dasco intro

23
Dasco Engineering 24747 Crenshaw Blvd. Torrance, Ca. 90505 310-326-2277

Upload: john-silk

Post on 13-Jul-2015

196 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Dasco Intro

Dasco Engineering

24747 Crenshaw Blvd.

Torrance, Ca. 90505

310-326-2277

Page 2: Dasco Intro

Background - Who is Dasco ?

• 45 years supplying machined parts to the aerospace industry.

• Recognized as a leader in machining complex hardware.

• Specialize in machining titanium and other hard and exotic alloys.

• Strong engineering team utilizing state-of-art software and hardware.

Page 3: Dasco Intro

Core Business Strategy

• Support Prime aerospace manufacturers

• Industry leader for titanium machining

• Increase value added product deliveries

• Gold Quality and Delivery recognition

• Offer partner/risk relationships

Page 4: Dasco Intro

Torrance Facility66,000 sq. ft.Main facility: machining, sub-assembledstructures and final source inspection.

Long Beach Facility40,000 sq. ft.Multi-spindle rough and finishmachining of hard metals

Total 106,000 sq. ft.

FacilitiesFacilities

Page 5: Dasco Intro

Manufacturing Equipment

Torrance Main Facility

Page 6: Dasco Intro

Vertical Machining

Page 7: Dasco Intro

Horizontal Machining

• Makino MC1210, 50-taper, pallet changer, 99 tools, 36” sq. pallets, 49” x 39.5” x 31.5” work envelope, 6,600 lb. pallet load.

• Nigata 4-Axis HN100B, 50-taper, pallet changer, 60 tools, 49” sq. pallets, 78” x 55” x 40” work envelope, 6,600 pallet load.

Page 8: Dasco Intro

Multi-Spindle Machining

(17) Multi-Spindle Gantries and CNC Profilers

Page 9: Dasco Intro

Multi-Spindle Machining

(5) Cincinnati 5-axis Gantries with(75) HP high torque spindles

Page 10: Dasco Intro

Hinge Manufacturing

Hinge machining and drilling upTo (20) feet in length

Page 11: Dasco Intro

Assembly Shop

Experienced with riveting, hardware installation, bushing and bearinginstallation for small to medium assembled components up to 20 feet in size

Page 12: Dasco Intro

Manufactured Products

Titanium wing spars

Titanium wing attach fitting

Titanium Frames

Page 13: Dasco Intro

Manufactured Products cont.

Addition products manufactured include: engine mounts, stringers,cords and machined frames

Page 14: Dasco Intro

Assembled Products

Main landing gear structureSheet metal assemblies

Assembled aircraft hinges

Page 15: Dasco Intro

Assembled Products

Page 16: Dasco Intro

Business Jet

Upper Cabin Door Assembly

Assembled Products

Page 17: Dasco Intro

Aircraft Hinges

Page 18: Dasco Intro

6-Axis CNC Tool Grinding

•State-of-the-art CNC equipment.

•Design and Manufacture of high-precision carbide cutting tools.

•Advanced tool design software.

•Development and test of advanced geometry tools.

•Highly accurate/repeatable tool regrinding.

Page 19: Dasco Intro

CNC Programming

• CATIA V4 and V5• NCL 502, Version 9.6 CAD/CAM System• Vericut 6.1 Tool Path Verification• Postworks, 6-Axis Post-Processor

Page 20: Dasco Intro

Quality System

• AS9100 – certified third party approved.• Mitutoyo “Bright 1230” 5-Axis CMM, 118” x 48” x 40” work envelope• Mitutoyo “Bright 916” 5-Axis CMM, 80” x 36” x 36” work envelope.

Page 21: Dasco Intro

Management Systems

• “JobBOSS” manufacturing management software system in use since 1998 – provides real-time data capture via barcode.

° Quote Processing° Order Processing° Material Control° Shop Floor Control

° Labor Reporting

° Cost Analysis

° Shipping

° Accounting

With over 4,300 installations worldwide, JobBOSS is the established leader in shop management for the machine shops.

Page 22: Dasco Intro

“JobBOSS” system coordinated with MS Access data base.

