S.NODescription of Foundations (Customer
Scope)Schedule Date Actual / Expected
1 Boiler Main & Auxiliary
2 Column Foundation
3 PA Fan 30.06.2011 30.04.2013
4 ID fan 30.06.2011 15.07.2012
5 FD Fan 30.06.2011 30.04.2013
6Duct Support Foundation Boiler (Outlet) &
ESP (Inlet)30.04.2011 30.01.13
7Duct Support Foundation ESP (Outlet) &
ID Fan (Inlet)31.03.2011 30.02.2012
8Duct Support Foundation ID Fan (Outlet)
& Chimney30.04.2011 15.12.2011
9 Condenser Foundation/ TG Deck 31.12.2010 28.08.2012(3rdPedestal handed over)
10TG Hall With covering & EOT crane in
Remote control mode30.01.2011
11 Oil Canal 30.05.2012 30.04.2013
12 Control Fluid Room with Foundations 30.03.2012 30.04.2013
13 Main Oil Room wall 15.03.2012 10.04.2013
14 ESP 30.04.2010 22.01.2011
15 De-aerator Floor 30.06.2011 25.11.2012
16 CEP 24.06.2011 30.07.2012
17 MD-BFP 30.07.2011 23.10.2012
18 TD-BFP 30.07.2011 30.04.2013
19 Mills foundations 31.08.2011 15.05.2013
20
21 DC Power 02.11.2011 30.12.2012
22 Control Room with A/C 31.10.2011 30.03.2013
23 ESP Control Room 30.09.2011 30.10.2012
24Instrument air, Compressed air & Service
Air31.03.2012 30.03.2013
25Start Up Power (ST & STN Board
Charging)31.01.2012 30.01.2013
26 NDCT- Cooling Tower 31.03.2012 30.05.2013
27 Chimney for Duct Connection 28.12.2011 30.05.2013
28 DM Plant 15.10.2011 30.06.2012
29 Switch Yard 30.07.2012 30.08.2012
System Readiness
30.03.2010 28.10.2010
-
8/13/2019 Customer Inputs 600mw
2/17
30 CW & ACW System 28.02.2012
31 Fire Protection system 02.02.2012
32 Coal handling System 31.07.2012
33 Ash Handling System 31.07.2012
34 Readiness for Power Evacuation 31.07.2012 20.02.2013
35 AC & Ventilation system 31.07.2012
-
8/13/2019 Customer Inputs 600mw
3/17
Remarks
Only RHS handed over on28.12.2012
Only RHS handed over on
28.12.2012
RHS handed over
15.12.201
Deck handed Over on28.02.2012
(TES -25.05.12 )
Side covering is Still
pending. Floors (0.0, 8.5 &
17 M pending)
1 Nos was handed over on
25.02.2013
LHS last 2 Nos handed
over on 23.03.2013
Ready
Ready
Ready
Ready
Ready
157/172 completed, work
stopped since Oct12
because of fatal accident
BLU was done with temp
chimney
Ready
Ready
-
8/13/2019 Customer Inputs 600mw
4/17
Ready
Pending
-
8/13/2019 Customer Inputs 600mw
5/17
Sl. No. DescriptionScheduled
Date
Commitment in
last CRM
(25.04.13)
Remarks
Commitment as
on 18.06.13
(CRM)
1
Boiler Main & Auxiliary
Column Foundation30-Mar-10 Available Available Available
2 Condenser Foundation31-Dec-10 Available (handed
over on 28.02.12Available(handed over
on 28.02.12
Available
3
TG Hall With covering with
EOT crane31-Jan-11
Side cladding -
10.05.13
Side cladding
is still pending30.06.13
4 De-aerator Floor 30-Jun-11 Available Available Available
5 PA Fan Foundation30-Jun-11
B side- Available
A side- 10.05.13
A side- Not
yet available07.08.13
6
Availability of TG
Foundation31-Dec-10 Available Available Available
7 Mill Foundations 31-Aug-11All 9 foundations
from 20.05.13 to
10.06.13
Still pending
F & G Available
A by 19.06.13
H by 24.06.13
B by 30.07.13
C, D & E by 15.08.13
J by 30.08.13
8 CEP Foundation 24-Jun-11 Available Available Available
9 Mill bay Foundations 30-Jun-11 completed Completed Available
10 ID fan Foundation 30-Jun-11 Available Available
Foundation Readiness
Avantha 1 x 600 MW - Balance Customer Inputs
-
8/13/2019 Customer Inputs 600mw
6/17
Sl. No. DescriptionScheduled
Date
Commitment in
last CRM
(25.04.13)
Remarks
Commitment as
on 18.06.13
(CRM)
11 FD Fan Foundation30-Jun-11
B side- Available
A side- 10.05.13
A side- Not
yet available07.08.13
12
Duct Support Foundation -
Boiler (Outlet) & ESP
(Inlet)30-Apr-11 01.05.13 Available Available
13
Duct Support Foundation -
ESP (Outlet) & ID Fan
(Inlet)31-Mar-11 01.05.13 Available Available
14
Duct Support Foundation -
ID Fan (Outlet) & Chimney30-Apr-11 01.05.13 Available Available
15 MDBFP Foundation 30-Jul-11 Available Available Available
16 TDBFP Foundation30-Jul-11
1 foundation
handed over. 2nd
by 26.04.13
Available
17
