t

he M

iam

i-Dad

e Co

unty

Cod

e. H

olde

rs o

f Mia

mi-

Dade

Cou

nty

Certi

ficat

es o

f Com

pete

ncy

mus

t also

hol

d Ce

rtific

ates

of R

egist

ratio

n iss

ued

by th

e St

ate

of F

lorid

a Co

nstru

ctio

n In

dust

ry L

icens

ing

Boar

d, p

ursu

ant t

o th

e pr

ovisi

ons o

f Se

ctio

n 48

9.17

7, F

lorid

a St

atut

es.

Page

3 o

f 3

Avi

atio

n C

apita

l Pro

gram

Rep

ort -

Pro

cure

men

t Sta

tus

7

Page 8: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

EXHIBIT B

8

Page 9: Date: January 20, 2021 · 2021. 1. 13. · MIA Project Name / Description: MIA Terminal Wide Re-roofing and Lightning System Upgrades Proposed Method of Award Contract Measures Pre-Proposal

Cont

ract

No.

Proj

ect D

escr

iptio

nPr

ojec

t Pha

se

Estim

ated

Co

mpl

etio

n Da

te

FY 2

020-

21Ad

opte

d Bu

dget

Am

ount

Cur

rent

Ap

prov

ed

Budg

et

Amou

nt

Prio

r Ex

pend

iture

s Cu

rren

t Mon

th

Expe

nditu

res

Cum

ulat

ive

Ex

pend

iture

s to

Dat

e

Expe

nditu

res

Indi

cato

r at

30%

Expe

nditu

res

Indi

cato

r at

60%

Expe

nditu

res

Indi

cato

r at

90%

Com

men

ts

A19-

MDA

D-02

Notic

e to

Pro

fess

iona

l Con

sulta

nts -

Facil

ity D

esig

n an

d Co

nstr

uctio

nIn

spec

tion

Serv

ices

Pre-

Awar

d09

/25/

2522

,055

,000

$

-$

-$

-

$

-$

-

-

-

A19-

MDA

D-01

MIA

Ter

min

al W

ide

Re-ro

ofin

g an

d Lig

htni

ng S

yste

m U

pgra

des

Pre-

Awar

d09

/25/

27$1

4,23

2,60

3-

$

-

$

-$

-

$

-

-

-

MDA

D-CI

P-V0

09A

Mia

mi E

xecu

tive

Airp

ort (

TMB)

Run

way

In

curs

ion

Miti

gatio

n (R

IM)

Awar

ded

09/3

0/22

15,8

56,2

16$

13

,301

,531

$

-$

-

$

-$

-

-

-

Proj

ect a

war

ded

on7/

30/2

020.

TO

TAL

52,1

43,8

19$

13

,301

,531

$

-$

-

$

-$

Avia

tion

Capi

tal P

rogr

am R

epor

t - F

inan

cial

Sta

tus

Page

1 o

f 1

9