DAR mandate/organization Milestones Programs outlook Outline 0

Upload: others

Post on 11-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

• DAR mandate/organization

• Milestones

• Programs outlook

Outline

0

Page 2: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

• Provide the Comd RCAF with advice,

recommendation and plans for the management

of aircraft fleets either for refurbishment or

replacement

• Acquire the equipment and systems to maintain

a combat capable Air Force

Mandate

1

Page 3: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

2

The DAR Team

Col Chouinard

DAR

LCol Godbout

DAR 2 (SAR/Air Mobility)

Maj Bourque

DAR 3 (Maritime/EW/AVS)

LCol Michaud

DAR 6 (GSE/Gear)

LCol John Whalen

DAR 8 (UAS)

LCol Tim Streek

DAR 9 (Tac Aviation)

Page 4: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

• Chinook

• C-17

• C-130J

• Vehicles

Milestones

3

Page 5: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

Programs Outlook

4

Page 6: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

5

JUSTAS

• Description: To provide an all-weather,

persistent, intelligence, surveillance,

reconnaissance and payload delivery capability

in support of CAF operations.

Current Phase: Options Analysis

Page 7: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

6

Aurora Incremental

Modernization Project (AIMP)

• Description: Equipment modernization and

structural life extension of 14 x CP140 Aurora

Aircraft

• Block IV– Link 16

– Wideband SATCOM (WGS)

– DIRCM

Current Phase: Implementation (Block III) and

(Block IV)

Page 8: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

7

Fixed-Wing Search and Rescue Aircraft Replacement (FWSAR) Project

• Description: To replace the CC115 and

CC130H to support the National Search and

Rescue program.

• Acquisition: competitive procurement

strategy with 20-year ISS integrator

(Canadian Contractor).

Current Phase: Definition

Page 9: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

8

Twin Otter Life Extension (TOLE)

88

• Extend CC138 operational life to 2025 to

ensure a continued Canadian Armed Forces

light transport capability in the Far North.

• Wing replacement to address structural life

issues.

Current Phase: Options Analysis

Page 10: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

9

Cormorant Mid-Life Upgrade (CMLU)

9

• Extend CH149 operational life to 2040.

• Return all-weather rotary wing Search and

Rescue capability to Trenton.

• Address obsolescence/maintenance issues.

• Provide capability improvements to enhance

its overall mission effectiveness.

Current Phase: Options Analysis

Page 11: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

Griffon Limited Life Extension

(GLLE)

:

• Griffon estimated life expectancy is 2021

• Fleet replacement project (TRUH) was

postponed to after 2030

• Avionics, instruments and display are

obsolete and must be replaced as an

integrated systems architecture

Current Stage: Options Analysis

Page 12: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

Omnibus Support Vehicle

Replacement

Description:

This project will replace 6 fleets of vehicles

that support airfield operations.

The first 3 are in Implementation.

Current Stage: Definition to Implementation

Page 13: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

Snow and Ice Control Capability

Recapitalization

Description:

This project will provide high speed snow

removal equipment designed for airfield

operation, to replace an aging fleet of

equipment.

Current Stage: Options Analysis

Page 14: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

Future Projects

• Canadian Multi-mission Aircraft (CMA)

• Strategic Tanker Transport Capability (STTC)

• Multi-Fleet Air Traffic Management Avionics (MFATMA)

• CC150 Life-Extension

• Tactical Reconnaissance Utility Helicopter (TRUH)

• Utility Transport Aircraft (UTA)

Page 15: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM

Questions