Bunker Bay Transfer Point -
A 2-Dec-11 NA NA NA
18
Bunker Bay Transfer Point -
B2-Dec-11 NA NA NA
19 Bunker Floor 2-Dec-11 A, B available A, B available
20 ESP Foundation 30-Apr-10 Available Available Available
21 Feeder Floor A,B available
A,B available and C,
D, E by 05.07.13
and F, G, H, J by
07.08.13
-
8/13/2019 Customer Inputs 600mw
7/17
-
8/13/2019 Customer Inputs 600mw
8/17
Sl. No. DescriptionScheduled
Date
Commitment in
last CRM
(25.04.13)
Remarks
Commitment as
on 18.06.13
(CRM)
14
Readiness of Cooling
Tower31-Mar-12 30.05.2013
50% by 20.08.13
100% by 20.09.13
15 Readiness of Chimney 28-Dec-11 30.05.13 21.06.13
16 O&M Staff 31-Dec-11 Placed Placed Available
17 Availability of Coal atBunker 31-Jul-12 NA 30.08.13
1
Readiness of Compressed
Air System31-Mar-12 Available Available
2 Readiness of DM Plant 15-Oct-11 Ready Available
3 Readiness of Switchyard30-Jul-12 Ready Available
4
Start-Up Power (ST & STN
Board Charging)30-Jan-12 Available Available
5
Readiness of Circulating
Water System
28-Feb-121st by 20.06.13
2nd by 15.07.13
6
Readiness of Cable and
Pipe Rack for LU2-Feb-12 Pending Available
7
Readiness of Fire
protection System2-Feb-12 pending Available
8
Readiness of
Communication System28-Feb-12 pending
PA System by Jul'13
Walky Talkies
Available
System Readiness
-
8/13/2019 Customer Inputs 600mw
9/17
Sl. No. DescriptionScheduled
Date
Commitment in
last CRM
(25.04.13)
Remarks
Commitment as
on 18.06.13
(CRM)
9
Readiness of Air
Conditioning System28-Feb-12 pending Available
10
Readiness of ventilation
System28-Feb-12 pending Available
11
Readiness of Auxiliary
Cooling Water 28-Feb-12 pendingBy BHEL 18.06.13
By WPIL 21.06.13
12
Readiness of Fuel Oil
System28-Feb-12 Available
13 Readiness of ASH Dyke 31-Jul-12 30.09.13
14
Readiness of Coal
Handling System31-Jul-12 Jul'13 Pending 30.08.13
15
Readiness of Ash
Handling System31-Jul-12
15.05.13 bottom
sealPending
25.08.13 till
intermediate silo
16
Readiness for Power
Evacuation31-Jul-12 Available Available
-
8/13/2019 Customer Inputs 600mw
10/17
2 Boiler Main & Auxiliar3 Column Foundation
ID fan 30.06.2
Duct Support Foundation Boiler (Outlet) & ESP (Inlet) 30.04.2
Duct Support Foundation ESP (Outlet) & ID Fan (Inlet) 31.03.2
Duct Support Foundation
ID Fan (Outlet) & Chimney30.04.2
Condenser Foundation/ TG Deck 31.12.2
PA Fan 30.06.2
FD Fan 30.06.2
Description of Foundations (Customer Scope) Date
30.03.2
-
8/13/2019 Customer Inputs 600mw
11/17
TG Hall With covering &
EOT crane in Remote
control mode
Oil Canal 30.05.2
Control Fluid Room with Foundations 30.03.2
Main Oil Room wall 15.03.2
ESP 30.04.2
De-aerator Floor 30.06.2
CEP 24.06.2
MD-BFP 30.07.2
TD-BFP 30.07.2
Mills foundations 31.08.2
DC Power 02.11.2
30.01.2
System Readiness
-
8/13/2019 Customer Inputs 600mw
12/17
Control Room with A/C 31.10.2
ESP Control Room 30.09.2
Instrument air, Compressed air & Service Air 31.03.2
Start Up Power (ST & STN Board Charging) 31.01.2
NDCT- Cooling Tower 31.03.2
Chimney for Duct Connection 28.12.2
DM Plant 15.10.2
Switch Yard 30.07.2
CW & ACW System 28.02.2
Fire Protection system 02.02.2
Coal handling System 31.07.2
-
8/13/2019 Customer Inputs 600mw
13/17
-
8/13/2019 Customer Inputs 600mw
14/17
-
8/13/2019 Customer Inputs 600mw
15/17
Side
coverin
isStill
pendin
.
Floors(0.0,
8.5 &17 M
pendin
30.04.2
013
Pendin
30.04.2
013
Pendin
10.04.2
013
Pendin
22.01.2
011
Handed
over25.11.2
012
Handed
over30.07.2
012
Handed
over23.10.2
012
Handed
over30.04.2
013
1 Nos
washanded
over on
25.02.2
013,
2nd
Founda
tion
still
pendin
g
15.05.2
013
Still
pendin
30.12.2
012
Ready
-
8/13/2019 Customer Inputs 600mw
16/17
30.03.2
013
Ready
30.10.2
012
Ready
30.03.2
013
Ready
30.01.2013
Ready
30.05.2
013
157/17
2
comple
ted,
work
stoppe
d since
Oct12
because of
fatal
acciden
t
30.05.2
013
Still
pendin
g -BLU
was
done
with
temp
chimne
30.06.2
012
Ready
30.08.2
012
Ready
12 Still
pendin
12 Still
pendin
12 Still
pendin
-
8/13/2019 Customer Inputs 600mw
17/17
12 Still
pendin
20.02.2
013
Ready
12 Pendin