dao 1998-12 sec. 5-12 multiple choice sample

2
1) Land survey for registration and other survey with prescribe of accuracy as stated in this manual, shall be made by geodetic engineer or junior geodetic engineer duly registered in accordance with _________, as amended. a.)Republic Act No. 1273 b.)Republic Act No. 4374 c.)Republic Act No. 10023 d.)Republic Act No. 8974 2) Geodetic engineers and junior geodetic engineers who are in the service of the Department of Environmental and Natural Resources (DENR) may undertake public land surveys, government land surveys and other land survey, subjected to the administrative direction, control and supervision of the _________ through the Regional Technical Director for Lands Management Services. a.) Director of Lands Managements Bureau b.) Bureau of coast and Geodetic Survey c.) Regional Executive Director d.)all of the above 3) Duly licensed Geodetic Engineers and Junior Geodetic Engineers in private practice may undertake private land surveys, subject to these rules and regulation. In the case of junior geodetic engineers, subject further to the limitation of _________ with an aggregate area of not exceeding one hectare and other limitations prescribed by the geodetic engineer board. a.) Three lots b.) Five lots c.) Seven lots d.) Nine lots 4) Duly licensed Geodetic Engineers and Junior Geodetic Engineers in private practice may undertake private land surveys, subject to these rules and regulation. In the case of junior geodetic engineers, subject further to the limitation of three lots with an aggregate area of not exceeding one hectare and other limitations prescribed by the geodetic engineer board. a.) one hectare b.) Five hectares c.) two hectares d.) 3 hectares 5) Duly licensed geodetic engineers and junior geodetic engineers in private practice may be authorized to undertake surveys of _________of public and government lands, subject to the administrative direction. Control and supervision of the Lands Management Bureau through the DENR-Lands Management Service. a.) conversion b.) Isolated parcels c.) cadastral d.) none of the above 6) Duly licensed geodetic engineers and junior geodetic engineers in private practice may be authorized to undertake_________, subject to existing laws and the administrative direction, control and supervision of the Lands Management Bureau through the DENR-Lands Management Service. a.) conversion survey b.) Isolated survey c.) Cadastral surveys d.) Geodetic survey 7) Geodetic Engineer in private practice may be authorized to undertake survey of isolated parcels of public lands under the administration of the lands management bureau, upon issuance of survey authority. The request for survey authority shall be accompanied by documents that will show the actual occupation of the land by the claimant. Such documents may be a certification of the barangay captain or the municipal mayor. Survey for________, lease or sale application is exempted from this requirement. a.) free patent b.) Subdivision c.) Homestead d.) none of the above 8) A. An _______shall be any narrow natural bed or channel through which the water flows continuously or intermittently throughout the year. a.) arroyo b.) estero c.) pond d.) lake 9) B. An _______ shall be any bed or channel through which stagnant. Dirty or salt water flows under the influence of the tides. a.) arroyo b.) estero c.) pool d.) creek 10) D. A ______ shall be any wide natural bed or channel through which water flows continuously or intermittently throughout the year. a.) lake b.) seacoast c.) pond d.) river 11) E. Lake shall be a considerable inland body of standing water, also an expanded part of a river.

Upload: broddett-abatayo

Post on 03-Sep-2015

216 views

Category:

Documents


1 download

DESCRIPTION

broddett abatayo geodetic engineer 3rd placer 2014 official gazette

TRANSCRIPT

1) Land survey for registration and other survey with prescribe of accuracy as stated in this manual, shall be made by geodetic engineer or junior geodetic engineer duly registered in accordance with _________, as amended.a.)Republic Act No. 1273 b.)Republic Act No. 4374 c.)Republic Act No. 10023 d.)Republic Act No. 89742) Geodetic engineers and junior geodetic engineers who are in the service of the Department of Environmental and Natural Resources (DENR) may undertake public land surveys, government land surveys and other land survey, subjected to the administrative direction, control and supervision of the _________ through the Regional Technical Director for Lands Management Services.a.) Director of Lands Managements Bureau b.) Bureau of coast and Geodetic Survey c.) Regional Executive Director d.)all of the above 3) Duly licensed Geodetic Engineers and Junior Geodetic Engineers in private practice may undertake private land surveys, subject to these rules and regulation. In the case of junior geodetic engineers, subject further to the limitation of _________ with an aggregate area of not exceeding one hectare and other limitations prescribed by the geodetic engineer board.a.) Three lots b.) Five lots c.) Seven lots d.) Nine lots