MASTER MONTHLY SHIP PLANStatus: 1=On Time, 2=Schedule Concern, 3= Late

JOB NO. CUSTOMER P/N DESCRIPTION PM COMMENTS QTY DATE QTY DATE QTY DATE QTY

S2467 BAC MIL-WA 5-96763-19 HINGE ASSY JFK SEAN - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED

S2468 BAC MIL-WA 5-96763-20 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED

S2469 BAC MIL-WA 5-96763-23 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED

1673 BAC MIL-WA 5HF75308-105 SUPPORT FITTING JFK X X X 1 TMG 2 3/18 2

1883 BAC MIL-WA 5HF75712-105 AFT FRAME JK STAGED FOR CNC 6/5/02

1883-NRE BAC MIL-WA 5HF75712-105 S/UP JK

1884 BAC MIL-WA 5HF75712-107 AFT FRAME JK NEED PROGRAM 2 3/22 2

1884-NRE BAC MIL-WA 5HF75712-107 NRE JK

1727 BAC MIL-WA 5HW82316-101 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03

1725 BAC MIL-WA 5HW82316-101 STRUT SUPPORT JK X X X 1 CNC - FADAL(2) PCS STOCK

1726 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADAL(2) PCS. STOCK 5 4/7

1728 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DEL'Y 04/01/03

1873 BAC MIL-WA 5HW82492-103 SPLICE JK

1682 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15

1379 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING

1874 BAC MIL-WA 5HW82492-104 SPLICE JK

1683 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15

1380 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING

1875 BAC MIL-WA 5HW82492-105 SPLICE JK

1684 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15

1381 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X X 1 STOCK THRU SEPT.

1382 BAC MIL-WA 5HW82492-106 SPLICE JFK X X X X 1 STOCK THRU SEPT.

1876 BAC MIL-WA 5HW82492-106 SPLICE JK

LATE

NC

PR

OG

.

TO

OL

ING

PR

OD

. RE

L.

ST

AT

US

PL

AN

NIN

G

MAR MAYAPR

5/2

4

6/14

5/31

6/1

2

7/22 6/3

6/5

6/14 7/2

7/2

6/1

8

7/9

7/1

2

7/16 8/8

8/1

2

8/6

8/2

6

9/2

5

9/4

10/

2

170

4

170

6

1711

174

9

175

1

1755

175

7

1761

1763

176

4

1758

174

3

176

6

1745

176

0

175

3

1746

174

8

185

5

1842

184

4

KURAKI 05 913

0

913

0

9430

943

0

943

0

9230

923

0

9330

9330

933

0

9230

913

0

933

0

9130

923

0

943

0

9130

913

0

933

0

9430

943

0

SNK 3-SPIND. #1 11

CIN. 5-AXIS 04

SNK 5-AXIS #1

SNK 5-AXIS #2

SNK 3-SPIND. #2

2677-102 / 1321J

9/286/16

2675-102 / 1689B

2679-104 / 1323J

2685-103 / 1696B

6/28 7/306/30

7/9

6/2

2305-102 / 1331

7/27

9955843-5/-6S2458-1/-2

6/16 7/27 6/30

0055-2013/ 1465

7/22

1752

933

0

9/4

184

39

430

7/12

175

97

/9

7/1

617

44

9330

913

0

943

0

923

0

9430

9230

933

0

180'S 9130

8/6

8/1

2

185

61

0/2

1854

8/26

174

7

175

4

2305-101 / 1330

6/30

2675-102 / 1319J

2682-103 / 1694B

2675-101 / 1688B

2682-103 / 1694C

2682-103 / 1694A

2685-103 / 1696B, C

5/24 6/3

9130

5/31

1705

6/1

2

1756

171

2

1750

9/4

943

0

9430

9230/9330

9/4

2677-101 / 1690E,F,G

7/13

2679-103 / 1692C

7/30 7/30

2677-102 / 1691C

7/13 7/13

2685-104 / 1697A

2305-102 / 1331

2685-104 / 1697C

2685-103 / 1696C

9/9 8/25

2685-104 / 1697B

2679-103 / 1692D,E,F

2305-102 / 1331

2675-102 / 1689A

2685-103 / 1696G,H,I

2685-104 / 1697G,H,I

2682-103 / 1694D,E,F

9230/93309230/9330

2685-103 / 1696D,E,F

2685-104 / 1697D,E,F

2685-103 / 1696A

9130/9430

6/18

7/9

1765

176

2

9330

9130/9430

9/4

2685-104 / 1697A, B, C

2677-101 / 1690C,D

2677-102 / 1691C

2305-101 / 1330

2677-102 / 1691D,E,F

9/24

2685-103 / 1696D

10/22 10/22

8/25 9/14

2685-103 / 1696E

2685-103 / 1696F

2679-104 / 1693C

2677-101 / 1690C

9130/9430

Master Ship Plan

Machine Loading

Production Control System

Page 23: Dasco Intro