c.v ahmed abdelsalam

5
Education Bachelor’s degree, Architecture Arab Academy for Science, Technology & Maritime Transport Architectural Engineering & Environmental Design. Alexandria – Abu Qir Campus Completion Date February 2014 Professional Affiliation Royal Institute of British Architects (RIBA II) Work Experience Summer 2011 Training Certificate from ghi Formwork Company Training in the branch of Jeddah, Saudi Arabia on the field of formwork for Makkah Expansion project by learning the standard materials of the company and how to read the formwork drawings. 2014 - 215 Work in ghi Formwork Company Mecca / Madinah – Saudi Arabia March 2014 – June 2015 Site Engineer/ Technical Support Work with ghi Formwork as a site engineer and technical support. Work in Mecca with a special fabrication single, double and triple trusses for Mataf expansion in Mecca project in phase II & phase III from columns, beams by single /double and triple trusses, roofs and marble finishing. Work in Madinah with standard Formwork of ghi company from foundation to the second floor structure. Ahmed Abdelsalam San Stefano- Alexandria, Egypt [email protected] +2 01112229533 +966 544065558

Upload: ahmed-el-shenawy

Post on 13-Feb-2017

67 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: C.V Ahmed Abdelsalam

Education Bachelor’sdegree,Architecture

ArabAcademyforScience,Technology&MaritimeTransportArchitecturalEngineering&EnvironmentalDesign.

Alexandria–AbuQirCampus

CompletionDate February2014

Professional Affiliation RoyalInstituteofBritishArchitects(RIBAII)

Work Experience Summer2011 TrainingCertificatefromghiFormworkCompany

TraininginthebranchofJeddah,SaudiArabiaonthefieldofformworkforMakkahExpansionprojectbylearningthestandardmaterialsofthecompanyandhowtoreadtheformworkdrawings.

2014-215 WorkinghiFormworkCompany

Mecca/Madinah–SaudiArabiaMarch2014–June2015

SiteEngineer/TechnicalSupport

WorkwithghiFormworkasasiteengineerandtechnicalsupport.

WorkinMeccawithaspecialfabricationsingle,doubleandtripletrussesforMatafexpansioninMeccaprojectinphaseII&phaseIIIfromcolumns,beamsbysingle/doubleandtripletrusses,roofsandmarblefinishing.

WorkinMadinahwithstandardFormworkofghicompanyfromfoundationtothesecondfloorstructure.

Ahmed Abdelsalam

SanStefano-Alexandria,Egypt

[email protected]+201112229533+966544065558

Page 2: C.V Ahmed Abdelsalam

2015 WorkinArchivisionofficeAlexandria,EgyptAugust2015–October2015

ArchitectintechnicalofficeWorkwithArchivisionasdesignerandextractshopdrawings.Alsorevisetheworksinthesite.

2015 Coursein3dsmaxModeling&V.Ray

Alexandria,EgyptNovember2015–December2015

TakeacourseinArabAcademyforscienceandtechnology3dsmaxmodeling

2016

WorkinDioramaforDesignandconstruction

Alexandria,EgyptJanuary2016–August2016

SiteEngineer/DesignerWorkindioramaasadesignerforresidentialbuildingsandsiteengineer

• L Passage – Fouad st. Alexandria, Egypt 2015

Landscape,Nightshots.Historicalarea.Usethecrowdsinphotos.Blackandwhitephotos.Mixing

betweenBlurandFocusing.

• The Corner – Kafr Abdu zone. Alexandria, Egypt 2015

Shop,Menu,Nightshots.

InteriorShots,ExteriorShots.

Freelance Architecture Photography Works •

Page 3: C.V Ahmed Abdelsalam

• Archvision architecture office – Tharwat st. Alexandria, Cairo, Egypt 2016

Office,InteriorShots.

NBKBank,ExteriorShots.

NOTE:Youcanseemyprojectsonthislink

Skills and Work tools

• Siteworks• Finishingworks• Basiccivilworks• EnglishLanguage• 3dsMaxModeling&V.Ray• Photoshop• AutoCAD2D• AdobeLightRoom• Windowsoffice• GoogleSketchup• ArchitectureRevit

Page 4: C.V Ahmed Abdelsalam
Page 5: C.V Ahmed Abdelsalam