4) Duly licensed Geodetic Engineers and Junior Geodetic Engineers in private practice may undertake private land surveys, subject to these rules and regulation. In the case of junior geodetic engineers, subject further to the limitation of three lots with an aggregate area of not exceeding one hectare and other limitations prescribed by the geodetic engineer board.a.) one hectare b.) Five hectares c.) two hectares d.) 3 hectares

5) Duly licensed geodetic engineers and junior geodetic engineers in private practice may be authorized to undertake surveys of _________of public and government lands, subject to the administrative direction. Control and supervision of the Lands Management Bureau through the DENR-Lands Management Service.a.) conversion b.) Isolated parcels c.) cadastral d.) none of the above

6) Duly licensed geodetic engineers and junior geodetic engineers in private practice may be authorized to undertake_________, subject to existing laws and the administrative direction, control and supervision of the Lands Management Bureau through the DENR-Lands Management Service.a.) conversion survey b.) Isolated survey c.) Cadastral surveys d.) Geodetic survey

7) Geodetic Engineer in private practice may be authorized to undertake survey of isolated parcels of public lands under the administration of the lands management bureau, upon issuance of survey authority. The request for survey authority shall be accompanied by documents that will show the actual occupation of the land by the claimant. Such documents may be a certification of the barangay captain or the municipal mayor. Survey for________, lease or sale application is exempted from this requirement. a.) free patent b.) Subdivision c.) Homestead d.) none of the above

8) A. An _______shall be any narrow natural bed or channel through which the water flows continuously or intermittently throughout the year.a.) arroyo b.) estero c.) pond d.) lake

9) B. An _______ shall be any bed or channel through which stagnant. Dirty or salt water flows under the influence of the tides.a.) arroyo b.) estero c.) pool d.) creek

10) D. A ______ shall be any wide natural bed or channel through which water flows continuously or intermittently throughout the year.a.) lake b.) seacoast c.) pond d.) river

11) E. Lake shall be a considerable inland body of standing water, also an expanded part of a river.a.) arroyo b.) estero c.) pond d.) lake

12) F. A pond is a body of water naturally or ______confined and usually smaller than a lake.a.) standing water b.) stagnant water c.) artificially

13) The classification of stream as arroyos, esteros, creek or river is at times difficult as such streams gradually merge into one or the other. In cases of doubt, the local designation or name of the _____shall determine its classification and shall be clearly indicated in the field notes and on the plan of the survey.a.) stream b.) estero c.) pond d.) river14) The natural bed or channel of ___________or river shall be the ground within the banks covered by water during the highest floods which do not cause inundation.a.) creek, bond, arroyo b.) arroyo, esteros, creek c.) estero, arroyo, pool d.) arroyo, creek, estero

15) Navigable ______shall be those which contain sufficient water to allow rafts, boats, cascos , etc., to float thereon and engage in transportation or other activities.a.) river or lake b.) esteros or rivers c.) estero or arroyo d.) lake or arroyo

16) R.A 1273 amending section 90 of act 141 which took effect in _______provides that a strip of forty (40) meters wide starting from the banks on each side of any river stream shall be demarcated and preserved as permanent timberland; that even after patent or lease contract has been issued no clearing can be done thereon or the same cannot be utilized for farming purpose but shall be planted to trees of economic value.a.) June 14, 19557 b.) June 14, 1965 c.) June 14, 1956 d.) June 14, 1955

17) For land classified in accordance with R.A 1273, the boundary lines of survey shall extend to a line _______ meters from the bank on each side of rivers or streams with channels of at least five (5) meters wide.a.) fifteen (15) b.) twenty (20) c.) ten (10) d.) forty (40)

For land classified pursuant to P.D. 705, the boundary lines of survey shall extend to a line ______ meters from the edge of normal high waterline of rivers and streams with channels of not less than five (5) meters wide. Twenty (20) meters from the terrestrial limit of a lake being the line reached by its highest ordinary depth. a.) five (5) b.) twenty (20) c.) ten (10) d.) fifteen (15)

18) _______to points on the banks of stream to show that these strips of land are excluded from the survey shall be indicated in the field notes and computation sheets and plotted on the plan. These points shall be connected in red dotted lines to the traverse station from which they were observed.a.) Side shot b.) fore sight c.) back sight

19) A strip of _______meters in width on each side of the centerlines of trails and roads which are reserved for right-of-way and timber outlet should be sent on the ground, and indicated in the field notes and on the plan.a.) seven (7) b.) twenty (20) c.) ten (10) d.) fifteen (15)

20) Geodetic Engineer in private practice may be authorized to undertake survey of isolated parcels of public lands under the administration of the_______, upon issuance of survey authority.a.) lands management bureau b.) Department of Environmental and Natural Resources c.) Regional Executive Director d.) all of the above