  • 8/11/2019 Datas for buildings

    1/3

    1

    Unit - 1 RM

    Qty Particulars Rate unit Amount

    Rate as per P .107,Item.39

    10

    Rate Of Edge Cut-Rectified Ceramic Tile Flooring

    As Above As per Data No.36 6312.62 10 sqm 6,312.62

    Rate Of Skirting For 10 CM Thick 6,312.62

    Rate Of Skirting For 10 cm thick (for 100 MTS) 6,312.62

    63.13

    (0.03)

    RATE PER 1 RM 63.10

    2

    Unit - 1 Sqm

    Qty Particulars Rate unit Amount

    10.1

    cost of edge cut-Rectified ceramic tiles (Item 51,

    P.10) 450.00 Sqm 4545.00

    0.12 Cost of Cement Mortar (1:6) prop 1247.34 Cum 149.68

    33 Cost of Cement 3.00 Kg 99.0010 Labour charges 1518.94 10 sqm 1518.94

    6312.62

    Rate per 10 SQM 6312.62

    631.26

    0.04

    Rate per 1 SQM 631.30

    Providing skirting to internal wall 100mm height with Edge Cut Rectified ceramic tiles of 1st quality with

    tiles of 8.0 mm thick with length equal to flooring tiles set over base coat of CM (1:6) 12mm thick with grey

    cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with

    cement to full depth (joints of stone should be flushed)including cost and conveyance of all materials like

    cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials,

    operational & incidental charges and all labour charges like dressing to the required size, mixing of mortar,

    curing and lift charges including cutting the brick wall to place the stones and redoing the surface smooth,including cost of base coat complete for finished item of works. (APSS No.701 & 707).

    Supplying and laying of Edge cut Rectified CERAMIC tiles of 1st quality of KHAZARIA / JHONSON make of

    tiles 8 mm thick of approved colour not less than 400x400mm set over a base coat in C.M (1:6) , 12 mm

    thick incluidng applying neat cement slurry honey like consistency spread at the rate of 3.30kg/Sqm and

    filling the joints with white cement mixed with pigments of matching shade laid over existing concrete

    bed/RCC slab including cost of base coat, cost and conveyance of all materials, excluding CC bed/RCC slab,

    labour charges for mixing cement mortar , laying of tiles to required slopes/levels, curing etc complete for

    finished item of work.for Staircase steps (Treads)

  • 8/11/2019 Datas for buildings

    2/3

    3Unit -One metic tonne

    1 Cost of Steel 35300 1 M.T 35300.00

    1000 Fabrication charges 9 1 KG 9000.00

    -0.02 Recovery towards scrap 35300 1 M.T -706.00

    0.05 add for wastage 35300 1 M.T 1765.00

    0.33 Add for MA & LALI @ 33% 5400 1 MT 1782.00

    Total Rate per 1 MT 47141.00

    a Ground Floor

    1 Rate as above 47141 1 M.T 47141.00

    Total Rate per 1 MT - For Ground Floor 47141.00

    b First Floor

    1 Rate as above 47141 1 M.T 47141.00

    1 Add Lift charges 250 1 M.T 250.00

    Total Rate per 1 MT - For First Floor 47391.00

    c Second Floor

    1 Rate as above 47141 1 M.T 47141.00

    2 Add Lift charges 250 1 M.T 500.00

    Total Rate per 1 MT - For Second Floor 47641.00

    Fabrication and placing of Mild steel/ Fe 250 grade steel reinforcement confirming to IS-226 and 1786-1985

    of SAIL/ VSP/ TISCON or any approved TMT of different diameters straightening, cutting & bending to

    required sizes & shapes placing in position with cover blocks of approved material & size tieing firmly with

    MS binding wire 18 guage forming grills for reinforcement work as per approved design & drawings supplied

    at the time of executing of work including cost & conveyance of steel and all materials and all wastages such

    as overlaps, couplings,welded joints,chairs,space bars, binding wire, cover blocks and all operational,

    incidential, labour charges such as cutting, bending, placing in position, tieing etc., complete for finished item

    of work as directed by the Deptt.

  • 8/11/2019 Datas for buildings

    3/3

    4

    6.666667 d) 150 mm Thick Landing

    1 Rate of M 20 design mix concrete 3924.46 1 Cum 3924.46

    6.67 Centering charges (item 998 P.62) 169 1 Sqm 1127.23

    1 Vibrating Charges (P 25 Item 291) 43 1 Cum 43.00

    Total 5094.69

    Sundries 0.01

    Ground Floor Total Rate per 1 CUM 5094.70

    Lift charges 55 1 Cum 5149.70

    Sundries 0.00

    1st Floor Rate Total Rate per 1 CUM 5149.70

    5

    1 No 651.7 1 No 651.7

    651.7

    6

    1 Rate as per SSR item S.No. 429, page no.85 81 81

    1 Boxing of Nahany traps in RCC floors 123 1 Each 123Rate as per SSR item S.No. 105, page no.74 204

    Total Rate for Each 204.00

    S/F and testing of 25mm dia PP-R ball valves of approved make including cost and conveyance of all

    materials and all labour charges etc. complete.

    Cost of 32mm Ball valve as per communicated vide circular

    Memo No 6/APRSCL/DT/2008 of the Excutive Director

    APRSCL,Hyderabad

    Supplying & fixing PVC 3" (76.2 mm ) Nahany Trap with Jali of 1st quality confirming to IS standards and as

    directed by the Engineer-in-Charge with C.P. Grating fixing with white cement as per site requirements with

    standard practice

    Vibrated Reinforced Cement Concrete M20Design Mix ( by weigh batching ) using20mm size (SS5) hard

    granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity

    of 300 kgs. of cement per cum of concrete including cost and conveyance of all materials like cement, fine

    aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials

    including steel centering, form work using Cashewrina ballies and wooden runners and staging including all

    bracing corss number etc., shuttering , machine mixing, laying concrete, vibrating, lift charges, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work and as directed by

    the Eingineer- in - Charge for Roof Slab in Ground floor