cynthia brosque robotics evaluation framework › sites › g › files › sbiybj9681 › ... ·...

16
Robotics Evaluation Framework CIFE SEED RESEARCH UPDATE I Cynthia Brosque Martin Fischer 11/7/2018

Upload: others

Post on 03-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Robotics Evaluation FrameworkCIFE SEED RESEARCH UPDATE I

Cynthia Brosque

Martin Fischer

11/7/2018

Page 2: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Motivation & Background Case Study 1 Case Study 2 & Next Steps

Page 3: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

• What are the repercussions of using a robot on site? What are the potential benefits?

• What are the planning activities and workflow required?

• What are the safety and quality differences?

• How does it affect decision making?

• How many product, organizational, and process boundaries have to be crossed to make a robot cost- and schedule-effective?

Research questions

Motivation & Background

Page 4: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Analysis method

Motivation & Background

Page 5: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

5

Page 6: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Case Study 1

Motivation & Background Case Study 1

Page 7: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

• What are the repercussions of using a drilling robot on site? What are the potential benefits? -40hs, +$29K

• What are the planning activities and workflow required? Collect design information, automate hanger-placement, and clash detection (+10d)

• What are the safety and quality differences? 98% reduction on muscle strain hs, -50 clashes

• How does it affect decision making? Until 1 day before to make changes

• How many product, organizational, and process boundaries have to be crossed to make a robot cost-and schedule-effective? 4 main boundaries

Research answers

Motivation & Background Case Study 1

Page 8: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

EXTRA COSTCHANGES IN WORK PROCESS ANDCOORDINATION TIME

INCREASE LEVEL OF BIM DEVELOPMENT

ORGANIZATION CHANGES (PROJECT PARTICIPANTS)

Social acceptance of technologyAvailability of human resources

Automation benefits:Safety and qualityCalendar time reduction (scale)

Technical feasibility Extra clash detection and prefabrication

Faster installation (33% reduction thanks to pre-drilled holes)Predictability

MANUALROBOT

Motivation & Background Case Study 1

Product, process, and organizational barriers

Page 9: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Lack of manual drilling metrics

Variability

• Drilling and installation rework• Overtime work• Number of clashes• Percent plan complete

• Waiting time to access a zone• Sequencing and use of resources• % manual rework • Adoption of new technology• Project zones and accessibility• Diameters used for robot

Observed analysis challenges

Motivation & Background Case Study 1

Page 10: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

1. Shorten the effort and duration for coordination of robot work

2. Consider the scale of the project and the key benefit for automation (shorter duration, safety, quality, reliability, other?)

3. Obtain benchmark data of manual and robot work to back-up the decision

Recommendations

Motivation & Background Case Study 1

Page 11: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

How general is this information and this approach to analyze other types of robots?

Page 12: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

1 2

3

4

6 7 8 9

1. nLink concrete drilling robot2. Taisei automatic façade coat and paint applier 3. Construction Robotics SAM 100 semi-automated brick laying robot 4. Taisei Corporation and University of Tsukuba T- iROBO slab finisher5. Drywall robot Build-R6. Tsukuba University Hal exoskeleton7. Tokio University of Science muscle suit8. NEDO project teleoperation of construction machines9. Built Robotics self-driving excavator

5

Motivation & Background Case Study 1 Case Study 2 & Next Steps

Page 13: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …
Page 14: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Information:Structures and architecture BIM updated until one day before

Robotic operation:Lift and fasten tool Battery powerMachine vision identification (QR code at mm level)Intelligent navigation system (10cm tolerance)Robot operator and site cutting crew

Limitations:Installation of full boards (90cm x 250cm) only - cutting not integratedInstallation of ceiling not possible yet

Case Study 2

Motivation & Background Case Study 1 Case Study 2 & Next Steps

Page 15: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Next Steps

Case Study 1:Drilling robot

completed

Case Study 2:Drywall robot

completed

Case Study 3:…

completed

Analysis and comparison of cases finished

Existing research of robotics in construction studied and analyzed

Existing manufacture evaluation frameworks studied

Robotics Evaluation Framework

developed and validated

Motivation & Background Case Study 1 Case Study 2 & Next Steps

Page 16: Cynthia Brosque Robotics Evaluation Framework › sites › g › files › sbiybj9681 › ... · Drilling robot completed Case Study 2: Drywall robot completed Case Study 3: …

Questions?