cvac administration building
TRANSCRIPT
Chesterfield Valley Athletic ComplexAdministration and Maintenance BuildingSt. Louis, Missouri
Designed to handle the maintenance, storageand administrative needs of a 245 acre athleticdevelopment, the building is laid out in threedistinct use areas, Administration Area,Public/Assembly Area and Maintenance Area.The spatial requirements of these areas requirephysical separation forming the floor plan. Thisalong with the building massing and rooftreatments of the three distinct areas the threevolumes articulate the exterior design of thebuilding.
Due to the size of the building and the diminutivenature of the adjacent buildings, considerationwas given to the exterior walls, roof treatmentsand building masses to create a pedestrianfriendly scale and to avoid a single large mass orrepetitious structure.
Constructed planned to be completed inNovember 2008
Construction Costs: $2,200,000Square Footage: 12,000 S.F.
WORKSTATION
Lunchroom
AB.C.D.E.F.
. CafeteriaConferenceMud Room
ROfficeWork CubiclesLocker ooms
G.H.I.J.K.L.
StorageMech/ElecIT RoomWorkroomWorkbayBulk Storage
View from Southeast
A
BCD
D EE
EF
GGG
H
H I
J
KKKK
L L
Entry
AB.C.D.E.
. Arcade HallCash CounterOfficeStorage RoomWork Room
C
1
2
1
3
4
ABCDEFG
EntryLiving AreaKitchenDining AreaSecond BedroomUtility ClosetMaster Bedroom
LEGEND
ABCDEFG
1
1234
View from SoutheastArchitectural PlanLunchroomEntry Vestibule