VISIBILTY DURABILITY COST

TRAFFIC STRIPES & TRAFFIC SIGNS

Page 3: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

Traffic Signs and Stripes are one of the Most Cost-effective Means of Improving Highway Safety

The Cost of Traffic Sign Panels and Stripes is Minimal Compared to the Total Project Cost < 4%

Page 4: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

PAINTTO

HIGH REFLECTIVE THERMO

TRAFFIC STRIPES

Page 5: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

PAINT STRIPES

• D-11 has 4,000 lane miles

• Up until 2010 District 11 used paint stripes

• Paint Life Expectancy < 1 Year

• To maintain visibility Caltrans MTCE crew had to refresh the paint stripes on a yearly basis

• Total Yearly Cost = $3,000,000 million

Issues: Safety + Labor Cost + Material Cost

Page 6: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

THERMOPLASTIC STRIPES

In 2009 we Started Experimenting with

THERMOPLASTIC STRIPES

HEATED-PLASTIC & REFLECTIVE BEADS

• Layer #1 heated thermo, 400-440 degrees

• Layer #2 Glass beads on top of the thermo

Page 7: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

THERMOPLASTIC STRIPES

THERMOPLASTIC CLOSE-UP VIEW

Page 8: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

THERMOPLASTIC STRIPES

THERMOPLASTIC TRUCK

BEADS TANK

HEATED THERMOPLASTIC

TANK

NOZZLES

Page 9: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

THERMOPLASTIC STRIPES

SPRAY NOZZLES

Page 10: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

THERMOPLASTIC STRIPES• D-11 Started Experimenting 2009

• Reflectivity Value: White = 250 Yellow = 150

COST PER YEAR OF SERVICE

  $ COST/LF LIFE EXPECTANCY YEARS

COST PER YEAR OF SERVICE

Paint $0.18 1 $0.18Thermoplastic $0.31 4 $0.08

IN 2010 DISTRICT-11 SWITCHED

STRIPES ALL THERMO

Page 11: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

HIGH REFLECTIVE THERMOPLASTIC STRIPES

Page 12: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

HIGH REFLECTIVE THERMOPLASTIC STRIPES

• D-11 Started Experimenting 2011

• Layer #1 Heated Thermoplastic Material

• Layer #2 Highly Reflective Glass Beads

• Layer #3 Standard Glass Beads

• Cost $/LF in 2011 = $0.42

• Cost $/LF in 2014 = $0.32

Page 13: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

FINAL PRODUCT CLOSE-UP

Page 14: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

HIGH REFLECTIVE BEADS

DRY BEADS CLOSE-UP

COIN(DIME)

STANDARD BEADS

Page 15: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

DRY BEADS CLOSE-UP

HIGH REFLECTIVE BEADS

STANDARD BEADS

Page 16: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

FINAL PRODUCT ENHANCED THERMO

Page 17: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST
Page 18: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

RETROREFLECTIVITY IN (MCDM-2LX-1)

YELLOW STRIPES

RETROREFLECTIVITY COMPARISON

WHITE STRIPES

3XRETROREFLECTIVITY

Page 19: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

RETROREFLECTIVITY COMPARISON

Page 20: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

HIGH PERFORMANCE THERMOPLASTIC HAS:

DISTRICT-11 IS CURRENTLY USING ENHANCED THERMOPLASTIC ON ALL NEW PROJECTS

D11 - STRIPING CONCLUSION

Standard Thermo Vs

High Performance Thermo

• ALMOST THE SAME COST

• 3X TIMES THE RETROREFLECTIVITY

• HIGH VISIBILITY DURING DRY & WET WEATHER IN 2012 D-11 SWITCHED STRIPES

TO ALL HIGH REFLECTIVE THERMO

Page 21: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

WHAT IS NEXT IN FOR STRIPING?

Page 22: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

SIGN SHEETING

Reflectivity Durability Cost

Page 23: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

RETROREFLECTIVE SHEETING TYPES

WHICH TYPE SHOULD WE USE?

Page 24: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

RETROREFLECTIVITY

Retroreflectivity is defined as the light that returns to the light source

Page 25: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

2010

Page 26: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS OFF (Location 1)

Page 27: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS ON (Location 1)

Page 28: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS OFF (Location 2)

Page 29: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS ON (Location 2)

Page 30: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS OFF (Location 3)

Page 31: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS ON (Location 3)

Page 32: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS OFF (Location 4)

Page 33: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CAR HEADLIGHTS ON (Location 4)

Page 34: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

RETROREFLECTIVITY / WARRANTY

Page 35: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

D-11 REPORT

Page 36: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

• REDUCE INFRASTRUCTURE COST

• REDUCE ELECTRICAL ENERGY COST

• INCREASE SAFETY•REDUCE MAINTENANCE COST (Bulbs, Copper Theft)

SAVINGS & BENEFITS - TYPE XI

“2015 LIGHTS OUT”

IN 2012 D-11 SWITCHED TO

TYPE XI SHEETING FOR ALL SIGNS

Page 37: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

JULY 2014 - TYPE XI SHEETING STATEWIDE STANDARD

FOR GUIDE SIGNS

TYPE XI SHEETING A STATEWIDE STANDARD

Page 38: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

OTHERS REASONS FOR BETTER & BRIGHTER

SIGNING & STRIPING MATERIALS

Page 39: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

MUTCD MINIMUM MAINTAINED RETROREFLECTIVITY LEVELS

REPLACE NON-COMPLIANT WARNING AND REGULATORY SIGNS 2015REPLACE GUIDANCE AND STREET NAME SIGNS 2018

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES

Page 40: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

NOW MORE THAN EVER WE NEED BRIGHTER SIGNING & STRIPING

ELDERLY BABY BOOMERS POPULATION IS GROWING

Page 41: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

GROWING DRIVING POPULATION

Page 42: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST
Page 43: D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST

CHOOSE WISELY