d5.3 - website v01
DESCRIPTION
You can read the entire delivarable here.TRANSCRIPT
Website
Person responsible / Author: Lion Benjamins - POLIMI
Deliverable No.: D 5.3
Work Package No.: WP 5
Date: 15.01.2013
Project No.: 286885
Classification: Public
Distribution: To all the Consortium
File name: D 5.3 – Website v01.docx
Number of pages: 6
286885 BOMA
2
Status of Deliverable
Action By Date (dd.mm.yyyy)
Submitted (author(s)) Lion Benjamins 15.01.2013
VU (WP Leader) Sture Berg 15.01.2013
Approved (QIM)
Revision History
Date (dd.mm.yyyy) Version (version revision) Author Comments
15.12.2012 0.1 Lion Benjamins First Version
10.01.2013 0.1 Sture Berg Revision
15.01.2013 0.1 Lion Benjamins Final Version
Author(’s) contact information
Name Organisation E-mail Tel
Lion Benjamins POLIMI [email protected]
Ernesto de
Bartolomeis
FIART [email protected]
Dagfinn Knutsen Marex [email protected]
Kim Orthen MarineCenter [email protected]
Nick M. Karaolis Karnic [email protected]
Sture Berg Hydrolift [email protected]
286885 BOMA
3
Figures
Figure 1 - Home page with new items ........................................................................................................ 4
Figure 2 - Consortium and Team ................................................................................................................. 5
Figure 3 - Draft Survey ................................................................................................................................ 6
286885 BOMA
4
1. Abstract
This deliverable describes the development of the Project website, which is part of the dissemination,
marketing and exploitation work package.
It includes introductory information about the project and public deliverables as they become available
(technical journal paper, public deliverables,..).
It needs to be regularly updated.
2. Development of the Project Website
The project website www.boma-project.eu will serve as one of the main dissemination channels. It will
eventually include download areas for public deliverables as well as interactive elements in the later
stages of the project.
Due to the early nature of the project and limited public deliverables no effort has yet been made to
direct external (public) traffic to the site. Consortium members may log-in and access work packages
details and progress. Currently under construction, although this might be revisited for reasons set out
below.
Major news items are listed on the home page.
Figure 1 - Home page with new items
286885 BOMA
5
As the project itself is of relative short duration it is intended to use the site to support the on-going
effort of the consortium and members of the marine leisure industry surrounding them to find relevant
information about BOMA results rather than the details of the project. The BOMA site will act as a
support for acceptance and implementation of BOMA.
Besides and introduction to the project and “about” BOMA, sections are dedicated to the Consortium,
Team, Project Structure and special attention to the underlying concepts of Quantum Lifecycle
Management (QLM).
In order to prepare for bringing BOMA to the attention of the boating public and members of the
leisure marine industry a “Feedback” section with questionnaires is under construction. The draft
version is available on-line. Members of the consortium have tested this and minor improvements are
planned shortly.
Figure 2 - Consortium and Team
286885 BOMA
6
Figure 3 - Draft Survey
Contact details are being gathered for a number of specialized blog sites and forums that concentrate
on various specific boating communities. These will be targeted to gather information on the
questionnaires and directed to the BOMA site.