Daimler Wind Tunnel Project. Project Review. Capstone Team Andre Nylund Chris Grewell Craig Lechtenberg Fadel Al Jutail Matt Melius Mufeed Yacoub Team Advisor Dr. Raul Bayoán Cal Customer Daimler Trucks North America. Project Review. Tunnel Details 12,000 sq. ft. facility - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/1.jpg)
Daimler Wind Tunnel Project
![Page 2: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/2.jpg)
Project Review
Capstone Team Andre Nylund Chris Grewell Craig Lechtenberg Fadel Al Jutail Matt Melius Mufeed Yacoub
Team Advisor Dr. Raul Bayoán Cal
Customer Daimler Trucks North
America
![Page 3: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/3.jpg)
Project Review
Tunnel Details 12,000 sq. ft. facility Wind speeds up to 65 mph 30ft long test section 21ft wide 26ft tall
![Page 4: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/4.jpg)
Project Review
Tunnel Details Pressure sensitive floor for calculating trucks drag coefficient.
Smoke wand for flow visualization
Rotating floor panel to test various angles of attack
![Page 5: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/5.jpg)
Project Review
Mission Statement: Improve smoke testing methods
Increase the testable area within the wind tunnel
Increase stability of the system
Deliver smoke to location of interest accurately
Provide these requirements while maintaining negligible aerodynamic impact to test region
Delivery of final product by June,16th
![Page 6: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/6.jpg)
Modified Scope• Design
Complete System• Build Roller Box
Original Scope
• Design Complete System• Build Complete
System
General Scope Modification
![Page 7: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/7.jpg)
Concept Design
Horizontal Rail
Smoke Wand
Vertical Rails
Horizontal Carriage
Wind Tunnel Wall
Vertical Carriages
Drive MotorWand Support Rollers
Horizontal motion Vertical motion Tunnel seal
![Page 8: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/8.jpg)
Final Detailed Design
![Page 9: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/9.jpg)
Horizontal motionLinear actuator • Pre-fabricated
Roller box• Allows the smoke wand to move in
and out of the tunnel while being supported
![Page 10: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/10.jpg)
Vertical motion
Lifting motor• Drive system
• 700 lb/in • 10 ft/min• 1.5 hp
• Ball screws• 1” X 0.5” (OD X Pitch)• 21’ Long
Trolley• Designed with simple
fabrication and installation in mind
![Page 11: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/11.jpg)
Tunnel sealRolling shutters • Custom fit shutters to prevent pressure
from escaping from the wind tunnel
![Page 12: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/12.jpg)
Roller Box• Roller box components– Flat Roller Beam (2X)– Angular Roller Beam (2X)– Rubber Roller Wheel (16X)– Roller Housing– Roller Clamps-Upper and Lower
![Page 13: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/13.jpg)
Roller Box
![Page 14: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/14.jpg)
Roller Box• Stability– Four sets of rollers– Sixteen points of contact
• Adjustability– Two adjustable set
screws/roller assembly
• Angel variation – Upper and lower
brackets are loosened to rotate
![Page 15: Daimler Wind Tunnel Project](https://reader035.vdocuments.us/reader035/viewer/2022062512/568163be550346895dd4dd6a/html5/thumbnails/15.jpg)
Final Design Progress• Horizontal motion
(completion 6/6/2012)– Linear actuator– Roller box (65% complete
fabrication)• Vertical motion (completion
5/30/2012)– Trolley – Lifting motor (70% complete
design)• Tunnel seal (completion
5/30/2012)– Rolling shutters (70%
complete design)